Technical Requirements Manual Unit 2
ML061720204
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/14/2006
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401
Download: ML061720204 (41)


Text

Jun. 14, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-27372 USER INFORMATION:

Name:GERLACH*ROSE M Address: NUCSA2 Phone#:

254-3194 EMPL#:028401 CA#:0363 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 06/14/2006 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no IC will be issued with the updated material.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/03/2006 ADD MANUAL TABLE OF CONTENTS DATE: 06/13/2006 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT 3.3.4 REMOVE:

REV:1 ADD:

REV:

2 CATEGORY: DOCUMENTS TYPE: TRM2 ID:

TEXT B3.3.4 REMOVE:

REV:I ADD:

REV:

2 CATEGORY: DOCUMENTS TYPE:

TRM2 ID:

TEXT B3.3.5 REMOVE:

REV:0 ADD:

REV: 1 CATEGORY:

DOCUMENTS TYPE: TRM2 I-TEXT LOES

ýýMOVE:

REV:24 ADD:

REV:

25 CATEGORY: DOCUMENTS TYPE: TRM2

-4,00

Jun. 14, 2006 Page 2 of 2 ID:

TEXT TOC REMOVE:

REV:7 ADD:

REV:

8 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

I %SSES MANUAL Manual Name:

TRMr2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

06/13/2006 Procedure Name Rev Issue Date TEXT LOES 25 06/13/2006

Title:

LIST OF EFFECTIVE SECTIONS Change ID Change Number TEXT TOC

Title:

8 06/13/2006 TABLE OF CONTENTS TEXT 1.1 0

11/19/2002

Title:

USE AND APPLICATION'DEFINITIONS TEXT 2.1

Title:

TEXT 2.2

Title:

TEXT 3.0

Title:

1 02/04/2005',,

PLANT PROGRAMS AND SETPOINTS PLANTiPROGRAMS 5

11/22/2005 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE

/

,/ 1 01/06/2006 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION,-(ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2

. (

0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 2

11/22/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 4

04/14/2005

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Page 1 of 15 Report Date: 06/13/06 Page 1 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 7

K~)

TEXT 3.3.1

Title:

INSTRUMENTATION TEXT 3.3.2

Title:

INSTRUMENTATION TEXT 3.3.3

Title:

INSTRUMENTATION 0

11/19/2002 RADIATION MONITORING INSTRUMENTATION 1

04/26/2006 SEISMIC MONITORING INSTRUMENTATION 1

04/26/2006 METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4

.2 06/13/2006

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6

Title:

INSTRUMENTATION TEXT 3.3.7

Title:

INSTRUMENTATION 2

10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION 0

11/19/2002 MAIN TURBINE OVERSPEED PROTECTION SYSTEM K>

TEXT 3.3.8 1

10/2.2/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1

11/22/2004

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10' 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11

Title:

INSTRUMENTATION TEXT 3.4.1

Title:

REACTOR COOLANT 1

10/22/2003 MVP ISOLATION INSTRUMENTATION 1

04/26/2006 SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page 2 of 15 Report Date: 06/13/06 Page 2 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM£-

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 0

11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0

11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1i 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0

11/19/2002

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2

.0 11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0

11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN Page 3 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2--

.Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 K>r TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT TEXT 3.7.5.2

Title:

PLANT 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 1

04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2

04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS S.2 SYSTEMS C02 SYSTEMS 08/18/2005 1

04/26/2006 SYSTEMS HALON SYSTEMS 1

04/26/2006 SYSTEMS FIRE HOSE STATIONS 1

04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 5

01/06/2006 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 06/13/06 Page 4 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3

Title:

PLANT TEXT 3.7.6

Title:

PLANT 1

04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 1

03/01/2005 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8

..3 04/26/2006

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0

11/19/2002

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT 3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT 3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT 3.8.3

Title:

ELECTRICAL TEXT 3.8.4

Title:

ELECTRICAL TEXT 3.8.5

Title:

ELECTRICAL 2

02/04/2005 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 1

12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

2 12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/19/2002 POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 1

02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0

11/19/2002 POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15 Report Date: 06/13/06 Page 5 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3

.0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0

11/19/2002

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 0

11/19/2002

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1

  • 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Page 6 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRMe-2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE TEXT 3.11.4.3

Title:

