MONTHYEARRA-24-0092, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis2024-07-29029 July 2024 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required LPSW Pump Inoperable on a One-Time Basis ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22096A1872022-07-15015 July 2022 Issuance of Amendment Nos. 424, 426, and 425 Revise TS 3.7.7, Low Pressure Service Water (LPSW) System to Extend the Completion Time for One Required Inoperable LPSW Pump RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17103A5092017-05-11011 May 2017 Issuance of Amendments Allowing the Use of the Copernic Fuel Performance Code ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16138A3322016-06-0606 June 2016 Issuance of Amendments to Correct Usage Problem with Technical Specification 3.8.1 ML16088A3302016-04-29029 April 2016 Issuance of Amendments to Add High Flux Trip for Three Reactor Coolant Pump Operation ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML15166A3872015-09-24024 September 2015 Issuance of Amendments Regarding Allowed Maximum Rated Thermal Power ML15170A0552015-07-27027 July 2015 Issuance of Amendments Regarding Adoption of TSTF-513 ML15174A2672015-07-0707 July 2015 Issuance of Amendments Regarding the Inservice Testing Program ML15050A6712015-06-19019 June 2015 Issuance of Amendments Regarding Inspection Plan for Reactor Vessel Internals ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15093A3492015-04-23023 April 2015 Issuance of Amendments Regarding Keowee Hydro Unit (Khu) Steady State Frequency Requirements ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14195A3552014-10-21021 October 2014 Issuance of Amendments ML14254A2462014-09-25025 September 2014 Issuance of Amendments Regarding Quality Assurance Requirements for the Standby Shutdown Facility Equipment ML14206A7902014-08-13013 August 2014 Issuance of Amendments Regarding Implementation of the Protected Service Water System ML14106A4182014-04-30030 April 2014 Issuance of Amendment Regarding Use of Reverse Osmosis System ONS-2103-005, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 42013-10-21021 October 2013 Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 4 ML13231A0132013-08-23023 August 2013 Issuance of Amendments Regarding the Technical Specification for Keowee Hydro Units (TAC Nos. ME9880, ME9881, and ME9882) ML12307A2192012-10-30030 October 2012 License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation and Associated Proposed Tech Specs and Bases.. ML12086A2892012-04-20020 April 2012 Issuance of Amendments Regarding Revising the Frequency of Certain Technical Specifications Surveillance Requirements from 18 Months to 24 Months ML12097A2482012-04-0303 April 2012 License Amendment Request for a One-Time, 15-Month Extension to the Integrated Leak Rate Test Interval License Amendment Request No. 2012-03 ML12109A3452012-03-16016 March 2012 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate, License Amendment Request No. 2011-02, Supplement 2 ML1020302532010-07-14014 July 2010 License Amendment Request (LAR 2009-08) for Adoption of NRC Approved Technical Specification Task Force Change to Standard Technical Specifications, TSTF-52, Implement 10CFR50, App J, Option B ML1013304992010-05-0606 May 2010 License Amendment Request to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles License Amendment Request No. 2010-001 ML0935600772009-12-15015 December 2009 Technical Specifications Revision Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity. ML0924003112009-09-21021 September 2009 Issuance of Amendments Regarding Proposed Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Ts. 5.2.2 to Support Compliance with 10 CFR Part 26. Catawba Units 1& 2, McGuire, Units 1 & 2, Oconee, Units 1, 2, & ML0924501082009-08-31031 August 2009 License Amendment Request to Amend Technical Specification Required Action to Permit Replacement of the 230 Kv 125 Volt Switchyard Batteries, License Amendment Request No. 2006-20 ML0914102832009-05-18018 May 2009 License Amendment Request to Revise the