Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement CNL-24-011, Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology2024-01-22022 January 2024 Application for Subsequent Renewed Operating Licenses, Supplemental Information - Neutron Fluence Analyses Methodology ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-057, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use CNL-22-056, Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2022-04-28028 April 2022 Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-009, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-03-31031 March 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CNL-21-002, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance.2021-12-0303 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance. CNL-21-090, Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539)2021-11-19019 November 2021 Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539) CNL-21-020, Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518)2021-11-0505 November 2021 Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518) CNL-21-053, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)2021-07-23023 July 2021 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535) CNL-21-050, License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2021-05-29029 May 2021 License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-008, Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532)2021-03-0505 March 2021 Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-002, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529)2020-07-17017 July 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529) CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis2020-05-0606 May 2020 License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition CNL-19-009, License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515)2019-09-18018 September 2019 License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515) CNL-19-070, TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor2019-07-0303 July 2019 TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor CNL-19-034, to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3..2019-03-0808 March 2019 to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3.. CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497)2017-08-15015 August 2017 Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro2017-04-0505 April 2017 Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Proce CNL-16-155, Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To..2017-01-17017 January 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To.. CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-010, Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508)2016-08-12012 August 2016 Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508) CNL-16-016, License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-07-14014 July 2016 License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-16-068, Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2016-03-28028 March 2016 Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. 2024-11-01
[Table view] Category:Technical Specifications
MONTHYEARCNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20190A1052020-08-11011 August 2020 Correction to Amendment No. 319 Regarding Revisions to Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML18283A8972018-10-10010 October 2018 Enclosure 1: Proposed Changes to Browns Ferry Nuclear Plant Unit 1 Technical Specifications, Attachments 1, 2, & 3 ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects2017-01-20020 January 2017 Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects NL-17-015, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Saf2017-01-20020 January 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safe ML16330A1582017-01-17017 January 2017 Issuance of Amendments Regarding Revisions to Technical Specification 4.3.1.2, Fuel Storage Criticality ML16028A4142016-04-26026 April 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15317A4782016-02-0909 February 2016 Issuance of Amendment to Revise Technical Specifications Related to Cycle 18 Safety Limit Minimum Critical Power Ratio ML15344A3212016-01-0707 January 2016 Issuance of Amendment Regarding Modification of Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits ML15321A4722015-12-23023 December 2015 Issuance of Amendments Regarding Revision to Table 3.3.6.1-1, Primary Containment Isolation Instrumentation ML15287A2132015-12-16016 December 2015 Issuance of Amendments Regarding Technical Specification Changes to Reactor Core Safety Limits ML15324A2472015-12-14014 December 2015 Issuance of Amendment to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Valves to Licensee Control ML15287A3712015-12-0404 December 2015 Issuance of Amendments for the Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-535 (CNL-15-029) ML15212A7962015-10-28028 October 2015 Issuance of Amendments to Transition to Fire Protection Program NFPA-805 ML15251A5402015-09-29029 September 2015 Issuance of Amendment Regarding Control Rod Scram Time Testing Frequency Per TSTF-460, Revision 0 CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. ML15065A0492015-06-0202 June 2015 Issuance of Amendment