b Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No:
004*042*04*01 Task
Title:
WA
Reference:
004A2.14 (3.8/3.9)
Sim-A Emergency Borate (alternate path)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: Five minutes ago, the reactor was manually tripped from 250 MWe per POP-3.1. Required actions of E-0 steps 1-4 are complete with a transition to ES-0.1 Reactor Trip Response. The CRS has directed you to perform ES-0.1 step 4, Check if Emergency Boration is Required.
Task Standard: Required actions of ES-0.1 step 4 complete.
Required Materials:
ES-0.1 Step 4 ONOP-CVCS-3, Emergency Boration General
References:
Reactivity summary sheet for IC Initiating Cue: Perform ES-0.1 Step 4, Check if Emergency Boration is Required Time Critical Task: No Validation Time: 10 minutes I u SIM-A Rev.0 1 of8
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
~~
~
- 1. Performance Step:
Check RCS temperature.
Standard:
Observes RCS temperature indication and observes that Tave is 547°F and stable.
Com rnent:
4 2. Performance Step:
Check all control rods inserted less than 20 steps.
Standard:
Observes IRPl indications for all control rods and notes that three control rod IRPls (D4, G5, E9) indicate greater than 20 steps.
Comment:
4 3. Performance Step:
Check charging pump running.
Standard:
NOTE:
Comment:
Observes one charging pump is running.
~
~~
~~
~~
~~
- 4. Performance Step:
Check MCC-36A and 368 both available.
Standard:
Observes both energized by breaker closed indication lamps illuminated on Panel SBF-2 Comment:
SIM-A Rev.0 2 o f 8
d Appendix C 3
Form ES-C-I Performance Information (Denote critical steps with a check mark) d 4 5. Performance Step:
Open emergency boration valve CH-MOV-333 Standard:
Places control switch on panel SFF to open. Observes that valve does not open.
Comment:
- 6. Performance Step:
(Alternate Path) Emergency borates using Attachment 1, Emergency Boration Using Normal Boration.
CUE:
If asked, CRS prefers using the Attachment 1 method using normal boration.
Standard:
Proceeds to section for Attachment 1 Emergency Boration Using Normal Boration Comment:
4 7. Performance Step:
Place both boric acid transfer pump speed switches to FAST Standard:
Boric Acid Trans Pump No. 31 Speed in FAST on panel FCF Boric Acid Trans Pump No. 32 Speed in FAST on panel FCF Comment:
~
~~
~~
4 8. Performance Step: Restart boric acid transfer pumps Standard:
Observes both boric acid transfer pumps running (red lamp illuminated)
Comment:
SIM-A Rev.0 3 of 8
Appendix C 4
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4 9. Performance Step:
Place FCV-I IOA, Boric Acid Flow Control Blender controller in MANUAL and adjust full open.
Standard:
FCV-110 controller on panel FBF output meter at 0 (full left - open)
Comment:
4 I O. Performance Step:
Place FCV-IIIA, Makeup H20 to Boric Acid Blender in MANUAL and adjust full closed.
Standard:
FCV-111 controller on panel FBF output meter at 0 (full left - closed)
Comment:
4 1 I.
Performance Step:
Place Makeup Mode Selector switch on panel FCF to MANUAL Standard:
Makeup Mode Selector switch on panel FCF to MANUAL Comment:
4 12. Performance Step:
Turn Makeup Control switch on panel FCF to start and return to Norm Standard:
FI-I 10 on panel FBF indicates boric acid flow > 10 gpm and FI-I 11 on panel FBF indicates demin water flow = 0 gpm.
Comment:
SIM-A Rev.0 4 of 8
Appendix C 5
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 13. Performance Step:
Standard:
Check FI 1 10A Flow indicated FI 1 I OA Flow checked Comment:
~
4 14. Performance Step: Close Boric Acid Storage Tank Recirculation valves CH-HCV-IO4 and 105 Standard:
On panel SFF, adjusts HCV-104 and HCV-105 controllers to zero.
Comment:
d 15. Performance Step: Transfer operating charging pump to manual and increase speed to maximum Standard:
On panel FBF places AUTO-BAL-MAN switch to MAN. Adjusts speed control knob (small knob, not bias dial) until output meter indicates 100.
Comment:
~~~~
~
~
- 16. Performance Step:
Determine Required Emergency Boration Time CUE: CRS informs RO that the Shift Technical Advisor will determine the boration time.
CUE: Subsequent actions will be performed by the CRS.
Standard:
Boration will not be secured until required time has elapsed.
Terminating Cue: Emergency Boration aligned and in progress awaiting completion of expected boration time or required boron concentration achieved.
SIM-A Rev.0 5 of 8
Appendix C 6
Form ES-C-1 VERI F I CAT1 0 N 0 F CO M PLETl 0 N Job Performance Measure No. Sim-A, Emergency Borate (alternate path)
Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-A Rev.0 6 o f 8
Appendix C Simulator Setup Form ES-C-1 Reset simulator to IC-99 SIM-A Rev.0 7 of 8
Appendix C Initial Conditions Form ES-C-1 Initial Conditions:
o Five minutes ago, the reactor was manually tripped from 250 MWe per POP-3.1.
o Required actions of E-0 steps 1-4 are complete with a transition to ES-0.1 Reactor Trip Response.
o The CRS has directed you to perform ES-0.1 step 4, Check if Emergency Boration is Required.
Initiating Cue:
o Perform ES-0.1 Step 4, Check if Emergency Boration is Required RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SIM-A Rev.0
Appendix C Job Performance Measure Form ES-C-1 Worksheet d
Facility:
Indian Point 3 Task No:
000*013*05*01 Task
Title:
Reset Safety Injection (Alternate Path)
WA
Reference:
013A4.02 (4.314.4)
Sim-B Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
d Initial Conditions: A reactor trip and safety injection occurred 18 minutes ago. The CRS has just transitioned to E-I. You are the BOP reactor operator performing RO-1, BOP Operator Actions During Use of EOPs.
Task Standard: SI has been reset per RO-1 step 14 Required Materials: RO-1, BOP Operator Actions During Use of EOPs General
References:
N/A Initiating Cue: Reset Safety Injection per RO-1 step 14 Time Critical Task: No Validation Time: 5 minutes "d
SIM-B Rev.0 1 of6
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 1. Performance Step:
Press both SI reset buttons Train 1 SI Reset and Train 2 SI Standard:
Comment:
Reset.
Both pushbuttons on panel SBF-2 have been pushed.
d 2. Performance Step:
Standard:
Check SI Reset Observes SI Actuated light on panel SBF-2 is NOT extinguished.
Comment:
d 3. Performance Step:
Place SI block key switches to defeat on panel SBF-2:
- Manual Defeat SI Train A
- Manual Defeat SI Train B Standard:
Obtains keys from key locker and places both switches to the Defeat position.
