July 5, 2006 Mr. Joseph E. Conen, Chairman BWR Owners Group DTE Energy-Fermie 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166
SUBJECT:
DRAFT SAFETY EVALUATION FOR THE BOILING WATER REACTOR OWNERS GROUP (BWROG) TOPICAL REPORT (TR) NEDO-33160, REGULATORY RELAXATION FOR THE POST ACCIDENT SRV [SAFETY RELIEF VALVE] POSITION INDICATION SYSTEM (TAC NO. MC5446)
Dear Mr. Conen:
By letter dated December 13, 2004, the BWROG submitted NEDO-33160, Regulatory Relaxation for the Post Accident SRV Position Indication System to the U.S. Nuclear Regulatory Commission (NRC) staff for review. Enclosed for the BWROG review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.
Twenty working days are provided to you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Michelle Honcharik at 301-415-1774.
Sincerely,
/RA/
Juan D. Peralta, Acting Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691
Enclosure:
Draft SE cc w/encl: See next page
BWR Owners Group Project No. 691 cc:
Mr. Randy C. Bunt Vice Chairman, BWROG Southern Nuclear Operating Company Bin B057 P.O. Box 1295 Birmingham, AL 35201 Mr. J. A. Gray, Jr.
Regulatory Response Group Vice Chairman BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 Mr. H. Lewis Sumner Executive Chairman, BWROG Southern Nuclear Company 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35242 Mr. Thomas G. Hurst GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Amir Shahkarami Executive Vice Chairman, BWROG Exelon Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Mr. William A. Eaton Entergy P.O. Box 31995 Jackson, MS 39286 Mr. Al Wrape PPL Mail Code GENPL4 Two North Ninth Street Allentown, PA 18101 Mr. Richard Libra DTE Energy - Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 Mr. James F. Klapproth GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Kenneth Putnam Regulatory Response Group Chairman BWR Owners Group Nuclear Management Company Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 12/21/05
Mr. Joseph E. Conen, Chairman July 5, 2006 BWR Owners Group DTE Energy-Fermie 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166
SUBJECT:
DRAFT SAFETY EVALUATION FOR THE BOILING WATER REACTOR OWNERS GROUP (BWROG) TOPICAL REPORT (TR) NEDO-33160, REGULATORY RELAXATION FOR THE POST ACCIDENT SRV [SAFETY RELIEF VALVE] POSITION INDICATION SYSTEM (TAC NO. MC5446)
Dear Mr. Conen:
By letter dated December 13, 2004, the BWROG submitted NEDO-33160, Regulatory Relaxation for the Post Accident SRV Position Indication System to the U.S. Nuclear Regulatory Commission (NRC) staff for review. Enclosed for the BWROGs review and comment is a copy of the NRC staff's draft safety evaluation (SE) for the TR.
Twenty working days are provided to you to comment on any factual errors or clarity concerns contained in the SE. The final SE will be issued after making any necessary changes and will be made publicly available. The NRC staff's disposition of your comments on the draft SE will be discussed in the final SE.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Michelle Honcharik at 301-415-1774.
Sincerely,
/RA/
Juan D. Peralta, Acting Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691
Enclosure:
Draft SE cc w/encl: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter BMarcus RLobel GThomas GCranston RDennig ADAMS ACCESSION NO.: ML061810262
- No major changes to SE input.