RADIOACTIVE TEXT 3.12.1 3

04/26/2006 EFFLUENTS DOSE RATE 2

12/14/2004 RADIOACTIVE GASEOUS EFFLUENTS EFFLUENT MONITORING INSTRUMENTATION 2

04/26/2006 EFFLUENTS LAND USE CENSUS 1 -

04/26/2006 EFFLUENTS INTERLABORATORY COMPARISON PROGRAM 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 1

01/06/2006

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

TEXT B3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT ROD INJECTION (ATWS-ARI)

INSTRUMENTATION APPLICABILITY SCRAM ALTERNATE TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 2

11/22/2005

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Page 7 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM£-2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0

11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION BASES TEXT B3.3.4

Title:

INSTRUMENTATION BASES TEXT B3.3.5

Title:

INSTRUMENTATION BASES TEXT B3.3.6

Title:

INSTRUMENTATION BASES TEXT B3.3.7

Title:

INSTRUMENTATION BASES TEXT B3.3.8

Title:

INSTRUMENTATION BASES TEXT B3.3.9

Title:

INSTRUMENTATION BASES TEXT B3.3.10

Title:

INSTRUMENTATION BASES TEXT B3.3.11

Title:

INSTRUMENTATION BASES 1.I 02/04/2005 METEOROLOGICAL MONITORING INSTRUMENTATION 2

06/13/2006 TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 1

06/13/2006 THIS PAGE INTENTIONALLY LEFT BLANK 3

10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION 0

11/19/2002 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 TRM RPS INSTRUMENTATION 1

11/22/2004 LPRM UPSCALE ALARM INSTRUMENTATION 0

11/19/2002 REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 MVP ISOLATION INSTRUMENTATION Page 8 of 15 Report Date: 06/13/06 Page 8 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM--

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR TEXT B3.5.1 0

11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0

11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0

11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0

11/19/2002

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0

11/19/2002

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 9 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRMý-

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 1

04/26/2006 FIRE SUPPRESSION WATER SUPPLY SYSTEM

.-2 04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0

11/19/2002 C02 SYSTEMS 1

04/26/2006 HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS 1

04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION-INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 10 of 15 Report Date: 06/13/06 Page 10 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0

11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1

03/01/2005

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0

11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1

Title:

PLANT SYSTEMS BASES SNUBBERS 12/14/2004 TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM Page 11 of 15 Report Date: 06/13/06 Page 11 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-t Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1

02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2

.0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0

11/19/2002

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 0

11/19/2002

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM Page 12 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2

)

TEXT B3.11.1.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 0

BASES 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2

.0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4 STitle: RADIOACTIVE EFFLUENTS 0

BASES 0

BASES 11/19/2002 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM -

TEXT B3.11.2.5 3

05/20/2005

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.2

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTS 1

BASES 0

BASES 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING 11/19/2002 TOTAL DOSE 2

01/06/2006 BASES MONITORING PROGRAM 0

BASES 0

BASES 11/19/2002 LAND USE CENSUS 11/19/2002 INTERLABORATORY COMPARISON PROGRAM Page 13 of 15 Report Date: 06/13/06 Page 13 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2-Ž Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2

£ TEXT B3.12.1

Title:

LOADS CONTROL TEXT B3.12.2

Title:

LOADS CONTROL TEXT B3.12.3

Title:

LOADS CONTROL 0

11/19/2002 PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 0

11/19/2002 PROGRAM BASES HEAVY LOADS REQUIREMENTS 0

11/19/2002 PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5

-1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS EFFLUENTS 2

04/26/2006 VENTILATION EXHAUST TREATMENT SYSTEM 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM TEXT 4.1 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION K-.~

Page 14 of 15 Report Date: 06/13/06 Page 14 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name:

TRM2--

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.3

Title:

TEXT 4.4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

0 CONTROLS ADMINISTRATIVE ADMINISTRATIVE CONTROLS 09/27/2003 SAFETY LIMIT VIOLATION 09/27/2003 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM ADMINISTRATIVE ADMINISTRATIVE 0

CONTROLS

.CT

.0 CONTROLS TEXT 4.7 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Page 15 of 15 Report Date: 06/13/06 Page 15 of 15 Report Date: 06/13/06

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE 1.0 USE AND APPLICATION............................................................................

