Jun. 14, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-27372 USER INFORMATION:

Name:GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 06/14/2006 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no IC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 05/03/2006 ADD MANUAL TABLE OF CONTENTS DATE: 06/13/2006 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.4 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.4 REMOVE: REV:I ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.5 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TRM2 I- TEXT LOES

ýýMOVE: REV:24 ADD: REV: 25 CATEGORY: DOCUMENTS TYPE: TRM2

-4,00

Jun. 14, 2006 Page 2 of 2 ID: TEXT TOC REMOVE: REV:7 ADD: REV: 8 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

I%SSES MANUAL Manual Name: TRMr2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 06/13/2006 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 25 06/13/2006

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 8 06/13/2006

Title:

TABLE OF CONTENTS TEXT 1.1 0 11/19/2002

Title:

USE AND APPLICATION'DEFINITIONS TEXT 2.1 1 02/04/2005',,

Title:

PLANT PROGRAMS AND SETPOINTS PLANTiPROGRAMS TEXT 2.2 5 11/22/2005

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE

/

TEXT 3.0 1

,/ 01/06/2006

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION,-(ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 . ( 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 2 11/22/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 4 04/14/2005

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Report Date: 06/13/06 Page 11 of of 15 15 . Report Date: 06/13/06

SSES MANUAL 7 Manual Name: TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 K~)

TEXT 3.3.1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 1 04/26/2006

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 1 04/26/2006

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 .2 06/13/2006

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION K>

TEXT 3.3.7 0 11/19/2002

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/2.2/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1 11/22/2004

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10' 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Report Date: 06/13/06 Page 22 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM£-

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 1 12/14/2004

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1i 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0 11/19/2002

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION -

TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 .0 11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2--

.Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 K>r TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 1 04/26/2006

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 S.2 08/18/2005

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 5 01/06/2006

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Report Date: 06/13/06 Page 44 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1 03/01/2005

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 3

.. 04/26/2006

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0 11/19/2002

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1 2 02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT 3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Report Date: 06/13/06 Page 55 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 .0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0 11/19/2002

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1 04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 0 11/19/2002

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 *1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Page 6 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRMe-2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.6 2 12/14/2004

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 - 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 1 01/06/2006

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 2 11/22/2005

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Page 7 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM£-2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0 11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1.I 02/04/2005

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 2 06/13/2006

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 1 06/13/2006

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0 11/19/2002

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 1 11/22/2004

Title:

INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION Report Date: 06/13/06 Page 88 Page of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM--

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0 11/19/2002

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0 11/19/2002

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 9 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRMý-

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 .-2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004

Title:

PLANT SYSTEMS BASES FIRE DETECTION-INSTRUMENTATION TEXT B3.7.4 0 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR Report Date: 06/13/06 10 Page 10 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1 12/14/2004

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM Report Date: 06/13/06 Page 11 Page 11 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2- t Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 .0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0 11/19/2002

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 0 11/19/2002

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM Page 12 of 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2-Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2

)

TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 .0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002 STitle: RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM -

TEXT B3.11.2.5 3 05/20/2005

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM Report Date: 06/13/06 Page 13 Page 13 of of 15 15 Report Date: 06/13/06

£ SSES MANUAL Manual Name: TRM2-Ž Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5 -1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 4.1 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION K-.~

Report Date: 06/13/06 Page 14 of of 15 15 Report Date: 06/13/06

SSES MANUAL Manual Name: TRM2--

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.3 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 09/27/2003

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 .CT.0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Report Date: 06/13/06 Page 15 of of 15 15 Report Date: 06/13/06

