MONTHYEARIR 05000373/20224042022-12-21021 December 2022 County Station - Material Control and Accounting Program Inspection Report 05000373/2022404 and 05000374/2022404 IR 05000373/20225012022-12-0505 December 2022 County Station - Emergency Preparedness Biennial Exercise Inspection Report 05000373/2022501 and 05000374/2022501 IR 05000373/20214022021-12-15015 December 2021 County Station - Security Baseline Inspection Report 05000373/2021402 and 05000374/2021402 ML19179A2842019-07-22022 July 2019 Correction Letter for License Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High-Pressure Core Spray Diesel Generator IR 05000373/20182012018-09-14014 September 2018 County Generating Station - NRC Security Inspection Report 05000373/2018201 and 05000374/2018201 Report Cover Letter ML18176A3792018-06-21021 June 2018 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000373/2018413; 05000374/2018413 (DRS-D.Szwarc) ML16231A3952016-08-18018 August 2016 County Station - Acknowledgment of Disputed Violation of NRC Inspection Report 05000373/2016007; 05000374/2016007 ML15132A7762015-05-26026 May 2015 2015 Lasalle County Station - FOF Inspection Report Cover Letter IR 05000373/20152012015-05-26026 May 2015 2015 Lasalle County Station - FOF Inspection Report Cover Letter ML15020A1092015-01-15015 January 2015 Ltr 2014 LaSalle EP Annual Closeout (Rdj) IR 05000373/20135022014-02-12012 February 2014 Ltr 02/12/14 LaSalle EP Annual Closeout (RDJ) ML14045A2292014-02-12012 February 2014 EP Annual Closeout (Rdj) ML0914907972009-05-27027 May 2009 Information Request for an NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection IR 05000373/20085012009-02-13013 February 2009 Ltr. 02/13/2009 LaSalle County Station - NRC Emergency Preparedness Annual IR 05000373-08-501, 05000374-08-501, NRC Security Annual IR 0500373-08-401, 05000374-08-401 IR 05000373/20084022008-05-0606 May 2008 IR 05000373-08-402, (Drs), IR 05000374-08-402, (Drs), on 04/11/2008, for Lasalle County Station ML0812202082008-04-25025 April 2008 County Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information 05000373/2008004 and 05000374/2008004 IR 05000373/20075012008-02-14014 February 2008 County Station - NRC Emergency Preparedness Annual Inspection Report No. 05000373/2007501; 05000374/2007501; NRC Security Annual Inspection Report No. 05000373/2007404; 05000374/2007404 ML0801505522008-01-15015 January 2008 Biennial Problem Identification & Resolution Inspection Information Request IR 05000373/20074032007-07-23023 July 2007 NRC Material Control & Accounting Ti 2515/154 Phase III Inspection Report 05000373/2007403(DRP); 05000374/2007403(DRP) IR 05000373/20074012007-05-10010 May 2007 IR 05000373-07-401(DRS); IR 05000374-07-401(DRS); 01/17/2007 - 01/19/2007, Exelon Nuclear Corporate; 04/02/2007 - 04/06/2007; LaSalle Nuclear Power Station, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter ML0626904432006-09-25025 September 2006 Memo 09/25/06 LaSalle: Re Input to DRP IR 06-005 ML0620505382006-07-19019 July 2006 Oak Ridge Institute for Science and Education - Analytical Results for Thirty-Seven Water Samples, Batch Two, from the Vicinity of LaSalle Station, LaSalle, Illinois (Inspection Report No. 050-00373/2006-004) (Rfta No. 06-001) ML0534901992005-12-0909 December 2005 05 LaSalle County Station, Unit 1 and 2 Notification of an Supplemental Inspection 05000373/2006002; 05000374/2006002(DRS) IR 05000373/20060132005-09-25025 September 2005 IR 05000373-06-013, IR 05000374-06-013, on 08/21/2006 - 08/25/2006, LaSalle County Station, Units 1 and 2, Access Control and Security Training - Cover Letter IR 05000373/20010192002-03-0505 March 2002 IR 05000373/2001-019(DRP) & IR 05000374/2001-019(DRP), LaSalle County Station, Units 1 & 2, Inspection on 12/30/01-2/16/02. Non-Cited Violations Noted 2022-12-05
