ML061160014

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 350 Replacement of Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers
ML061160014
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 05/04/2006
From: Olshan L
Plant Licensing Branch III-2
To:
bxt1
Shared Package
ML061150507 List:
References
TAC MC8127
Download: ML061160014 (2)


Text

HPI 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify each HPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing Program required developed head.

SR 3.5.2.4 Verify each HPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.2.5 Verify each HPI pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.5.2.6 Verify, by visual inspection, each HPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or I abnormal corrosion.

SR 3.5.2.7 Cycle each HPI discharge crossover valve and 18 months LPI-HPI flow path discharge valve.

O C O NEE U NITS 1,2,& 3 3.5.2-5 AmendmentNos. 348/350/350 I

LPI 3.5.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.3.2 ------------------- NOTE ----------

Not applicable to operating LPI pump(s).

Vent each LPI pump casing. 31 days SR 3.5.3.3 Verify each LPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing required developed head. Program SR 3.5.3.4 Verify each LPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.3.5 Verify each LPI pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.5.3.6 Verify, by visual inspection, each LPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers I

show no evidence of structural distress or abnormal corrosion.

OCONEE UNITS 1, 2, & 3 3.5.3 AmendmentNos. 348/350/350 I