Letter Sequence Other |
---|
|
|
MONTHYEARML0534600702006-01-24024 January 2006 Withholding from Public Disclosure, GE-NE-0000-0046-3343-P, Oyster Creek SSV (Steam Safety Valve) Set-point Tolerance Change Effects on Anticipated Operational Occurrences, Revision I, Class III, November 2005 Project stage: Other ML0626101962006-09-13013 September 2006 Technical Specification Pages Re Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent Project stage: Other ML0622600272006-09-13013 September 2006 Issuance of Amendment Request to Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent Project stage: Approval 2006-01-24
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21119A0642021-06-25025 June 2021 License Amendment 299 ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) RA-15-030, Submittal of Changes to Technical Specifications Bases2015-04-14014 April 2015 Submittal of Changes to Technical Specifications Bases ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 RA-10-028, Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document2010-04-16016 April 2010 Response to Request for Additional Information, License Amendment Request Regarding Relocation of Selected Technical Specification Surveillance Frequencies to a Licensee Controlled Document RA-09-029, Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A..2009-03-30030 March 2009 Supplement to License Amendment Request Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action, and Clarification of A.. RA-08-100, Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor2008-11-18018 November 2008 Special Report for Inoperability of Turbine Building High Range Radioactive Noble Gas Monitor ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0812303462008-05-30030 May 2008 Tec Specs to Amd 266/License DPF-16/Oyster Creek ML0810505452008-04-30030 April 2008 Technical Specification Pages for License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. RA-08-004, Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR)2008-03-10010 March 2008 Technical Specification Change Request No. 348 - Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0802901792008-02-0101 February 2008 Oyster Creek,Technical Specifications, Corrected, Revised Pages of Facility Operating License No. DPR-16 RA-08-011, Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement..2008-01-23023 January 2008 Response to Request for Additional Information - Exelon/Amergen Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement.. ML0729202902007-10-18018 October 2007 Technical Specification Change Request No. 374 - Revision to Mechanical Snubber Functional Testing Requirements ML0722501972007-08-0808 August 2007 Technical Specifications Pages Re Annual Radioactive Effluent Release Report Submittal Date ML0721302932007-07-27027 July 2007 Technical Specifications, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0713603392007-05-16016 May 2007 Technical Specification Change Request No. 327 - Modify Technical Specifications for Primary Containment Oxygen Concentration ML0711703892007-04-26026 April 2007 Technical Specifications Application of Alternate Source Term Methodology ML0633201962006-11-27027 November 2006 Technical Specification Change Request No. 341 - Revision to Required Submittal Date for Annual Radioactive Effluent Release Report ML0626101962006-09-13013 September 2006 Technical Specification Pages Re Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent ML0624404112006-09-0101 September 2006 Tech Spec Pages for Amendment 260 Regarding Revision to Electromatic Relief Valve Surveillance Requirement ML0623704752006-08-25025 August 2006 Technical Specifications - Deletion of Reporting Requirement in Facility Operating License ML0605500582006-02-22022 February 2006 Tech Spec Page for Amendment 258 Regarding Deletion of Reporting Requirement in Facility Operating License ML0600600152006-01-0404 January 2006 Technical Specifications, 1.0 Environmental Monitoring ML0529701902005-10-18018 October 2005 Technical Specification Change Request No. 328 - Modify Surveillance Requirements for Testing of Main Steam Line Electromatic Relief Valves ML0520000612005-07-14014 July 2005 Tech Spec Pages for Amendment 256 Capability Upgrade of a 69-KV Offsite Power Line to 230-KV ML0517802562005-06-23023 June 2005 Tech Spec Pages for Amendment, Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions ML0516002532005-06-0808 June 2005 Tech Spec Page for Amendment 254 Delete the TS Requirements to Submit Monthly Operating Reports and Annual Occupational Radiation Exposure Reports RS-05-006, Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License2005-02-25025 February 2005 Nuclear/Amergen, Proposed Changes to Delete the Reporting Requirement Section of the Facility Operating License ML0505900852005-02-24024 February 2005 Technical Specification Change Request No. 319 - Revision to Table 3.1.1 Notes Aa and Bb Regarding Reactor Building Closed Cooling Water Pump and Service Water Pump Trip Conditions RS-04-157, Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License2004-12-17017 December 2004 Proposed