NOTE:
Comment:
SIM-B Rev.0 2 of 6
u' Appendix C 3
Form ES-C-I Performance Information (Denote critical steps with a check mark) 4 4. Performance Step:
Press pin resets on the following SI relays:
SI-I, SI Train A Relay in Logic Cabinet G-3 SI-I I, SI Train A Relay in Logic Cabinet G-3 SI-2, SI Train B Relay in Logic Cabinet G-5 SI-12, SI Train B Relay in Logic Cabinet G-5 Standard:
Pin resets have been depressed and relays reset.
Com ment :
Terminating Cue: RO-1 Step 14 completed, Reset SI.
SIM-B Rev.0 3 o f 6
Appendix C 4
Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: Sim-6, Reset Safety Injection (Alternate Path)
Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-B Rev.0 4 of 6
Simulator Setup Reset simulator to IC-98 SIM-B Rev.0 5 of 6
Initial Conditions Initial Conditions:
o A reactor trip and safety injection occurred 18 minutes ago.
o The CRS has just transitioned to E-I.
o You are the BOP reactor operator performing RO-1, BOP Operator Actions During Use of EOPs.
Initiating Cue:
o Reset Safety Injection per RO-1 step 14 RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SIM-B Rev.0
Appendix C Job Performance Measure Form ES-C-1 d
Worksheet Facility:
Indian Point 3 Task No:
013*016*05*01 Task
Title:
WA
Reference:
006A4.07 (4.4/4.4)
Sim-C Realign High Head Recirculation 006A4.06 (4.4/4.4)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Act ua I Perform an ce X
Classroom READ TO THE EXAMINEE Simulator X Plant I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: A small break LOCA occurred several hours ago. The team has transitioned from ES-1.2, Post LOCA Cooldown and Depressurization, to ES-1.3, Transfer to Cold Leg Recirculation. Safety Injection and Containment Spray have been reset.
Task Standard: The ECCS system has been aligned for Cold Leg Recirculation up to and including Recirculation Switch 8.
Required Materials: ES-1.3, Transfer to Cold Leg Recirculation, General
References:
Initiating Cue: The CRS has directed you to align the ECCS system for Cold Leg Recirculation in accordance with ES-1.3.
Time Critical Task: No Validation Time: 25 minutes SIM-C Rev.0 1 of 12
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 1. performance Step:
Determine if Transfer to Cold Leg Recirc is required CUE: When LR-1253/1254 are checked - cue that level is slowly rising.
Standard: Verify both RWST Low-Low Level alarms LIT and VC sump trending up Comment:
~
- 2. Performance Step:
Reset SI CUE: SI has been previously reset.
Standard:
Verify SI reset Com ment :
- 3. Performance Step:
Standard:
Comment:
Check SI RESET Verify SI Actuated light extinguished
~~
~
~
~
- 4. Performance Step:
RESET Containment Spray Standard:
Verify VC Spray reset Comment:
.( 5. Performance Step:
Standard:.
Com ment :
Align SI Recirc Switches #I and #3.
Place Recirc Sw #I and #3 to ON.
SIM-C Rev.0 2of 12
-4 Appendix C 3
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 6. Performance Step:
Energize the following valves on MCC-36A and MCC-36B AC-MOV-743, 744 and SI-MOV-894A, AC-MOV-1870, SI-MOV-882 and SI-MOV-894B, 894D.
CUE: Acknowledge as NPO.
Standard:
Direct NPO to energize valves on MCC-36A and 36B.
Booth Operator: Energize requested valves.
Comment:
- 7. Performance Step:
Establish communications with PAB 73 ft and prepare for operation of SWN-35-1 and 35-2 CUE:
Acknowledge as NPO.
Standard:
Comment:
Dispatch NPO to PAB 73ft
- 8. Performance Step:
Standard:
Corn ment :
Check status of Recirc Switch #I Verify Recirc Switch #I function complete light LIT
- 9. Performance Step:
Standard:
Comment:
Check status of Recirc Switch #3 Verify Recirc Switch #3 function complete light LIT I O. Performance Step:
Standard:
Comment:
Check RCS pressure less than intact SG pressure Verify RCS pressure less than intact SG pressure SIM-C Rev.0 3 of 12
Appendix C 4
Form ES-C-1 d
Performance Information (Denote critical steps with a check mark)
~~
~~
4 1 I. Performance Step:
Stop Motor Driven Auxiliary Feed pumps Standard:
Place 31 I33 ABFP in PULLOUT Comment:
- 12. Performance Step:
Initiate performance of Attachment 1 CUE: CRS has directed an additional RO to perform Attachment 1 Standard:
Direct performance of attachment 1.
Booth Operator:
Role play extra RO. Verify 459, 460, 200 A,B,C are closed, stop running Charging pump(s), close TCV-130, and place ALL Pressurizer heaters in OFF. Notify operator that Attachment 1 is complete Comment:
W
- 13. Performance Step:
Check status of FCV-I 1 11 and 11 12 CUE: FCV-I 11 1 and 11 12 are CLOSED Standard:
Direct NPO to verify SWN-FCV-1111 and 11 12 CLOSED Comment:
4 14. Performance Step:
Standard:
Comment:
Align Safety Injection Recirc Switch #2 Place SI Recirc Sw #2 to ON
- 15. Performance Step:
Standard:
Comment:
Check status of Safety Injection Recirc Switch #2 Verify switch #2 function complete light LIT SIM-C Rev.0 4 of 12
W Appendix C 5
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 16. Performance Step:
CUE: Acknowledge as NPO Standard:
Comment:
Establish communications with PAB 73 ft Dispatch NPO to PAB 73 ft
- 17. Performance Step:
Standard:
Comment:
Check RHR Hx CCW Shutoff valves OPEN Verify 822A and 822B OPEN 4 18. Performance Step:
Standard:
32 Recirc running Comment:
Manually start 32 Recirc Pump 4 19. Performance Step:
Standard:
Comment:
Align Safety Injection Recirc Switch #4 Place Recirc Sw #4 to ON
~~
- 20. Performance Step:
Check status of Safety Injection Recirc Switch #4 Standard:
Verify switch #I4 function complete light LIT Comment:
SIM-C Rev.0 5 of 12
W Appendix C 6
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 21. Performance Step:
Verify Recirculation Trains not affected by sump blockage
- Low Head Injection Line Low Flow alarm
- SI Pump Suction Low Pressure alarm
- Indications of erratic / reduced flow
- Abnormal sump level indication CUE: The CRS has determined that sump blockage does not exist.