[Table view] Category:Memoranda
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20150A2862020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for LaSalle ISFSI ML20239A8322020-08-25025 August 2020 Summary of the August 4, 2020 Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16154A0822016-06-0303 June 2016 Advisory Committee on Reactor Safeguards Review of the Lasalle County Station, Units 1 and 2, License Renewal Application Transmittal of the Final Safety Evaluation Report ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16049A4232016-03-0202 March 2016 Advisory Committee on Reactor Safeguards Review of the LaSalle County Station, Units 1 and 2, License Renewal Application -Transmittal of Safety Evaluation Report with Open Items ML16021A3252016-01-29029 January 2016 Summary of Teleconference Held on January 21, 2016, Between the NRC and Exelon Generation Co., LLC, Concerning RAI 4.2.10-1 Response ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13097A0022013-04-17017 April 2013 Forthcoming Meeting with Exelon Generation Company, LLC Regarding Deferred Implementation of Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML12320A4222013-01-0909 January 2013 Request for Additional Information Related to License Amendment to Technical Specification 3.7.3 Ultimate Heat Sink (ME9076 and ME9077) ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12167A1292012-06-18018 June 2012 6/28/2012 Forthcoming Pre-Application Meeting with Exelon Generating Company, LLC, to Discuss Licensing Amendment Request for LaSalle County Station Unit 1 and 2 Ultimate Heat Sink ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1206807332012-03-20020 March 2012 Forthcoming Public Meeting with Exelon Generation Company, LLC Regarding Proposed License Amendment Request to Install Power Range Neutron Monitor ML1129114092011-10-18018 October 2011 Notice of Meeting with Exelon and NEI, to Discuss Application of Nuclear Energy Institute Pilot for Pre-Submittal Meetings to LaSalle Nuclear Power Station Extended Power Uprate Submittal ML1114409852011-05-26026 May 2011 Notice of Meeting with Exelon to Discuss Proposed License Amendment Request Related to the Installation of a Power Range Neutron Monitoring System for LaSalle Units 1 and 2 ML1028003592010-10-0707 October 2010 Notice of Public Meeting with Exelon Generation Company, LLC, Regarding LaSalle Netco Insert Request ML1022501922010-08-12012 August 2010 Memo C Lipa, Response to Region-III Technical Assistance Request - LaSalle Station and Byron Station Independent Spent Fuel Storage Installation (ISFSI) Pad Seismic Design REGION-III TAR ML101680320 Dated 6-4-2010 ML1011904862010-05-0303 May 2010 Notice of Meeting with Exelon, LaSalle, Units 1 and 2, to Discuss Response to Request for Additional Information License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks ML1002005172010-01-20020 January 2010 Memo to C. A. Lipa Revision to Response to Region III Technical Assistance Request- LaSalle Station Independent Spent Fuel Storage Installation (ISFSI) Pad- Seismic Design LaSalle Station Region III Technical Assistance Request (TAR) Dated ML0930205882009-11-16016 November 2009 Staff Review of LaSalle County Generating Station ISFSI Physical Security Plan and ASM Incorporation ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0915903582009-06-0808 June 2009 Notice of Meetng with Exelon Generation Company to Discuss the Recapture License Amendment Request ML0906305362009-03-0404 March 2009 Corrected Notice of Meeting with Exelon to Discuss Request That Allow Use of NETCO-SNAPIN Inserts in the Lasalle County Station, Unit 2, Spent Fuel Storage Rack Cells as Neutron Absorbing Hardware ML0905705582009-03-0404 March 2009 Notice of Meeting with Exelon to Discuss Request