Revision to Appendix B, Environmental Protection Plan (Non-Radiological) of the Facility Operating License ML0430803562004-11-0202 November 2004 Tech Spec Pages for Amendment 250 Main Steam Line Isolation Valve Leakage Testing ML0433100362004-10-20020 October 2004 Technical Specification, Control Rod Scram Time Testing Requirements ML0429203072004-10-13013 October 2004 Table, Run or Startup Mode (Except for Low Power Physics Testing) ML0427902182004-10-0404 October 2004 Technical Specifications, Modify Control Rod Scram Time Testing Surveillance Requirements ML0425301502004-08-27027 August 2004 Station,Technical Specification Change Request No. 331 - Safety Limit Minimum Critical Power Ratio ML0423604742004-08-19019 August 2004 Technical Specification for Oyster Creek ML0422301962004-08-0909 August 2004 Tech Spec for Oyster Creek, License Amendment No. 246, Elimination of Requirements for Hydrogen Monitors ML0421703712004-07-30030 July 2004 Technical Specifications, Sections 3.7 and 4.7, Auxiliary Electrical Power, and Added a New Section 6.8.5, Station Battery Monitoring and Maintenance Program ML0415600412004-07-13013 July 2004 Unit, 1, License Amendments 244 and 250 Re.: Amendments to Delete a License Condition Regarding the Long Range Planning Program ML0415305902004-05-27027 May 2004 Unit 1, Technical Specifications, Reflect Ownership Change ML0409002892004-03-29029 March 2004 Tech Spec Pages for Amendment 241 Regarding Increasing Flexibility in Mode Restraints ML0333201312003-11-24024 November 2003 Tech Spec Pages for Amendment 239 Regarding Startup Transformer and Emergency Diesel Generator Unavailability 2021-06-25
[Table view] |
Text
FUNCTION LIMITING SAFETY SYSTEM SETTINGS B. Neutron Flux, Control Rod The Rod Block setting shall be the minimum of:
Block For W _>0.0 x 106 lb / hr:
FRP S <_[(0.90 x 10") W + 60.1] MFLPD ; or The applicable stability protection settings, as defined in the COLR, with a maximum setpoint of 115.0% for core flow equal to 61 x 106 lb/hr and greater.
The definitions of S, W, FRP and MFLPD used above for the APRM scram trip apply.
The ratio of FRP to MFLPD shall be set equal to 1.0 unless the actual operating value is less than 1.0, in which case the actual operating value will be used.
This adjustment may be accomplished by Increasing the APRM gain and thus reducing the flow referenced APRM rod block curve by the reciprocal of the APRM gain change.
C. Reactor High Pressure, <1060 psig Scram D. Reactor High Pressure, 2 @ < 1085 psig Relief Valves Initiation 3 @ < 1105 psig E. Reactor High Pressure, < 1060 psig with time delay Isolation Condenser < 3 seconds Initiation F. Reactor High Pressure, Safety Valve Initiation 4 @ 1212 psig 5 @ 1221 psig
_+/-36 psi
+/-36 psi I G. Low Pressure Main Steam > 825 psig (initiated in IRM Line, range 10)
MSIV Closure H. Main Steam Line Isolation :510% Valve Closure from full open Valve Closure, Scram OYSTER CREEK 2.3-2 Amendment No. 71,7-5,1114,0,14, 1 77, 208, 235, 2A-8, 261
4.3 REACTOR COOLANT Applicability: Applies to the surveillance requirements for the reactor coolant system.
Obiective: To determine the condition of the reactor coolant system and the operation of the safety devices related to it.
Specification: A. Materials surveillance specimens and neutron flux monitors shall be installed in the reactor vessel adjacent to the wall at the midplane of the active core.
Specimens and monitors shall be periodically removed, tested, and evaluated to determine the effects of neutron fluence on the fracture toughness of the vessel shell materials. The results of these evaluations shall be used to assess the adequacy of the P-T curves A, B, and C in Figures 3.3.1, 3.3.2 and 3.3.3. New curves shall be generated as required.
B. Inservice inspection of ASME Code Class 1, Class 2 and Class 3 systems and components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR, Section 50.55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR, Section 50.55a(g)(6)(i).
C. Inservice testing of ASME Code Class 1, Class 2 and Class 3 pumps and valves shall be performed in accordance with Section Xl of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR, Section 50.55a(f), except where specific written relief has been granted by the NRC pursuant to 10 CFR, Section 50.55a(f)(6)(i).
D. A visual examination for leaks shall be made with the reactor coolant system at pressure during each scheduled refueling outage or after major repairs have been made to the reactor coolant system in accordance with Article 5000, Section Xl. The requirements of specification 3.3.A shall be met during the test.
E. Each replacement safety valve or valve that has been repaired shall be tested in accordance with Specification C above. Setpoints shall be as follows:
I Number of Valves Set Points (psiq) 4 1212 t 36 5 1221 +/- 36 F. A sample of reactor coolant shall be analyzed at least every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for the purpose of determining the content of chloride ion and to check the conductivity.
OYSTER CREEK 4.3-1 Amendment No.: 82, 00,1420, 160, 4154,6 ,88, 4,10 261