Standard:
Verify indications of sump blockage do NOT exist Comment:
- 22. Performance Step:
Check minimum recirculation flow established Standard:
Determine 360 gpm Recirc flow cannot be maintained and implement Attach 4 Comment:
.! 23. Performance Step:
Standard:
Comment:
Turn ON control power to HHSIP Miniflow valves 842 and 843 control switches in ON
- 24. Performance Step:
Standard:
Comment:
Check RHR pump status Verify NO RHR pumps running 4 25. Performance Step:
Align Recirc Switch #5 Standard:
Place Recirc Sw #5 to ON Comment:
SIM-C Rev.0 6 of 12
Appendix C 7
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 26. Performance Step:
Standard:
Comment:
Check status of Recirc Switch #5 Verify Recirc Sw #5 function complete light LIT
- 27. Performance Step:
UNBLOCK SI Pump Suction Low Pressure alarm Standard:
Place SI Pump Suction Low Pressure alarm block switch to UNBLOCK Comment:
- 28. Performance Step:
Standard:
Comment:
Check SI Pump Suction Low Press alarm CLEAR Verify alarm clear on panel SBF-1
- 29. Performance Step:
CUE: Acknowledge as NPO Standard:
BOOTH OPERATOR: Energize MOV-1810 Comment:
Energize RWST Outlet Isolation valve Direct NPO to energize MOV-1810 at MCC-36A SIM-C Rev.0 7 of 12
Appendix C 8
Form ES-C-1 4
Performance Information (Denote critical steps with a check mark)
~~~
~~
- 30. Performance Step:
.Control CCW Heat Exchanger Outlet Temperature CUE: Acknowledge as NPO Standard:
Direct NPO to maintain CCW temperature 70°F to 110°F using SWN-35-1 and 35-2 BOOTH OPERATOR: Control SWN-35-1 (e 27.5") and SWN-35-2 (< 27") to maintain temperature 70°F to 1 10°F Comment:
- 31. Performance Step:
Standard:
Check High Head Recirculation Status Verify 850NC AND 1852A OR B AND 1835A OR B OPEN Comment:
u'
- 32. Performance Step:
Check SI Pump Status Standard:
Verify 31 / 33 SIPS running. 32 secured Comment:
- 33. Performance Step:
Place control switch for non-running SI Pump in PULLOUT Standard:
Place 32 SIP in PULLOUT Comment:
- 34. Performance Step:
Standard:
Comment:
Check high-head loop injection flows established Verify flow in Non-BIT OR BIT header SIM-C Rev.0 8 of 12
W Appendix C 9
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
~
~
- 35. Performance Step:
Check status of all 480V buses Standard:
Verify all 480V buses energized Comment:
4 36. Performance Step:
Standard:
Comment:
Align Recirc Switch #7 Place Recirc Sw #7 to ON
- 37. Performance Step:
Standard:
Comment:
Check status of Recirc Switch #7 Verify Recirc Sw #7 function complete light LIT 4 38. Performance Step:
Standard:
Com ment :
Align Recirc Switch #N3 Place Recirc Sw #8 to ON
~~
~
- 39. Performance Step:
Check status of Recirc Switch #8 Standard:
Verify Recirc Sw #8 function complete light LIT Comment:
Terminating Cue:
The ECCS system is aligned for cold leg recirculation up to and including switch 8 SIM-C Rev.0 9of 12
Appendix C 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No. Sim-C, Realign High Head Recirculation Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-C Rev.0 10 of 12
Simulator Setup SIM-C Reset simulator to IC-97 Perform NPO field actions as requested per the standard NPO actions list.
SIM-C Rev.0 11 of 12
d Initial Conditions Initial Conditions:
0 0
0 Initiating Cue:
0 A small break LOCA occurred several hours ago.
The team has transitioned from ES-1.2, Post LOCA Cooldown and Depressurization, to ES-1.3, Transfer to Cold Leg Recirculation.
Safety Injection and Containment Spray have been reset.
The CRS has directed you to align the ECCS system for Cold Leg Recirculation in accordance with ES-1.3.
RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SIM-C Rev.0
w Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No:
003*010*04*01 Task
Title:
RCP #2 Seal Failure Actions WA
Reference:
003A2.01 (333.9)
Sim-D Examinee:
NRC Examiner:
Facility Evaluator:
Date:
x
- .?.
4:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: Plant is at indicated power level. An RCP malfunction is in progress.
The CRS has directed you to perform the actions of AOP-RCP-1, Reactor Coolant Pump Malfunction.
Task Standard: AOP-RCP-1 actions completed.
Required Materials: 3-AOP-RCP-1 General
References:
Initiating Cue: Perform the actions of AOP-RCP-1, Reactor Coolant Malfunction for the indicated malfunction.
d Time Critical Task: No Validation Time: 15 minutes SIM-D rev. 0 1 of7
4 Appendix C 2
Form ES-C-I Performance Information (Denote critical steps with a check mark)
- 1. Performance Step: Determine if reactor trip is required:
0 Checks motor winding temp> 250°F with Tave > 540°F 0
Checks upper or lower motor bearing temp > 200°F 0
Checks shaft vibration > 20 mils 0
Checks shaft vibration > 15 mils and increasing 0
Checks Frame vibration > 5 mils 0
Checks Frame vibration > 3 mils and increasing 0
Checks seal delta-p 200 psid 0
Checks seal inlet temp > 225°F 0
Checks seal outlet temp > 235°F Standard:
Comment:
Determines reactor trip not required
.( 2. Performance Step:
Diagnose seal malfunction on 34 RCP is indicated Standard:
Proceeds to seal malfunction section of procedure Comment:
4 3. Performance Step:
Check 34 RCP #I Seal return flow < 1 gpm Standard:
Notes indicated # I seal return flow is less than 1 gpm.
Comment:
- 4. Performance Step:
Checks # 1 seal return > 6 gpm Standard:
Notes seal return is not > 6 gpm Comment:
4 5. Performance Step:
When #I seal return flow is e 0.84 gpm, proceeds to step 4.18 Standard:
Observes flow lowering until less than 0.84 gpm and then proceeds.
The candidate may go step 4.37, but returns to step 4.17 when #I seal return flow < 0.84 gpm.
Com m e n t:
~~
~
SIM-D rev. 0 2 of 7
Appendix C 3
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
Booth Instructor: Activate Trigger I to cause further degradation of the seal.
- 6. Performance Step: Checks seal temperatures increasing.
Standard:
Observes seal temperatures are increasing, 34 RCP is running, and
- I seal return flow is < 0.84 gpm Comment:
d 7. Performance Step:
Trip the reactor CUE:
CRS directs the rest of the crew to perform E-0 immediate actions. You are to continue with the subsequent actions of AOP-RCP-1.
Sta nda rd :
Reactor manually tripped Comment:
d 8. Performance Step:
Stop 34 Reactor Coolant Pump Standard:
Places 34 RCP Control Switch to stop.
Comment:
- 9. Performance Step:
Initiate E-0, Reactor Trip or Safety lnjectioin CUE:
CRS directs the rest of the crew to perform E-0 immediate actions. You are to continue with the subsequent actions of AOP-RCP-I.
Standard :
E-0 initiated Comment:
SIM-D rev. 0 3 0 f 7
Appendix C 4
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4 I O. Performance Step: Monitors Loop 34 flow. When 34 RCP has stopped rotating, closes 261 D, 34 RCP Seal Return isolation valve.
Standard:
Comment:
261 D closed by placing control switch on panel SAF to close.
4 11. Performance Step: Closes PC-455G Sta nda rd :
Places controller PC-455G to manual and reduces output to 0 (closed).