NRR-106 OFFICE PSPB/PM PSPB/LA Tech Branch*
PSPB/BC(A)
NAME MHoncharik DBaxley AHowe JPeralta DATE 6/30/06 6/29/06 6/21/06 7/5/06 OFFICIAL RECORD COPY
DRAFT SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION TOPICAL REPORT (TR) NEDO-33160 "REGULATORY RELAXATION FOR THE POST ACCIDENT SRV [SAFETY RELIEF VALVE] POSITION INDICATION SYSTEM BOILING WATER REACTOR OWNERS GROUP (BWROG)
PROJECT NO. 691
1.0 INTRODUCTION AND BACKGROUND
1 2
By letter dated December 13, 2004 (Agencywide Documents Access and Management System 3
(ADAMS) Accession No. ML043510165), the BWROG submitted TR NEDO-33160, "Regulatory 4
Relaxation for the Post Accident SRV Indication System," for U.S. Nuclear Regulatory 5
Commission (NRC) staff review. The TR requested a change in category for SRV position 6
indication instrumentation, for boiling water reactors (BWRs), as classified by Regulatory Guide 7
(RG) 1.97, Revision 3, "Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess 8
Plant and Environs Conditions During and Following an Accident." The BWROG submitted 9
supplemental material in response to the NRC staff's request for additional information, by letter 10 dated October 31, 2005 (ADAMS Accession No. ML053110138).
11 12
2.0 REGULATORY EVALUATION
13 14 The primary purpose of Accident Monitoring Instrumentation is to display plant variables that 15 provide information required by the control room operator during accident situations. This 16 information provides the necessary support for the operator to take manual actions to initiate 17 safety systems and other appropriate systems important to safety.
18 19 Criterion 13 of Appendix A to Title 10 of the Code of Federal Regulations (10 CFR) Part 50 20 requires operating reactor licensees to provide instrumentation to monitor variables and 21 systems over their anticipated ranges for accident conditions as appropriate to ensure adequate 22 safety.
23 24 Criterion 19 of Appendix A of 10 CFR Part 50 requires operating reactor licensees to provide a 25 control room from which actions can be taken to maintain the nuclear power unit in a safe 26 condition under accident conditions, including loss-of-coolant accidents.
27 28 Section 50.34(f)(2)(xi) of 10 CFR requires plants to provide direct indication of relief and safety 29 valve position (open or closed) in the control room.
30 31 NUREG-0737, Clarification of TMI Action Plan Requirements, Item II.D.3 requires, "Reactor 32 coolant system relief and safety valves shall be provided with a positive indication in the control 33 room derived from a reliable valve-position detection device or a reliable indication of flow in the 1
discharge pipe."
2 3
RG 1.97 describes a method acceptable to the NRC staff for complying with the Commission's 4
regulations to provide instrumentation for monitoring plant variables and systems during and 5
after an accident. RG 1.97 groups these variables into five types, Types A, B, C, D, and E.
6 Type D variables provide the operator with information on the operation of individual safety 7
systems and other systems important to safety. Type D variables are to help the operator 8
make appropriate decisions in using the individual systems important to safety in mitigating the 9
consequences of an accident. For BWRs, RG 1.97 recommends that Type D key variables be 10 monitored by instrumentation that meets the Category 2 criteria. The Category 2 criteria 11 includes environmental qualification, augmented quality, and reliable power. In addition, 12 RG 1.97 recommends that Type D variables that provide backup information should meet the 13 Category 3 criteria. The Category 3 criteria includes high-quality commercial grade equipment 14 that is designed to withstand the specified service environment.
15 16
3.0 TECHNICAL EVALUATION
17 18 One of the RG 1.97 Type D systems is the main steam system. RG 1.97 recommends that 19 primary system SRV positions, including automatic depressurization system (ADS) or flow 20 through or pressure in valve lines (SRV position) is a key variable for providing detection of an 21 accident and boundary integrity indication for the main steam system and, therefore, should 22 meet the Category 2 criteria.
23 24 NEDO-33160 states that for BWRs, reactor pressure vessel (RPV) pressure and suppression 25 pool temperature instrumentation in combination with other instruments (e.g., RPV water level, 26 suppression pool level, containment pressure) satisfy the RG 1.97 accident detection and 27 boundary integrity indication purpose as specified in RG 1.97 for the SRV position variable.
28 This alternate instrumentation either meets or exceeds the Category 2 criteria. SRV position 29 indication instrumentation provides backup information and does not need to be classified as a 30 Category 2 variable. Therefore, NEDO-33160 recommends that, for BWRs, SRV position 31 indication should be reclassified as a Type D Category 3 variable.
