Tech Specs for Amendment 147 Allowable Values of Degraded Voltage
ML061880152
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/05/2006
From:
Plant Licensing Branch III-2
To:
Peter Tam LPL3-1
Shared Package
ML061660288 List:
References
TAC MD1267
Download: ML061880152 (2)


Text

4.

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, NMC to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and

5.

Pursuant to the Act and 10 CFR Parts 30 and 70, NMC to possess, but not separate, such byproduct and special nuclear material as may be produced by operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission, now or hereafter in effect, and is subject to the additional conditions specified or incorporated below:

1.

Maximum Power Level NMC is authorized to operate the facility at steady state reactor core power levels not in excess of 1775 megawatts (thermal).

2.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 147, are hereby incorporated In the license. NMC shall operate the facility in accordance with the Technical Specifications.

3.

Physical Protection NMC shall implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Monticello Nuclear Generating Plant Physical Security Plan", with revisions submitted through November 30, 1987; "Monticello Nuclear Generating Plant Guard Training and Qualification Plan," with revisions submitted through February 26, 1986; and "Monticello Nuclear Generating Plant Safeguards Contingency Plan," with revisions submitted through August 20, 1980. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

Amendment No. -t-hfu 147

.. rreetin letter of,

.25,'.,,,

LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1 (page 1 of 1)

Loss of Power Instrumentation REQUIRED CHANNELS SURVEILLANCE ALLOWABLE FUNCTION PER BUS REQUIREMENTS VALUE

1. 4.16 kV Essential Bus Loss of Voltage 4

SR 3.3.8.1.1

>2345 V and *2905 V SR 3.3.8.1.3 SR 3.3.8.1.4

2. 4.16 kV Essential Bus Degraded Voltage
a.

Bus Undervoltage 3

SR 3.3.8.1.1

>3913 V and *3927 V SR 3.3.8.1.2 SR 3.3.8.1.4

b.

Time Delay 3

SR 3.3.8.1.1

> 8.8 seconds and SR 3.3.8.1.2

< 9.2 seconds SR 3.3.8.1.4 Monticello 3.3.8.1-3 Amendment No. 446,147