ML062130303

From kanterella
Jump to navigation Jump to search

Withholding from Public Disclosure, GNF-A Document 0000-0043-8309, Additional Information Regarding the Cycle Specific SLMCPR for Browns Ferry 1 Cycle 7, Dated March 29, 2006
ML062130303
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/03/2006
From: Raghavan L
NRC/NRR/ADRO/DORL/LPLII-2
To: Lingenfelter A
Global Nuclear Fuel
Chernoff M, NRR/DORL, 415-4041
References
0000-0043-8309, TAC MD1721
Download: ML062130303 (5)


Text

August 3, 2006 Mr. Andrew A. Lingenfelter Manager, GNF Engineering Global Nuclear Fuel Americas, LLC P.O. Box 780, M/C F12 Wilmington, NC 28402

SUBJECT:

TENNESSEE VALLEY AUTHORITY REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BROWNS FERRY NUCLEAR PLANT, UNIT 1 (TAC NO. MD1721)

Dear Mr. Lingenfelter:

By letter dated May 1, 2006, Tennessee Valley Authority (TVA), submitted an affidavit to the U.S. Nuclear Regulatory Commission (NRC) dated March 29, 2006, executed by Jens G. M.

Andersen, Consulting Engineer, Thermal Hydraulic Methods, Global Nuclear Fuel - Americas, LLC (GNF-A), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

GNF-A Document 0000-0043-8309, Additional Information Regarding the Cycle Specific SLMCPR for Browns Ferry 1 Cycle 7, dated March 29, 2006 The document is included in Enclosure 3 to TVAs letter to NRC dated May 1, 2006.

A nonproprietary version of this document has been placed in the NRCs Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because it includes the following:

a.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-As competitors without license from GNF-A constitutes a competitive economic advantage over other companies.

b.

Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

A. A. Lingenfelter Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-2429.

Sincerely,

/RA by MChernoff for/

L. Raghavan, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 cc: See next page

ML062130303 NRR-084 OFFICE LPL-2/PM LPL-2/LA LPL-1/BC NAME JHoncharik KGoldstein MChernoff for LRaghavan DATE 8 / 2 /06 8 / 1 /06 8 / 3 /06

Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:

Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Brian OGrady, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert J. Beecken, Vice President Nuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Bruce Aukland, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Masoud Bajestani, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones, General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Larry S. Mellen Browns Ferry Unit 1 Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.

Suite 23T85 Atlanta, GA 30303-8931 Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. William D. Crouch, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611

GNF-A, LLC cc:

Mr. Charles M. Vaughan, Manager Facility Licensing Global Nuclear Fuel - Americas P.O. Box 780 Wilmington, NC 28402 Mr. George B. Stramback Regulatory Services Project Manager GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 Mr. James F. Klapproth, Manager Engineering & Technology GE Nuclear Energy 3901 Castle Hayne Road Wilmington, NC 28402 Mr. Glen A. Watford, Manager Technical Services GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125