Revising Pressure and Temperature Limit Curves CNL-15-070, Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-4852015-05-29029 May 2015 Withdrawal of Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs - TS-485 CNL-15-019, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501)2015-03-0909 March 2015 License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) CNL-15-029, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502)2015-03-0909 March 2015 License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502) CNL-15-033, License Amendment Request Under Exigent Circumstances for the Change to Add a Reference to the ATRIUM-10 Xm NRC Safety Evaluation Approval in Technical Specification 5.6.5.b in Support of ATRIUM-10 Xm Fuel Use2015-02-12012 February 2015 License Amendment Request Under Exigent Circumstances for the Change to Add a Reference to the ATRIUM-10 Xm NRC Safety Evaluation Approval in Technical Specification 5.6.5.b in Support of ATRIUM-10 Xm Fuel Use CNL-14-156, Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Withdrawal of Requests and Update to EPU Plans and Schedules2014-09-18018 September 2014 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Withdrawal of Requests and Update to EPU Plans and Schedules NL-14-081, Browns Ferry, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Fer2014-05-16016 May 2014 Browns Ferry, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferr CNL-14-081, Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferry2014-05-16016 May 2014 Units, 1, 2 & 3, Revised Pages to Technical Specification Change TS-478-Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Tech Spec 2.1.1.2 in Support of ATRIUM-10 Xm Fuel Use at Browns Ferry NL-13-148, Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484)2013-12-18018 December 2013 Browns Ferry, Unit 1, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) CNL-13-148, Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484)2013-12-18018 December 2013 Application to Modify Technical Specification 3.4.9, RCS Pressure and Temperature Limits (BFN TS 484) CNL-13-126, Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-4852013-11-22022 November 2013 Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs-TS-485 ML13199A2212013-08-30030 August 2013 Issuance of Amendments Re. Deletion of References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25% Extension of Surveillance Intervals ML13092A3932013-03-27027 March 2013 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (Technical Specification Change TS-480) ML13070A3072013-02-28028 February 2013 Technical Specification Change TS-478 - Addition of Analytical Methodologies to Technical Specification 5.6.5 for Browns Ferry 1, 2, & 3, & Revision of Technical Specification 2.1.1.2 for Browns Ferry Unit 2, in Support of ATRIUM-10 Xm Fuel ML11189A2172012-07-30030 July 2012 Issuance of Amendments Regarding Request to Add Technical Specification 3.7.3, Control Room Emergency Ventilation System, Action to Address Two Crev Subsystems Inoperable ML12114A0042012-04-18018 April 2012 Supplement to License Amendment Request to Transition to Areva Fuel ML1011601532010-04-16016 April 2010 Supplemental Information for Technical Specification Change TS-473 - Areva Fuel Transition Amendment Request ML0923700452009-11-19019 November 2009 Issuance of Amendments Regarding Technical Specification Improvement to Adopt Technical Specification Task Force (TSTF) TSTF-476, Revision 1 ML0931402652009-10-31031 October 2009 Attachment 13, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2864(NP), Revision 2, Reload Safety Analysis Report 2024-04-01
[Table view] |
Text
October 26, 2006 TVA-BFN-TS-457 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket Nos. 50-260 Tennessee Valley Authority ) 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 2 and 3 - TECHNICAL SPECIFICATIONS (TS) CHANGE TS-457 - CHANGE OF EMERGENCY DIESEL GENERATOR (EDG) REQUIRED ACTION 3.8.1.B.4 COMPLETION TIME (CT) FROM 14 DAYS TO 7 DAYS Pursuant to 10 CFR 50.90, the Tennessee Valley Authority (TVA) is submitting a request for a TS change (TS-457) to licenses DPR-52 and DPR-68 for BFN Units 2 and 3, respectively. The proposed change revises the CT for TS Required Action 3.8.1.B.4 from 14 days to 7 days for restoration of an inoperable EDG. The current 14-day CT was established via a license amendment requested by TVA in March 1997 and approved by NRC in August 1999. Part of the formal basis for that amendment as requested and approved was the assumption that BFN Unit 1 was shutdown. The near-term restart of Unit 1 will invalidate this assumption, therefore, the affected CTs are being returned to their original duration of 7 days. Enclosure 1 to this letter provides the justification for this request. Enclosure 2 provides mark-ups of the affected TS pages.
TVA has determined that there are no significant hazards considerations associated with the proposed change and that the TS change qualifies for a categorical exclusion from
U.S. Nuclear Regulatory Commission Page 2 October 26, 2006 environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and enclosures to the Alabama State Department of Public Health.
Approval of TS-457 is requested prior to BFN Unit 1 Cycle 7 operation, which is scheduled to begin in Spring 2007.
