ML062560094
| ML062560094 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire (NPF-009, NPF-017) |
| Issue date: | 08/31/2006 |
| From: | Gordon Peterson Duke Energy Carolinas, Duke Energy Corp, Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML062560094 (4) | |
Text
Y Dk GARY R. PETERSON Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP / 12 700 Hagers Ferry Rd.
Hunters ville, NC 28078 704 875 5333 704 875 4809 fax grpeters@duke -energy. corn August 31, 2006 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
Document Control Desk
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC (Duke)
McGuire Nuclear Station, Units 1 and 2 Docket'Nos. 50-369 and 50-370 License Amendment Request for Selective Implementation of the Alternative Source Term and Revision to Technical Specification 3.9.4, Containment Penetrations.
Additional Commitments Regarding Containment Closure Administrative Controls.
Duke letters to NRC dated December 20, 2005 and May 4, 2006 on same subject
References:
On August 16, 2006, a telephone conversation was held between Duke,personnel and the NRC staff concerning the proposed admi'nistrative controls to adequately close containment penetrations if necessary during refueling operations.
At the conclusion of this conversation, the NRC staff requested additional commitments by McGuire Nuclear Station to ensure the containment closure administrative controls are adequately implemented.
ADDI www. duke-energy.comn
U.S. Nuclear Regulatory Commission August 31, 2006 Page 2 The additional commitments are as follows:
- 1. Controls will be established to maintain the containment equipment hatch closed and held in place by a minimum of four bolts during movement of irradiated fuel assemblies within containment.
This closure control will remain in place until a prompt closure method is developed.
- 2. Other penetrations open during movement of irradiated fuel assemblies within containment shall have the ability to be closed promptly within approximately 30 minutes.
- 3. The penetration closure method will be robust enough to limit dose and allow the containment purge system to function adequately.
- 4. The procedure changes necessary to implement the administrative controls will be in place prior to implementing an approved License Amendment.
- 5. Personnel training for prompt closure will be conducted prior to opening a penetration during movement of irradiated fuel assemblies within containment.
With this letter, Duke is also requesting a change to the implementation grace period for this License Amendment Request (LAR) from 30 days to 60 days.
This is requested due to the extensive document changes necessary to implement this LAR.
The conclusions reached in the original determination that the LAR contains No Significant-Hazards Considerations and the basis for the categorical exclusion from performing an Environmental/Impact Statement have.not changed as a result of these additional commitments.
U.S. Nuclear Regulatory Commission August 31, 2006 Page 3 Please contact Lee A. Hentz at 704-875-.4187 if additional questions arise regarding this license amendment request.
Sincerely, Gary R. Peterson cc:
W. D. Travers Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J. F. Stang, Jr. (addressee only)
Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop 8-H4A Washington, D.C.
20555 J. B.* Brady NRC Senior Resident Inspector McGuire Nucldar Station B. 0. Hall Section Chief Division of Radiation Section 1645 Mail Service Center Raleigh, NC 27699
U.S. Nuclear Regulatory Commission August 31, 2006 Page 4 OATH AND AFFIRMATION Gary R. Peterson affirms that he is the person who subscribed his name to the foregoing statement, and-that all the matters and facts set forth herein are true and correct to the best of his knowledge.
Gary R. Peterson, Site Vice President Subscribed and sworn to me:
Date 6601ýtz2_
Notary Public My c ommission expires:
Date