That Allow Use of NETCO-SNAP-IN Inserts in LaSalle County Station, Unit 2, Spent Fuel Storage Rack Cells as Neutron Absorbing Hardware ML0810800102008-04-16016 April 2008 Summary of Public Meeting with NRC and Exelon Generation Company LaSalle Performance Assessment, with Presentation Slides ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0700900372007-01-0909 January 2007 Extension of TS Completion Times, Associated with the Residual Heat Removal Service Water System, Diesel Generator Cooling Water System, and the Core Standby Cooling System ML0626904432006-09-25025 September 2006 Memo 09/25/06 LaSalle: Re Input to DRP IR 06-005 ML0607305732006-03-13013 March 2006 Memo 03/13/06 LaSalle DRS Input to DRP IR 06-003 Dej ML0606702252006-03-0808 March 2006 Meeting with Exelon to Discuss LaSalle Amendment Request Related to the Extension of Completion Times for the Core Standby Cooling System Maintenance ML0511604182005-04-21021 April 2005 4/21/05, Braidwood and Byron Stations, Units 1 and 2 - Summary of April 12, 2005, Telephone Conference Regarding the Emergency Plan for the Above Facilities (TAC Nos. MC6669 Thru MC6684) ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0323801232003-08-25025 August 2003 Results of the Lasalle Nuclear Power Station, Units 1 and 2 SDP Phase 2 Notebook Benchmarking Visit ML0324005922003-05-24024 May 2003 May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld ML0306400152003-04-28028 April 2003 TIA, Evaluation of LaSalle Water Hammer Analysis, Revision 1 ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR ML0210505942002-04-17017 April 2002 Notice of Meeting with Exelon Generation Company to Discuss Aspects of Security Orders ML0212006172002-03-18018 March 2002 Enclosures to 03/18/2002 Meeting Summary 2023-02-15
[Table view] |
Text
September 25, 2006 MEMORANDUM TO: Bruce Burgess, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM: Ann Marie Stone, Chief /RA/
Engineering Branch 2 Division of Reactor Safety
SUBJECT:
LASALLE COUNTY STATION DRS INPUT TO INTEGRATED REPORT 05000373/2006005; 05000374/2006005 Enclosed is the report input for LaSalle County Station, Integrated Report 05000373/2006005; 05000374/2006005. I have reviewed this input and have determined it is ready for distribution to the licensee and dissemination to the public.
We have completed three samples for IP 71111.07B. Please update RPS accordingly.
Enclosure:
Input to Inspection Report 05000373/2006005; 05000374/2006005 CONTACT: Caroline E Acosta Acevedo, DRS (630) 829-9718 DOCUMENT NAME: E:\Filenet\ML062690443.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME CAcosta Acevedo: ls AMStone DATE 09/25/06 09/25/06 OFFICIAL RECORD COPY
Cover Letter U No input, no significant findings.
Title Page Inspector: C. Acosta Acevedo, Reactor Engineer
SUMMARY
OF FINDINGS ADAMS boilerplate - Inspectable area: None (no findings)
Modify second paragraph as follows:
The inspection was conducted by resident inspectors and a regional engineering specialist.
A. Inspector-Identified and Self-Revealed Findings None B. Licensee-Identified Violations None REPORT DETAILS 1R07 Heat Sink Performance (71111.07B)
.1 Biennial Review of Heat Sink Performance
- a. Inspection Scope The inspectors reviewed the performance of the Unit 1 and Unit 2 high pressure core spray pump room cooler, the Unit 1 and Unit 2 low pressure core spray pump and reactor core isolation cooling pump room cooler and the Unit 1 low pressure core spray pump motor cooler. These heat exchangers were chosen for review based on their high risk assessment worth in the licensees probabilistic safety analysis. This review resulted in the completion of three inspection samples. While on-site, the inspectors verified that the inspection/maintenance were adequate to ensure proper heat transfer.