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE 1.0 USE AND APPLICATION ............................................................................ 1.0-1 1.1 Definitions .................................... TRM/1.0-2 2.0 PLANT PROGRAMS ................................................................................... 2.0-1 2.1 Plant Program s ..................................................................................... 2.0-1 2.2 Instrument Trip Setpoint Table ..................................................... TRM/2.0-5 3.0 APPLICABILITY ................................................................................. TRM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability ............................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability .................................. TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS ................................ 3.1-1 3.1.1 Alternate Rod Injection ............................................... ............. 3.1-1 3.1.2 CRD Housing Support ................................ 3.1-4 3.1.3 Control Rod Block Instrumentation ........................................................ 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation a'nd Check Valve ............................................ ........ ................ TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT ..... ' / ................................. 3.2-1 3.2.1 Core Operating Limits Report ......... 3.2-1 3.3 INSTRUMENTATION ................................................................ TRM/3.3-1 3.3.1 Radiation Monitoring Instrtimentation .......................................... TRM/3.3-1 3.3.2 Seismic Monitoring Instrumeritation .............................................. TRM/3.3-4 3.3.3 Meteorological Monit6ong Instrumentation ................................... TRM/3.3-7 3.3.4 TRM Post-Acciden.l:Mo-nitoring Instrumentation ...................... :..... TRM/3.3-9 3.3.5 Section Not UsedLe................................................................... TRM/3.3-12 3.3.6 TRM Containmed1olation Instrumentation ................................. TRM/3.3-13 3.3.7 Turbine Ovekpe-Wd Protection System ......................................... TRM/3.3-17 3.3.8 Sectionr o.........................................................................

t:*o' J*slfd .. TRM/3.3-19 3.3.9 OPRIV[if[sttriJ*-eritation ................................................................. TRM/3.3-21 3.3.10 React-Vt0- i"-ulation Pump MG Set Electrical and

-1i*h ja* Tttops ......................................................................... TRM/3.3-22 3.3.11 \MV ijso0ation Instrumentation ...................................................... TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM .......................................................... TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry ....................................................... 3.4-1 3.4.2 Structural Integrity .................................................................................. 3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ........................... TRM/3.4-13 3.5 EMERGENCY. CORE COOLING AND RCIC ...................................... TRM/3.5-1 3.5.1 ADS Manual Inhibit ....................................................................... TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ....................... 3.5-6 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF4OONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE 3.6 CONTAINMENT .......................................................................................... 3.6-1 3.6.1 VENTING or PURGING ......................................................................... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication ............................................................................................... 3.6-3 3.6.3 Suppression Pool Alarm Instrumentation ..... ......... ..... 3.6-4 3.6.4 Primary Containment Closed System Boundaries ........................ TRM/3.6-7 3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System ....................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ........................ TRM/3.7-8 3.7.3.3 C02 systems ................................................................................ TRM/3.7-12 3.7.3.4 Halon Systems ................................. TRM/3.7-16 3.7.3.5 Fire Hose Stations ........................................................................ TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies .................................................................. TRMI3.7-24 3.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-26 3.7.4 Solid Radwaste System ................................................................ TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks ..................................................................... TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation ......................................... 3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ..................................................... ............... 3.7-41 3.7.8 Snubbers ...................................................................................... TRM/3.7-43 3.7.9 Control Structure HVAC ........................... TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-51 3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ........................................................................ TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous ................................................................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic ...................................................................................... TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities ............................... I...... 3.8-13 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ....................................................... TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .................................................. 3.8-24 3.9 REFUELING OPERATIONS ........................................................................ 3.9-1 3.9.1 Decay Tim e ........................................................................................... 3.9-1 3.9.2 Communications .................................................................................... 3.9-2 3.9.3 Refueling Platform ................................................................................. 3.9-3 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF-CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.10 MISCELLANEOUS ............................................................................. TRM/3.10-1 3.10.1 Sealed Source Contamination ....................... TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation .......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ..................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM) ................................................ TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS .............................................................. TRM/3.11-1 3.11.1 Liquid Effluents ............................................................................. TRM/3.11-1 3.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ................................................................... TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System .................................................. TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ........................ 3.11-13 3.11.2 Gaseous Effluents ....................................................................... TRM/3.11-17 3.11.2.1 Dose Rate ..................................................................................... TRMI3.11-17 3.11.2.2 Dose - Noble Gases ..................................................................... TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ........................................................................... TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System ...................... TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ...................................................................................... 3.11-26 3.11.3 Total Dose .................................................................................... -TRM/3.11-33 3.11.4 Radiological Environmental Monitoring ................................. *....... TRM/3.11-35 3.11.4.1 Monitoring Program ...................................................................... TRM/3.11-35 3.11.4.2 Land Use Census ......................................................................... TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program ............................................ TRM/3.11-47 3.12 LOADS CONTROL PROGRAM .......................................................... TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ....................................... TRM/3.12-1 3.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.3 3.12.3 Light Loads Requirements ........................................................... TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS .................................................................. 4.0-1 4.1 Organization .......................................................................................... 4.0-1 4.2 Reportable Event Action ........................................................................ 4.0-2 4.3 Safety Limit Violation ...................................... ;...................................... 4.0-3 4.4 Procedures and Programs ..................................................................... 4.0-4 4.5 Reporting Requirements ........................................................ ................ 4.0-5 4.6 Radiation Protection Program ................................................................ 4.0-7 4.7 Training .................................................................................................. 4.0-8 SUSQUEHANNA - UNIT 2 TRM / TOC-3 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF.CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability ...................................... B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability ......................................... B 3.0-9 B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1 B 3.1.2 CRD Housing Support ......................................................................... B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve ......................................................................... TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ................................................. B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation .................................................... B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4 B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-8 B 3.3.6 TRM Containment Isolation Instrumentation ........................................ B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14 B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................ TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation ..................................................... TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry ..................................................... B 3.4-1 B 3.4.2 Structural Integrity ...................................................................  :............ B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors .................................. B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit .......................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6 B 3.5.1 ADS Manual Inhibit .............................................................................. 63.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .......................... B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................... B 3.5-4 B 3.6.1 VENTING or PURGING .............................................................. TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication ............................................................................................. B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation ............................................. B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2 B 3.7.3.1 Fire Suppr.ession Water Supply System ...................................... TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5 B 3.7.3.3 C02 Systems .............................................................................. TRM/B 3.7-7 B 3.7.3.4 Halon Systems ............................................................................ TRM/B 3.7-8 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL).