Therefore, TVA is asking that this TS change be approved by January 17, 2007, and that the implementation of the revised TS be made within 60 days of NRC approval or prior to changing the Unit 1 reactor mode to startup, whichever is earlier.
It is TVAs position that the suitability of a 14-day EDG CT for all three BFN units can be demonstrated, and the subject request to return the Unit 2 and Unit 3 TS CT to a 7-day duration is being made only to address the interval until such time this position is adequately presented to NRC. It is TVAs intention to resubmit a TS change request to extend the TS Required Action 3.8.1.B.4 CT to 14 days for all three BFN units prior to the end of calendar year 2007.
There are no regulatory commitments associated with this submittal. If you have any questions about this matter, please contact me at (256) 729-2636.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October 26, 2006.
Sincerely, Original signed by:
William D. Crouch Manager of Licensing and Industry Affairs
Enclosures:
- 1. TVA Evaluation of the Proposed Change
- 2. Proposed Technical Specifications Changes (mark-up) cc: See page 3
U.S. Nuclear Regulatory Commission Page 3 October 26, 2006 Enclosures cc:(Enclosures):
State Health Officer Alabama State Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite Atlanta, Georgia 30303-8931 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 4 October 26, 2006 DTL:PSH:BAB Enclosures cc (Enclosures):
B. M. Aukland, POB 2C-BFN M. Bajestani, NAB 1A-BFN A. S. Bhatnagar, LP 6A-C R. H. Bryan, BR 4X-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. F. Marks, PAB 1C-BFN R. G. Jones, NAB 1A-BFN B. J. OGrady, PAB 1E-BFN K. W. Singer, LP 6A-C P. D. Swafford, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT 6A-K s:lic/submit/TechSpec/TS-457 Ro post nsrb.doc
Enclosure 1 Browns Ferry Nuclear Plant (BFN) Units 2 and 3 Technical Specifications (TS) Change TS-457 Change Of Emergency Diesel Generator (EDG) Completion Time (CT)
From 14 Days To 7 Days TVA Evaluation of the Proposed Change
1.0 DESCRIPTION
Pursuant to 10 CFR 50.90, the Tennessee Valley Authority (TVA) is submitting this request for a TS change to licenses DPR-52 and DPR-68 for BFN Units 2 and 3, respectively. The proposed change revises the CT for Required Action 3.8.1.B.4 from 14 days to 7 days for restoration of an inoperable EDG. The current 14-day CT was established via a license amendment requested by TVA in March 1997 (Reference 1) and approved by NRC in August 1999 (Reference 2). Part of the formal basis for that amendment as requested and approved was the assumption that BFN Unit 1 is shutdown. The near-term restart of Unit 1 will invalidate this assumption, therefore, the affected CTs are being returned to the original duration of 7 days.
2.0 PROPOSED CHANGE
The proposed TS change revises the Required Action 3.8.1.B.4 14-day CT currently in the Unit 2 and Unit 3 TS back to the 7-day duration which was part of the original TS. Marked-up TS pages showing the proposed revision are provided in Enclosure 2.
3.0 BACKGROUND
By Reference 1, TVA requested the extension of the CT for Required Action 3.8.1.B.4 from the original duration of 7 days to a new duration of 14 days for Units 2 and 3. NRC approved this request in Reference 2. At the time, the eventual TVA decision to return Unit 1 to operation was still years in the future, so no change was requested for the Unit 1 TS. Additionally, since at that time no Unit 1 operation was possible for the foreseeable future, the formal justification for the changes to the Unit 2 and Unit 3 TS was made assuming Unit 1 remained in a shutdown condition. It was understood by both TVA and NRC that the 14-day CT in the Unit 2 and Unit 3 TS would require reevaluation and a Unit 1 TS change for a 14-day CT would be required should Unit 1 ever return to power operations.
