ML061720200
| ML061720200 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/14/2006 |
| From: | Susquehanna |
| To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 028401 | |
| Download: ML061720200 (44) | |
Text
Jun. 14, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-27279 USER INFORMATION:
Name:GERLACH*ROSE M Address: NUCSA2 Phone#:
254-3194 EMPL#:028401 CA#:0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 06/14/2006 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no
'C will be issued with the updated material.
TRMI -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/27/2006 ADD MANUAL TABLE OF CONTENTS DATE: 06/13/2006 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT 3.3.4 REMOVE:
REV:1 ADD:
REV:
2 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT B3.3.4 REMOVE:
REV:1 ADD:
REV: 2 CATEGORY:
DOCUMENTS TYPE: TRMI ID:
TEXT B3.3.5 REMOVE:
REV:0 ADD:
REV: 1 CATEGORY: DOCUMENTS TYPE: TRMI N-TEXT LOES
\\MOVE:
REV:28 ADD:
REV:
29 CATEGORY: DOCUMENTS TYPE: TRM1
. A-001
Jun. 14, 2006 Page 2 ID:
TEXT TOC REMOVE:
REV:8 ADD:
REV:
9 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL
' Manual Name:
TRMi-Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
06/13/2006 Procedure Name Rev Issue Date TEXT LOES 29 06/13/2006
Title:
LIST OF EFFECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
TEXT 3.0
Title:
9 06/13/2006 TABLE OF CONTENTS 0
11/18/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT /PROGRAMS, 5
03/31/2006 PLANT PROGRAMS AND SETPOINTS. INSTRUMENT TRIP SETPOINT TABLE
,~1 01/06/2006 TECHNICAL REQUIREMENT"-FOR OPERATION (TRO)
APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY
/
TEXT 3. 1. 1 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION-(ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 3
03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 7
04/26/2006
Title:
CORE OPERATING LIMITS REPORT (COLR)
Page 1 of 15 Report Date: 06/13/06 Page I of 15 Report Date: 06/13/06
SSES MANUAL Manual Name :
TRM+/--'
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 I
TEXT 3.3.1
Title:
INSTRUMENTATION TEXT 3.3.2
Title:
INSTRUMENTATION TEXT 3.3.3
Title:
INSTRUMENTATION TEXT 3.3.4
Title:
INSTRUMENTATION 0
11/18/2002 RADIATION MONITORING INSTRUMENTATION 1
04/26/2006 SEISMIC MONITORING INSTRUMENTATION 1
04/26/2006 METEOROLOGICAL MONITORING INSTRUMENTATION
.. 2 06/13/2006 TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6
Title:
INSTRUMENTATION TEXT 3.3.7
Title:
INSTRUMENTATION TEXT 3.3.8
Title:
INSTRUMENTATION TEXT 3.3.9 2
10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION 0
11/18/2002 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 TRM RPS INSTRUMENTATION 2
03/31/2006 Uj
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1
04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM SET, STOPS CHEMISTRY K)
Page 2 of 15 Report Date: 06/13/06 Page2 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM1--
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 0
11/18/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0
11/18/2002 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 1
12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0
11/18/2002
- _*)
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0
11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN Page3 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM1--
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 I
K>
TEXT 3.7.2 0
11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT 1
04/26/2006 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SYSTEMS SPRAY AND SPRINKLER SYSTEMS
.-. 2 SYSTEMS C02 SYSTEMS 1
SYSTEMS HALON SYSTEMS 08/18/2005 04/26/2006 1
04/26/2006 SYSTEMS FIRE HOSE STATIONS 1
04/26/2006 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES
-4 09/08/2005 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Q_,
.Page4 of 15 Report Date: 06/13/06
. Page 4 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM+/--
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 1
03/01/2005 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0
11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8
.2 04/26/2006
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0
11/18/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC mEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 1
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 2
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
PROTECTION -
TEXT 3.8.3 0
11/18/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES TEXT 3.8.4 0
11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 0
11/18/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15 Report Date: 06/13/06 Page 5 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRMi Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.6 0
11/18/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3
.-0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 1
03/31/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1
04/26/2006
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
~
TEXT 3.10.4
Title:
MISCELLANEOUS LEADING 0
11/18/2002 EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4
Title:
RADIOACTIVE EFFLUENTS 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Page 6 of 15 Report Date: 06/13/06 Page6 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM* Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.5 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID TEXT 3.11.2.1 3