32 33 NEDO-33160 states that the knowledge of SRV position is not used by the operator to make 34 appropriate decisions in using individual systems important to safety in mitigating the 35 consequences of an accident. SRVs are used as part of ADS whose successful indication of 36 performance of the safety function is the reduction of RPV pressure to enable use of low 37 pressure Emergency Core Cooling System (ECCS) to mitigate the consequences of an 38 accident. Other operator indications and requirements for ADS operation include an increase in 39 suppression pool water temperature, increase in suppression pool water level, and change in 40 RPV water level before the ADS will function. These other indications are included as RG 1.97 41 Category 1 or 2 variables, but the primary RG 1.97 variables are RPV pressure and 42 suppression pool water temperature. The operator would use SRV position indication as a 43 confirmation of SRV opening; however, this would be a backup to the main safety function for 44 ADS of reduction in RPV pressure to enable use of low pressure ECCS.
45 46 BWRs are specifically designed to depressurize the RPV during certain accident scenarios.
47 Depressurization allows the initiation of low pressure ECCS loops to provide core cooling. Low 48 pressure ECCS initiation and operation is independent of the causes for RPV depressurization 49 (e.g., line break or ADS actuation). ECCS initiation and operation are primarily based on RPV 1
water level, RPV dome pressure, containment pressure, and suppression pool temperature.
2 Knowledge of SRV position or its indication does not significantly affect automatic or manual 3
low pressure ECCS operation and thus does not affect short-term or long-term core cooling.
4 5
SRV position indication instrumentation provides direct indication of flow through a main steam 6
SRV. This can occur as a result of: (1) planned manual operation of the SRV under normal 7
operating conditions, (2) planned manual opening of the SRV under shutdown conditions 8
(i.e., pressure control), (3) primary reactor system pressure exceeding the SRV relief function 9
setpoint during power operation, (4) the effect of a system isolation and reactor shutdown, 10 (5) a spurious actuation of the valve while at power (i.e., stuck open SRV), or (6) manual or 11 automatic operation of the ADS function.
12 13 A review of the BWR Emergency Procedures Guidelines (EPGs) shows that suppression pool 14 temperature, not SRV position, is an entry condition for the EPGs.
15 16 Of the above six scenarios, only the usage of SRV position information, as it relates to 17 operation of the ADS function, is associated with an accident within the context of the guidance 18 of RG 1.97. The function of ADS is to provide the capability to reduce reactor pressure to allow 19 low pressure ECCS to function to provide core cooling.
20 21 While SRV position information provides positive indication of flow through SRVs, this 22 information is of secondary importance to the operator during ADS operation. Successful 23 indication of ADS actuation is provided by RPV pressure and suppression pool temperature.
24 Flow indication through SRVs does not provide the operator with a unique indication of ADS 25 actuation, a positive indication that an accident has occurred, or essential confirmation that an 26 accident mitigation has occurred.
27 28 Therefore, NEDO-33160 concludes that there is no event where SRV position indication is 29 relied upon for accident detection.
30 31 The NRC staff agrees with the NEDO-33160 conclusion that the RG 1.97 SRV position 32 indication does not perform or ensure a safety-related function. The purpose of SRV position 33 indication instrumentation is the detection of a stuck open SRV. This was the original intent of 34 the NUREG-0737 Item II.D.3 requirement for, "Reactor coolant system relief and safety relief 35 valves shall be provided with a positive indication in the control room derived from a reliable 36 valve-position detective device or a reliable indication of flow in the discharge pipe." Per the 37 requirements of NUREG-0737 Item II.D.3 and 10 CFR 50.34(f)(2)(xi), BWRs are required to 38 have instrumentation that will provide the operator with direct indication of SRV position.