E1-1
Enclosure 1 BFN Units 2 and 3 - TS 457 TVA Evaluation of the Proposed Change References 3 through 7 detail communications between TVA and NRC on the subject of EDG CT duration subsequent to TVAs decision to return Unit 1 to operation. No agreement was reached between TVA and NRC in this extensive dialogue, and at this juncture, adequate time no longer exists to reach agreement prior to the scheduled restart of Unit 1. To support the Unit 1 restart schedule while recognizing that the formal justification for the current 14-day Unit 2 and Unit 3 Required Action 3.8.1.B.4 CT duration assumes Unit 1 is not operating, TVA is requesting that the original 7-day CT duration be reinstated in the Unit 2 and Unit 3 TS.
Approval of TS-457 is requested prior to BFN Unit 1 Cycle 7 operation, which is scheduled to begin in Spring 2007.
Therefore, TVA is asking that this TS change be approved by January 17, 2007, and that the implementation of the revised TS be made within 60 days of NRC approval or prior to changing the Unit 1 reactor mode to startup, whichever is earlier.
It is TVAs position that the suitability of a 14-day CT for all three BFN units can be demonstrated, and the subject request to return the Unit 2 and Unit 3 TS CT to a 7-day duration is being made only to address the interval until such time this position is adequately presented to NRC. It is TVAs intention to resubmit a request to extend the TS Required Action 3.8.1.B.4 CT to 14 days for all three BFN units prior to the end of calendar year 2007.
4.0 TECHNICAL ANALYSIS
The basis for this request is technical only in the sense that the return to the previous 7-day CT in the Unit 2 and Unit 3 TS is being made to comply with an existing BFN licensing basis assumption. The formal justification for the current 14-day CT assumes BFN Unit 1 is shutdown, and the near-term restart of Unit 1 will invalidate this assumption.
The requested 7-day CT duration was included as part of the original BFN custom TS for all three units, and this duration was in place during the BFN operating interval between 1973 and 1999.
It is apparent that the reinstatement of this original TS duration does not require the depth of technical analysis similar to that which typically accompanies TS change requests.
E1-2
Enclosure 1 BFN Units 2 and 3 - TS 457 TVA Evaluation of the Proposed Change 5.0 REGULATORY SAFETY ANALYSIS Pursuant to 10 CFR 50.90, the Tennessee Valley Authority (TVA) is submitting a request for a Technical Specifications (TS) change (TS-457) to licenses DPR-52 and DPR-68 for Browns Ferry (BFN)
Units 2 and 3, respectively. The proposed change revises the TS Completion Time (CT) for Required Action 3.8.1.B.4 from 14 days to 7 days for restoration of an inoperable emergency diesel generator (EDG). The current 14-day CT was established via a license amendment requested by TVA in March 1997 and approved by NRC in August 1999. Part of the formal basis for that amendment as requested and approved was the assumption that BFN Unit 1 is shutdown. The near-term restart of Unit 1 will invalidate this assumption, therefore, the affected CTs are being returned to the original duration of 7 days.
5.1 No Significant Hazards Consideration TVA has evaluated whether or not a significant hazards consideration is involved with the proposed TS changes by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment", as discussed below:
- 1. Does the proposed Technical Specification change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The EDGs are designed as backup alternating current (AC) power sources in the event of a loss of offsite power. The proposed restoration of the EDG CT to its original TS duration does not change the conditions, operating configurations, or minimum amount of operating equipment assumed in the safety analysis for accident mitigation. No changes are proposed in the manner in which the EDGs provide plant protection or which create new modes of plant operation. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed Technical Specification change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No E1-3
Enclosure 1 BFN Units 2 and 3 - TS 457 TVA Evaluation of the Proposed Change The proposed amendment does not introduce new equipment which could create a new or different kind of accident.
Existing equipment will not be operated in any new modes or for purposes different than it is now utilized. No new external threats, release pathways, or equipment failure modes are created. Therefore, the implementation of the proposed amendment will not create a possibility for an accident of a new or different type than those previously evaluated.
- 3. Does the proposed Technical Specification change involve a significant reduction in a margin of safety?
