Public End of Cycle 05/02/2006 Meeting Summary
ML061280323
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/05/2006
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
FirstEnergy Nuclear Operating Co
References
Download: ML061280323 (5)


Text

May 5, 2006 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE MAY 2, 2006, PUBLIC MEETING TO DISCUSS THE DAVIS-BESSE END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 2, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building. The meeting was between the NRC Region III management and FirstEnergy Nuclear Operating Company (FENOC) to discuss the NRCs assessment of Davis-Besses safety performance for the period from January 1 through December 31, 2005. The letter of notification, meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML061040091, ML061040115, ML061240481, and ML061240414, respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Davis-Besses performance in calendar year 2005, which was documented in the March 2, 2006 end-of-cycle assessment letter.

As part of this regulatory performance meeting, FENOC responded to the NRCs assessment, discussing the recent refueling outage, and future initiatives for 2006. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials, however, there were no questions.

These documents can be found on the NRCs website at http://www.nrc.gov/reading-rm/adams.html (The Pubic Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: E:\Filenet\ML061280323.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII NAME CLipa:dtp DATE 05/05/06 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

JLD RMS2 SJC4 RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC M. Satorius, Director of Division of Reactor Projects, RIII C. Lipa, Branch Chief, DRP, RIII, Davis-Besse S. Campbell, Project Manager, NRR J. Rutkowski, Senior Resident Inspector, Davis-Besse R. Smith, Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company M. Bezilla, Site Vice President B. Allen, Plant Manager R. Schrauder, Director of Site Improvement