MONTHYEARNL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owners Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owners Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error 2024-09-09
[Table view] |
Text
.0 L M. Stinson (Mike) Southern Nuclear Vice President Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 4 A SOUTHERN N COMPANY August 29, 2006 Energy to Serve Your Waorld' Docket Nos.: 50-321 NL-06-1637 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Request to Implement an Alternative Source Term Ladies and Gentlemen:
In accordance with the requirements of 10 CFR 50.90 and 10 CFR 50.67, Southern Nuclear Operating Company (SNC) proposes to revise the Edwin I. Hatch Nuclear Plant (HNP) licensing/design basis with a full scope implementation of an alternative source term (AST). As justified by the implementation of an AST, SNC also proposes to revise the HNP Units I and 2 Technical Specifications (TS), Appendix A to Operating Licenses DPR-57 and NPF-5, respectively.
10 CFR 50.67, "Accident Source Term," provides a mechanism for revising the accident source term used in the radiological consequences analyses for the design basis accidents.
Full scope AST analyses have been performed consistent with the guidance in Regulatory Guide 1.183, "Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors," dated July, 2000 and Standard Review Plan section 15.0.1 revision 0, "Radiological Consequence Analyses Using Alternative Source Terms." In addition, applicable issues covered in NRC Regulatory Issue Summary 2006-04, "Experience with Implementation of Alternative Source Terms," have been addressed.
The AST analyses include determination of the on-site radiological doses, specifically the main control room and technical support center, and off-site radiological doses resulting from the HNP design bases accidents, specifically the loss-of-coolant accident, main steam line break accident, control rod drop accident, and fuel handling accident. The analyses demonstrate that, using AST methodologies, the post-accident onsite and offsite doses remain within regulatory acceptance limits.
Generic Letter (GL) 2003-01, "Control Room Habitability," requests confirmation that the actual unfiltered inleakage into the main control room boundary is bounded by the value assumed in the design bases radiological consequences analyses. NRC issuance of Amendments 249 and 193 to the HNP Units 1 and 2 Operating Licenses, respectively, authorized SNC to credit administering potassium iodide (KI) to reduce the 30-day post-accident thyroid dose to the occupants of the main control room for an interim period
U. S. Nuclear Regulatory Commission NL-06-1637 Page 2 of 4 years, ending on May 31, 2010. With the crediting of KI, the interim current licensing basis reflects a main control room unfiltered inleakage limit of 110 cfm. This facilitated the completion of ASTM E741 tracer gas testing in June, 2006, that demonstrated that the actual main control room unfiltered inleakage is 5 cfm which is bounded by the current licensing basis limit of 110 cfm. With the completion of tracer gas testing, SNC will be completing its response to GL 2003-01 under a separate letter.
The interim current licensing basis crediting KI also facilitates the NRC review and approval of AST and subsequent SNC implementation. AST implementation will result in a licensing basis main control room unfiltered inleakage limit of 115 cfm.
AST implementation is necessary to allow for a reasonable main control room unfiltered inleakage design margin and to replace the current interim current licensing basis by May 31, 2010.
As justified by AST, the following HNP Units 1 and 2 TS revisions are proposed:
- Revise the definition of dose equivalent 1-131 (DE 1-131) to replace "thyroid dose" with "Committed Effective Dose Equivalent" and to reference Federal Guidance Report 11 for the dose conversion factors used in calculating 1-131 concentration on Units 1 and 2 (reference TS 1.1).
" Revise the maximum allowed reactor coolant specific activity from 4.0 pCi/gmn DE 1-131 to 2.0 VCi/gm DE 1-131 on Units I and 2 (reference TS 3.4.6).
" Add a Unit I TS on secondary containment bypass leakage, consistent with the current licensing basis on Unit 2, and conservatively increase the maximum allowed bypass leakage rate from 0.9% to 2.0% of the maximum allowable primary containment leakage rate (La) to allow for newly identified secondary containment bypass leakage paths (reference new TS surveillance SR 3.6.1.3.13 on Unit I and existing SR 3.6.1.3.10 on Unit 2).
- Revise the maximum allowed combined main steam line isolation valve leakage rates by increasing the Unit 1 limit and decreasing the Unit 2 limit to 100 scfhi and by eliminating the per line leakage limit. In addition, two separate surveillance acceptance criteria will be provided dependant on leakage rate test pressure (reference TS surveillance SR 3.6.1.3.10 on Unit I and SR 3.6.1.3.11 on Unit 2).
" Add a residual heat removal drywell spray TS on Units I and 2 reflecting the crediting of drywell spray as part of the AST loss-of-coolant accident assumptions (reference TS 3.6.2.5).
- Revise the TS Bases to support the above listed TS revisions and to reflect the implementation of AST by adding appropriate references to 10 CFR 50.67 in lieu of 10 CFR 100.