1.0-1 1.1 Definitions....................................

TRM/1.0-2 2.0 PLANT PROGRAMS...................................................................................

2.0-1 2.1 Plant Program s.....................................................................................

2.0-1 2.2 Instrument Trip Setpoint Table.....................................................

TRM/2.0-5 3.0 APPLICABILITY.................................................................................

TRM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability...............................

TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability..................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS................................

3.1-1 3.1.1 Alternate Rod Injection............................................................ 3.1-1 3.1.2 CRD Housing Support................................

3.1-4 3.1.3 Control Rod Block Instrumentation........................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation a'nd Check Valve....................................................

................ TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT..... '

/

................................. 3.2-1 3.2.1 Core Operating Limits Report.........

3.2-1 3.3 INSTRUMENTATION TRM/3.3-1 3.3.1 Radiation Monitoring Instrtimentation..........................................

TRM/3.3-1 3.3.2 Seismic Monitoring Instrumeritation..............................................

TRM/3.3-4 3.3.3 Meteorological Monit6ong Instrumentation...................................

TRM/3.3-7 3.3.4 TRM Post-Acciden.l:Mo-nitoring Instrumentation...................... :..... TRM/3.3-9 3.3.5 Section Not UsedLe...................................................................

TRM/3.3-12 3.3.6 TRM Containmed1olation Instrumentation.................................

TRM/3.3-13 3.3.7 Turbine Ovek pe-Wd Protection System.........................................

TRM/3.3-17 3.3.8 Section r t:*o' J*slfd..

o.........................................................................

TRM/3.3-19 3.3.9 OPRIV[if[sttriJ*-eritation.................................................................

TRM/3.3-21 3.3.10 React-Vt0-i"-ulation Pump MG Set Electrical and

-1i*h ja* Tttops.........................................................................

TRM/3.3-22 3.3.11

\\MV ijso0ation Instrumentation......................................................

TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM..........................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry.......................................................

3.4-1 3.4.2 Structural Integrity..................................................................................

3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors....................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program........................... TRM/3.4-13 3.5 EMERGENCY. CORE COOLING AND RCIC......................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit.......................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS.......................

3.5-6 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF4OONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE 3.6 CONTAINMENT..........................................................................................

3.6-1 3.6.1 VENTING or PURGING.........................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication...............................................................................................

3.6-3 3.6.3 Suppression Pool Alarm Instrumentation..............

3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS..............................................................................

TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level.........................................

3.7-3 3.7.3.1 Fire Suppression Water Supply System.......................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems TRM/3.7-8 3.7.3.3 C02 systems................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems TRM/3.7-16 3.7.3.5 Fire Hose Stations........................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses.............................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies..................................................................

TRMI3.7-24 3.7.3.8 Fire Detection Instrumentation......................................................

TRM/3.7-26 3.7.4 Solid Radwaste System................................................................

TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...........................................

3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture.......................................

TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks.....................................................................

TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation.........................................

3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.................................................................... 3.7-41 3.7.8 Snubbers......................................................................................

TRM/3.7-43 3.7.9 Control Structure HVAC...........................

TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)..............................................

TRM/3.7-51 3.8 ELECTRICAL POWER.......................................................................

TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices........................................................................

TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous...................................................................................

TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic......................................................................................

TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities............................... I...... 3.8-13 3.8.4 24VDC Electrical Power Subsystem.............................................

TRM/3.8-15 3.8.5 Degraded Voltage Protection.......................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling..................................................

3.8-24 3.9 REFUELING OPERATIONS........................................................................

3.9-1 3.9.1 Decay Tim e...........................................................................................

3.9-1 3.9.2 Communications....................................................................................

3.9-2 3.9.3 Refueling Platform.................................................................................

3.9-3 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF-CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.10 MISCELLANEOUS.............................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination.......................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation.......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)..................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM)................................................

TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS..............................................................

TRM/3.11-1 3.11.1 Liquid Effluents.............................................................................

TRM/3.11-1 3.11.1.1 Liquid Effluents Concentration......................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...................................................................

TRM/3.11-4 3.11.1.3 Liquid W aste Treatment System..................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation........................ 3.11-13 3.11.2 Gaseous Effluents.......................................................................

TRM/3.11-17 3.11.2.1 Dose Rate.....................................................................................