SECTION TITLE PAGE B 3.7.3.5 Fire Hose Stations ....................................................................... TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System ............................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ......................................... B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ............................................................................ B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation .......................................................... TRM/B 3.7-22 B 3.7.8 Snubbers ............................................................................................. B 3.7-24 B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ............................................................ TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ....................................................................... TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous ......................................... TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Autom atic .................................................................................... TRM /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power.Subsystem ............................................ T-RM/B 3.8-6 B 3.8.5 Degraded Voltage Protection ............................................... "...... TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ........................................ TRM/B 3.8-17 B.3.9.1 Decay Time ......................................................................................... B 3.9-1 B 3.9.2 Communications ................................................................................. B 3.9-2 B 3.9.3 Refueling Platform ............................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination ............................................................. B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4 B 3.10.4 Leading Edge Flow Meter (LEFM) ............................................... TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration ............................................................. B 3.11-1 B 3.11.1.2 Liquid Effluents Dose .......................................................................... B 3.11-4 B 3.11.1.3 Liquid W aste Treatment System ......................................................... 83.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation .......................... B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10 B 3.11.2.1 Dose Rate .................................................................................... TRM/B 3.11-12 B 3.11.2.2 Dose - Noble Gases ............................................................................ B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form .................................................................................. B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21 TRM I TOC-5 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 8 TABLE OF-CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ............................................................................ TRM/B 3.11-24 B 3.11.3 Total Dose ........................................................................................... B 3.11-26 B 3.11.4.1 Monitoring Program ..................................................................... TRMIB 3.11-28 B 3.11.4.2 Land Use Census ................................................................................ B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ........................................... TRMIB 3.11-36 B3.12 LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ..................................... TRMIB 3.12-1 B.3.12.2 Heavy Loads Requirements ........................................................ TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ......................... TRM/B 3.12-3 TRM2 Text TOC 5/22/06 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 05/30/2006 I 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 11/15/2004 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Pages TRM / 2.0-12 through TRM /2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/08/1999 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-6 -08/31/1998 Pages TRM / 3.1-7 and TRM / 3.1-8 11/15/2005 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-39 03/03/2005 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 03/31/2006 Pages 3.3-5 and 3.3-6 08/31/1998 Page TRM 3.3-7 03/31/2006 Page 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM I 3.3-9a 12/17/1998 Page TRM / 3.3-10 05/30/2006 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-1 Ia 05/30/2006 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 11/15/2004 Pages TRM /3.3-21a through TRM / 3.3-21d 11/15/2004 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 08/31/2005 Pages 3.4-6 through 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM ./3.7-2, 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 and TRM / 3.7-13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 through TRM / 3.7-27 08/02/1999 Page TRM / 3.7-28 08/09/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Pages TRM / 3.7-40 and TRM / 3.7-40a 02/14/2005 Pages 3.7-41 and 3.7-42 08/31/1998 Page TRM / 3.7-43 03/31/2006 Pages 3.7-44 through 3.7-47 10/13/1998 Page TRM / 3.7-48 03/08/2003 Pages TRM / 3.7-49 and TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 "04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM /3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Page TRM / 3.10-5 03/08/2003 Page TRM / 3.10-6 06/05/2002 Page TRM / 3.10-7 03/31/2006 Page TRM / 3.10-8 04/17/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page 3.11-13 09/01/1998 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM /3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 03/31/2006 Pages TRM / 3.11-24 05/13/2005 Page 3.11-25 09/01/1998 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 -01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM I B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM I B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 11/15/2005 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 01/31/2005 Pages TRM / B 3.3-4 through TRM / B 3.3-7 05/30/2006 Pages TRM / B 3.3-8 and TRM / B 3.3-9 03/30/2001 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 06/14/2002 Page TRM / B 3.3-14b 06/14/2002 Page TRM / B 3.3-15 10/22/2003 Page TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 11/15/2004 Pages TRM / B 3.3-19a through TRM / B 3.3.19e 11/15/2004 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B3.3-22 10/22/2003 Page TRM / B3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/31/1998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08131/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 01/07/2002 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 08/02/1999 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM /B 3.7-10 08/02/1999 Pages TRM / B 3.7-1 Oa through TRM / B 3.7-11 a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM / B 3.7-21 and TRM / B3.7-21a 02/14/2005 Pages TRM/B 3.7-22 and TRM/B 3.7-23 04/07/2000 Page B 3.7-24 08/31/1998 Page TRM / B 3.7-25 12/03/2004 Pages B 3.7-26 through B 3.7-30 08/31/1998 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/0912001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM I B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OFEFIFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 08/31/1998 Page TRM / B 3.10-3 03/08/2003 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Pages TRM / B 3.11-21 through TRM / B 3.11-23a 05/1312005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 "08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 05/22/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev-2 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.4-1 ACTIONS