Response: No BFNs emergency AC system is designed with sufficient redundancy such that an EDG may be removed from service for maintenance or testing. The remaining EDGs are capable of carrying sufficient electrical loads to satisfy the UFSAR requirements for accident mitigation or unit safe shutdown.
The proposed change does not impact the redundancy or availability requirements of offsite power supplies or change the ability of the plant to cope with station blackout events.
For these reasons, the proposed amendment does not involve a significant reduction in a margin of safety.
Based on the above, TVA concludes that the proposed TS change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
E1-4
Enclosure 1 BFN Units 2 and 3 - TS 457 TVA Evaluation of the Proposed Change
6.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed TS changes would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed TS changes do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed TS changes meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed TS changes.
E1-5
Enclosure 1 BFN Units 2 and 3 - TS 457 TVA Evaluation of the Proposed Change
7.0 REFERENCES
- 1. TVA letter to NRC, Browns Ferry Nuclear Plant (BFN) -
Units 2 And 3 - Technical Specifications (TS) Change 376 -
Extended Emergency Diesel Generator (EDG) Allowed Outage Time (AOT), March 12, 1997.
- 2. NRC letter to TVA, Browns Ferry Nuclear Plant, Units 2 And 3
- Issuance Of Amendments Regarding Authorization Of 14 Day Allowable Outage Time For Emergency Diesel Generators (TAC NOS. M98205 AND M98206), August 2, 1999.
- 3. TVA letter to NRC, Browns Ferry Nuclear Plant (BFN) Unit 1 -
Technical Specification (TS) Change TS 426 - Revision to Diesel Generators Allowed Outage Time, December 6, 2004.
- 4. NRC letter to TVA, Browns Ferry Nuclear Plant, Unit 1 -
Request For Additional Information Regarding Extended Allowable Outage Time For Inoperable Diesel Generator (TAC NO. MC5254) (TS-426), August 30, 2005.
- 5. TVA letter to NRC, Browns Ferry Nuclear Plant (BFN) - Unit 1
- Technical Specifications (TS) Change 426 - Response To Request For Additional Information Regarding Revision To Diesel Generators Allowed Outage Time (TAC NO. MC5254),
October 28, 2005.
- 6. TVA letter to NRC, Browns Ferry Nuclear Plant (BFN) - Unit 1
- Withdrawal Of Technical Specification (TS) Change 426 -
Revision To Diesel Generators Allowed Outage Time, August 4, 2006.
- 7. NRC letter to TVA, Browns Ferry Nuclear Plant, Unit 1 -
Withdrawal Of License Amendment Request To Revise Diesel Generators Allowed Outage Time (TAC NO. MC5254),
August 17, 2006.
E1-6
Enclosure 2 Browns Ferry Nuclear Plant (BFN) Units 2 and 3 Technical Specifications (TS) Change TS-457 Change Of Emergency Diesel Generator (EDG) Completion time (CT)
From 14 Days To 7 Days Proposed Technical Specification Changes (mark-up)
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported by discovery of the inoperable Unit 1 and Condition B 2 DG, inoperable when concurrent with the redundant required inoperability of feature(s) are inoperable. redundant required feature(s)
AND B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 1 and 2 DG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.1 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE Unit 1 and 2 DG(s).
7 days AND B.4 Restore Unit 1 and 2 DG 14 days to OPERABLE status.
AND 14 days from discovery of failure to meet LCO (continued)
BFN-UNIT 2 3.8-3 Amendment No.
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported by discovery of the inoperable Unit 3 DG, Condition B inoperable when the concurrent with redundant required inoperability of feature(s) are inoperable. redundant required feature(s)
AND B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 3 DG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.1 for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE Unit 3 DG(s).
7 days AND B.4 Restore Unit 3 DG to 14 days OPERABLE status.
AND 14 days from discovery of failure to meet LCO (continued)
BFN-UNIT 3 3.8-3 Amendment No.