TRMI3.11-17 3.11.2.2 Dose - Noble Gases.....................................................................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form...........................................................................

TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System........................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System......................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation......................................................................................

3.11-26 3.11.3 Total Dose....................................................................................

-TRM/3.11-33 3.11.4 Radiological Environmental Monitoring................................. *....... TRM/3.11-35 3.11.4.1 Monitoring Program......................................................................

TRM/3.11-35 3.11.4.2 Land Use Census.........................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program............................................

TRM/3.11-47 3.12 LOADS CONTROL PROGRAM..........................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.......................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements.........................................................

TRM/3.12.3 3.12.3 Light Loads Requirements...........................................................

TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS..................................................................

4.0-1 4.1 Organization..........................................................................................

4.0-1 4.2 Reportable Event Action........................................................................

4.0-2 4.3 Safety Limit Violation......................................

...................................... 4.0-3 4.4 Procedures and Programs.....................................................................

4.0-4 4.5 Reporting Requirements........................................................................ 4.0-5 4.6 Radiation Protection Program................................................................

4.0-7 4.7 Training..................................................................................................

4.0-8 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF.CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability......................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.........................................

B 3.0-9 B 3.1.1 Alternate Rod Injection................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support.........................................................................

B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..............................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.........................................................................

TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR).................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation..........................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation....................................................

B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation..................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation........................... TRM/B 3.3-4 B 3.3.5 Section Not Used.........................................................................

TRM/B 3.3-8 B 3.3.6 TRM Containment Isolation Instrumentation........................................

B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................

TRM/B 3.3-14 B 3.3.8 Section Not Used.........................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation................................................................

TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops........................................................................

TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.....................................................

TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry.....................................................

B 3.4-1 B 3.4.2 Structural Integrity...................................................................

............ B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors..................................

B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.......................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program..................................

B 3.4-6 B 3.5.1 ADS Manual Inhibit..............................................................................

63.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.......................... B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS....................................................

B 3.5-4 B 3.6.1 VENTING or PURGING..............................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.............................................................................................

B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation.............................................

B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)...................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.......................................

B 3.7-2 B 3.7.3.1 Fire Suppr.ession Water Supply System......................................

TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems......................................................

TRM/B 3.7-5 B 3.7.3.3 C02 Systems..............................................................................

TRM/B 3.7-7 B 3.7.3.4 Halon Systems............................................................................

TRM/B 3.7-8 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

PPL Rev. 8 SECTION B 3.7.3.5 B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 TITLE PAGE Fire Hose Stations.......................................................................

TRM/B 3.7-10 Yard Fire Hydrants and Hydrant Hose Houses............................ TRM/B 3.7-11 Fire Rated Assemblies.................................................................

TRM/B 3.7-12 Fire Detection Instrumentation.....................................................

TRM/B 3.7-14 Solid Radwaste System...............................................................

TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor.........................................

B 3.7-17 Main Condenser Explosive Gas Mixture..............................................

B 3.7-19 Liquid Holdup Tanks............................................................................

B 3.7-20 ESSW Pumphouse Ventilation....................................................

TRM/B 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................................

TRM/B 3.7-22 Snubbers.............................................................................................

B 3.7-24 Control Structure HVAC...............................................................

TRM/B 3.7-31 Spent Fuel Storage Pools............................................................

TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................

TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous.........................................

TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Autom atic....................................................................................

TRM /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power.Subsystem............................................

T-RM/B 3.8-6 B 3.8.5 Degraded Voltage Protection...............................................

"...... TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling........................................

TRM/B 3.8-17 B.3.9.1 B 3.9.2 B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 Decay Time.........................................................................................

B 3.9-1 Communications.................................................................................

B 3.9-2 Refueling Platform...............................................................................

B 3.9-3 Sealed Source Contamination.............................................................

B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation........................

B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 Leading Edge Flow Meter (LEFM)...............................................

TRM/B 3.10-6 Liquid Effluents Concentration.............................................................

B 3.11-1 Liquid Effluents Dose..........................................................................

B 3.11-4 Liquid W aste Treatment System.........................................................

83.11-6 Liquid Radwaste Effluent Monitoring Instrumentation..........................

B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 Dose Rate....................................................................................