39 40 Although licensees may reference NEDO-33160 as the basis for revising SRV position 41 indication from Type D Category 2 to Type D Category 3, they are still required to meet the 42 requirements of NUREG-0737 Item II.D.3 and 10 CFR 50.34(f)(2)(xi). Licensees will be 43 required to maintain SRV position indication in the control room consistent with these 44 requirements.
45 The reviewer's note in Technical Specification (TS) Table 3.3.3.1-1 of NUREG-1433 and 1
NUREG-1434 reads:
2 3
Table 3.3.3.1-1 shall be amended for each plant as necessary to list:
4 5
1.
All Regulatory Guide 1.97, Type A instruments and 6
2.
All Regulatory Guide 1.97, Category 1, non-Type A instruments specified in the 7
plant's Regulatory Guide 1.97, Safety Evaluation Report.
8 9
Therefore, if a BWR licensee has classified SRV position as a Type A variable, NEDO-33160, 10 would not be applicable for that plant and the licensee would be expected to maintain the TS 11 status of SRV position.
12 13 SRV position may be reclassified as a Type D Category 3 instrument provided there is alternate 14 instrumentation that provides the main steam system status for detection of an accident or 15 boundary integrity indication information.
16 17 For certain BWR plants the RG 1.97 SRV position information is provided by SRV discharge 18 pipe thermocouples. The information from SRV discharge pipe thermocouples can be used to 19 determine if an SRV is open or closed. Therefore, if the SRV discharge pipe thermocouples 20 meet the RG 1.97 Category 3 criteria, they may be used in lieu of SRV position indication to 21 meet the RG 1.97 function of SRV position indication.
22 23
4.0 CONCLUSION
24 25 Based on the above evaluation, the NRC staff concludes that the proposed change for SRV 26 position indication to Category 3 as detailed in NEDO-33160 is acceptable for BWR plants.
27 Licensees electing to adopt NEDO-33160 should perform a plant-specific review to determine 28 the applicability of NEDO-33160. This change in RG 1.97 category does not relieve licensees 29 from meeting the requirements of NUREG-0737 Item II.D.3 and 10 CFR 50.34(f)(2)(xi).
30 31
5.0 REFERENCES
32 33 1.
Letter from K. S. Putnam (BWROG) to US NRC, "BWR Owners' Group Licensing 34 Topical Report NEDO-33160, Regulatory Relaxation for the Post Accident SRV Position 35 Indication System," dated December 13, 2004 (ADAMS Accession No. ML043510165).
36 37 2.
Regulatory Guide 1.97, Revision 3, "Instrumentation for Light-Water-Cooled Nuclear 38 Power Plants to Assess Plant and Environs Conditions During and Following an 39 Accident," NRC Office of Nuclear Regulatory Research, dated May 1983 (ADAMS 40 Accession No. ML003740282).
41 42 3.
Letter from J. E. Conen (BWROG) to US NRC, "BWR Owners' Group SRV Position 43 Indication Committee Response to NRC's Request for Additional Information Regarding 44 Licensing Topical Report NEDO-33160, Regulatory Relaxation for the Post Accident 45 SRV Position Indication System," dated October 31, 2005 (ADAMS Accession 46 No. ML053110138).
47 48 4.
Part 50 of Title 10, Chapter 1 of the Code of Federal Regulations.
49 1
5.
NUREG-0737, "Clarification of TMI Action Plan Requirements," dated November 30, 2
1980 (ADAMS Accession No. ML051400209).
3 4
6.
NUREG-1433, Rev. 3, "Standard Technical Specification General Electric Plants, 5
BWR/4," dated June 2004 (ADAMS Accession No. ML041910194).
6 7
7.
NUREG-1434, Rev. 3, "Standard Technical Specification General Electric Plants, 8
BWR/6," dated June 2004 (ADAMS Accession No. ML041910204).
9 10 Principle Contributors: B. Marcus 11 G. Thomas 12 R. Lobel 13 14 Date: July 5, 2006 15