Comment:
- 12. Performance Step:
CUE: CRS and balance of team are performing E-0, Reactor Trip or Safety Injection.
Standard:
Observes EOPs are in use and goes to step 4.28.
Comments:
Check EOPs in use.
- 13. Performance Step:
CUE: Shift Manager directs you to exit AOP-RCP-1 Standard:
Comments:
Return to procedure and step in effect.
Actions of AOP-RCP-1 are complete and procedure is exited.
Terminating Cue:
Actions of AOP-RCP-1 are complete and procedure is exited.
SIM-D rev. 0 4 of 7
Appendix C 5
Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No. Sim-D, RCP #2 Seal Failure Actions Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-D rev. 0 5 of 7
Simulator Setup Reset simulator to IC-96. When directed, execute trigger 1 to reduce seal return flow <
0.84 and raise seal outlet temperature.
SIM-D rev. 0 6 o f 7
Initial Conditions Initial Conditions:
o Plant is at indicated power level.
o An RCP malfunction is in progress.
o The CRS has directed you to perform the actions of AOP-RCP-1, Reactor Coolant Pump Malfunction.
Initiating Cue:
o Perform the actions of AOP-RCP-1, Reactor Coolant Malfunction for the indicated malfunction.
RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SIM-D rev. 0
'4 d
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No:
061*005*01*01 Task
Title:
Transfer from AFW Feed to Low Flow Bypass Feed KIA
Reference:
061A1.01 (3.9/4.2)
Sim-E Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: The unit is at 3% with a normal startup in progress. 31 MBFP is running. Feed flow to the SGs is being supplied by the AFW system.
All chemistry parameters are in specification. The CRS is in POP-I.3 at step 4.24 and has directed you to Transfer from AFW Feed to Low Flow Bypass Feed using 3-SOP-FW-001 Section 4.5.
Task Standard: Feed flow is being supplied by the low flow bypass valves and AFw system has been shutdown and restored to auto-standby operation.
Required Materials:
3-SOP-Fw-001, Main Feedwater System Operation 3-SOP-Fw-004, Auxiliary Feedwater System Operatioin General
References:
3-POP-I.3 step 4.24 Initiating Cue:
Transfer from AFw Feed to Low Flow Bypass Feed using 3-SOP-FW-001. When AFW FRVs are fully closed, then shutdown the ABFPs and return to standby operation per 3-SOP-FW-004.
Time Critical Task: No Validation Time: 15 minutes SIM-E 1 Of7
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark) d I( I. Performance Step: Check MBFP Turbine Trip reset flags are matched with the associated lamps.
Standard:
Places control switch for 32 MBFP to trip and then neutral to reset the flag from red to green.
Comment:
- 2. Performance Step:
Check Steam Flow and Feedwater Flow recorder inputs selected to narrow range transmitters.
Standard:
On panel FBF, selects Narrow position on all eight recorder input selector switches.
Comment:
I( 3. Performance Step:
Slowly throttle open bypass FRVs while closing associated AFW FRVs.
Standard:
Makes small controlled adjustments such that control of SG level is maintained. Panel SBF-2 alarms for SG High Level and alarms for SG Low Level Channel Trip remain clear. AFW FRVs 406A-D are closed.
Comment:
SIM-E 2 0 f 7
Appendix C 3
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 4. Performance Step:
When ARN FRVs are fully closed, implements 3-SOP-FW-004 to shutdown the ABFPs.
Standard:
Correct procedure referenced uses section 4.4 step 4.4.1 to shutdown the motor drive AFW Pumps.
CUE: CRS directs you to shutdown the ABFPs and return to standby operation.
Comment:
4
- 5. Performance Step:
Stops motor driven ABFPs and returns control switches to normal from stop.
Standard:
In any order, stops 31 and 33 motor driven ABFPs and returns switch to the neutral position.
Comment:
- 6. Performance Step:
Standard:
Comment:
Ensure recirc valve control switches are in auto Verifies BFD-FCV-1121 and BFD-FCV-1123 both in AUTO SIM-E 3 of 7
Appendix C 4
Form ES-C-1 d
Performance Information (Denote critical steps with a check mark)
.( 7. Performance Step:
Align AFW regulating valves as required for current plant conditions CUE:
If asked, CRS directs FCV-406A though 406D setpoints at zero.
Standard:
Adjusts AFW regulating valve controllers fully clockwise to 0 output (OPEN).
Com men t :
- 8. Performance Step:
Check MBFP suction flow stable and greater than 6500 gpm Standard:
Observes MBFP suction flow > 6500
.4' Comment:
Terminating Cue:
SOP-FW-001 step 4.5 complete with AFW system returned to stand by.
SIM-E 4 of 7
Appendix C 5
Form ES-C-I VERI F I CAT I 0 N 0 F CO M P LET1 0 N Job Performance Measure No. Sim-E Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-E 5 of 7
Simulator Setup Reset simulator to IC-95 SIM-E 6 of 7
Initial Conditions Initial Conditions:
o The unit is at 3% with a normal startup in progress.
o 31 MBFP is running.
o Feed flow to the SGs is being supplied by the AFW system.
o All chemistry parameters are in specification.
o The CRS is in POP-I.3 at step 4.24 and has directed you to Transfer from AFW Feed to Low Flow Bypass Feed using 3-SOP-FW-001 Initiating Cue:
o Transfer from AFW Feed to Low Flow Bypass Feed using 3-SOP-W-001 Section 4.5.
o When AFW FRVs are fully closed, then shutdown the ABFPs and return to standby operation per 3-SOP-FW-004.
RETURN THIS TO THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK SIM-E
Appendix C Job Performance Measure Form ES-C-1 4
Worksheet Facility:
Indian Point 3 Task No:
000*050*05*01 Task
Title:
K/A
Reference:
026A2.08 (3.2/3.7)
Sim-F Align CS System during Loss of Emergency Coolant Recirculation Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Si m u la ted Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: A LOCA occurred. All required actions of E-0 have been completed. A transition to ECA-I.I from E-I Attachment 1, Step 4 when cold leg recirculation capability could not be verified.
Task Standard: Minimum Containment Spray requirements established.
Required Materials:
ECA-1.I, Loss of Emergency Coolant Recirculation, step 8 General
References:
N/A Initiating Cue:
The CRS has directed you to determine and establish containment spray requirements in accordance with ECA-1.I, Loss of Emergency Coolant Recirculation, Step 8.
Time Critical Task: No Validation Time: 6 minutes SIM-F 1 of6
Appendix C 2
Form ES-C-1 l.J Performance Information (Denote critical steps with a check mark) 4 1. Performance Step: Check spary pumps running Standard:
Observes 31 and 32 containment spray pumps are both running Comment:
d 2. Performance Step:
Standard:
Check containment pressure greater than 16 psig Observes containment pressure is -28 psig.