TRM/B 3.11-12 Dose - Noble Gases............................................................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form..................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.......................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................

TRM/B 3.11-21 SUSQUEHANNA-UNIT2 TRM I TOC-5 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF-CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 8 SECTION B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................

TRM/B 3.11-24 Total Dose...........................................................................................

B 3.11-26 Monitoring Program.....................................................................

TRMIB 3.11-28 Land Use Census................................................................................

B 3.11-34 Interlaboratory Comparison Program...........................................

TRMIB 3.11-36 LOADS CONTROL PROGRAM...................................................

TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.....................................

TRMIB 3.12-1 Heavy Loads Requirements........................................................

TRM/B 3.12-2 Light Loads Requirements.........................

TRM/B 3.12-3 TRM2 Text TOC 5/22/06 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Pages TRM / 2.0-12 through TRM /2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-6 Pages TRM / 3.1-7 and TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-39 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 Pages 3.3-5 and 3.3-6 Page TRM 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM I 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-1 Ia Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 05/30/2006 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 11/15/2004 12/03/2004 11/15/2004 11/15/2005 04/08/1999 03/15/2002 11/30/2005

-08/31/1998 11/15/2005 02/18/1999 02/18/1999 08/31/1998 03/03/2005 07/16/1999 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/17/1998 05/30/2006 06/02/2005 05/30/2006 03/30/2001 09/13/2005 12/14/1998 10/22/2003 I

3.2 3.3 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Pages TRM /3.3-21a through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 06/27/2001 06/14/2002 10/22/2003 11/15/2004 11/15/2004 12/03/2004 05/16/2003 10/22/2003 03/31/2006 08/31/2005 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 04/17/2000 08/31/1998 3.5 3.6 3.7 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM./3.7-2, Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 through TRM / 3.7-27 Page TRM / 3.7-28 08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08/02/1999 08/09/2005 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/09/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Page TRM / 3.7-43 Pages 3.7-44 through 3.7-47 Page TRM / 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM /3.8-23 Pages 3.8-24 and 3.8-25 Effective Date 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 08/31/1998 03/31/2006 10/13/1998 03/08/2003 03/09/2001 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 01/31/2005 "04/02/2002 12/03/2004 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.8 3.9 3.10 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 08/31/1998 03/31/2006 08/30/1998 03/08/2003 06/05/2002 03/31/2006 04/17/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 3.12 4.0 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM /3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Pages TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 09/01/1998 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 03/31/2006 05/13/2005 09/01/1998 01/21/2004 12/03/2004

-01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.0 B 3.1 B 3.2 B3.3 B 3.4 B 3.5 B 3.6 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM I B 3.0-11 and TRM / B 3.0-12 Pages TRM I B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-7 Pages TRM / B 3.3-8 and TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3.19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Effective Date 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 08/31/1998 11/15/2005 02/18/1999 08/31/1998 04/07/2000 08/31/1998 01/31/2005 05/30/2006 03/30/2001 08/31/1998 09/13/2005 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08131/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.7 B 3.8 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM /B 3.7-10 Pages TRM / B 3.7-1 Oa through TRM / B 3.7-11 a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Page B 3.7-24 Page TRM / B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM I B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Effective Date 09/23/1999 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 08/31/1998 12/03/2004 08/31/1998 12/03/2004 03/0912001 04/15/2003 12/03/2004 07/05/2000 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFIFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 Effective Date 08/31/1998 10/23/1998 08/31/1998 03/08/2003 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/1312005 01/21/2004 "08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 02/05/1999 TRM2 text LOES.doc 05/22/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 05/30/2006

PPL Rev-2 TRM Post Accident Monitoring Instrumentation 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 APPLICABILITY:

The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

According to Table 3.3.4-1 ACTIONS NOTE-Separate condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Enter the Condition Immediately channel inoperable, referenced in Table 3.3.4-1 for the channel B.

As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1.

monitoring the appropriate parameter(s)

AND B.2 Restore the required channel 7 days to OPERABLE status.

C. As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D.

As required by Required D.1 Verify affected SRV position Immediately Action A.1 and referenced by alternate methods.

AND in Table 3.3.4-1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.3-9 EFFECTIVE DATE 12/17/1998

TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rey.2-ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME AND D.2 Verify a minimum 14 of the Immediately associated acoustic monitor channels and 5 of the ADS SRV acoustic monitor channels are operable.