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE -
NOBLE GASES PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE 1
04/26/2006 EFFLUENTS DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0
11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS EFFLUENTS 2
04/26/2006 VENTILATION EXHAUST 2
12/14/2004 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM 2
04/26/2006 LAND USE CENSUS 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM 0
11/19/2002 CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM Page 7 of 15 Report Date: 06/13/06 Page 7 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM1-'
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.12.2 0
11/19/2002
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0 1
01/06/2006
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0
11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION K-., 'I TEXT B3.3.2
Title:
INSTRUMENTATION BASES TEXT B3.3.3
Title:
INSTRUMENTATION BASES TEXT B3.3.4
Title:
INSTRUMENTATION BASES 0
11/19/2002 SEISMIC MONITORING INSTRUMENTATION 1
02/04/2005 METEOROLOGICAL MONITORING INSTRUMENTATION 2
06/13/2006 TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION Page 8 of 15 Report Date: 06/13/06 Page 8 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRMI--
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.5 1
06/13/2006
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3
10/19/2005
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0
11/19/2002
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1..
10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)
INSTRUMENTATION TEXT B3.3.9
Title:
OPRM INSTRUMENTATION 2
03/31/2006 TEXT B3.3.10
ý,
Title:
INSTRUMENTATION 0
11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS.
TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 0
11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 9 of 15 Report Date: 06/13/06 Page 9 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRMi-Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.5.1
Title:
Title:
11/19/2002 BASES ADS MANUAL INHIBIT 0
11/19/2002 BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0
11/19/2002
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1
-0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 1
04/26/2006 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS Page 10 of 15 Report Date: 06/13/06 Page 10 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM!-1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
/
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7 1
04/26/2006 HALON SYSTEMS SYSTEMS BASES SYSTEMS BASES 1
FIRE 04/26/2006 HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES FIRE 11/19/2002 RATED ASSEMBLIES 01/12/2004 DETECTION INSTRUMENTATION 1
FIRE SYSTEMS BASES 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS SYSTEMS BASES HYDROGEN MONITOR 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS SYSTEMS BASES 1
03/01/2005 SYSTEMS BASES ESSW PUMPHOUSE VENTILATION 0
11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1
12/14/2004
Title:
PLANT SYSTEMS BASES SNUBBERS Page 11 of 15 Report Date: 06/13/06 Page 11 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRMi--
t Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS KJ TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.9.1 1
02/04/2005 POWER BASES PRIMARY CONTAINMENT'PENETRATION CONDUCTOR OVERCURRENT DEVICES
- 0 11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
PROTECTION -
0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1
02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0
11/19/2002 ACTIVITIES
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM Page 12 of 15 Report Date: 06/13/06 Page 12 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRM3 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4
.0 11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION T EXT B3.11.1.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES TEXT B3.11.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
SSES MANUAL Manual Name:
TRM14-Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS 0
BASES 3
BASES 1
BASES
.BA0 BASES 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 05/20/2005 VENTILATION EXHAUST 01/27/2004 RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 11/19/2002 TOTAL DOSE TEXT B3.11.4.1 2
01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM TEXT 4.1 0
BASES 0
BASES 0
BASES 11/19/2002 LAND USE CENSUS 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL U
0 11/19/2002 BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION Page 14 of 15 Report Date: 06/13/06 Page 14 of 15 Report Date: 06/13/06
SSES MANUAL Manual Name:
TRMa-Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
CONTROLS 0
CONTROLS 08/31/1998 SAFETY LIMIT VIOLATION 08/31/1998 PROCEDURES & PROGRAMS 0
08/31/1998 CONTROLS REPORTING REQUIREMENTS 0
CONTROLS 0
CONTROLS 08/31/1998 RADIATION PROTECTION PROGRAM 08/31/1998 TRAINING Page 15 of 15 Report Date: 06/13/06 Page 15 of 15 Report Date: 06/13/06
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE OE CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE AND APPLICATION.......................................................................