Comment:
d 4 3. Performance Step:
Determine number of spray pumps required Standard:
Checks RWST level - Greater than 11.5 feet Checks Containment pressure - Between 22 and 47 psig Checks FCUs running - 5 Determines 0 spray pumps are required Comment:
4 4. Performance Step: Verify spray pumps running equals number required Standard:
Checks number of spray pumps running equals two.
Stops both spray pumps and place both CS in TRIP-PULL-OUT Com ment :
SIM-F 2 o f 6
Appendix C 3
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4
- 5. Performance Step:
Check Spray Pumps running Standard:
Observes no spray pumps are running o
o o
o o
Press both CS reset buttons on panel SBF-1 Place containment spray pumps control switches to auto Close Spray Pump Disch valves 866A and 866B Press Sodium Hyd Cancel pushbutton on panel SBF-1 Verify spray addition tank discharge valves are closed 876A and 876B Comment:
Terminating Cue:
Step 8 complete with no spray pumps running and spray system reset and returned to standby operation.
SIM-F 3 o f 6
Appendix C 4
Form ES-C-1 d
VERIFICATION OF COMPLETION Job Performance Measure No. Sim-F, Align CS System during Loss of Emergency Coolant Recirculation Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
4
Response
Result: SAT or UNSAT Examiners signature and date:
SIM-F 4of6
u Simulator Setup Reset simulator to IC-94 All FCU and both CS running Both Recirc pump flow paths valves deenergized Both RHR pumps tripped SIM-F 5 o f 6
Initial Conditions Initial Conditions:
o A LOCA occurred.
o All required actions of E-0 have been completed.
o A transition to ECA-1.1 from E-I Attachment 1, Step 4 when cold leg recirculation capability could not be verified.
Initiating Cue:
o The CRS has directed you to determine and establish containment spray requirements in accordance with ECA-I. 1, Loss of Emergency Coolant Recirculation, step 8.
RETURN THIS TO THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK SIM-F
d d
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No:
039*012*04*01 Task
Title:
Restore Steam Flow Channel to Service WA
Reference:
012A4.04 (3.313.3)
Sim-G Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Unit is at 100% power and steady state conditions exist. FT-419B, 31 SG Steam Flow transmitter failed earlier and has subsequently been repaired by maintenance.
Task Standard: Bistables untripped and B channel controlling Steam Flow and Feed Flow on 31 SG.
Required Materials:
3-AOP-INST-1, InstrumenVController Failures General
References:
3-AOP-INST-1, InstrumenVController Failures Initiating Cue:
The CRS has directed you to return FT-419B to service using 3-AOP-INST-1 starting at step 4.78.
Time Critical Task: No Validation Time: 5 minutes SIM-G 1 of6
Appendix C 2
Form ES-C-1 d
Performance Information (Denote critical steps with a check mark)
- 1. Performance Step:
Check Bistables associated with failed instrument in the tripped position.
Standard:
Checks Loop 1 B SF>FVVF and Loop 1 B High SF SI Bistables tripped in rack A-9.
Comment:
Note: Bistable trip switches in steps 2 and 3 can be untripped in any order.
4 2. Performance Step: Places bistable trip switch Loop IB, SF>FWF in the untripped position.
Standard:
Loop IB, SF>FWF bistable trip switch in the down position. White bistable status lamp turns off. SG 31 High Steam Flow Mismatch Trip alarm on panel SBF-2 clears.
Comment:
4 3. Performance Step:
Places bistable trip switch Loop I 8 High SF SI in the untripped position.
Standard:
Loop 1 B, High SF SI bistable trip switch in the down position. White bistable status lamp turns off. High Steam Flow SI Channel Trip alarm on panel SBF-2 clears.
Comment:
SIM-G 2 o f 6
Form ES-C-1 Appendix C 3
Performance Information (Denote critical steps with a check mark)
~
d 4. Performance Step: Select SG transfer switches to desired channel CUE: CRS directs you to place the B FF and SF channels in control.
Standard:
In any order, Places STM GEN No. 31 STM FL CONT. TRANSFER switch to B position and places STM GEN No. 31 FW FL CONT.
TRANSFER switch to B. (The Sequence in which the switches are repositioned is not critical.)
Comment:
- 5. Performance Step:
Return to procedure and step in effect.
Standard:
Notifies CRS that task is complete - FT-4196 is returned to service.
Comment:
Terminating Cue:
Bistables untripped and B channels controlling. Procedure exited.
SIM-G 3 o f 6
Appendix C 4
Form ES-C-1 VERI F I CAT I 0 N 0 F CO M P L ET I 0 N d
Sim-G, Restore Steam Flow Channel to Service Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
SI M-G 4 o f 6
Simulator Setup Reset simulator to IC-93:
- 1.
- 2.
- 3.
Place 31 SG SF and FF Channels to the A channel in control.
Trip Bistables for FI-419B in rack A-9: Loop 1 B SF>FWF and Loop 1 B High SF SI.
Acknowledge alarms SIM-G 5 o f 6
Initial Conditions Initial Conditions:
o Unit is at 100% power and steady state conditions exist.
o FT-419B, 31 SG Steam Flow transmitter failed earlier and has subsequently been repaired by maintenance.
Initiating Cue:
o The CRS has directed you to return FT-419B to service using 3-AOP-INST-1 starting at step 4.78.
RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SI M-G
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No: 073*015*01*01 Task
Title:
Adjust R-20 Process Radiation Monitor Setpoint WA
Reference:
071A4.15 (3.2/3.2)
Sim-H Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: Plant startup is in progress. Post maintenance testing is complete on R-
- 20. A new alert setpoint has been provided by chemistry. All requirements for setpoint control and log keeping have been met and are being performed by the CRS Task Standard:
New alert setpoint entered into Bantam I 1 for rad monitor R-20 Required Materials: 3-SOP-RM-008, Radiation Monitoring Control Cabinet (BANTAM-1 l/RM-23A Cabinet)
General
References:
N/A Initiating Cue:
The CRS has directed you to adjust the Bantam-I 1 alert setpoint to 1.05e2 uci/cc per 3-SOP-RM-008, Radiation Monitoring Control Cabinet step 4.3.5.
Time Critical Task: No Validation Time: 10 minutes SIM-H I
Of7
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 1. Performance Step:
Standard:
Refer to 3-SOP-RM-OI O Radiation Monitor Setpoint Control 3-SOP-RM-010 requirements verified to be met CUE: All requirements for setpoint control and log keeping have been met and are being performed by the CRS.
Comment:
.\\I 2. Performance Step:
Standard:
Select Bantam 11 RM-20 channel Channel R20 is selected and verified backlit on BANTAM-I 1 CRT screen.
Comment:
.\\I 3. Performance Step:
Select Channel Item Display Standard:
Depress Channel Items pushbutton Comment:
d 4. Performance Step: Place key switch to Supervisor position Standard:
CUE:
Normal Supervisor switch in Supervisor position.
