April 13, 2006 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No.: 50-346 Date and Time of Meeting: Tuesday, May 02, 2006; 7:00 p.m. to 9:00 p.m. (EDT)

Location of Meeting: Energy Education Center Davis-Besse Administration Building 5501 North State Route 2 Oak Harbor, OH 43449 Purpose of Meeting: Discuss End of Cycle plant performance assessment at Davis-Besse.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

M. Satorius, Director, Division of Reactor Projects, RIII C. Lipa, Chief, Division of Reactor Projects, RIII J. Rutkowski, Senior Resident Inspector, Davis-Besse Licensee Attendees:

G. Leidich, FENOC President and Chief Nuclear Officer, Davis-Besse D. Pace, FENOC Senior Vice President, Engineering, Davis-Besse M. Bezilla, FENOC Vice President, Davis Besse B. Allen, Davis-Besse Director, Site Operations J. Rinckel, FENOC Vice President, Oversight

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Christine Lipa at 630-829-9619 by COB April 28, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print),

please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved By: __/RA/_________________

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR S. Campbell (SJC4), Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII C. Lipa (CAL), DRP Branch Chief J. Rutkowski (JER7),SRI, Davis Besse DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP