ML061800032

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendments 293 and 230 Regarding Technical Specification Change Request for Positive Reactivity Additions During Shutdown Operations
ML061800032
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/28/2006
From:
Plant Licensing Branch III-2
To:
Nerses V, NRR//DLPM, 415-1484
Shared Package
ML061770060 List:
References
TAC MC6379, TAC MC6380
Download: ML061800032 (51)


Text

INDEX BASES SECTION PAGE 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 COOLANT LOOPS AND COOLANT CIRCULATION .......................... B 3/4 4-1 3/4.4.2 SAFETY VALVES .................................................................................. B 3/4 4-le 3/4.4.3 RELIEF VALVES ...................................................................................... B 3/4 4-2 3/4.4.4 PRESSURIZER ....................................................................................... B 3/4 4-2a 3/4.4.5 STEAM GENERATORS ......................................................................... B 3/4 4-2a 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE ....................................... B 3/4 4-3 3/4.4.7 DELETED .................................................................................................. B 3/4 4-4 3/4.4.8 SPECIFIC ACTIVITY ............................................................................... B 3/4 4-4 3/4.4.9 PRESSURE/TEMPERATURE LIMITS .................................................... B 3/4 4-5 3/4.4.10 DELETED ................................................................................................ B 3/4 4-7c 3/4.4.11 DELETED .................................................................................................. B 3/4 4-8 3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3/4.5.1 SAFETY INJECTION TANKS ................................................................. B 3/4 5-1 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS ........................................................................ B 3/4 5-2 3/4.5.4 REFUELING WATER STORAGE TANK (RWST) ............................... B 3/4 5-2e 3/4.5.5 TRISODIUM PHOSPHATE (TSP) .......................................................... B 3/4 5-3 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT ................................................................. B 3/4 6-1 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS .............................. B 3/4 6-3 3/4.6.3 CONTAINMENT ISOLATION VALVES ............................................... B 3/4 6-3b 3/4.6.4 COMBUSTIBLE GAS CONTROL ........................................................... B 3/4 6-4 3/4.6.5 SECONDARY CONTAINMENT ............................................................. B 3/4 6-5 MILLSTONE - UNIT 2 XII Amendment No. 66,69, :-, 4.04, 4-53, 4-8-, 24-, 264,2-6, 294-, 292, 293

REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION HOT STANDBY LIMITING CONDITION FOR OPERATION 3.4.1.2 Two reactor coolant loops shall be OPERABLE and one reactor coolant loop shall be in operation.

NOTE All reactor coolant pumps may not be in operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:

a. no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1; and
b. core outlet temperature is maintained at least 10°F below saturation temperature.

APPLICABILITY: MODE 3.

ACTION: a. With one reactor coolant loop inoperable, restore the required reactor coolant loop to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. With no reactor coolant loop OPERABLE or in operation, immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1 and immediately initiate corrective action to return one required reactor coolant I

loop to OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS 4.4.1.2.1 The required reactor coolant pump, if not in operation, shall be determined to be OPERABLE once per 7 days by verifying correct breaker alignment and indicated power available.

4.4.1.2.2 One reactor coolant loop shall be verified to bein operation at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.2.3 Each steam generator secondary side water level shall be verified to be > 10% narrow range at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 2 3/4 4-1a Amendment No. 69, -249,293

REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION HOT SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.1.3 Two loops or trains consisting of any combination of reactor coolant loops or shutdown cooling trains shall be OPERABLE and one loop or train shall be in operation.

NOTES

1. All reactor coolant pumps and shutdown cooling pumps may not be in operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:
a. no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1; and
b. core outlet temperature is maintained at least 10°F below saturation temperature.
2. The following restrictions apply when starting the first reactor coolant pump and any RCS cold leg temperature is < 275 *F. The first reactor coolant pump shall not be started unless:
a. pressurizer water level is < 43.7%;
b. pressurizer pressure is < 340 psia; and
c. secondary water temperature in each steam generator is < 50°F above each RCS cold leg temperature.

APPLICABILITY: MODE 4 ACTION: a. With one reactor coolant loop AND two shutdown cooling trains inoperable:

Immediately initiate action to restore a second reactor coolant loop, or one shutdown cooling train to OPERABLE status.

b. With two reactor coolant loops AND one shutdown cooling train inoperable:

Immediately initiate action to restore a second shutdown cooling train, or one reactor coolant loop to OPERABLE status, and be in COLD SHUTDOWN within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c. With all reactor coolant loops AND shutdown cooling trains inoperable, OR no reactor coolant loop or shutdown cooling train in operation:

Immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1 and immediately initiate action to restore one reactor coolant loop or one shutdown cooling train to OPERABLE status and operation.

MILLSTONE - UNIT 2 3/4 4-1b Amendment No. 69, 24-, 249,293

REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION COLD SHUTDOWN - REACTOR COOLANT SYSTEM LOOPS FILLED LIMITING CONDTON FOR OPERATION 3.4.1.4 One shutdown cooling train shall be OPERABLE and in operation, and either:

a. One additional shutdown cooling train shall be OPERABLE; OR
b. The secondary side water level of each steam generator shall be > 10% narrow range.

NOTES

1. The normal or emergency power source may be inoperable in MODE 5.
2. All shutdown cooling pumps may not be in operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:
a. no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1; and
b. core outlet temperature is maintained at least 10°F below saturation temperature.
3. The following restrictions apply when starting the first reactor coolant pump and any RCS cold leg temperature is < 275°F. The first reactor coolant pump shall not be started unless:
a. pressurizer water level is < 43.7%;
b. pressurizer pressure is < 340 psia; and
c. secondary water temperature in each steam generator is < 50'F above each RCS cold leg temperature.
4. One required shutdown cooling train may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other shutdown cooling train is OPERABLE and in operation.
5. All shutdown cooling trains may not be in operation during planned heatup to MODE 4 when at least one reactor coolant loop is in operation.

MILLSTONE - UNIT 2 3/4 4-1d Amendment No. 249, 293

REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION COLD SHUTDOWN - REACTOR COOLANT SYSTEM LOOPS FILLED LIMITING CONDITION FOR OPERATION (continued) I APPLICABILITY: MODE 5 with Reactor Coolant System loops filled.

ACTION: a. With one shutdown cooling train inoperable and any steam generator secondary water level not within limits, immediately initiate action to either restore a second shutdown cooling train to OPERABLE status or restore steam generator secondary water levels to within limit.

b. With no shutdown cooling train OPERABLE or in operation, immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1 and immediately initiate action to restore one shutdown cooling train to I

OPERABLE status and operation.

SURVEILLANCE REQUIREMENTS 4.4.1.4.1 The required shutdown cooling pump, if not in operation, shall be determined OPERABLE once per 7 days by verifying correct breaker alignment and indicated power available.

4.4.1.4.2 The required steam generators shall be determined OPERABLE, by verifying the secondary side water level to be > 10% narrow range at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.3 One shutdown cooling train shall be verified to be in operation at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 2 3/4 4-1e Amendment No. 249, 293

REACTOR COOLANT SYSTEM COOLANT LOOPS AND COOLANT CIRCULATION COLD SHUTDOWN - REACTOR COOLANT SYSTEM LOOPS NOT FILLED LIMITING CONDITION FOR OPERATION 3.4.1.5 Two shutdown cooling trains shall be OPERABLE and one shutdown cooling train shall be in operation.

NOTES

1. The normal or emergency power source may be inoperable in MODE 5.
2. All shutdown cooling pumps may not be in operation for up to 15 minutes when switching from one train to another provided:
a. no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1;
b. core outlet temperature is maintained at least 10°F below saturation temperature; and
c. no draining operations to further reduce Reactor Coolant System water volume are permitted.
3. The following restrictions apply when starting the first reactor coolant pump and any RCS cold leg temperature is < 275"F. The first reactor coolant pump shall not be started unless:
a. pressurizer water level is < 43.7%;
b. pressurizer pressure is < 340 psia; and
c. secondary water temperature in each steam generator is < 50*F above each RCS cold leg temperature
4. One shutdown cooling train may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other shutdown cooling train is OPERABLE and in operation.

APPLICABILITY: MODE 5 with Reactor Coolant System loops not filled.

ACTION: a. With one shutdown cooling train inoperable, immediately initiate action to restore the required shutdown cooling train to OPERABLE status.

b. With no shutdown cooling train OPERABLE or in operation, immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1 and immediately initiate action to restore one shutdown cooling train to I

OPERABLE status and operation.

MILLSTONE - UNIT 2 3/4 4-1f Amendment No. 249, 293

ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. One circuit between the offsite transmission network and the onsite Class 1E distribution system, and
b. One diesel generator with a fuel oil supply tank containing a minimum of 12,000 gallons of fuel.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above minimum required A.C. electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could result in loss of required SDM or boron concentration, and movement of irradiated fuel assemblies.

SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillance Requirements 4.8.1.1.1 and 4.8.1.1.2, except for testing pursuant to Surveillance Requirements 4.8.1.1.2.a.3, 4.8.1..-2.c.2, 4.8.1.1.2.c.5, 4.8.1.1.2.c.6, 4.8.1.1.2.c.7, and 4.8.1.1.2.d.3.

MILLSTONE - UNIT 2 3/4 8-5 Amendment No. 49-7, 24, 24-7, 293

ELECTRICAL POWER SYSTEMS A.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE and energized from sources of power other than a diesel generator but aligned to an OPERABLE diesel generator:

1 - 4160 volt Emergency Bus 1 - 480 volt Emergency Load Center 2 - 120 volt A.C. Vital Busses APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above complement of A.C. busses OPERABLE and energized, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could result in loss of required SDM or boron concentration, and movement of irradiated fuel assemblies.

SURVEILLANCE REQUIREMENTS 4.8.2.2 The specified A.C. busses shall be determined OPERABLE and energized from normal A.C. sources at least once per 7 days by verifying correct breaker alignment and indicated power availability.

MILLSTONE - UNIT 2 3/48g-7 Amendment No. +9-7, 293

ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.4 One 125 - volt D.C. bus train electrical power subsystem shall be OPERABLE:

APPLICABILITY: MODES 5 and 6.

ACTION:

With no 125-volt D.C. bus trains OPERABLE, suspend all operations involving CORE ALTERATIONS and positive reactivity additions that could result in loss of required SDM or boron concentration, and movement of irradiated fuel assemblies. I SURVEILLANCE REQUIREMENTS 4.8.2.4.1 The above required 125-volt D.C. bus train shall be determined OPERABLE at least once per 7 days by verifying correct breaker alignment and indicated power availability.

4.8.2.4.2 The above required 125-volt D.C. bus train battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.

MILLSTONE - UNIT 2 3/4 8-10 Amendment No. 4-80, -97, 2*79,293

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATIONS LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained sufficient to ensure that the more restrictive of following reactivity conditions is met:

a. Either a Keff of0.95 or less, or
b. A boron concentration of greater than or equal to 1720 ppm.

APPLICABILITY: MODE 6.

NOTE Only applicable to the refueling canal when connected to the Reactor Coolant System ACTION:

With the requirements of the above specification not satisfied, within 15 minutes suspend all operations involving CORE ALTERATIONS and positive reactivity additions and initiate and I continue boration at greater than or equal to 40 gpm of boric acid solution at or greater than the required refueling water storage tank concentration (ppm) until Keff is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 1720 ppm, whichever is the more restrictive.

SURVEILLANCE REQUIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to:

a. Removing or unbolting the reactor vessel head, and
b. Withdrawal of any CEA in excess of 3 feet from its fully inserted position within the reactor pressure vessel.

4.9.1.2 The boron concentration of all filled portions of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

4.9.1.3 Deleted MILLSTONE - UNIT 2 3/4 9-1 Amendment No. 201-, 263, M, 293

REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 Two source range neutron flux monitors shall be OPERABLE, each with continuous visual indication in the control room and one with audible indication in the containment, and control room.

APPLICABILITY: MODE 6.

ACTION:

a. With one of the above required monitors inoperable, immediately suspend all operations involving CORE ALTERATIONS and operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.
b. With both of the above required monitors inoperable, immediately initiate action to restore one monitor to OPERABLE status. Additionally, determine that the boron concentration of the Reactor Coolant System satisfies the requirements of LCO 3.9.1 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

SURVEILLANCE REQUIREMENTS.

4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:

a. Deleted
b. A CHANNEL CALIBRATION at least once per 18 months*
c. A CHANNEL CHECK and verification of audible counts at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Neutron detectors are excluded from CHANNEL CALIBRATION.

MILLSTONE - UNIT 2 3/4 9-2 Amendment No. 2-6-3, 293

REFUELING OPERATIONS SHUTDOWN COOLING AND COOLANT CIRCULATION - HIGH WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.1 One shutdown cooling train shall be OPERABLE and in operation.

NOTE

1. The required shutdown cooling train may not be in operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided no operations are permitted that would cause introduction of coolant into the Reactor Coolant System with boron concentration less than that required to meet the minimum required boron concentration of LCO 3.9-1.
2. The normal or emergency power source may be inoperable for the required shutdown cooling train.
3. The shutdown cooling pumps may be removed from operation during the time required for local leak rate testing of containment penetration number 10 or to permit maintenance on valves located in the common SDC suction line, provided:
a. No operations are permitted that would cause reduction of the Reactor Coolant System boron concentration,
b. CORE ALTERATIONS are suspended, and
c. Containment penetrations are in the following status:
1) The equipment door is closed and secured with at least four bolts; and
2) At least one personnel airlock door is closed; and
3) Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be closed with a manual or automatic isolation valve, blind flange, or equivalent.

APPLICABILITY: MODE 6 with the water level > 23 feet above the top of the reactor vessel flange.

MILLSTONE - UNIT 2 3/4 9-8 Amendment No. 69, 7-4, 249, 2-84, 293

REFUELING OPERATIONS SHUTDOWN COOLING AND COOLANT CIRCULATION - HIGH WATER LEVEL LIMITING CONDITION FOR OPERATION ACTION:

With no shutdown cooling train OPERABLE or in operation, perform the following actions:

a. Immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1 and the loading of irradiated fuel assemblies in the core; and
b. Immediately initate action to restore one shutdown cooling train to OPERABLE status and operation; and
c. Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> place the containment penetrations in the following status:
1. Close the equipment door and secure with at least four bolts; and
2. Close at least one personnel airlock door; and
3. Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be closed with a manual or automatic isolation valve, blind flange, or equivalent.

SURVEILLANCE REQUIREMENTS 4.9.8.1 One shutdown cooling train shall be verified to be in operation and circulating reactor coolant at a flow rate greater than or equal to 1000 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 2 3/4 9-8a Amendment No. 4, 4-85, 249, -284, 293

REFUELING OPERATIONS SHUTDOWN COOLING AND COOLANT CIRCULATION - LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two shutdown cooling trains shall be OPERABLE and one shutdown cooling train shall be in operation.

APPLICABILI[TY: MODE 6 with the water level < 23 feet above the top of the reactor vessel flange.

ACTION: a With one shutdown cooling train inoperable, immediately initiate action to restore the shutdown cooling train to OPERABLE status OR immediately initiate action to establish Ž 23 feet of water above the top of the reactor vessel flange.

b. With no shutdown cooling train OPERABLE or in operation, perform the following actions:
1. Immediately suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1; and
2. Immediately initiate action to restore one shutdown cooling train to OPERABLE status and operation; and
3. Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> place the containment penetrations in the foUowing status:
a. Closed the equipment door and secure with at least four bolts; and
b. Close at least one personnel airlock door; and MILLSTONE - UNIT 2 3/4 9-8b Amendment No. -249,-284, 293

REFUELING OPERATIONS SHUTDOWN COOLING AND COOLANT CIRCULATION - LOW WATER LEVEL LIMITING CONDITION FOR OPERATION (continued)

c. Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be closed with a manual or automatic isolation valve, blind flange, or equivalent.

SURVEILLANCE REQUIREMENTS 4.9.8.2.1 One shutdown cooling train shall be verified to be in operation and circulating reactor coolant at a flow rate greater than or equal to 1000 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.9.8.2.2 The required shutdown cooling pump, if not in operation, shall be determined OPERABLE once per 7 days by verifying correct breaker alignment and indicated power available.

MILLSTONE - UNIT 2 3/4 9-8c Amendment No-291

3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.1 COOLANT LOOPS AND COOLANT CIRCULATION (continued)

During some transient conditions, such as heatups on SDC, the value calculated by this average definition will be slightly higher than the actual core average. During other transients, such as cooldowns where SG heat removal is still taking place causing some natural circulation flow, the value calculated by the average definition will be slightly lower than actual core average conditions. For the purpose of determining MODE changes and technical specification applicability, these transient condition results are conservative.

The Notes in LCOs 3.4.1.2, 3.4.1.3, 3.4.1.4, and 3.4.1.5 permit a limited period ofoperation without RCPs and shutdown cooling pumps. All RCPs and shutdown cooling pumps may be removed from operation for < 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period. This means that natural circulation has been established. When in natural circulation, a reduction in boron concentration with coolant at boron concentrations less than required to assure the SDM of LCO 3.1.1.1 is maintained is prohibited because an even concentration distribution throughout the RCS cannot be ensured.

Core outlet temperature is to be maintained at least 10F below the saturation temperature so that no vapor bubble may form and possibly cause a natural circulation flow obstruction.

Concerning TS 3.4.1.2, ACTION b.; 3.4.1.3, ACTION c.; 3.4.1.4, ACTION b.; and 3.4.1.5, ACTION b., if two required loops or trains are inoperable or a required loop or train is not in operation except during conditions permitted by the note in the LCO section, all operations involving introduction of coolant into the RCS with boron concentration less than required to meet the minimum SDM of LCO 3.1.1.1 must be suspended and action to restore one RCS loop or SDC train to OPERABLE status and operation must be initiated. The required margin to criticality must not be reduced in this type of operation. Suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1.1 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations.

The immediate completion times reflect the importance of decay heat removal. The ACTION to restore must continue until one loop or train is restored to operation.

Technical Specification 3.4.1.6 limits the number of reactor coolant pumps that may be operational during MODE 5. This will limit the pressure drop across the core when the pumps are operated during low-temperature conditions. Controlling the pressure drop across the core will maintain maximum RCS pressure within the maximum allowable pressure as calculated in Code Case No. N-514. Limiting two reactor coolant pumps to operate when the RCS cold leg temperature is less than 1200 F, will ensure that the requirements of 10 CFR 50 Appendix G are not exceeded. Surveillance 4.4.1.6 supports this requirement.

MILLSTONE - UNIT 2 B 3/4 4-id Amendment No. 5G, 66,69,439, 4-8-s, 24-, 249, 293

3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.2 SAFETY VALVES The pressurizer code safety valves operate to prevent the RCS from being pressurized above its Safety Limit of 2750 psia. Each safety valve is designed to relieve 296,000 lbs per hour of saturated steam at the valve setpoint. The relief capacity of a single safety valve is adequate to relieve any overpressure condition which could occur during shutdown. If any pressurizer code safety valve is inoperable, and cannot be restored to OPERABLE status, the ACTION statement requires the plant to be shut down and cooled down such that Technical Specification 3.4.9.3 will become applicable and require the Low Temperature Overpressure Protection System to be placed in service to provide overpressure protection MILLSTONE - UNIT 2 B 3/4 4-1e Amendment No.2931

3/4.8 ELECTRICAL POWER SYSTEMS BASES The OPERABILITY ofthe minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or REFUELING condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status. If the required power sources or distribution systems are not OPERABLE in MODES 5 and 6, operations involving CORE ALTERATIONS, positive reactivity additions, or movement of irradiated fuel assemblies are required to be suspended. Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC and DC electrical power source or distribution subsystems and to continue this action until restoration is accomplished in order to provide the necessary power to the unit safety systems.

Each 125-volt D.C. bus train consists of its associated 125-volt D.C. bus, a 125-volt D.C. battery bank, and a battery charger with at least 400 ampere charging capacity. To demonstrate OPERABILITY of a 125-volt D.C. bus train, these components must be energized and capable of performing their required safety functions. Additionally, at least one tie breaker between the 125-volt D.C. bus trains must be open for a 125-volt D.C. bus train to be considered OPERABLE.

Footnote (a) to Technical Specification Tables 4.8-1 and 4.8-2 permits the electrolyte level to be above the specified maximum level for the Category A limits during equalizing charge, provided it is not overflowing. Because of the internal gas generation during the performance of an equalizing charge, specific gravity gradients and artificially elevated electrolyte levels are produced which may exist for several days following completion of the equalizing charge. These limits ensure that the plates suffer no physical damage, and that adequate electron transfer capability is maintained in the event of transient conditions. In accordance with the recommendations of IEEE 450-1980, electrolyte level readings should be taken only after the battery has been at float charge for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Based on vendor recommendations and past operating experience, seven (7) days has been determined a reasonable time frame for the 125-volt D.C. batteries electrolyte level to stabilize and to provide sufficient time to verify battery electrolyte levels are with in the Category A limits.

MILLSTONE - UNIT 2 B 3/4 8-1o Amendment No. 499, 49-2 134, 249, 264-,2*-7,2479, 293

3/4.8 ELECTRICAL POWER SYSTEMS BASES Footnote (b) to Technical Specification Tables 4.8-1 and 4.8-2 requires that level correction is not required when battery charging current is < 5 amps on float charge. This current provides, in general, an indication of overall battery condition.

Footnote (c) to Technical Specification Tables 4.8-1 and 4.8-2 states that level correction is not required when battery charging current is < 5 amps on float charge. This current provides, in general, an indication of overall battery condition. Because of specific gravity gradients that are produced during the recharging process, delays of several days may occur while waiting for the specific gravity measurement for determining the state of charge. This footnote allows the float charge current to be used as an alternative to specific gravity to show OPERABILITY of a battery for up to seven (7) days following the completion of a battery equalizing charge. Each connected cells specific gravity must be measured prior to expiration of the 7 day allowance.

Surveillance Requirements 4.8.2.3.2.c. 1 and 4.8.2.5.2.c.1 provide for visual inspection of the battery cells, cell plates, and battery racks to detect any indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

The non-safety grade 125V D.C. Turbine Battery is required for accident mitigation for a main steam line break within containment with a coincident loss of a vital D.C. bus. The Turbine Battery provides the alternate source of power for Inverters 1 & 2 respectively via non-safety grade Inverters 5 & 6. For the loss of a D.C. event with a coincident steam line break within containment, the feedwater regulating valves are required to close to ensure containment design pressure is not exceeded.

The Turbine Battery D.C. electrical power subsystem consists of 125-volt D.C. bus 201D and 125-volt D.C. battery bank 201D. To demonstrate OPERABILITY of this subsystem, these components must be energized and capable of performing their required safety functions.

MILLSTONE - UNIT 2 B 3/4 8-lp Amendment No. 4+88,-+92, 23-,248, 2-6,4-7-7, 4279,293

3/4.9 REFUELING OPERATIONS BASES 3/4.9 REFUELING OPERATIONS The ACTION requirements to immediately suspend various activities (CORE ALTERATIONS, fuel movement, CEA movement, etc.) do not preclude completion of the movement of a component to a safe position.

3/4.9.1 BORON CONCENTRATION The limitations on reactivity conditions during REFUELING ensure that: 1) the reactor will remain subcritical during CORE ALTERATIONS, and 2) sufficient boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel.

These limitations are consistent with the initial conditions assumed for the boron dilution incident in the accident analyses. Reactivity control in the water volume having direct access to the reactor vessel is achieved by determining boron concentration in the refueling canal. The refueling canal is defined as the entire length of pool stretching from refuel pool through transfer canal to spent fuel pool.

The applicability is modified by a Note. The Note states that the limits on boron concentration are only applicable to the refueling canal when this volume is connected to the Reactor Coolant System (RCS). When the refueling canal is isolated from the RCS, no potential path for boron dilution exists. Prior to reconnecting portions of the refueling canal to the RCS, Surveillance 4.9.1.2 must be met. If any dilution activity has occurred while the refueling canal was disconnected from the RCS, this surveillance ensures the correct boron concentration prior to communication with the RCS.

Concerning the ACTION statement, operations that individually add limited positive reactivity (e.g., temperature fluctuations from inventory addition or temperature control fluctuations), but when combined with all other operations affecting core reactivity (e.g., intentional boration) result in overall net negative reactivity addition, are not precluded by this ACTION.

3/4.9.2 INSTRUMENTATION The OPERABILITY of the source range neutron flux monitors ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core.

Concerning ACTION a., with only one SRM OPERABLE, redundancy has been lost. Since these instruments are the only direct means of monitoring core reactivity conditions, CORE ALTERATIONS and introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1 must be suspended immediately.

Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required.to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that which would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Performance of ACTION a. shall not preclude completion of movement of a component to a safe position.

MILLSTONE - UNIT 2 B 3/4 9-1 Amendment No. 7, -144, 4-50, 24, 24-5, 2*3, 293

REFUELING OPERATIONS BASES 3/4.9.8 SHUTDOWN COOLING AND COOLANT CIRCULATION (Continued) a refueling outage until after the completion of the fuel shuffle such that approximately one third of the reactor core will contain new fuel. By waiting until the completion of the fuel shuffle, sufficient time (at least 14 days from reactor shutdown) will have elapsed to ensure the limited SDC flow rate specified for this alternate lineup will be adequate for decay heat removal from the reactor core and the spent fuel pool. In addition, CORE ALTERATIONS shall be suspended when using this alternate flow path, and this flow path should only be used for short time periods, approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If the alternate flow path is expected to be used for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or the decay heat load will not be bounded as previously discussed, further evaluation is required to ensure that this alternate flow path is acceptable.

These alternate lineups do not affect the OPERABILITY of the SDC train. In addition, these alternate lineups will satisfy the requirement for a SDC train to be in operation if the minimum required SDC flow through the reactor core is maintained.

In MODE 6, with the refueling cavity filled to >_23 feet above the reactor vessel flange, both SDC trains may not be in operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in each 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1. Boron concentration reduction with coolant at boron concentrations less than required to assure the RCS boron concentration is maintained is prohibited because uniform concentration distribution cannot be ensured without forced circulation. This permits operations such as core mapping or alterations in the vicinity of the reactor vessel hot leg nozzles, and RCS to SDC isolation valve testing. During this 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, decay heat is removed by natural convection to the large mass of water in the refueling pool.

In MODE 6, with the refueling cavity filled to Ž 23 feet above the reactor vessel flange, both SDC trains may also not be in operation for local leak rate testing of the SDC cooling suction line (containment penetration number 10) or to permit maintenance on valves located in the common SDC suction line. This will allow the performance of required maintenance and testing that otherwise may require a full core offload. In addition to the requirement prohibiting operations that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1, CORE ALTERATIONS are suspended and all containment penetrations providing direct access from the containment atmosphere to outside atmosphere must be closed. The containment purge valves are containment penetrations and must satisfy all requirements specified for a containment penetration. No time limit is specified to operate in this configuration. However, factors such as scope of the work, decay heat load/heatup rate, and RCS temperature should be considered to determine if it is feasible to perform the work. Prior to using this provision, a review and approval of the evolution by the SORC is required. This review will evaluate current plant conditions and the proposed work to determine if this provision should MILLSTONE - UNIT 2 B 3/4 9-2a Amendment No. 69, ;4, 44, 4-8, 2440, 245, 209, -M4, 293

REFUELING OPERATIONS BASES 3/4,9.8 SHUTDOWN COOLING AND COOLANT CIRCULATION (Continued) be used, and to establish the termination criteria and appropriate contingency plans. During this period, decay heat is removed by natural convection to the large mass of water in the refueling pool.

The requirement that at least one shutdown cooling loop be in operation at >- 1000 gpm ensures that (1) sufficient cooling capacity is available to remove decay heat and maintain the water in the reactor pressure vessel below 140*F as required during the REFUELING MODE, (2) sufficient coolant circulation is maintained through the reactor core to minimize the effects of a boron dilution incident and prevent boron stratification, and (3) is consistent with boron dilution analysis assumptions. The 1000 gpm shutdown cooling flow limit is the minimum analytical limit. Plant operating procedures maintain the minimum shutdown cooling flow at a higher value to accommodate flow measurement uncertainties.

Average Coolant Temperature (Tavg) values are derived under shutdown cooling conditions, using the designated formula for use in Unit 2 operating procedures.

SDC flow greater than 1000 gpm: (SDCoutiet + SDCiniet) / 2 = Tavg During SDC only operation, there is no significant flow past the loop RTDs. Core inlet and outlet temperatures are accurately measured during those conditions by using T35 1Y, SDC return to RCS temperature indication, and T35 lX, RCS to SDC temperature indication. The average of these two indicators provides a temperature that is equivalent to the average RCS temperature in the core.

T35 IX will not be available when using the alternate SDC suction flow path from the SFP.

Substitute temperature monitoring capability shall be established to provide indication of reactor core outlet temperature. A portable temperature device can be used to indicate reactor core outlet temperature. Indication of reactor core outlet temperature from this temporary device shall be readily available to the control room personnel. A remote television camera or an assigned individual are acceptable alternative methods to provide this indication to control room personnel.

3/4.9.9 AND 3/4.9.10 DELETED 3/4.9.11 AND 3/4.9.12 WATER LEVEL-REACTOR VESSEL AND STORAGE POOL WATER LEVEL The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly. The minimum water depth is consistent with the assumptions of the accident analysis.

MILLSTONE - UNIT 2 B 3/4 9-2b Amendment No. 69, 4, 44-7, , 240, 24-S, -249, 293

INDEX BASES SECTION PAGE 3/4.7.11 DELETED .................................................................................................... B 3/4 7-25 3/4.7.12 DELETED 3/4.7.13 DELETED 3/4.7.14 AREA TEMPERATURE MONITORING .................................................... B 3/4 7-25 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1, 3/4.8.2 and 3/4.8.3 A.C. SOURCES D.C. SOURCES, AND

' 4SITE POWER DISTRIBUTIO 6N....... . ............

.. B 3/4 8-1 3/4.8.4 DELETED ...................................................................................................... B 3/4 8-3 3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION ......................................................................... B 3/4 9-1 3/4.9.2 INSTRUMENTATION .................................................................................. B 3/4 9-la 3/4.9.3 DECAY TIME ............................................................................................... B 3/4 9-la 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS ........................................ B 3/4 9-lb 3/4.9.5 DELETED ..................................................................................................... B 3/4 9-2a 3/4.9.6 DELETED ..................................................................................................... B 3/4 9-2a 3/4.9.7 DELETED ..................................................................................................... B 3/4 9-2a 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION ........... B 3/4 9-2a 3/4.9.9 DELETED ....................................................................................................... B 3/4 9-7 3/4.9.10 and 3/4.9.11 WATER LEVEL - REACTOR VESSEL AND STORAGE POOL ............................................................................................ B 3/4 9-8 3/4.9.12 DELETED ...................................................................................................... B 3/4 9-8 3/4.9.13 SPENT FUEL POOL - REACTIVITY ........................................................... B 3/4 9-9 3/4.9.14 SPENT FUEL POOL - STORAGE PATTERN ............................................... B 3/4 9-9 3/4.10 SPECIAL TEST EXCEPTIONS 3/4.10.1 SHUTDOWN MARGIN .............................................................................. B 3/4 10-1 3/4.10.2 GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION LIMITS ......................................................................................................... B 3/4 10-1 3/4.10.3 PHYSICS TESTS .......................................................................................... B 3/4 10-1 3/4.10.4 REACTOR COOLANT LOOPS ...................... B 3/4 10-1 3/4.10.5 DELETED ..................................................................................................... B 3/4 10-1 MILLSTONE - UNIT 3 xv Amendment No. 84,,89,400, W,44-9, 436,4.-9,4-9-?, -27,244,24-9, -2q , 230

TABLE 3.3-1 (Continued)

ACTION STATEMENTS (Continued)

ACTION 3 - With the number of channels OPERABLE one less than the Minimum Channels OPERABLE requirement and with the THERMAL POWER level:

a. Below the P-6 (Intermediate Range Neutron Flux Interlock)

Setpoint, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint, and

b. Above the P-6 (Intermediate Range Neutron Flux Interlock)

Setpoint but below 10% of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 10% of RATED THERMAL POWER.

ACTION 4 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, suspend all operations involving positive reactivity additions.* I ACTION 5 - (Not used)

ACTION 6 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.

ACTION 7 - (Not used)

ACTION 8- With less than the Minimum Number of Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

Limited plant cooldown or boron dilution is allowed provided the change is accounted for in the calculated SDM. I MILLSTONE - UNIT 3 3/4 3-6 Amendment No. -, 6- , -3,4-64,230

INSTRUMENTATION 3/4.3.5 SHUTDOWN MARGIN MONITOR LIMITING CONDITION FOR OPERATION 3.3.5 Two channels of Shutdown Margin Monitors shall be OPERABLE

a. With a minimum count rate as designated in the CORE OPERATING LIMITS REPORT (COLR), or
b. If the minimum count rate in Specification 3.3.5.a cannot be met, then the Shutdown Margin Monitors may be made OPERABLE with a lower minimum count rate, as specified in the COLR, by borating the Reactor Coolant System above the requirements of Specification 3-1.1.1.2 or 3.1.1.2. The additional boration shall be:
1. A minimum of 150 ppm above the SHUTDOWN MARGIN requirements specified in the COLR for MODE 3, or
2. A minimum of 350 ppm above the SHUTDOWN MARGIN requirements specified in the COLR for MODE 4, MODE 5 with RCS loops filled, and MODE 5 with RCS loops not filled.

APPLICABILITY: MODES 3*, 4, and 5.

ACTION:

a. With one Shutdown Margin Monitor inoperable, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. With both Shutdown Margin Monitors inoperable or one Shutdown Margin Monitor inoperable for greater than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, immediately suspend all operations involving positive reactivity additions"t via dilution and rod withdrawal. Verify the valves listed in Specification 4-1.1-2.2 are closed and secured in position within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once per 14 days thereafter.*** Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1.2 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
  • The shutdown margin monitors may be blocked during reactor startup in accordance with approved plant procedures.
    • Plant temperature changes are allowed provided the temperature change is accounted for in the calculated SDM.
  • The valves may be opened on an intermittent basis under administrative controls as noted in Surveillance 4.1.1.2.2.

MILLSTONE - UNIT 3 3/4 3-82 Amendment No. 1-64, 24-7, -8, 2-249, 230

REACTOR COOLANT SYSTEM HOT STANDBY LIMITING CONDITION FOR OPERATION 3.4.1.2 At least three of the reactor coolant loops listed below shall be OPERABLE, with at least three reactor coolant loops in operation when the Control Rod Drive System is capable of rod withdrawal or with at least one reactor coolant loop in operation when the Control Rod Drive System is not capable of rod withdrawal:*

a. Reactor Coolant Loop 1 and its associated steam generator and reactor coolant pump,
b. Reactor Coolant Loop 2 and its associated steam generator and reactor coolant pump, C. Reactor Coolant Loop 3 and its associated steam generator and reactor coolant pump, and
d. Reactor Coolant Loop 4 and its associated steam generator and reactor coolant pump.

APPLICABILITY: MODE 3.

ACTION:

a. With less than the above required reactor coolant loops OPERABLE, restore the required loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. With less than the above required reactor coolant loops in operation and the Control Rod Drive System is capable of rod withdrawal, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> open the Reactor Trip System breakers.
c. With no reactor coolant loop in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1.2 and immediately initiate corrective action to return the required reactor coolant loop to operation.
  • All reactor coolant pumps may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided:

(1) no operations are permitted that would cause introductionof coolant into the RCS with boron concentration less than required to meet the SDM ofLCO 3.1.1.1.2, and (2) core outlet temperature is maintained at least 10F below saturation temperature.

MILLSTONE - UNIT 3 3/4 4-2 Amendment No. 60, 4-9-7, 230

REACTOR COOLANT SYSTEM HOT STANDBY SURVEILLANCE REQUIREMENTS 4.4.1.2.1 At least the above required reactor coolant pumps, if not in operation, shall be determined OPERABLE once per 7 days by verifying correct breaker alignments and indicated power availability.

4.4.1.2.2 The required steam generators shall be determined OPERABLE by verifying secondary side water level to be greater than or equal to 17% at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4A.1.2.3 The required reactor coolant loops shall be verified in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 3 3/4 4-2a .Amendment No. 23ý

REACTOR COOLANT SYSTEM HOT SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.1.3 Either: *, **

a. With the Control Rod Drive System capable of rod withdrawal, at least two RCS loops shall be OPERABLE and in operation, or
b. With the Control Rod Drive System not capable of rod withdrawal, at least two loops consisting of any combination of RCS loops and residual heat removal (RHR) loops shall be OPERABLE, and at least one of these loops shall be in operation. For RCS loop(s) to be OPERABLE, at least one reactor coolant pump (RCP) shall be in operation.

APPLICABILITY: MODE 4.

ACTION:

a. With less than the above required loops OPERABLE, immediately initiate corrective action to return the required loops to OPERABLE status as soon as possible; if the remaining OPERABLE loop is an RHR loop, be in COLD SHUTDOWN within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
  • All reactor coolant pumps and RHR pumps maybe deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1.2, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
    • The first reactor coolant pump shall not be started when any RCS loop wide range cold leg temperature is < 226°F unless:
a. Two pressurizer PORVs are in service to meet the cold overpressure protection requirements of Technical Specification 3.4.9.3 and the secondary side water temperature of each steam generator is < 50°F above each RCS cold leg temperature; OR
b. The secondary side water temperature of each steam generator is at or below each RCS cold leg temperature.

This restriction only applies to RCS loops and associated components that are not isolated from the reactor vessel.

NULLSTONE - UNIT 3 3/4 4-3 Amendment No. 7, 4-57, --9-, 230

REACTOR COOLANT SYSTEM HOT SHUTDOWN LIMITING CONDITION FOR OPERATION (continued)

b. With less than the above required reactor coolant loops in operation and the Control Rod Drive System is capable of rod withdrawal, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> open the Reactor Trip System breakers.
c. With no loop in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1.2 and immediately initiate corrective action to return the required loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.3.1 - The required pump(s), if not in operation, shall be determined OPERABLE once per 7 days by verifying correct breaker alignments and indicated power availability.

4.4.1.3.2 The required steam generator(s) shall be determined OPERABLE by verifying secondary side water level to be greater than or equal to 17% at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.3.3 The required loop(s) shall be verified in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

MILLSTONE - UNIT 3 3/44-4 Amendment No. 44-5, 4+9-, 230

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS FILLED LIMITING CONDITION FOR OPERATION 3.4.1.4.1 At least one residual heat removal (RHR) loop shall be OPERABLE and in operation*, and either:

a. One additional RHR loop shall be OPERABLE**, or
b. The secondary side water level of at least two steam generators shall be greater than 17%.

APPLICABILITY: MODE 5 with at least two reactor coolant loops filled***.

  • a. The RHR pump may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1.2, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
b. All RHR loops may be removed from operation during a planned heatup to MODE 4 when at least one RCS loop is OPERABLE and in operation and when two additional steam generators are OPERABLE as required by LCO 3.4.1.4.1.b.
    • One RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other RHR loop is OPERABLE and in operation.
a. Any RCS loop wide range cold leg temperature is > 150'F unless:
1. Two pressurizer PORVs are in service to meet the cold overpressure protection requirements of Technical Specification 3.4.9.3 and the secondary side water temperature of each steam generator is < 50°F above each RCS cold leg temperature; OR
2. The secondary side water temperature of each steam generator is at or below each RCS cold leg temperature.
b. All RCS loop wide range cold leg temperatures are < 150°F unless the secondary side water temperature of each steam generator is < 50*F above each RCS cold leg temperature.

This restriction only applies to RCS loops and associated components that are not isolated from the reactor vessel.

MILLSTONE - UNIT 3 3/4 4-5 Amendment No. 4-7, 4-9-,230

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS FILLED LIMITING CONDITION FOR OPERATION ACTION:

a. With less than the required RHR loop(s) OPERABLE or with less than the required steam generator water level, immediately initiate corrective action to return the inoperable RHR loop to OPERABLE status or restore the required steam generator water level as soon as possible.
b. With no RHR loop in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1.2 and immediately initiate corrective action to return the required RHR loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.4.1.1 The secondary side water level of at least two steam generators when required shall be determined to be within limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.1.2 At least one RHR loop shall be determined to be in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.1.3 The required pump, if not in operation, shall be determined OPERABLE once per 7 days by verifying correct breaker alignment and indicated power availability.

MILLSTONE - UNIT 3 3/4 4-5a Amendment No. 4-57, 49-, 230

REACTOR COOLANT SYSTEM COLD SHUTDOWN - LOOPS NOT FILLED LIMITING CONDITION FOR OPERATION 3.4.1.4.2 Two residual heat removal (RHR) loops shall be OPERABLE* and at least one RHR loop shall be in operation.**

APPLICABILITY: MODE 5 with less than two reactor coolant loops filled***.

ACTION:

a. With less than the above required RHR loops OPERABLE, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.
b. With no RHR loop in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet SDM of LCO 3.1.1.1.2 and immediately initiate corrective action to return the required RHR loop to operation.
  • One RHR loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other RHR loop is OPERABLE and in operation.
    • The RHR pump may be deenergized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided: (1) no operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SDM of LCO 3.1.1.1.2, and (2) core outlet temperature is maintained at least 10°F below saturation temperature.
a. Any RCS loop wide range cold leg temperature is > 150'F unless:
1. Two pressurizer PORVs are in service to meet the cold overpressure protection requirements of Technical Specification 3.4.9.3 and the secondary side water temperature of each steam generator is < 50'F above each RCS cold leg temperature; OR
2. The secondary side water temperature of each steam generator is at or below each RCS cold leg temperature.
b. All RCS loop wide range cold leg temperatures are < 150'F unless the secondary side water temperature of each steam generator is < 50'F above each RCS cold leg temperature.

This restriction only applies to RCS loops and associated components that are not isolated from the reactor vessel.

MILLSTONE - UNIT 3 3/4 4-6 Amendment No. 6G, 99, -- , 4-9-, 230

A. C. SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A. C. electrical power sources shall be OPERABLE:

a. One circuit between the offsite transmission network and the Onsite Class 1E Distribution System, and
b. One diesel generator with:
1) A day tank containing a minimum volume of 278 gallons of fuel,
2) A fuel storage system containing a minimum volume of 32,760 gallons of fuel,
3) A fuel transfer pump,
4) Lubricating oil storage containing a minimum total volume of 280 gallons of lubricating oil, and
5) Capability to transfer lubricating oil from storage to the diesel generator unit.

APPLICABILITY: MODES 5 and 6.

ACTION:

With less than the above minimum required A. C. electrical power sources OPERABLE, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity additions that could result in loss of required SDM or boron concentration, movement of irradiated fuel, crane operation with loads over the fuel storage pool, or operation with a potential for draining the reactor vessel; initiate corrective action to restore the required sources to OPERABLE status as soon as possible.

SURVEILLANCE REQUIREMENT 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1, 4.8.1.1.2 (except for Specifications 4.8.1.1.2.a.6 and 4.8.1.1.2.b.2).

MILLSTONE - UNIT 3 3/4 8-10 Amendment No. -- , 64, 9W, 449, 4-94,230

ELECTRICAL POWER SYSTEMS D. C. SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, one train (A or B) of batteries and their associated full capacity chargers shall be OPERABLE:

a. Train - "A" consisting of:
1) Battery Bank 30 1A-I and a full capacity battery charger, and
2) Battery Bank 301A-2 and a full capacity battery charger.

OR

b. Train - "B" consisting of:
1) Battery Bank 30 1B-I and a full capacity battery charger, and
2) Battery Bank 301B-2 and a full capacity battery charger.

APPLICABILITY: MODES 5 and 6.

ACTION:

With the required train inoperable, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity additions that could result in loss of required SDM or boron concentration, movement of irradiated fuel; crane operation with loads over the fuel storage pool, or operation with a potential for draining the reactor vessel; initiate corrective action to restore the required train to OPERABLE status as soon as possible.

SURVEILLANCE REQUIREMENTS 4.8.2.2 The above required train shall be demonstrated OPERABLE in accordance with Specification 4.8.2.1.

NULLSTONE - UNIT 3 3/4 8-15 Amendment No. 48-8,64,4G&8, 446, 230

ELECTRICAL POWER SYSTEMS ONSITE POWER DISTRIBUTION SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, one train (A or B) of the following electrical busses shall be OPERABLE:

a. Train - "A" consisting of:
1) One 4160 volt AC Emergency Bus #34C, and
2) Four 480 volt AC Emergency Busses #32R, #32S, #32T, #32Y, and
3) Two 120 volt AC Vital Busses consisting of:

a) Bus #VIAC-1 energized from Inverter #INV-1 connected to DC Bus #301A-1, and b) Bus #VIAC-3 energized from Inverter #INV-3 connected to DC Bus #301A-2, and

4) Two 125 volt DC Busses consisting of:

a) Bus #301A-1 energized from Battery Bank #301A-1, and b) Bus #301A-2 energized from Battery Bank #301A-2.

OR

b. Train - "B" consisting of
1) One 4160 volt AC Emergency Bus #34D, and I
2) Four 480 volt AC Emergency Busses #32U, #32V, #32W, #32X, and
3) Two 120 volt AC Vital Busses consisting of:

a) Bus #VIAC-2 energized from Inverter #INV-2 connected to DC Bus #301B-l, and b) Bus #VIAC-4 energized from Inverter #INV-4 connected to DC Bus #301B-2, and MILLSTONE - UNIT 3 3/4 8-18 Amendment No. 4-8, 64, 408, 446, 4-7-,230

ELECTRICAL POWER SYSTEMS ONSITE POWER DISTRIBUTION SHUTDOWN LIMITING CONDITION FOR OPERATION (Continued)

4) Two 125 volt DC Busses consisting of:

a) Bus #301B-1 energized from Battery Bank #301B-1, and b) Bus #301B-2 energized from Battery Bank #301B-2.

APPLICABILITY: MODES 5 and 6.

ACTION:

With any of the above required electrical busses not energized in the required manner, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity additions that could result in loss of required SDM or boron concentration, movement of irradiated fuel, crane operation with loads over the fuel storage pool, or operations with a potential for draining the reactor vessel, initiate corrective action to energize the required electrical busses in the specified manner as soon as possible.

SURVEILLANCE REQUIREMENTS 4.8.3.2 The specified busses shall be determined energized in the required manner at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.

MILLSTONE - UNIT 3 3/4 8-18a Amendment No. 446, 230

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained sufficient to ensure that the more restrictive of the following reactivity conditions is met; either:

a. A Keff of 0.95 or less, or
b. A boron concentration of greater than or equal to the limit specified in the CORE OPERATING LIMITS REPORT (COLR).

Additionally, the CVCS valves of Specification 4.1.1.2.2 shall be closed and secured in position.

APPLICABILITY: MODE 6.*

ACTION:

a. With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS and positive reactivity additions and initiate and continue boration at greater than or equal to 33 gpm of a solution containing greater than or equal to 6600 ppm boron or its equivalent until Keff is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to the limit specified in the COLR, whichever is the more restrictive.
b. With any of the CVCS valves of Specification 4.1.1.2.2 not closed** and secured in position, immediately close and secure the valves.

SURVEILLANCE REQUIREMENTS 4.9.1.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to:

a. Removing or unbolting the reactor vessel head, and
b. Withdrawal of any full-length control rod in excess of 3 feet from its fully inserted position within the reactor vessel.

4.9.1.1.2 The boron concentration of the Reactor Coolant System and the refueling cavity shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

4.9.1.1.3 The CVCS valves of Specification 4.1.1.2.2 shall be verified closed and locked at least once per 31 days.

The reactor shall be maintained in MODE 6 whenever fuel is in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.

    • Except those opened under administrative control.

MILLSTONE - UNIT 3 3/4 9-1 Amendment No. -5G,60, 99, 443, 0-3, 24.-, 230

REFUELING OPERATIONS 3/4.9.2 INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 Two Source Range Neutron Flux Monitors shall be OPERABLE with continuous visual indication in the control room, and one with audible indication in the containment and control room.

APPLICABILITY: MODE 6.

ACTION:

a. With one of the above required monitors inoperable immediately suspend all operations involving CORE ALTERATIONS and operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.1.
b. With both of the above required monitors inoperable determine the boron concentration of the Reactor Coolant System within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

SURVEILLANCE REQUIREMENTS 4.9.2 Each Source Range Neutron Flux Monitor shall be demonstrated OPERABLE by performance of:

a. A CHANNEL CHECK and verification of audible counts at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
b. A CHANNEL CALIBRATION at least once per 18 months.*
  • Neutron detectors are excluded from CHANNEL CALIBRATION.

MILLSTONE - UNIT 3 3/4 9-2 Amendment No. +W-,20-, 230

REFUELING OPERATIONS 3/4.9.8 RESIDUAL HEAT REMOVAL AND COOLANT CIRCULATION HIGH WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.1 At least one residual heat removal (RHR) loop shall be OPERABLE and in operation.*

APPLICABILITY: MODE 6, when the water level above the top of the reactor vessel flange is greater than or equal to 23 feet.

ACTION:

With no RHR loop OPERABLE or in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.1 and suspend loading irradiated fuel assemblies in the core and immediately initiate corrective action to return the required RHR loop to OPERABLE and operating status as soon as possible. Close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.9.8.1 At least one RHR loop shall be verified in operation and circulating reactor coolant at a flow rate of greater than or equal to 2800 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8-hour period, provided no operations are permitted that could cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.1. I MILLSTONE - UNIT 3 3/4 9-8 Amendment No. 4-07, 230

REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent residual heat removal (RHR) loops shall be OPERABLE, and at least one RHR loop shall be in operation.*

APPLICABILITY: MODE 6, when the water level above the top of the reactor vessel flange is less than 23 feet.

ACTION:

a. With less than the required RHR loops OPERABLE, immediately initiate corrective action to return the required RHR loops to OPERABLE status, or to establish greater than or equal to 23 feet of water above the reactor vessel flange, as soon as possible.
b. With no RHR loop in operation, suspend operations that would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.1 and immediately initiate corrective action to return the required RHR loop to operation. Close all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.9.8.2 At least one RHR loop shall be verified in operation and circulating reactor coolant at a flow rate of greater than or equal to 2800 gpm at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The RHR loop may be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8-hour period, provided no operations are permitted that could cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.1. I MILLSTONE - UNIT 3 3/4 9-9 Amendment No. 44-q, 230

INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM INSTRUMENTATION and ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

The methodology, as defined in WCAP-10991 to derive the Nominal Trip Setpoints, is based upon combining all of the uncertainties in the channels. Inherent in the determination of the Nominal Trip Setpoints are the magnitudes of these channel uncertainties. Sensors and other instrumentation utilized in these channels should be capable of operating within the allowances of these uncertainty magnitudes. Occasional drift in excess of the allowance may be determined to be acceptable based on the other device performance characteristics. Device drift in excess of the allowance that is more than occasional, may be indicative of more serious problems and would warrant further investigation.

The above Bases does not apply to the Control Building Inlet Ventilation radiation monitors ESF Table (Item 7E). For these radiation monitors the allowable values are essentially nominal values. Due to the uncertainties involved in radiological parameters, the methodologies of WCAP-10991 were not applied. Actual trip setpoints will be reestablished below the allowable value based on calibration accuracies and good practices.

The OPERABILITY requirements for Table 3.3-3, Functional Units 7.a, "Control Building Isolation, Manual Actuation," and 7.e, "Control Building Isolation, Control Building Inlet Ventilation Radiation," are defined by table notation "*". These functional units are required to be OPERABLE at all times during plant operation in MODES 1, 2, 3, and 4. These functional units are also required to be OPERABLE during fuel movement within containment or the spent fuel pool, as specified by table notation "*". This table notation is also applicable during fuel movement within containment or the spent fuel pool. The fuel handling accident analyses assume that during a fuel handling accident some of the fuel that is dropped and some of the fuel impacted upon is damaged. Therefore, the movement of either new or irradiated fuel (assemblies or individual fuel rods) can cause a fuel handling accident, and functional units 7.a and 7.e are required to be OPERABLE whenever new or irradiated fuel is moved within the containment or the storage pool. Table notation "*" of Table 4.3-2 has the same applicability.

The verification of response time at the specified frequencies provides assurance that the reactor trip and the engineered safety features actuation associated with each channel is completed within the time limit assumed in the safety analysis. No credit is taken in the analysis for those channels with response times indicated as not applicable (i.e., N.A.).

Required ACTION 4. of Table 3.3-1 is modified by a Note to indicate that normal plant control operations that individually add limited positive reactivity (e.g., temperature or boron fluctuations associated with RCS inventory management or temperature control) are not precluded by this ACTION provided they are accounted for in the calculated SDM. The proposed change permits operations introducing positive reactivity additions but prohibits the temperature change or overall boron concentration from decreasing below that required to maintain the specified SDM or required boron concentration.

MILLSTONE - UNIT 3 B 3/4 3-2 Amendment No. -3,-91, 4-59, 4-77, 4-97, S973O

INSTRUMENTATION 3/4.3.5 SHUTDOWN MARGIN MONITOR BASES (continued)

Required ACTION b. is modified by a Note which permits plant temperature changes provided the temperature change is accounted for in the calculated SDM. Introduction of temperature changes, including temperature increases when a positive MTC exists, must be evaluated to ensure they do not result in a loss of required SDM.

2. All dilution flowpaths are isolated and placed under administrative control (locked closed). This action provides redundant protection and defense in depth (safety overlap) to the SMMs. In this configuration, a boron dilution event (BDE) cannot occur. This is the basis for not having to analyze for BDE in MODE 6. Since the BDE cannot occur with the dilution flow paths isolated, the SMMs are not required to be OPERABLE as the event cannot occur and OPERABLE SMMs provide no benefit.
3. Increase the SHUTDOWN MARGIN surveillance frequency from every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This action in combination with the above, provide defense in depth and overlap to the loss of the SMMs.

Surveillance Requirements The SMMs are subject to an ACOT every 92 days to ensure each train of SMM is fully operational. This test shall include verification that the SMMs are set per the CORE OPERATING LIMITS REPORT.

MILLSTONE - UNIT 3 B 3/4 3-9 Amendment No. 4-64, 230

3/4.4 REACTOR COOLANT SYSTEM BASES (continued)

  • For the isolated loop being restored, the power to both loop stop valves has been restored Surveillance 4.4.1.6.2 indicates that the reactor shall be determined subcritical by at least the amount required by Specifications 3.1.1.1.2 or 3.1.1.2 for MODE 5 or Specification 3.9.1.1 for MODE 6 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of opening the cold leg or hot leg stop valve.

The SHUTDOWN MARGIN requirement in Specification 3.1.1.1.2 is specified in the CORE OPERATING LIMITS REPORT for MODE 5 with RCS loops filled. Specification 3.1.1.1.2 cannot be used to determine the required SHUTDOWN MARGIN for MODE 5 loops isolated condition.

Specification 3.1.1.2 requires the SHUTDOWN MARGIN to be greater than or equal to the limits specified in the CORE OPERATING LIMITS REPORT for MODE 5 with RCS loops not filled provided CVCS is aligned to preclude boron dilution. This specification is for loops not filled and therefore is applicable to an all loops isolated condition.

Specification 3.9.1.1 requires K.eff of 0.95 or less, or a boron concentration of greater than or equal to the limit specified in the COLR in MODE 6.

Specification 3.1.1.1.2 or 3.1.1.2 for MODE 5, both require boron concentration to be determined at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. SR 4.1.1.1.2.1.b.2 and 4.1.1.2.1.b.1 satisfy the requirements of Specifications 3.1.1.1.2 and 3.1.1.2 respectfully. Specification 3.9.1.1 for MODE 6 requires boron concentration to be determined at least once each 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. S.R. 4.9.1.1.2 satisfy the requirements of Specification 3.9.1.1.

Per Specifications 3.4.1.2, ACTION c.; 3.4.1.3, ACTION c.; 3.4.1.4.1, ACTION b.; and 3.4.1.4.2, ACTION b., suspending the introduction of coolant into the RCS of coolant with boron concentration less than required to meet the minimum SDM of LCO 3.1.1.1.2 is required to assure continued safe operation. With coolant added without forced circulation, unmixed coolant could be introduced to the core, however, coolant added with boron concentration meeting the minimum SDM maintains acceptable margin to subcritical operations.

References:

1. Letter NEU-94-623, dated July 13, 1994; Mixing Evaluation for Boron Dilution Accident in Modes 4 and 5, Westinghouse HR-59782.
2. Memo No. MP3-E-93-821, dated October 7, 1993.

MILLSTONE - UNIT 3 B 3/4 4-1f Amendment No. 24-7, 230

3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1. 3/4.8.2, and 3/4.8.3 A.C. SOURCES, D.C. SOURCES, AND ONSITE POWER DISTRIBUTION Technical Specification 3.8.1.1 .b. 1 requires each of the diesel generator day tanks contain a minimum volume of 278 gallons. Technical Specification 3.8.1.2.b.l requires a minimum volume of 278 gallons be contained in the required diesel generator day tank. This capacity ensures that a minimum usable volume of 189 gallons is available. This volume permits operation of the diesel generators for approximately 27 minutes with the diesel generators loaded to the 2,000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> rating of 5335 kw. Each diesel generator has two independent fuel oil transfer pumps. The shutoff level of each fuel oil transfer pump provides for approximately 60 minutes of diesel generator operation at the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating. The pumps start at day tank levels to ensure the minimum level is maintained. The loss of the two redundant pumps would cause day tank level to drop below the minimum value.

Technical Specification 3.8.1.1.b.2 requires a minimum volume of 32,760 gallons be contained in each of the diesel generator's fuel storage systems. Technical Specification 3.8.1.2.b.2 requires a minimum volume of 32,760 gallons be contained in the required diesel generator's fuel storage system. This capacity ensures that a minimum usable volume (29,180 gallons) is available to permit operation of each of the diesel generators for approximately three days with the diesel generators loaded to the 2,000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> rating of 5335 kW. The ability to cross-tie the diesel generator fuel oil supply tanks ensures that one diesel generator may operate up to approximately six days. Additional fuel oil can be supplied to the site within twenty-four hours after contacting a fuel oil supplier.

Suspending positive reactivity additions that could result in failure to meet the minimum SDM or boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum SDM or refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Introduction of temperature changes including temperature increases when operating with a positive MTC must also be evaluated to ensure they do not result in a loss of required SDM.

Suspension of these activities does not preclude completion of actions to establish a safe conservative condition. These actions minimize the probability of the occurrence of postulated events. It is further required to immediately initiate action to restore the required AC and DC electrical power source and distribution subsystems and to continue this action until restoration is accomplished in order to provide the necessary power to the unit safety systems.

Surveillance Requirements 4.8.1.1.2.a.6 (monthly) and 4.8.1.1.2.b.2 (once per 184 days) and 4.8.1.1.2.j (18 months test)

The Surveillances 4.8.1.1.2.a.6 and 4.8.1.1.2.b.2 verify that the diesel generators are capable of synch-ronizing with the offsite electrical system and loaded to greater than or equal to continuous rating of the machine. A minimum time of 60 minutes is required to stabilize engine temperatures, while MILLSTONE - UNIT 3 B 3/4 8-1c Amendment No. 9W, 44-, 4-3-7, -94, 240-, 230

3/4.9 REFUELING OPERATIONS BASES 3/4.9.1 BORON CONCENTRATION The limitations on reactivity conditions during REFUELING ensure that: (1) the reactor will remain subcritical during CORE ALTERATIONS, and (2) a uniform boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel.

The value of 0.95 or less for Keff includes a 1% Ak/k conservative allowance for uncertainties.

Similarly, the boron concentration value specified in the CORE OPERATING LIMITS REPORT includes a conservative uncertainty allowance of 50 ppm boron. The boron concentration, specified in the CORE OPERATING LIMITS REPORT, provides for boron concentration measurement uncertainty between the spent fuel pool and the RWST. The locking closed of the required valves during refueling operations precludes the possibility of uncontrolled boron dilution of the filled portion of the RCS. This action prevents flow to the RCS of unborated water by closing flow paths from sources of unborated water.

MODE ZERO shall be the Operational MODE where all fuel assemblies have been removed from containment to the Spent Fuel Pool. Technical Specification Table 1.2 defines MODE 6 as "Fuel in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed." With no fuel in the vessel the definition for MODE 6 no longer applies. The transition from MODE 6 to MODE ZERO occurs when the last fuel assembly of a full core off load has been transferred to the Spent Fuel Pool and has cleared the transfer canal while in transit to a storage location. This will:

" Ensure Technical Specifications regarding sampling the transfer canal boron concentration are observed (4.9.1.1.2);

" Ensure that MODE 6 Technical Specification requirements are not relaxed prematurely during fuel movement in containment.

Concerning ACTION a., suspension of CORE ALTERATIONS and positive reactivity additions shall not preclude moving a component to a safe position. Operations that individually add limited positive reactivity (e.g., temperature fluctuations from inventory addition or temperature control fluctuations) but when combined with all other operations affecting core reactivity (e.g., intentional boration) result in overall net negative reactivity addition, are not precluded by this action.

MILLSTONE - UNIT 3 B 3/4 9-1 Amendment No. -2, 60, 4-59, +.W9, 230

3/4.9 REFUELING OPERATIONS BASES 3/4.9.1.2 BORON CONCENTRATION IN SPENT FUEL POOL During normal Spent Fuel Pool operation, the spent fuel racks are capable of maintaining Keff at less than or equal to 0.95 in an unborated water environment. This is accomplished in Region 1, 2, and 3 storage racks by the combination of geometry of the rack spacing, the use of fixed neutron absorbers in some fuel storage regions, the limits on fuel burnup, fuel enrichment and minimum fuel decay time, and the use of blocking devices in certain fuel storage locations.

The boron requirement in the spent fuel pool specified in 3.9.1.2 ensures that in the event of a fuel assembly handling accident involving either a single dropped or misplaced fuel assembly, the Keff of the spent fuel storage racks will remain less than or equal to 0.95.

3/4.9.2 INSTRUMENTATION The OPERABILITY of the Source Range Neutron Flux Monitors ensures that redundant monitoring capability is available to detect changes in the reactivity condition of the core.

Concerning ACTION a., with only one source range neutron flux monitor OPERABLE, redundancy has been lost. Since these instruments are the only direct means of monitoring core reactivity conditions, CORE ALTERATIONS and introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1.1 must be suspended immediately. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation. Performance of ACTION a. shall not preclude completion of movement of a component to a safe position.

3/4.9.3 DECAY TIME The minimum requirement for reactor suberiticality prior to movement of irradiated fuel assemblies in the reactor vessel ensures that sufficient time has elapsed to allow the radioactive decay of the short-lived fission products. This decay time is consistent with the assumptions used in the safety analyses.

MILLSTONE - UNIT 3 B 3/4 9-1a Amendment No. 4-12, 60, 4-59, 3, 24-9, 230

3/4.9 REFUELING OPERATIONS BASES 3/4.9.4 CONTAINMENT BUILDING PENETRATIONS The requirements on containment penetration closure and OPERABILITY ensure that a release of radioactive material within containment to the environment will be minimized. The OPERABILITY, closure restrictions, and administrative controls are sufficient to minimize the release of radioactive material from a fuel element rupture based upon the lack of containment pressurization potential during the movement of fuel within containment. The containment purge valves are containment penetrations and must satisfy all requirements specified for a containment penetration.

This specification is applicable during the movement of new and spent fuel assemblies within the containment building. The fuel handling accident analyses assume that during a fuel handling accident some of the fuel that is dropped and some of the fuel impacted upon is damaged.

Therefore, the movement of either new or irradiated fuel can cause a fuel handling accident, and this specification is applicable whenever new or irradiated fuel is moved within the containment.

Containment penetrations, including the personnel access hatch doors and equipment access hatch, can be open during the movement of fuel provided that sufficient administrative controls are in place such that any of these containment penetrations can be closed within 30 minutes.

Following a Fuel Handling Accident, each penetration, including the equipment access hatch, is closed such that a containment atmosphere boundary can be established. However, if it is determined that closure of all containment penetrations would represent a significant radiological hazard to the personnel involved, the decision may be made to forgo the closure of the affected penetration(s). The containment atmosphere boundary is established when any penetration which provides direct access to the outside atmosphere is closed such that at least one barrier between the containment atmosphere and the outside atmosphere is established. Additional actions beyond establishing the containment atmosphere boundary, such as installing flange bolts for the equipment access hatch or a containment penetration, are not necessary.

Administrative controls for opening a containment penetration require that one or more designated persons, as needed, be available for isolation of containment from the outside atmosphere. Procedural controls are also in place to ensure cables or hoses which pass through a containment opening can be quickly removed. The location of each cable and hose isolation device for those cables and hoses which pass through a containment opening is recorded to ensure timely closure of the containment boundary. Additionally, a closure plan is developed for each containment opening which includes an estimated time to close the containment opening. A log of personnel designated for containment closure is maintained, including identification of which containment openings each person has responsibility for closing. As necessary, equipment will be pre-staged to support timely closure of a containment penetration.

MILLSTONE - UNIT 3 B 3/4 9-1b Amendment No.2301

3/4.9 REFUELING OPERATIONS BASES 3/4.9.8.1 HIGH WATER LEVEL (continued)

APPLICABLE SAFETY ANALYSES If the reactor coolant temperature is not maintained below 200TF, boiling of the reactor coolant could result. This could lead to a loss of coolant in the reactor vessel. Additionally, boiling of the reactor coolant could lead to a reduction in boron concentration in the coolant due to boron plating out on components near the areas of the boiling activity. The loss of reactor coolant and the reduction of boron concentration in the reactor coolant would eventually challenge the integrity of the fuel cladding, which is fission product barrier. One train of the RHR system is required to be operational in MODE 6, with the water level > 23 ft above the top of the reactor vessel flange to prevent this challenge. The LCO does permit deenergizing the RHR pump for short durations, under the conditions that the boron concentration is not diluted. This conditional deenergizing of the RHR pump does not result in a challenge to the fission product barrier.

APPLICABILITY One RHR loop must be OPERABLE and in operation in MODE 6, with the water level Ž 23 ft above the top of the reactor vessel flange, to provide decay heat removal. The 23 ft level was selected because it corresponds to the 23 ft requirement established for fuel movement in LCO 3.9.10, "Water Level - Reactor Vessel." Requirements for the RHR system in other MODES are covered by LCOs in Section 3.4, Reactor Coolant System (RCS), and Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level < 23 ft are located in LCO 3.9.8.2, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."

LIMITING CONDITION FOR OPERATION The requirement that at least one RHR loop be in operation ensures that: (1) sufficient cooling capacity is available to remove decay heat an maintain the water in the reactor vessel below 140'F as required during the REFUELING MODE, and (2) sufficient coolant circulation is maintained through the core to minimize the effect of a boron dilution incident and prevent stratification.

An OPERABLE RHR loop includes an RHR pump, a heat exchanger, valves, piping, instruments and controls to ensure an OPERABLE flow path. An operating RHR flow path should be capable of determining the low-end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs.

The LCO is modified by a Note that allows the required operating RHR loop to be removed from operation for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would dilute the RCS boron concentration by introduction of coolant into the RCS with boron concentration less than required to meet the minimum boron concentration of LCO 3.9.1.1.

Boron concentration reduction with coolant at boron concentrations less than required to assure the RCS boron concentration is maintained is prohibited because uniform concentration distribution cannot be ensured without forced circulation. This permits operations such as core mapping or alterations in the vicinity of the reactor vessel hot leg nozzles and RCS to RHR isolation valve testing. During this 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, decay heat is removed by natural convection to the large mass of water in the refueling cavity.

MILLSTONE - UNIT 3 B 3/4 9-3 Amendment No. 4-0, 24-9,230

3/4.9 REFUELING OPERATIONS BASES 3/4.9.8.1 HIGH WATER LEVEL (continued)

ACTIONS RHR loop requirements are met by having one RHR loop OPERABLE and in operations, except as permitted in the Note to the LCO.

If RHR loop requirements are not met, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

If RHR loop requirements are not met, actions shall be taken immediately to suspend loading of irradiated fuel assemblies in the core. With no forced circulation cooling, decay heat removal from the core occurs by natural convection to the heat sink provided by the water above the core.

A minimum refueling water level of 23 ft above the reactor vessel flange provides an adequate available heat sink. Suspending any operation that would increase decay heat load, such as loading a fuel assembly, is a prudent action under this condition.

If RHR loop requirements are not met, actions shall be initiated and continued in order to satisfy RHR loop requirements. With the unit in MODE 6 and the refueling water level > 23 ft above the top of the reactor vessel flange, corrective actions shall be initiated immediately.

If RHR loop requirements are not met, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the RHR loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere. Closing containment penetrations that are open to the outside atmosphere ensures dose limits are not exceeded.

The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on the low probability of the coolant boiling in that time.

Surveillance Requirement This Surveillance demonstrates that the RHR loop is in operation and circulating reactor coolant.

The flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability and to prevent thermal and boron stratification in the core. The frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering the flow, temperature, pump control, and alarm indications available to the operator in the control room for monitoring the RHR system.

MILLSTONE - UNIT 3 B 3/4 9-4 Amendment No. 44-, 24-9, 230

3/4.9 REFUELING OPERATIONS I BASES 3/4.9.8.2 LOW WATER LEVEL (continued)

An OPERABLE RHR loop consists of an RHR pump, a heat exchanger, valves, piping, instruments, and controls to ensure an OPERABLE flow path. An operating RHR flow path should be capable of determining the low end temperature. The flow path starts in one of the RCS hot legs and is returned to the RCS cold legs.

APPLICABILITY Two RHR loops are required to be OPERABLE, and one RHR loop must be in operation in MODE 6, with the water level < 23 ft above the top of the reactor vessel flange, to provide decay heat removal. Requirements for the RHR System in other MODES are covered by LCOs in Section 3.5, Emergency Core Cooling Systems (ECCS). RHR loop requirements in MODE 6 with the water level > 23 ft are located in LCO 3.9.8.1, "Residual Removal (RHR) AND Coolant Circulation-High Water Level."

ACTIONS

a. If less than the required number of RHR loops are OPERABLE, actions shall be immediately initiated and continued until the RHR loop is restored to OPERABLE status and to operation, or until > 23 ft of water level is established above the reactor vessel flange. When the water level is > 23 ft above the reactor vessel flange, the Applicability changes to that of LCO 3.9.8.1, and only one RHR loop is required to be OPERABLE and in operation. An immediate Completion Time is necessary for an operator to initiate corrective action.
b. If no RHR loop is in operation, there will be no forced circulation to provide mixing to establish uniform boron concentrations. Suspending positive reactivity additions that could result in failure to meet the minimum boron concentration limit is required to assure continued safe operation. Introduction of coolant inventory must be from sources that have a boron concentration greater than that what would be required in the RCS for minimum refueling boron concentration. This may result in an overall reduction in RCS boron concentration, but provides acceptable margin to maintaining subcritical operation.

If no RHR loop is in operation, actions shall be initiated immediately, and continued, to restore one RHR loop to operation. Since the unit is in ACTIONS 'a' and 'b' concurrently, the restoration of two OPERABLE RHR loops and one operating RHR loop should be accomplished expeditiously.

If no RHR loop is in operation, all containment penetrations providing direct access from the containment atmosphere to the outside atmosphere must be closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. With the RHR loop requirements not met, the potential exists for the coolant to boil and release radioactive gas to the containment atmosphere. Closing containment penetrations that are open to the outside atmosphere ensures that dose limits are not exceeded.

MILLSTONE - UNIT 3 B 3/4 9-6 Amendment No. 4-04, 230

3/4.9 REFUELING OPERATIONS BASES The Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on the low probability of the coolant boiling in that time.

Surveillance Requirement This Surveillance demonstrates that one RHR loop is in operation and circulating reactor coolant.

The flow rate is determined by the flow rate necessary to provide sufficient decay heat removal capability and to prevent thermal and boron stratification in the core. In addition, during operation of the RHR loop with the water level in the vicinity of the reactor vessel nozzles, the RHR pump suction requirements must be met. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is sufficient, considering the flow, temperature, pump control, and alarm indications available to the operator for monitoring the RHR System in the control room.

MILLSTONE - UNIT 3 B 3/4 9-7 Amendment No. 4-0, 249, 230