TRM/1.0-1 1.1 Definitions.........................................................................................
TRM /1.0-2 2.0 PLANT PROGRAMS.......................................................................................
2.0-1 2.1 Plant Program s..........................................................................................
2.0-1 2.2 Instrument Trip Setpoint Table..........................................................
TRM/2.0-5 3.0 APPLICABILITY................
TRM/3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability.
TRM/3.0-1 3.0 (TRS) -.TR Surveillance (TRS) Applicability.................................
TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS...........................
3.1-1 3.1.1 Alternate Rod Injection................................
1;........................................ 3.1-1 3.1.2 CRD Housing Support........................
- ..................................................... 3.1-4 3.1.3 Control Rod Block Instrumentation.......... ;................................................. 3.1-5 3.1.4 Control Rod Scram Accumulator's Instrumentation and Check Valve.......................................
........................................... TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT......................
TRMI3.2-1 3.2.1 Core Operating Limits Report...;........................................................
TRM/3.2-1 3.3 INSTRUMENTATION..
- .4..
TRM/3.3-1 3.3.1 Radiation Monitoring-instrumentation................................................
TRM/3.3-1 3.3.2 SeismicvMQrjjtordng Instrumentation................................... TRMI3.3-4 3.3.3 Meteodological Monitoring Instrumentation.................
TRM/3.3-7 3.3.4 TRMKPostL-Accident Monitoring Instrumentation.................................
TRM/3.3-9 3.3.5 Section Not Used.............................................................................
TRMI3.3-12 3.3.6 TRM Containment Isolation Instrumentation................
TRM/3.3-13 3.3.7 Turbine Overspeed Protection System..............................................
TRM/3.3-17 3.3.8 Section Not Used..............................................................................
TRM/3.3-19 3.3.9 O PRM Instrumentation......................................................................
TRM/3.3-22 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................
TRM/3.3-23 3.3.11 MVP Isolation Instrumentation...........................................................
TRM/3.3-25 3.4 REACTOR COOLANT SYSTEM.............................................................
TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry...................................................
TRM/3.4-1 3.4.2 Structural Integrity......................................................................................
3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors.........................................
3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................
TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program................................
TRM/3.4-13 SUSQUEHANNA UNIT I TRM I TOC-1 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM / TOC-1 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE 2E CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC..........................................
TRM/3.5-1 3.5.1 ADS Manual Inhibit TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................................
3.5-3 3.5.3 Long Term Nitrogen Supply to ADS...........................................................
3.5-6 3.6 CO NTA INM ENT...............................................................................................
3.6-1 3.6.1 VENTING or PURGING.............................................................................
3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication....................................................................................................
3.6-2 3.6.3 Suppression Pool Alarm Instrumentation....................................................
3.6-3 3.6.4 Primary Containment Closed System Boundaries.............................
TRM/3.6-6 3.7 PLANT SYSTEMS...........................................................................................
3.7-1 3.7.1 Emergency Service Water System (Shutdown)..........................................
3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................
3.7-3 3.7.3.1 Fire Suppression Water Supply System............................................
TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems............................................................
TRM/3.7-8 3.7.3.3 C02 Systems....................................
TRM/3.7-12 3.7.3.4 Halon Systems..................................................................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations............................................................................
TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................
TRMI3.7-22 3.7.3.7 Fire Rated Assemblies............................................................
TRMI3.7-24 3.7.3.8, Fire Detection Instrumentation..........................................................
TRM/3.7-26 3.7.4 Solid Radwaste System.............................
TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor....................
3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture....................................................
3.7-39 3.7.5.3 Liquid Holdup Tanks.........................................................................
TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation.........................................................
TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.........................................................................