Definition of Shutdown Margin (SDM) ML0816504752008-05-30030 May 2008 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). License Amendment Request (LAR) No. 2008-01 L-96-006, Response to RAI Regarding License Amendment Request for Low Pressure Service Water Reactor Building Waterhammer Prevention System Modification to Mitigate Waterhammers Described in Generic Letter 96-06 and Associated Technical..2008-05-0707 May 2008 Response to RAI Regarding License Amendment Request for Low Pressure Service Water Reactor Building Waterhammer Prevention System Modification to Mitigate Waterhammers Described in Generic Letter 96-06 and Associated Technical.. ML0806304962008-03-28028 March 2008 Technical Specifications, Issuance of Amendments Regarding a Change in Corporate Name of License & Oconee Independent Spent Fuel Storage Installation (TAC Nos. MD5156 - MD5162) ML0803200712008-02-21021 February 2008 Technical Specifications, Issuance of Amendments Regarding Use of Fiber-Reinforced Polymer (FRP) ML0735506292007-12-19019 December 2007 Tech Spec Pages for Amendments 359, 361 & 360, Regarding Removal of the Gaseous Radioactive Monitor from the Technical Specifications ML0732503892007-11-14014 November 2007 Technical Specifications for Oconee, Units 1, 2, and 3, Issuance of Amendments Regarding the Flood Protection Measures for the Auxiliary Building ML0709303722007-04-0202 April 2007 Technical Specifications, Issuance of Amendments Regarding Steam Generator Tube Integrity ML0630601812006-10-26026 October 2006 Technical Specifications, Correction to Amendment 350, 352, & 351 ML0628404622006-10-0303 October 2006 Tech Spec Pages for Amendments 354, 356 and 355 Regarding AC Sources-Operating ML0627201112006-09-27027 September 2006 License Amendment Request Applicable to Technical Specification 3.8.1, AC Sources - Operating, License Amendment Request (LAR) 2006-16 ML0619205882006-07-11011 July 2006 Technical Specifications, Issuance of Amendments Regarding Eliminate Out-Of-Date Requirements for Keowee Hydro Units, MC7318, MC7319, MC7320 ML0617103042006-06-15015 June 2006 Tech Spec Pages for Amendments 351, 353 and 352 Regarding Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool ML0611600142006-05-0404 May 2006 Tech Spec Pages for Amendment 350 Replacement of Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers ML0610805002006-04-11011 April 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Other Administrative Changes ML0610804092006-04-11011 April 2006 Application for Technical Specification Change to Add/Revise LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0607303802006-03-15015 March 2006 License Page 8, Revised Design Basis Threat ML0607200302006-03-0101 March 2006 License Amendment Request to Reconcile 10 CFR 50 and 10 CFR 72 Criticality Requirements for Loading and Unloading Dry Spent Fuel Storage Canisters in the Spent Fuel Pool, License Amendment Request No. 2006-009 2024-07-29
[Table view] |
Text
PAM instrumentation 3.3.8 ACTIONS (continued)
CONDITION REQUIRED ACTION rCOMPLETION I TIM C. - ---------- NOTE --------. 1 Restore one channel to 7 days Not applicable to OPERABLE status.
Functions 14,18,19, and 22.
One or more Functions with two required channels inoperable.
D. Not Used D.1 Not Used Not Used.
E. - ---------NOTE-------- E.1 Restore required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Only applicable, to channel to OPERABLE Function 14. status.
One required channel inoperable.
(continued)
OCONEE UNITS 1,2, & 3 3.3.8-2 Amendment Nos. 350, 352.'& 351 Corrected by letter dated, October 26, 2006
PAM instrumentation 3.3.8 ACTIONS (continued)
CONDITION REQUJ IRED
- ACTION I tl..*..J%*'IVII I ,'*.JI COMPL ETIONrr Li.-/ k i T *ME F. -------- NOTE -------- F.1 Declare the affected Immediately Only applicable to train inoperable.
Functions 18, 19, and 22.
One or more Functions with required channel inoperable.
G. Required Action and G.I Enter the Condition Immediately associated Completion referenced in Time of Condition C or Table 3.3.8-1 for the E not met. channel.