- ----- NOTE-Separate condition entry is allowed for each Function.

CONDITION - REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Enter the Condition Immediately channel inoperable, referenced in Table 3.3.4-1 for the channel B. As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.4-1. monitoring the appropriate parameter(s)

AND B.2 Restore the required channel 7 days to OPERABLE status.

C. As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.

D. As required by Required D.1 Verify affected SRV position Immediately Action A.1 and referenced by alternate methods. AND in Table 3.3.4-1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.3-9 EFFECTIVE DATE 12/17/1998

TRM Post Accident Monitoring Instrumentation PPL Rey.2- 3.3.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME AND D.2 Verify a minimum 14 of the Immediately associated acoustic monitor channels and 5 of the ADS SRV acoustic monitor channels are operable.

AND D.3.1 Verify SRV tailpipe Immediately temperature indication and alarm are available.

OR D.3.2 Restore SRV tailpipe temperature indication and 7 days alarm to functional status.

AND D.4.1 Restore the required channel(s) to OPERABLE 30 days status. OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

SUSQUEHANNA - UNIT 2 TRM / 3.3-9a EFFECTIVE DATE 12/17/1998

TRM Post Accident Monitoring Instrumentation PPL Rev.2 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE

-- - NOTE -.. . .

1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
2. When a channel is placed in an inoperable status solely for performance of required Sur(eillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.

TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the Primary 92 days Containment H2 and 02 Analyzers.