3.7-42 3.7.8 Snubbers...........................................................................................
TRM/3.7-44 3.7.9 Control Structure HVAC....................................................................
TRM/3.7-50 3.7.10 Spent Fuel Storage Pools.................................................................
TRM/3.7-52 SUSQUEHANNA - UNIT 1 TRM / TOC-2 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE.OE. CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8 ELECTRICAL POWER...........................................................................
TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices............................................................................
TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous........................................................................................
TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic..........................................................................................
TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities...........................................
3.8-13 3.8.4 24VDC Electical Power Subsystem.................................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection............................................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling.......................................................
3.8-24 3.9 REFUELING OPERATIONS............................................................................
3.9-1 3.9.1 Decay Time;...............................................................................................
3.9-1 3.9.2 Communications........................................................................................
3.9-2 3.9.3 Refueling Platform......................................................................................
3.9-3 3.10 MISCELLANEOUS...................................................................................
TRM/3.10-1 3.10.1 Sealed Source Contamination.............................................................
TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation............................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).........................
TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM)............................................ :........ TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS.................................................................
TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration........................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...............................
TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System..,....................................................
TRMI3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.................................
3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation............................. 3.11-13 3.11.2.1 Dose Rate........................................................................................
TRM/3.11-17 3.11.2.2 Dose - Noble Gases..........................................................................
TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form................................................................................
TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System.............................................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System..............................................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation..........................................................................................
3.11-25 3.11.3 Total Dose...........................................................................................
TRM/3.11-33 3.11.4.1 Monitoring Program.............................................................................
TRM/3.11-35 3.11.4.2 Land Use Census..................................
TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program..................................................
TRM/3.11-47 SUSQUEHANNA UNIT I TRM / TOC-3 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT I TRM I TOC-3 EFFECTIVE DATE 05/3012006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE.OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.12 LOADS CONTROL PROGRAM..............................................................
TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.................................................
TRM/3.12-1 3.12.2 Heavy Loads Requirements....................................................................
TRM/3.12-3 3.12.3 Light Loads Requirements......................................................................
TRM/3.12-5 4.0 ADM INISTRATIVE CONTROLS......................................................................
4.0-1 4.1 Organization....................................................................................................
4.0-1 4.2 Reportable Event Action..................................................................................
4.0-2 4.3 Safety Limit Violation.......................................................................................
4.0-3 4.4 Procedures and Programs...............................................................................
4.0-4 4.5 Reporting Requirements..................................................................................
4.0-5 4.6 Radiation Protection Program..........................................................................
4.0-7 4.7 Training............................................................................................................
4.0-8 SUSQUEHANNA - UNIT 1 TRM /TOC-4 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE.OFCONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 Applicability................................................................................................
B 3.0-1 B 3.0 (TRO) - TR for Operation (TRO) Applicability.............................................
B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability...............................................
B 3.0-9 B 3.1.1 Alternate Rod Injection......................................................................
TRM/B 3.1-1 B 3.1.2 CRD Housing Support.......................................................................
TRM/B 3.1-4 B 3.1.3 Control Rod Block Instrumentation.................................................... TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve......................................................................................
TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)........................................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation................................................
TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation............................................................
B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation........................................
TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation..............
TRM/B 3.3-4 B 3.3.5 Section Not Used.................................
TRM/B 3.3-8 B 3.3.6 TRM Containment Isolation Instrumentation...............................................
B 3.3-10 B 3.3.7 Turbine Overspeed Protection System...........................................
- ... TRM/B 3.3-14 B 3.3.8 Section Not Used..............................................................................
TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation.............................................................
TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................
TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation...........................................................
TRM/B 3.3-20 B 3.4.1 Reactor Coolant System Chemistry...........................................................
B 3.4-1 B 3.4.2 Structural Integrity......................................................................................
B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors.........................................
B 3.4-4 B 3.4.4.
Reactor Recirculation Flow and Rod Line Limit.................................
TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program.........................................
B 3.4-6 B 3.5.1 ADS Manual Inhibit....................................................................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................................
B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS...........................................................
B 3.5-4 SUSQUEHANNA -
UNIT I TRM I TOC-5 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM /TOC-5 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 9 TABLE. QE CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.6.1 VENTING or PURGING....................................................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication....................................................................................................
B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation........................................... TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.............................
TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)..........................................
B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................
B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System............................................
TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems............................................................
TRM/B 3.7-5 B 3.7.3.3 C02 systems....................................................................................
TRM/B 3.7-7.
B 3.7.3.4 Halon Systems....
............................... TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.............................................................................
TRM/B 3.7-10 B 3.7.3.6 Yard Fire'Hydrants and Hydrant Hose Houses..................................
TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies......................................................................
TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation..........................................................
TRM/B 3.7-14 B 3.7.4 Solid Radwaste System....................................................................
TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor.....................
B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................
B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks..................................................................................
B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation..........................................................
TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation...........................
TRM/B 3.7-22 B 3.7.8 Snubbers....................................................................................................
B 3.7-24 B 3.7.9 Control Structure HVAC....................................................
TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools............................
TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.................................
TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous........................................................................................
TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic......................................
TRM/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities...........................................
B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem...........................................................
B 3.8-6 B 3.8.5 Degraded Voltage Protection............................................................
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling..............................................
TRM/B 3.8-17 B.3.9.1 Decay Tim e................................................................................................
B 3.9-1 B 3.9.2 Communications........................................................................................
B 3.9-2 SUSQUEHANNA -
UNIT I TRM I TOC-6 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM /TOC-6 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION TABLE O.E CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 9 SECTION B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Refueling Platform.................
B 3.9-3 Sealed Source Contamination....................................................................
B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation...................... TRM/B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI)......................... TRM/B 3.10-4 Leading Edge Flow Meter (LEFM).....................................................
TRM/B 3.10-6 Liquid Effluents Concentration....................................................................
B 3.11-1 Liquid Effluents Dose.................................................................................
B 3.11-4 Liquid Waste Treatment System...........................
B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation.................................
B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation.................... TRM/B 3.11-10 Dose Rate.........................................................................................
TRM/B 3.11-12 Dose - Noble Gases...................................................................................
B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.........................................................................................
B 3.11-18 Gaseous Radwaste Treatment System.............................................
TRM/B 3.11-20 Ventilation Exhaust Treatment System..............................................
TRMIB 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation................................................................................
TRM/B 3.11-24 Total Dose....... *..........................................................................................
B 3.11-26 Monitoring Program.............................................................................
TRM/B 3.11-28 Land Use Census............................................
B 3.11-34 Interlaboratory Comparison Program................................................
TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool........................................... TRM/B 3.12-1 Heavy Loads Requirements.............................................................
TRM/B 3.12-2 Light Loads Requirements................................................................
TRM/B 3.12-3 TRMl text TOC 5/22106 SUSQUEHANNA - UNIT 1 TRM / TOC-7 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 05/30/2006 TOC TABLE OF CONTENTS 1.0 2.0 3.0 3.1 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM /2.0-11 Page TRM / 2.0-12 Pages TRM /. 2.0-13 and TRM /2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM /3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-5 Pages TRM / 3.1-6 through TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-44 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 Pages TRM / 3.3-5 and TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM1 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 10/04/2002 08/31/1998 01/28/2005
- 06/25/2002 04/02/1999 03/22/2006 12/03/2004 11/15/2004 03/22/2006 11/15/2004 11/15/2005
- 04/08/1999 03/15/2002 11/30/2005 08/31/1998 03/22/2006 02/18/1999 02/18/1999 07/07/1999 03/31/2006 07/16/1999 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/17/1998 05/30/2006 06/02/2005 05/30/2006 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 3.2 3.3 SUSQUEHANNA-UNITI TRM I LOES-1 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 3.5 3.6 3.7 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-28 and TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Effective Date 10/22/2003 03/22/2006 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1009 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 04/17/2000 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 08131/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 12/29/1999 08/02/1999 08/09/2005 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08102/1999 03/31/2006 08/09/2005 08/25/2005 11/16/2001 01/09/2004 SUSQUEHANNA
- UNIT I TRM / LOES-2 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.8 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Pages TRM / 3.7-41 and TRM / 3.7-41a Pages 3.7-42 and 3.7-43 Page TRM / 3.7-44 Pages 3.7-45 through 3.7-48 Page TRM / 3.7-49 Pages TRM / 3.7-50 and TRM I 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 through TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 Effective Date 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 08/31/1998 03/31/2006 10/13/1998 03/08/2003 03/09/2001 12/03/2004 04/15/2003 07/29/1999 04/02/2002 01/28/2005 04/02/2002 12/03/2004 08/10/2004 12/03/2004 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 08/31/1998 3.9 3.10 03/31/2006 08/31/1998 03/22/2006 03/31/2006 04/17/2002 03/31/2006 08/31/1998 03/31/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 SUSQUEHANNA
- UNIT I TRM I LOES-3 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM /3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM /3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 Effective Date 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 09/011998 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 03/31/2006 05/13/2005 09/01/1998 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 3.12 02/05/1999 08/31/199 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA
- UNIT I TRM / LOES-4 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 B3.1 B 3.2 B 3.3 B 3.4 B 3.5 B 3.6 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM I B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-7 Pages TRM / B 3.3-8 and TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17f Pages TRM / B3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM-/ B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 08/31/1998 01/31/2005 05/30/2006 03/30/2001 08/31/1998 09/13/2005 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 03/22/2006 03/22/2006 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08/31/1998 SUSQUEHANNA
- UNIT I TRM / LOES-5 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA -UNIT 1 TRM / LOES-5 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM / B 3.6-11 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM / B 3.7-11 a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM/B 3.7-21 and TRM/B 3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Page B 3.7-24 Page TRM / B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 09/23/1999 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03131/2006 08/02/1999 08/02/1999 01109/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 08/31/1998 12/03/2004 08/31/1998 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/02/2002 01/28/2005 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 08/31/1998 B 3.8 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 05/30/2006
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 29 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / B 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B.3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM /B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.7-31 through B 3.7-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 08/31/1998 03/22/2006 08/23/1999 04/17/2002 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 01/21/2004 08/30/1998 11/30/2005 12/03/2004 08/30/1998 02/12/1999 02/05/1999 TRM1 ted LOES 5r22106 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.-2 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
APPLICABILITY:
According to Table 3.3.4-1 ACTIONS iv' I-Separate condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Enter the Condition referenced Immediately channel inoperable, in Table 3.3.4-1 for the channel B.
As required by Required B.1 Initiate the preplanned 72-hours Action A.1 and referenced alternate method of monitoring in Table 3.3.4-1.
the appropriate parameter(s)
AND B.2 Restore the required channel 7 days to OPERABLE status.
C.
As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D. As required by Required D.1 Verify affected SRV position Immediately Action A.1 and referenced in by alternate methods.
Table 3.3.4-1 AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter I
SUSQUEHANNA - UNIT 1 TRM / 3.3-9 EFFECTIVE DATE 12/17/1998
TRM Post Accident Monitoring Instrumentation PPL Rev,-2
.3.3.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME AND D.2 Verify a minimum 14 of the associated acoustic monitor channels and 5 of the ADS SRV acoustic monitor channels are operable.
AND D.3.1 Verify SRV tailpipe temperature indication and alarm are available.
OR D.3.2 Restore SRV tailpipe temperature indication and alarm to functional status.
AND D.4.1 Restore the required channel(s) to OPERABLE status.
Immediately Immediately 7 days 30 days OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
SUSQUEHANNA - UNIT 1 TRM / 3.3-9a EFFECTIVE DATE 12/17/1998
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.-2 TECHNICAL REQUIREMENT SURVEILLANCE NOTE-
- 1.
Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.4.5 Perform CHANNEL CALIBRATION of the 92 days Primary Containment H2 and 02 Analyzers.