In addition, the following key revisions to the HNP licensing/design basis are credited and justified as part of the full scope AST analyses:
A main steam isolation valve alternate leakage treatment path is credited in AST for H-NP Unit 1. NRC previously approved a similar revision for HNP Unit 2. A seismic verification of the Unit I alternate leakage treatment path is provided that conforms to the NRC safety evaluation, dated March 3, 1999, of the GE topical report NEDC-31858P revision 2, "BWROG Report for Increasing MSIV
U. S. Nuclear Regulatory Commission NL-06-1637 Page 3 Leakage Limits and Elimination of Leakage Control Systems." In addition, deposition in the main condenser is credited for those secondary containment bypass leakage paths that terminate in the main condenser. Therefore, seismic verifications for the Units I and 2 bypass paths are provided that also conform to the referenced March 3, 1999 NRC SER.
- The main control room, as part of the control building, is located between the open end bays of the Units I and 2 turbine buildings. The Units 1 and 2 turbine building ventilation exhaust systems are credited in AST with purging the area around the main control room following a loss-of-coolant accident, main steam line break accident, and control rod drop accident. Applying the precedent established by NRC approval of the main steam isolation valve alternate leakage treatment path, seismic verifications have been performed to demonstrate that the Units I and 2 turbine building exhaust ductwork will remain in place and maintain exhaust flow in the event of a design basis earthquake. These verifications are based on earthquake experience data and use the methodology documented in Electric Power Research Institute (EPRI) Technical Report 1007896 "Seismic Evaluation Guidelines for HVAC Duct and Damper Systems," dated April, 2003. Finally, peer reviews of the EPRI guidelines and their application to HNP Unit 1 were performed by Dr. R. P. Kennedy, an acknowledged industry expert.
- A new design function is added for the standby liquid control system to buffer the suppression pool, preventing iodine re-evolution following a design basis loss-of-coolant accident.
- As stated previously, drywell spray is credited in AST following a design basis loss-of-coolant accident.
- The atmospheric dispersion factors for the main control room and technical support center are revised as follows. ARCON96 is used, instead of ARCON95, and the atmospheric dispersion factors are based on a set of 3 years of meteorological data, instead of one year of data.
- A plant modification will be implemented to automatically secure the cable spreading room supply and exhaust fans when the control room pressurization mode is initiated. Currently, these supply and exhaust fans, located in the cable spreading room beneath the main control room, are secured via operator action when the control room is pressurized to preclude a potential malfunction of those fans which could impact the capability to maintain the control room at a positive pressure relative to the surrounding turbine building.
A list of enclosures is provided at the end of this letter. These enclosures, together with this letter, comprise SNC's proposed revision of the licensing and design bases of HNP to incorporate AST.
A similar amendment has been previously approved for Browns Ferry on September 27, 2004 and Vermont Yankee on March 29, 2005. In addition, the HNP application of AST incorporates elements of the Columbia and Oyster Creek AST submittals currently under review by the NRC.
SNC requests approval of the proposed license amendment requests by December 31, 2008. The proposed changes will be implemented by May 31, 2010. Also, conforming changes will be made to the Units 1 and 2 HNP updated Final Safety Analysis Reports
4 I 1 ".
U. S. Nuclear Regulatory Commission NL-06-1637 Page 4 (FSARs) following issuance of the amendment, and submitted to the NRC in accordance with the requirements of 10 CFR 50.71 as part of the normal FSAR update process.
In accordance with the requirements of 10 CFR 50.91, a copy of this letter and all applicable enclosures will be sent to the designated State official of the Environmental Protection Division of the Georgia Department of Natural Resources.
Mr. L. M. Stinson states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.
If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY L. M. Stinson
% Sworn to and subscribedbefore me this*_9 day of sJ .72006.
r, Notary Public
, "'..... -- My commission expires:
...... "LMS/CLT/daj
Enclosures:
- 1. AST Safety Assessment
- 2. Description and Justification of TS Changes
- 3. 10 CFR 50.92 Significant Hazards Evaluation and Environmental Assessment
- 4. Regulatory Safety Analysis
- 5. Marked-up TS and Bases Pages
- 6. Clean Typed TS and Bases Pages
- 7. List of Regulatory Commitments
- 8. Unit I Main Steam Isolation Valve Alternate Leakage Path Seismic Evaluation
- 9. Unit 1 Seismic Verification of Potential Secondary Containment Bypass Leakage Paths Terminating at the Main Condenser
- 10. Unit 2 Seismic Verification of Potential Secondary Containment Bypass Leakage Paths Terminating at the Main Condenser
- 11. Hatch Nuclear Plant Unit I Seismic Verification of the Turbine Building Exhaust Ductwork
- 12. Hatch Nuclear Plant Unit 2 Seismic Verification of the Turbine Building Exhaust Ductwork
- 13. EPRI Technical Report 1007896, Seismic Evaluation Guidelines for HVAC Duct and Damper Systems
U. S. Nuclear Regulatory Commission NL-06-1637 Page 5
- 14. R. P. Kennedy Peer Review Comments on EPRI Seismic Evaluation Guidelines for HVAC Duct and Damper Systems
- 15. R. P. Kennedy Peer Review of the Hatch Unit 1 Seismic Verification of the Turbine Building Exhaust Ductwork cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, General Manager - Plant Hatch RType: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch State of Georgia Mr. L. C. Barrett, Commissioner - Department of Natural Resources