SUSQUEHANNA - UNIT 2 TRM / 3.3-10 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev-2 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

1. Suppression Chamber Air 1,2 2 C TRS 3.3.4.1 Temperature TRS 3.3.4.4
2. Main Steam Safety/Relief Valve 1,2 1/valve D TRS 3.3.4.1 Position Indicator (Acoustic TRS 3.3.4.2 Monitor)(c) TRS 3.3.4.3
3. Reactor Building Vent Noble Gas Monitor
a. Mid Range(b) 1,2, (a) I B TRS 3.3.4.1 TRS 3.3.4.4
b. High Range(b) 1,2, (a) I B TRS 3.3.4.1 TRS 3.3.4.4
4. Standby Gas Treatment System Vent Noble Gas Monitor
a. Mid Range(b) 1,2, (a) 2 B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4
b. High Range(b) 1,2, (a) 2 B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4
5. Turbine Building Vent Noble Gas Monitor
a. Mid Range(b) 1,2 2 B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4
b. High Range(b) 1,2 2 B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4 (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.3-11 EFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation PPL Re~v..2 3.3.4 TABLE 3.3.4-1 (continued)

TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
a. Effluent System 1,2, (a) 1 C TRS 3.3.4.1 flow rate monitor(b) TRS 3.3.4.4
b. Sampler flow rate 1,2, (a) 1 C TRS 3.3.4.1 monitorb) TRS 3.3.4.4
7. Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
a. Effluent System 1,2 1 C TRS 3.3.4.1 flow rate monitor) TRS 3.3.4.4
b. Sampler flow rate 1,2 1 C TRS 3.3.4.1 monitor(b) TRS 3.3.4.4
8. Containment H2 and 02 1,2 2 C TRS 3.3.4.1 Analyzer TRS 3.3.4.5 (a) When moving irradiated fuel in the secondary containment.

(b) The provisions of TRO 3.0.4 are not applicable.

(C) Alternate monitoring methods listed in Bases.

SUSQUEHANNA - UNIT 2 TRM / 3.3-11 a EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rey.2. B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations." It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.

Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.

LOOP A LOOP B

  • TE-25703
  • TE-25725
  • TT-25703 , TT-25725
  • TR-25795A
  • TR-25795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position are:

Suppression Pool Level Suppression Pool Temperature RPV Level RPV Pressure SRV Tailpipe Temperature (7 day restoration of requirement applies)

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-4 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev.-2 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The required channels for REACTOR BUILDING VENT Noble Gas Monitor, (continued) Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.

For the Noble Gas Monitors the only required channels are the mid range and high range. For the Standby Gas Treatment System Vent Noble Gas Monitor and the Turbine Building Vent Noble Gas Monitor, the "2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor; and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.

The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.

Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-5 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev._2 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of 1 or 2 channels of acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.

Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.

Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement A TRM requirement of 7 days for restoring concurrent failures of the SRV tailpipe temperature monitoring for channels with failed acoustic monitors is added to ensure prompt restoration.

Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other altemative methods.

TRS The TRSs are defined to be performed at the specified*Frequency to ensure that the TRM PAM Function is maintained OPERABLE.

TRS 3.3.4.1 Performance of the CHANNEL failure of instrumentation CHECK has not onceAevery occurred. 31 days CHANNEL ensures CHECK that a gross is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.3-6 EFFECTIVE DATE 05/30/2006

TRM Post Accident Monitoring Instrumentation PPL Rev.2 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS Agreement criteria, which are determined by the plant staff based on an (continued) investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.

REFERENCES 1. Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident"

2. NUREG-0578, "TMI-2 Lessons Leamed Task Force Status Report and Short-Term Recommendations."
3. Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S"acoustic monitor.
4. Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 "S"acoustic monitor.
5. Proposed amendment No. 183 to License No. NPF.-22 failed Unit 2 "J" acoustic monitor.

SUSQUEHANNA - UNIT 2 TRM / B 3.3-7 EFFECTIVE DATE 05/30/2006

B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-8 EFFECTIVE DATE 03/3012001

B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-9 EFFECTIVE DATE 03/30/2001