ML070300615

From kanterella
Jump to navigation Jump to search

Enclosure to Amendment, Cycle-Specific Safety Limit Minimum Critical Power Ratio (TAC No. MD1721) (TS-455)
ML070300615
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/06/2007
From: Chernoff M
NRC/NRR/ADRO/DORL/LPLII-2
To: Singer K
Tennessee Valley Authority
Chernoff M, NRR/DORL, 415-4041
Shared Package
ML063120386 List:
References
TAC MD1721, TS-455
Download: ML070300615 (2)


Text

(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CER Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1:

Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3293 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 267, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 234 to Facility Operating License DPR-33, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 234. For SRs that existed prior to Amendment 234, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 234.

Renewed License No. DPR-33 Amendment No. 267

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow

< 10% rated core flow:

THERMAL POWER shall be -<25%RTP.

2.1.1.2 With the reactor steam dome pressure Ž! 785 psig and core flow

Ž10% rated core flow:

MCPR shall be Ž! 1.09 for two recirculation loop operation or Ž!1.11 for single loop operation.

2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be!* 1325 psig.

2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br />:

2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.

BFN-UNIT 1 2.0-1 BFN-UIT 1 .0-1Amendment No.-246- 267