This was done by conducting independent heat transfer capability calculations, reviewing the methods used to inspect the heat exchangers, and verifying that the as-found results were appropriately dispositioned, such that the final condition was acceptable. The inspectors also verified, by review of procedures and test results, that chemical treatments, ultrasonic tests, and methods used to control biotic fouling corrosion and macrofouling were sufficient to ensure required heat exchanger performance.
The inspectors verified that the condition and operation of these heat exchangers were consistent with design assumptions in heat transfer calculations by conducting a service water system walkdown and reviewing related procedures and surveillance. The inspectors also verified that redundant and infrequently used heat exchangers were flow tested periodically at maximum design flow. This was performed by reviewing related procedures and surveillance.
The inspectors verified the performance of the ultimate heat sink and its sub-components, such as piping, intake screens, intake bays, pumps, valves, etc. by reviewing procedures, surveillance, and inspections conducted on the system.
The inspectors verified that the licensee had entered significant heat exchanger/heat sink problems into their corrective action program. The inspectors reviewed issues entered to verify that the corrective actions taken were appropriate.
The documents that were reviewed are included at the end of the report.
- b. Findings No findings of significance were identified.
4OA6 Meetings, including Exit
.2 Interim Exit An interim exit was conducted for:
The results of the heat sink biennial inspection were presented to Mrs. Landhal and other members of licensee management at the conclusion of the inspection on September 1, 2006.
KEY POINTS OF CONTACT Licensee S. Landhal, Plant Vice President W. Hilton, Engineering Department Nuclear Regulatory Commision D. Eskins, Resident Inspector
LIST OF DOCUMENTS REVIEWED 1R07 Heat Sink Performance Calculations:
97-198; VY Cooler Thermal Performance Model - 1(2)VY04A; A00 97-200; VY Cooler Thermal Performance Model - 1(2)VY01A and 1(2)VY02A; Revision A00 L-001024; LPCS Pump Cubicle Cooler Ventilation System; Revision 3 L-001221; HPCS Pump Cubicle Cooler Ventilation System; Revision 2 L-002404; CSCS Cooling Water System Road Map Calculation; Revision 1 CAPs Reviewed:
AR 00137664; Required design flow not achieved during LTS-200-19; December 30, 2002 IR 00525348; Repair Drain Pan Bolt on 1VY02A Cooler; August 30, 2006 Letters:
Letter; LaSalle County Station Units 1 and 2 Response to Generic Letter 89-13; dated January 29, 1990 Letter; LaSalle Station Units 1 and 2 Supplemental Response to Generic Letter 89-13; dated June 7, 1991 Letter; LaSalle Station Unit 2 Response to Generic Letter 89-13; dated May 14, 1992 Letter; LaSalle County Stations Unit 1 and 2 Flow Testing Required by Generic Letter 89-13; dated March 18, 1993 Letter; LaSalle County Station Units 1 and 2 Service Water System Problems Affecting Safety-Related Equipment (Supplemental Response to NRC Generic Letter 89-13); dated May 18, 1994 Letter; LaSalle County Nuclear Power Station Units 1 and 2 Service Water System Problems Affecting Safety-Related Equipment (Supplemental Response to NRC Generic Letter 89-13);
dated July 18, 1997 Letter; Documentation of Service Water Intake Structure Inspections within LaSalle County Station Generic Letter 89-13 Program; dated April 24, 1998 Letter; Generic Letter 89-13 Revised Response LaSalle County Nuclear Power Station, Units 1 and 2; dated July 28, 1998
