ML061040091

From kanterella
Jump to navigation Jump to search
Public Meeting Letter to Firstenergy Nuclear Operating Company, Davis-Besse, to Discuss the End-of-Cycle Performance Assessment
ML061040091
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/13/2006
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML061040091 (5)


Text

April 13, 2006 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

Dear Mr. Bezilla:

This letter confirms the discussion between members of our staff to meet and discuss the End-of-Cycle performance assessment of the Davis-Besse Nuclear Power Station. The meeting will be held on May 2, 2006, from 7:00 p.m. to 9:00 p.m. (EDT) at the Energy Education Center in the Davis-Besse Administration Building. The Meeting is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.

We will gladly discuss any questions you may have concerning this matter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 See Attached Distribution

April 13, 2006 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

Dear Mr. Bezilla:

This letter confirms the discussion between members of our staff to meet and discuss the End-of-Cycle performance assessment of the Davis-Besse Nuclear Power Station. The meeting will be held on May 2, 2006, from 7:00 p.m. to 9:00 p.m. (EDT) at the Energy Education Center in the Davis-Besse Administration Building. The Meeting is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.

We will gladly discuss any questions you may have concerning this matter.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 See Attached Distribution DOCUMENT NAME:E:\Filenet\ML061040091.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME FRamirez:dtp CLipa DATE 04/13/06 04/13/06 OFFICIAL RECORD COPY

M. Bezilla cc: The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead President of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

M. Bezilla ADAMS Distribution:

JLD SPS1 SJC4 RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 RJS2 VTM