Comment:
SIM-H 2 0 f 7
W Appendix C 3
Form ES-C-I Performance Information (Denote critical steps with a check mark) d 5. Performance Step:
Enter 0,1, 0 Standard:
Keypad sequence 0,1,0 entered Comment:
4 6. Performance Step:
Standard:
Comment:
Depress SEL and verify R20 backlit SEL button depressed and R20 backlit 4 7. Performance Step:
CUE:
Standard:
Enter new setpoint by entering [I]
[0] [5] [+I
[O] [2] and then depressing [ENTER]
If CRS asked for new setpoint, 1.05e2 ucikc Value entered is correct (if not, then candidate corrects entry)
Comment:
~~~
d 8. Performance Step:
Turn Normal Supervisor switch to NORMAL and remove key Standard:
Key switch in NORMAL Comment:
SIM-H 3 of 7
W Appendix C 4
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 9. Performance Step:
Depress desired channel button to return display to normal CUE: CRS requests group 26 display on Bantam -1 1, Standard:
Group 26 display selected [group menu], [2] [6] [enter]
Comment:
Terminating Cue:
Setpoint change complete SIM-H 4 of 7
Appendix C 5
Form ES-C-1 d
VERIFICATION OF COMPLETION Job Performance Measure No. Sim-H, Adjust R-20 Process Radiation Monitor Setpoint Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
SIM-H 5 0 f 7
Simulator Setup
'W Any IC where Bantam 11 and RM-23A are in service.
Suggest doing this JPM in parallel with SIM-E (or SIM-G)
Startup in progress with power at 4% and shifting feed to the low flow bypass FRVs.
Verify that the R-20 alert setpoint is not I
.05e2 ucikc on Bantam-I 1 (Initial value should be 5.85e+01)
Remove the Supervisory Key from the Bantam-I 1 and place in the Key Locker.
SIM-H 6 o f 7
Initial Conditions Initial Conditions:
o Plant startup is in progress.
o Post maintenance testing is complete on R-20.
o A new alert setpoint has been provided by chemistry.
o All requirements for setpoint control and log keeping have been met and are being performed by the CRS.
Initiating Cue:
o The CRS has directed you to adjust the Bantam-I 1 alert setpoint to 1.05e2 ucikc per 3-SOP-RM-008, Radiation Monitoring Control Cabinet section 4.3.5 RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE SIM-H
Appendix C Job Performance Measure Form ES-C-1
- d Worksheet Facility:
Indian Point 3 Task No:
061 001 0404 Task
Title:
Open Steam Supply Valves to 32 ABFP W
WA
Reference:
061A2.02 (3Z3.6)
Plant-I Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance X
Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions: A steam break inside the ABFP Building caused 32 ABFP Steam Supply Isolation Valves MS-PCV-I 31 OA and MS-PCV-1310B to close. The ABFP Building has been ventilated and is now safe for entry. The steam break has been isolated and was not associated with 32 ABFP steam supply.
Task Standard: MS-PCV-131 OA and MS-PCV-131 OB OPEN Required Materials: 3-SOP-ESP-OOI, Local Equipment Operations and Contingency Actions.
General
References:
N/A Initiating Cue: The CRS has directed you to simulate locally open MS-PCV-131 OA and MS-PCV-131 OB in accordance with 3-SOP-ESP-OOI, sections 4.1.3.3 and 4.1.3.4 and inform the control room when they are open.
Time Critical Task: No Validation Time: 10 minutes d
PLANT-I 1 Of5
ii Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
NOTE: Remind candidate to NOT change any switch or valve positions
- 1. Performance Step:
CUE: AUX FEED PUMP ROOM HI TEMP alarm has remained clear Review caution prior to step 4.1.3.3 Standard:
Check if AUX FEED PUMP ROOM HI TEMP alarm has annunciated Comment:
~
- 2. Performance Step:
Check MS-131 OA not open Standard:
MS-131 OA position checked Comment:
.( 3. Performance Step:
ISOLATE air supply and BLEED OFF at fitting to MS-PCV-131 OA Standard:
Candidate locates MS-PCV-1310 air supply isolation and simulates closing valve and simulates bleeding off air pressure by disconnecting fitting.
CUE: MS-PCV-131OA is still closed Comment:
~
.( 4. Performance Step:
IF MS-PCV-1310A remains closed, unlock and OPEN MS-177 MS-PCV-131 OA Bypass to equalize pressure.
Standard:
MS-177 is simulated unlocked and opened.
CUE: MS-PCV-131 OA is now open Comment:
PLANT-I
Form ES-C-1 Appendix C 3
Performance Information (Denote critical steps with a check mark)
- 5. Performance Step:
Check MS-1310B not open Standard:
MS-131 OB position checked Comment:
d 6. Performance Step:
ISOLATE air supply and BLEED OFF at fitting to MS-PCV-1310B Standard:
Candidate locates MS-PCV-131 OB air supply isolation and simulates closing valve and simulates bleeding off air pressure by disconnecting fitting.
CUE: MS-PCV-131 OB is open Comment:
- 7. Performance Step:
Inform control room that PCV-1310A and B are open CUE:
Acknowledge as control room Standard:
Control room informed that PCV-131 OA and B are open Comment:
Terminating Cue:
Control room informed that MS-PCV-131 OA and MS-PCV-131 OB are both OPEN PLANT-I
I Initial Conditions VERIFICATION OF COMPLETION Job Performance Measure No. PLANT-I, Open Steam Supply Valves to 32 ABFP Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
PLANT-I
Initial Conditions Initial Conditions:
o A steam break inside the ABFP Building caused 32 ABFP Steam Supply Isolation Valves MS-PCV-131 OA and MS-PCV-131 OB to close.
o The ABFP Building has been ventilated and is now safe for entry.
o The steam break has been isolated and was not associated with 32 ABFP steam supply.
Initiating Cue:
o The CRS has directed you to simulate locally open MS-PCV-131 OA and MS-PCV-13108 in accordance with 3-SOP-ESP-OOI, sections 4.1.3.3 and 4.1.3.4 and inform the control room when they are open.
RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE PLANT-I
Appendix C Job Performance Measure Form ES-C-1 W
Worksheet Facility:
Indian Point 3 Task No:
0840170401 Task
Title:
WA
Reference:
055EA2.03 (3.9/4.7)
Plant-J Start the Appendix R Diesel During Loss of AC Power (Alternate Path)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance X
Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
e Initial Conditions:
A station blackout has occurred. The control room team is performing ECA-0.0, Loss of All AC Power. All prerequisites and P&Ls for Appendix R Diesel Generator operation are met.
Task Standard:
CCR Notified that Appendix R diesel is running and ready for loading Required Materials:
3-SOP-EL-I 3, Appendix R Diesel Generator Operation General
References:
ECA-0.0 step 6 Initiating Cue:
The CRS has directed you to start the Appendix R Diesel per SOP-EL-I 3 through step 4.3.1 5 and notify the control room when it is ready for loading.
Time Critical Task: No Validation Time: 20 minutes W
Plant-J I of 10
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
- 1. Performance Step:
Verify OPEN GT-BT, GT-2F, and GT-CP CUE: CCR responds that all three breakers are open.