AND D.3.1 Verify SRV tailpipe Immediately temperature indication and alarm are available.

OR D.3.2 Restore SRV tailpipe temperature indication and 7 days alarm to functional status.

AND D.4.1 Restore the required channel(s) to OPERABLE 30 days status.

OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

SUSQUEHANNA - UNIT 2 TRM / 3.3-9a EFFECTIVE DATE 12/17/1998

TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.2 TECHNICAL REQUIREMENT SURVEILLANCE NOTE

1.

Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.

2.

When a channel is placed in an inoperable status solely for performance of required Sur(eillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.

TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.

SUSQUEHANNA - UNIT 2 TRM / 3.3-10 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev-2 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

1.

Suppression Chamber Air Temperature

2.

Main Steam Safety/Relief Valve Position Indicator (Acoustic Monitor)(c)

3.

Reactor Building Vent Noble Gas Monitor 1,2 1,2 2

1/valve C

D TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.2 TRS 3.3.4.3

a. Mid Range(b)
b. High Range(b) 1,2, (a) 1,2, (a)

I I

B B

TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4

4. Standby Gas Treatment System Vent Noble Gas Monitor
a. Mid Range(b)
b. High Range(b) 1,2, (a) 1,2, (a) 2 B (Both Ch. Inop)

C (One Ch. Inop) 2 B (Both Ch. Inop)

C (One Ch. Inop)

TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4

5.

Turbine Building Vent Noble Gas Monitor

a. Mid Range(b)
b. High Range(b) 1,2 1,2 2

B (Both Ch. Inop)

C (One Ch. Inop) 2 B (Both Ch. Inop)

C (One Ch. Inop)

TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.3-11 EFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Re~v..2 TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
a. Effluent System 1,2, (a) 1 C

TRS 3.3.4.1 flow rate monitor(b)

TRS 3.3.4.4

b. Sampler flow rate 1,2, (a) 1 C

TRS 3.3.4.1 monitorb)

TRS 3.3.4.4

7. Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
a. Effluent System 1,2 1

C TRS 3.3.4.1 flow rate monitor)

TRS 3.3.4.4

b. Sampler flow rate 1,2 1

C TRS 3.3.4.1 monitor(b)

TRS 3.3.4.4

8.

Containment H2 and 02 1,2 2

C TRS 3.3.4.1 Analyzer TRS 3.3.4.5 (a)

(b)

(C)

When moving irradiated fuel in the secondary containment.

The provisions of TRO 3.0.4 are not applicable.

Alternate monitoring methods listed in Bases.

SUSQUEHANNA - UNIT 2 TRM / 3.3-11 a EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rey.2.

B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations." It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.

Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.

LOOP A LOOP B TE-25703 TE-25725 TT-25703 TT-25725 TR-25795A TR-25795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position are:

Suppression Pool Level Suppression Pool Temperature RPV Level RPV Pressure SRV Tailpipe Temperature (7 day restoration of requirement applies)

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-4 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev.-2 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued)

The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.

For the Noble Gas Monitors the only required channels are the mid range and high range. For the Standby Gas Treatment System Vent Noble Gas Monitor and the Turbine Building Vent Noble Gas Monitor, the "2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor; and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.

The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.

Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-5 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev._2 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of 1 or 2 channels of acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.

Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.

Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement A TRM requirement of 7 days for restoring concurrent failures of the SRV tailpipe temperature monitoring for channels with failed acoustic monitors is added to ensure prompt restoration.

Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other altemative methods.

TRS The TRSs are defined to be performed at the specified*Frequency to ensure that the TRM PAM Function is maintained OPERABLE.

TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-6 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev.2 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS (continued)

Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.

REFERENCES 1.

Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident"

2.

NUREG-0578, "TMI-2 Lessons Leamed Task Force Status Report and Short-Term Recommendations."

3.

Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.

4.

Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "S" acoustic monitor.

5.

Proposed amendment No. 183 to License No.

acoustic monitor.

NPF.-22 failed Unit 2 "J" SUSQUEHANNA - UNIT 2 TRM / B 3.3-7 EFFECTIVE DATE 05/30/2006

B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-8 EFFECTIVE DATE 03/3012001

B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-9 EFFECTIVE DATE 03/30/2001