H. As required by H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action G.1 and referenced in AND Table 3.3.8-1.
H.2 Be in MODE 4. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> As required by 1.1 Initiate action in Immediately Required Action G.1 accordance with and referenced in Specification 5.6.6.
Table 3.3.8-1.
OCONEE UNITS 1, 2, & 3 3.3.8-3 Amendment Nos- R... 352. & 351 i Corrected by letter dated, October 26, 2006
PAM instrumentation 3.3.8 Table 3.3.8-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM FUNCTION REQUIRED CHANNELS REQUIRED ACTION G.1
- 1. Wide Range Neutron Flux 2 H
- 2. RCS Hot Leg Temperature 2 H
- 3. RCS Hot Leg Level 2 I
- 4. RCS Pressure (Wide Range) 2 H
- 5. Reactor Vessel Head Level 2 I
- 6. Containment Sump Water Level (Wide Range) 2 H
- 7. Containment Pressure (Wide Range) 2 H
- 8. Containment Isolation Valve Position 2 per penetration flow path(a)(b)(c) H
- 9. Containment Area Radiation (High Range) 2
- 10. Not Used H
- 11. Pressurizer Level 2 H
- 12. Steam Generator Water Level 2 per SG H
- 13. Steam Generator Pressure 2 per SG H
- 14. Borated Water Storage Tank Water Level 2 H
- 15. Upper Surge Tank Level 2 H
- 16. Core Exit Temperature 2 independent sets of 5 (d)
H
- 17. Subcooling Monitor 1 per train
- 18. HPI System Flow NA 1 per train
- 19. LPI System Flow NA
- 20. Not used
- 21. Emergency Feedwater Flow 2 per SG H
- 22. Low Pressure Service Water Flow to LPI Coolers 1 per train NA (a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) Position indication requirements apply only to containment isolation valves that are electrically controlled.
(d) The subcooling margin monitor takes the average of the five highest CETs for each of the ICCM trains.
OCONEE UNITS 1,2, & 3 3.3.8-5 Amendment Nos. 350, 352, & 351 I Corrected by letter dated, October 26, 2006
PAM instrumentation B 3.3.8 BASES ACTIONS B.1 (continued)
Required Action B.1 specifies initiation of action described in Specification 5.6.6 that requires a written report to be submitted to the NRC. This report discusses the results of the root cause evaluation of the inoperability and identifies proposed restorative actions. This action is appropriate in lieu of a shutdown requirement since alternative actions are identified before loss of functional capability and given the likelihood of unit conditions that would require information provided by this instrumentation. The Completion Time of "Immediately" for Required Action B.1 ensures the requirements of Specification 5.6.6 are initiated.
C._1 When one or more Functions have two required channels inoperable (i.e.,
two channels inoperable in the same Function), one channel in the Function should be restored to OPERABLE status within 7 days. This Condition does not apply to the hydrogen monitor channels. The Completion Time of 7 days is based on the relatively low probability of an event requiring PAM instrumentation action operation and the availability of alternative means to obtain the required information. Continuous operation with two required channels inoperable in a Function is not acceptable because the alternate indications may not fully meet all performance of qualification requirements applied to the PAM instrumentation. Therefore, requiring restoration of one inoperable channel of the Function limits the risk that the PAM Function will be in a degraded condition should an accident occur. Condition C is modified by a Note indicating this Condition is not applicable to PAM Functions 14, 18, 19, and 22.
D._1 Not Used.
E._1 When one required BWST water level channel is inoperable, Required Action E.1 requires the channel to be restored to OPERABLE status.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is based on the relatively low probability of an event requiring BWST water and the availability of the remaining BWST water level channel. Continuous operation with one of the two required channels inoperable is not acceptable because alternate OCONEE UNITS 1, 2, &3 B 3.3.8-14 Amendment Nos. 350, 352, & 351 Corrected bv letter dated, October 26, 2006