Standard:
Verifies position of breakers Comment:
- 2. Performance Step:
Check PI-815, Appendix R D/G Start Air Reservoir PI CUE: When PI-815 located, cue the candidate that the gauge reads 60 psig.
Standard:
PI-815 checked. Determines that backup diesel driven air compressor must be started since pressure is 12Opsig.
Com ment :
- 3. Performance Step:
Open Starting Air Compressor breaker on MCC-314 CUE: After locating breaker and describing operation, cue that breaker is open.
Standard:
Comment:
Starting Air Compressor breaker simulated open Plant-J 2 of 10
'W Appendix C 3
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
~~
~~
4 4. Performance Step:
Remove Compressor belts from electric motor and install on back up diesel driven air compressor Standard:
Describes actions to swap the compressor belt from the electric motor to the diesel.
CUE: Belts have been moved.
Comment:
For safety considerations, do not allow the candidate to climb up to the air compressor. Describing how to swap the belts from below the compressor is sufficient.
d 5. Performance Step:
Open DA-I 18, Backup Diesel Engine Compressor Speed Pilot Valle DA-I I 9 Isolation Standard:
CUE: DA-118 is open Comment:
Locates and simulates opening DA-I 18 4 6. Performance Step:
Standard:
CUE: Clutch lever is in OUT position Comment:
Position diesel engine Clutch lever to OUT Locates clutch lever and simulates positioning in OUT Plant-J 3of10
Appendix C 4
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4 7. Performance Step:
CUE:
Throttle at 1/3 Standard:
Position throttle lever to -1/3 Locates throttle lever and simulates positioning to 1/3 Comment:
_ _ ~
4 8. Performance Step: Start backup engine by turning key switch to on.
CUE: Engine is running Standard:
Simulates turning key switch to on.
Comment:
4 9. Performance Step:
Place diesel engine clutch lever IN CUE: Clutch is in the IN position Standard:
Simulates engaging clutch Comment:
Plant-J 4of10
'd Appendix C 5
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
I O. Performance Step:
When diesel is running loaded, then adjust throttle lever so diesel is running smoothly.
CUE: Engine is running smoothly Standard:
Simulates adjusting throttle Comment:
- 11. Performance Step:
CUE: Lockout relay is reset Standard:
Locates lockout relay switch Ensure Generator Lockout relay switch is RESET Comment:
d 12. Performance Step:
CUE: If not in unit, cue that switch is in UNIT after simulated repositioning.
Standard:
Verified in UNIT position Ensure Unit-Parallel Switch in UNIT Comment:
Plant-J 5of 10
Form ES-C-1 Appendix C 6
Performance Information (Denote critical steps with a check mark) 4 13. Performance Step:
CLOSE Output Breaker DC Feed Switch CUE: After locating and simulating closing switch, Output breaker feed switch is closed Standard:
Locates and simulates closing switch Comment:
d 14. Performance Step:
When Starting air reservoir pressure increases to 120 psig, then depress engine start pushbutton.
CUE: When air reservoir pressure checked, cue that pressure is 125 psig CUE: When start button is located and simulated pressed, cue that engine starts.
Standard:
Observes air reservoir pressure indication > 120 and simulates depressing engine start button.
Comment:
- 15. Performance Step:
When engine increases to 900 rpm on tachometer, verify generator automatically excites as indicated on Generator Field Ammeter and Generator Field Voltmeter CUE:
CUE:
CUE:
When tachometer located and checked, cue that engine speed is 900 rpm When Generator Field Ammeter is located and checked, cue that field is 2.5 amps When Generator Field Volts is located and checked, cue that field volts are in normal range (-60 volts).
Standard:
Verifies generator is excited.
Comment:
Plant-J 6 of 10
Appendix C 7
Form ES-C-I Performance Information (Denote critical steps with a check mark)
- 16. Performance Step:
Turn Voltmeter Switch Generator to one of three phases Standard:
Voltmeter is 1-2, 2-3, or 3-1 position Com m e n t:
- 17. Performance Step:
turn Ammeter Switch Generator to one of three phases:
Standard:
Ammeter switch in 1, 2, or 3 position Comment:
~~
d 18. Performance Step:
Adjust voltage control switch to obtain 6900 VAC on AC voltmeter Generator.
CUE: Indicates 6900 VAC Standard:
voltage adjusted as necessary to maintain 69OOVAC Comment:
4 19. Performance Step:
Adjust Governor control switch to obtain 60 Hz on Freq Meter Generator CUE: After locating Freq Meter, cue that freq is 59.9 Hz Standard:
Raises Speed to obtains 60 HZ using governor control Comment:
Plant-J 7of 10
Appendix C 8
Form ES-C-I Performance Information (Denote critical steps with a check mark)
.( 20. Performance Step:
Close 52-EG-4, Generator Output Breaker, using Breaker Control Switch CUE: After locating breaker control switch and describing operation, cue Generator Output Breaker is closed.
Standard:
Simulates closing Generator Output Breaker, using Breaker Control Switch Comment:
- 21. Performance Step:
Verify auxiliaries operating CUE: After locating indicator lamps for each auxiliary on MCC-314, cue that the associated red lamp is lit.
Standard:
Checks Crankcase exhauster, radiator fan, and engine room fans indicator lamps on MCC-314.
Comment:
.( 22. Performance Step:
Notify CCR that Appendix R diesel is running and ready for loading.
CUE: Acknowledge as CCR Standard:
CCR notified Corn ment :
Terminating Cue:
CCR notified that Appendix R diesel generator is running and ready for loading.
Plant-J 8 of 10
Appendix C 9
Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No. Plant-J, Start the Appendix R Diesel During Loss of AC Power (Alternate Path)
Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Plant-J 9 of 10
Initial Conditions L-,,
Initial Conditions:
0 0
0 Initiating Cue:
0 A station blackout has occurred.
The control room team is performing ECA-0.0, Loss of All AC Power.
All prerequisites and P&Ls for Appendix R Diesel Generator operation are met.
The CRS has directed you to start the Appendix R Diesel per SOP-EL-13 through step 4.3.15 and notify the control room when it is ready for loading.
RETURN THIS TO THE EVALUATOR WHEN THE TASK IS COMPLETE Plant-J
'W' Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:
Indian Point 3 Task No:
0040010404 Task
Title:
Align City Water Cooling to Charging Pumps (Alternate Backup)
WA
Reference:
026AA1.03 (3.6/3.6)
Plant-K Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance X
Actual Performance Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
A Safety Injection has occurred coincident with a loss of offsite power.
This has resulted in a loss of Component Cooling Water. There are currently no Charging Pumps operating.
Task Standard: Alternate Back-up city water cooling aligned to charging pumps.
Required Materials:
3-SOP-ESP-001, Local Equipment Operation and Contingency Actions General
References:
N/A Initiating Cue:
The CRS has directed you to align City Water Back-up supply to Charging Pumps per SOP-ESP-001 section 4.1 1 Time Critical Task: No Validation Time: 15 minutes Plant-K 1 of 10
Appendix C 2
Form ES-C-1 Performance Information (Denote critical steps with a check mark)
CUE: Provide the candidate a copy of 3-SOP-ESP-001, Local Equipment Operations and Contingency Actions.
