ML062760516

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 191 Application for Technical Specification Improvement to Eliminate Requirements for the Hydrogen Monitors Using the Consolidated Line Item Improvement Process
ML062760516
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/02/2006
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MD0031
Download: ML062760516 (3)


Text

(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components.

(5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:

Part 20, Section 30.34 of Part 30; Section 40.41 of Part 40; Section 50.54 and 50.59 of Part 50; and Section 70.32 of Part 70. The license is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is also subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1850 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendii A, which is attached hereto, as revised through Amendment No. 191 is hereby incorporated into this license. Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications.

(4) The licensee shall submit an application for license amendment, including supporting gnalyses and evaluations by December 18, 1998. This amendment application shall contain the proposed methods for compliance with GDC 19 dose guidelines under accident conditions based upon system design and without reliance upon the use of potassium iodide.

Amendment No. 1, 5, 16, .,,,1, 36, 191, .f72 191

TABLE 3.6.11-1 ACCIDENT MONITORING INSTRUMENTATION Minimum Number of Operable Parameters Total Number of Channels Sensors or Channels Action (See Table 3.6.11-2)

1) Relief Valve Position Indication 2/Valve 1Naive* 1
2) Safety Valve Position Indication 2/Valve 1Naive* 1
3) Reactor Vessel Water Level 2 1" 2
4) Drywell Pressure Monitor 2 4 1*
5) Suppression Chamber Water 2 4 Level 1"
6) Deleted I
7) Containment High Range 2 3 Radiation Monitor
8) Suppression Chamber Water 2 I 2 Temperature A channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance provided at least one Operable channel is monitoring that Parameter.

AMENDMENT NO. 442, 191 269

TABLE 4.6.11 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENT Parameter Instrument Channel Test Instrument Channel Calibration (1) Relief valve position indicator (Primary - Once per quarter Once during each major refueling outage Acoustic)

Relief valve position indicator (Backup - Once per quarter Once during each major refueling outage Thermocouple)

(2) Safety valve position indicator (Primary - Once per quarter Once during each major refueling outage Acoustic)

Safety valve position indicator (Backup - Once per quarter Once during each major refueling outage Thermocouple)

(3) Reactor vessel water level Once per quarter Once during each major refueling outage (4) Drywell Pressure Monitor Once per month Once during each major refueling outage (5) Suppression Chamber Water Level Monitor Once per quarter Once during each major refueling outage (6) Deleted I

(7) Containment High Range Radiation Monitor Once per month Once during each major refueling outage (8) Suppression Chamber Water Temperature Once per month Once during each major refueling outage AMENDMENT NO. 442, 191 272