SUSQUEHANNA - UNIT 1 TRM / 3.3-10 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev.-2 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 1. Suppression Chamber Air Temperature
- 2. Main Steam Safety/Relief Valve Position Indicator (Acoustic Monitor)(c)
- 3. Reactor Building Vent Noble Gas Monitor 1,2 1,2 2
C D
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.2 TRS 3.3.4.3 1/valve
- a. Mid Range(b)
- b. High Range(b) 1,2, (a) 1,2, (a)
I I
B B
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- a. Mid Range(b)
B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4
- 5. Turbine Building Vent Noble Gas Monitor
- a. Mid Range(b)
- b. High Rangerb) 1,2 1,2 2
B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4 2
B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4 (continued)
SUSQUEHANNA - UNIT 1 TRM / 3.3-11 EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev-2 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
- a. Effluent System 1,2, (a)
I C
TRS 3.3.4.1 flow rate monitorb)
TRS 3.3.4.4
- b. Sampler flow rate monitor')
1,2, (a)
- 7. Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
- a. Effluent System 1,2 1
C TRS 3.3.4.1 flow rate monitor~b)
- b. Sampler flow rate monitor(b) 1,2 1
C TRS 3.3.4.4
- 8. Containment H2 and 02 Analyzer 1,2 2
(b)
(c)
When moving irradiated fuel in the secondary containment.
The provisions of TRO 3.0.4 are not applicable.
Altemate monitoring methods listed in Bases.
SUSQUEHANNA - UNIT 1 TRM / 3.3-11 a EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation PPL Rev.2.
B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations." It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purpose of this TRM. The recorders are the primary method of indication used by the operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
" TE-15703 0 TE-15725 TT-15703 0
TT-15725 TR-15795A TR-15795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position are:
Suppression Pool Level Suppression Pool Temperature RPV Level RPV Pressure SRV Tailpipe Temperature (7 day restoration of requirement applies)
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-4 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rey.2, B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued)
The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range. For the Standby Gas Treatment System Vent Noble Gas Monitor and the Turbine Building Vent Noble Gas Monitor, the "2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor;, and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.
The drywell and suppression chamber hydrogen and oxygen concentrations gas analyzers monitor hydrogen and oxygen concentration to detect combustible gas levels in primary containment. The analyzers are capable of determining hydrogen concentration in the range of 0 to 30% by volume and oxygen concentration in the range of 0 to 10% by volume, and each provide control room indication and output to a control room recorder. Each gas analyzer must be capable of sampling either the drywell or the suppression chamber. The recorders are the primary method of indication available for use by the operator during an accident, therefore the PAM Specification deals specifically with this portion of the instrument channel. The gas analyzer piping is provided with heat tracing to reduce the buildup of condensation in the system. H20 2 Analyzers can be considered OPERABLE for accident monitoring for up to 100 days with their heat tracing INOPERABLE.
Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-5 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation PPL Rev.2 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of 1 or 2 channels of acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.
Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement. A TRM requirement of 7 days for restoring concurrent failures of the SRV tailpipe temperature monitoring for channels with failed acoustic monitors is added to ensure prompt restoration. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value.. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-6 EFFECTIVE DATE 05/30/2006
TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev.2 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRS (continued)
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES
- 1.
Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident"
- 2.
NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
- 3.
Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.
- 4.
Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit I "S" acoustic monitor.
- 5.
Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
SUSQUEHANNA - UNIT 1 TRM / B 3.3-7 EFFECTIVE DATE 05/30/2006
B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-8 EFFECTIVE DATE 03/30/2001
B 3.3.5 PPL Rev. 1 B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRM / B 3.3-9 EFFECTIVE DATE 03/30/2001
B 3.3.5 PPL Rev. 1-B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA-UNIT 1 TRM / B 3.3-8 EFFECTIVE 03/30/2001
B 3.3.5 PPL Rev. 1. -
B 3.3.5 Section not used THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TRM / B 3.3-9 EFFECTIVE 03/30/2001