- 1. Performance Step:
Refers to 3-SOP-ESP-001 section 4.1 1 Charging Pump Cooling Using City Water. Observes Caution regarding requirement for cooling water supply to charging pump oil coolers.
Standard:
Correct procedure section referenced. Observes from Initial conditions that no charging pumps are running.
Comment:
d 2. Performance Step: Close AC-756A, CC Supply Header to Charging Pumps Inlet Isolation.
CUE: After valve is located and candidate simulates closing valve, cue that the valve is closed Standard:
AC-756A verified closed.
Comment:
d 3. Performance Step:
Close AC-756B, CC Return Header from Charging Pumps Outlet Isolation.
CUE: After valve is located and candidate simulates closing valve, cue that the valve is closed Standard:
AC-756B verified closed.
Comment:
Plant-K 2of 10
Form ES-C-1 Appendix C 3
Performance Information (Denote critical steps with a check mark)
- 4. Performance Step:
Open MW-26, City Water Emergency Cooling Supply to Charging Pumps Isolation CUE: MW-26 can not be opened Standard:
Determines Normal Backup city water supply is not available and proceeds to Alternate Backup city water supply section.
Comment:
NOTE: If the CRS is contacted, direct the candidate to align Alternate Backup city water cooling using 3-SOP-ESP-001.
4 5. Performance Step:
CUE: Have candidate locate locker and simulate obtaining required hoses Obtain Fire hose from laundry truck bay Operations Contingency Hose Cabinet Standard:
Laundry truck bay Operations Contingency Hose Cabinet located and simulated obtaining required hoses.
Comment:
4 6. Performance Step:
Proceed to PAB 55 Charging Pump entrance cell with 25 fire hose.
Standard:
Charging pump entrance cell located with 25 hose.
Comment:
Plant-K 3of10
Appendix C 4
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4
~~
4 7. Performance Step:
Close MW-783, City Water Emergency Cooling Supply to Charging Pumps Backflow Preventer Downstream Isolation Valve.
CUE: When MW-783 is located and candidate simulates closing valve, provide cue that MW-783 is closed.
Standard:
MW-783 simulated closed Comment:
.( 8. Performance Step:
Close AC-701A Emergency City Water Cooling Supply to Charging Pumps Inlet Isolation.
CUE: When AC-701A is located and candidate simulates closing valve, provide cue that AC-701A is closed Standard:
AC-701A simulated closed.
Comment:
~~
~
4 9. Performance Step:
Remove cap at elbow downstream from MW-783 CUE:
When cap is located and simulated removed, cue that cap has been removed Standard:
Cap at elbow downstream of MW-783 removed Comment:
Plant-K 4of 10
Appendix C 5
Form ES-C-I Performance Information (Denote critical steps with a check mark) 4 I O. Performance Step: Attach fire hose to threaded end at elbow and drop fire hose through pipe chase to PAB 41 below CUE: When candidate simulates attaching hose and dropping through pipe chase, CUE that the hose is connected.
Standard:
Fire hose simulated connected to fitting and dropped through pipe chase.
Comment:
d 1 I.
Performance Step: Proceeds to PAB 41 Lower Pipe Penetration Area with 50 hose lengths.
Standard:
PAB 41 Lower Pipe Penetration Area located with simulated hoses.
Comment:
d 12. Performance Step: Ensure MW-17-1 and MW-17-2 City Water Containment Isolations are closed CUE: When valves are located and the candidate simulates closing the valves, cue that they are closed.
Standard:
Locates and verifies MW-17-1 and MW-17-2 closed Comment:
Plant-K 5of10
Appendix C 6
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4 13. Performance Step: Attach Fire Hose to MW-17-1 and 17-2 hose connection CUE: When candidate simulates attaching hose to correct fitting, cue that hose is attached.
Standard:
Fire Hose simulated attached to MW-17-1 and 17-2 hose connection Comment:
d 14. Performance Step: Run 50 Fire hose lengths to 25 fire hose hanging from pipe chase outside 41 CCW pump room and connect hoses.
CUE:
When pipe chase located and candidate simulates connecting hoses, cue that hoses are connected ii Standard:
Length of hose simulated run from MW-17-1 and 17-2 hose connection and connected to hose connected to elbow downstream of MW-783.
Comment:
4 15. Performance Step: OPEN MW-17-1 and 17-2 CUE: After candidate demonstrates simulated opening valves, cue that both valves are open Standard:
MW-17-1 and 17-2 simulated open Comment:
Plant-K 6of 10
Appendix C 7
Form ES-C-1 4
Performance Information (Denote critical steps with a check mark) 4 16. Performance Step: Ensure that AC-756A CC Supply to Charging Pumps Inlet Isolation is closed CUE: After AC-756A is located and the candidate simulates closing it, cue that the valve is closed.
Standard:
AC-756A simulated closed Comment:
NOTE: AC-756B was previously checked closed in step 1.
4 17. Performance Step: Ensure that AC-756B CC Return to Charging Pumps Outlet Isolation is closed CUE: After AC-756B is located and the candidate simulates closing it, cue that the valve is closed.
Standard:
AC-756B simulated closed Comment:
4 18. Performance Step: Ensure AC-701 B, Emergency City Water Cooling Return from Charging Pumps Outlet Drain flange is removed CUE: After locating flange and describing how to remove it, cue that the flange is removed.
Standard:
Locates AC-701 B and verifies the flange is removed Comment:
Plant-K 7of 10
Amendix C 8
Form ES-C-1 Performance Information (Denote critical steps with a check mark) 4 19. performance Step: Open AC-701 B Emergency City Water Cooling Return from Charging Pumps Outlet Drain CUE: After locating and simulating opening the valve, cue that the AC-701 B is open Standard:
AC-701 B simulated open.
Comment:
d 20. Performance Step: Open AC-701A Emergency City Water Cooling Supply to Charging Pumps Inlet Isolation CUE: After locating and simulating opening the valve, cue that the AC-701A is open Standard:
AC-701A simulated open.
Com ment :
Terminating Cue:
Alternate backup city water has been aligned to the charging pumps Plant-K 8of I O
Initial Conditions VERIFICATION OF COMPLETION Job Performance Measure No. Plant-K, Align City Water Cooling to Charging Pumps (Alternate Backup)
Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to complete:
Question Documentation:
Question:
d
Response
Result: SAT or UNSAT Examiners signature and date:
Plant-K 9of10
Initial Conditions Initial Conditions:
A Safety Injection has occurred coincident with a loss of offsite power. This has resulted in a loss of Component Cooling Water.
There are currently no Charging Pumps operating.
Initiating Cue:
The CRS has directed you to align City Water Back-up supply to Charging Pumps per SOP-ESP-001 section 4.1 1.
RETURN THIS FORM TO THE EXAMINER WHEN THE TASK IS COMPLETE Plant-K 10 of 10