Miscellaneous Documents:
AT 455081-05; Check-In Self-Assessment Report NRC Heat Sink Performance Inspection; dated July 28, 2006 Generic Letter 89-13 Program Basis Document; Revision 3 NOA-01-00-ES05; Nuclear Oversight Assessment Generic Letter 89-13 Service Water Systems Programs; dated February 11, 2000 Procedures:
CC-AA-103-2001 App B: Exelon Position on the Inclusion of Instrument Accuracy in Technical Specification Surveillance Acceptance Criteria; Revision 2 CY-AA-120-000; System Chemistry Control; Revision 5 CY-AA-120-410; Circulating/Service Water Chemistry; Revision 1 CY-AA-120-4110; Raw Water Chemistry Strategic Plan; Revision 0 CY-AA-120-4200; Corrosion Monitoring Guidelines; Revision 0 CY-LA-120-4100; LaSalle Station Lake Chemistry Control; Revision 2 EN-MW-402-0005; Extreme Heat Implementation Plan; Revision 2 EN-LA-402-0005; Extreme Heat Implementation Plan - La Salle; Revision 7 ER-AA-335-004; Manual Ultrasonic Measurement of Material Thickness and Interfering Conditions; Revision 2 ER-AA-340-1002; Service Water Heat Exchanger and Component Inspection Guide; Revision 3 LOA-UHS-001; Operating Abnormal Procedure; Revision 0 LCP-830-21; Circulating/Service Water Corrosion Monitoring Skid Operation; Revision 10 LOP-RH-04; Filling, Venting and Flushing the RHR Service Water System; Revision 21 Surveillances:
LTS-200-13; 1(2)VY02A Southwest Cubicle Area Cooler Flowrate Test, Div III; Revision 7 LTS-200-19; ECCS Cubicle Area Cooler Air Flowrate Test; Revision 13 Work Orders:
WO 950071394 01; Disassemble/Clean LPCS Motor Cooler; dated January 11, 1996
WO 980045205 01; Disassemble/Clean LPCS Motor Cooler; dated May 5, 1998 WO 00373003 01; ES Air Side Flowrate Test; dated July 7, 2003 WO 00387992 01; Air Side Flowrate Test; dated November 15, 2002 WO 00428324 01; Clean Air Side of 2VY02A Cooling Coil; dated September 6, 2002 WO 00465669 02; Inspection of South End of WS Tunnel for Corbicula and Sedim; dated June 22, 2004 WO 00485612 01; SW CNR RM Cooler Air Side Flowrate Test; dated May 10, 2004 WO 00485949 01; ES 1VY04A Air Side Flowrate Test; dated December 10, 2002 WO 00581940 01; Air Side Flowrate Test; dated April 4, 2005 WO 00594676 01; ES 1VY04A LPCS Pump Rm Air Side Flowrate Test; dated April 4, 2005 WO 00656176 01; Clean Unit 1 A CW Inlet Bay and Bypass Line; dated October 29, 2004 WO 00661696 01; U-2 NE Cubicle Area Cooler Air Side Flowrate Test; dated January 1, 2005 WO 00673390 01; MM 2CW01PA, Inspect/Clean Circ Water Bay Per LTS-600-23; dated December 28, 2004 WO 00759096 01; SW CNR RM Cooler Air Side Flowrate Test; dated May 8, 2006 WO 00781090 01; ES 1A FC Emergency Makeup Piping NDE UT; dated July 26, 2005 WO 00781091 01; LPCS Motor Cooler Piping NDE UT; dated December 1, 2005 WO 00781092 01; LPCS Motor Cooler Piping NDE UT; dated November 30, 2005 WO 00781093 01; RHR CSCS Piping NDE UT; dated June 13, 2005 WO 00781094 01; ES B FC Emergency Makeup Piping NDE UT; dated August 16, 2005 WO 00781096 01; ES 2A FC Emergency Makeup Piping NDE UT;dated August 30, 2005 WO 00781097 01; EP RHR CSCS Piping NDE UT Pipe 1RH84BA-1.5" (1A RH Seal Clr); dated June 17, 2005
LIST OF ACRONYMS USED AR Action Request AT Action Tracking CAP Corrective Action Program DBD Design Basis Document ESW Emergency Service Water System IR Issue Request MOD Modification NDE Non Destructive Examination RHR Residual Heat Removal UT Ultrasonic Testing WO Work Order