ML060790009

From kanterella
Jump to navigation Jump to search
Miscellaneous Correspondence for the Dresden Initial Examination - February 2006
ML060790009
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/06/2006
From: Charles Phillips
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co, Exelon Nuclear
Shared Package
ML060670299 List:
References
50-237/06-301, 50-249/06-301
Download: ML060790009 (37)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE DRESDEN INITIAL EXAMINATION - FEBRUARY 2006

.

  • Exelan, AmerGen,,

An ExelonlBntish Energy Company Nud ear Exelon Generation w.exeloncorp.com 4300 Winficld Road RIS 2003-14 Wamcnvillc. It 60555 RS-03-173 2130-03-20244 5928-03-20186 September 26,2003 U. S. Nuclear Regulatory Commission A T T N Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 N and STN 50-457 W

Byron Station, Units 1and 2 Facility Operating Ucense Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 5 0 4 5 Clinton Power Station,Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station. Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Response to RIS 2003-14 September 26.2003 Page 2 Quad C i e s Nudear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPRSO NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatwy Issue Summary 2003-14 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary (RE) 2003-14, Preparation and Scheduling of Operator Licensing Examinations. dated August 27,2003.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to

&e examined and intentions regarding the preparation of the examinations.

Attachments 1through 10 provide the responses to RIS 2003-14 for the Exelon Generation Company, U C (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above.

The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Year CY 2005,a total of 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in Attachment 6. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Umerlck Generating Station (LGS); the remainder of the operating exam will be completed at Peach bottom Atomic Power Slatbn (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS. rather than repeating the same information on both attachments, the exam scheduling information k provided on Attachment 6 for LGS only and for PBAPS references Attachment 6.

Ifyou have any questions or require additional information. please do not hesitate to contact us.

Sincerely, Michael P. Gallagher Director, Licensing 8 Regulatocy Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 - Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 - Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Attachment 10 -Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response io RIS 2003-14 September 26.2003 Page 3 cc: -

Regional Administrator NRC Region I wlattachments Regional Adminlstrator - NRC Region 111 Y NRC Senior Resident Inspector Braktwood Station Y NRC Senj,,Resident Inspector - Byron Station I NRC Senior Resident Inspector - Clinton Power Station Y NRC Senior Resident Inspector Dresden Nudear Power Station I NRC Senior Resident Inspector LaSalle County Station .I N R C Senior Resident Inspector Limetick Generating Station Y NRC Senior Resident Inspector W t e r Creek Generating Station Y NRC Senior Resident Inspector Peach Bottom Atomic Power Station "

NRC Senior Resident Inspector Three Mile Island Nuclear Station Y N R C Senior Resident Inspector -Quad Cities Nuclear Power Station Y

~~

, Response to RIS 2003-14 Attachment 4 Page 1 of 1 I

F A U n NRC REGICU Dresden Nuclear Power Station, U n k 2 and 3 m Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237and 50-249 b, PROPOSED EXAMINATIONPREPARATION SCHEDULE ESTIMATEDNUMBER OF ucouSEE~PARED 1 1 1 0 wiwnoNs ESTlMATED NUMBER OF MKipREPARED 0 0 0 0 I I

~ O F R OPERATORS E A I

~ 0 0 I 2 0

W E R OF SENIOR REACTOR OPERATORS-INSTANT I 6 6 6 0 W E R OF SENlOR WcroA OPERATORS-UPOWE 0 2 0 0

~~

NUMBER OF SENIOR REACTOR OPERATORS-LIMITED I o I o I o I o PROPOSED DATES I I PRIMARY DATE 8/16/04-&rzOx)4 BR2/05-&r26E05 8/2lK)6-#25/66 MA ALTERNATE DATE @a 4- 8/27/04 -

8(29/05 9 m 8/28/06 - 9/1/06 MA c y 2004 CY 2005

'ROPOSED NUMBER

~~

MARCH 1 JUNE ISEFTEMXRI DECEMBEFI MAACH I JUNE SEPTEMBER DECEMBER Esnmm VUMBER OF 1 a 0 0 0 a 0 0 XNDIDATES

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 March 4. 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS

Dear Mr. Crane:

In a letter dated September 26, 2003, your staff responded to NRC Regulatory Issue Summary (RE) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations," for all Exelon Nuclear Stations. This letter responds to the request for initial license examinations at Dresden Nuclear Power Station, Units 1 and 2.

Initial license examinations were requested during the week of August 16, 2004, during the week of August 22, 2005, and during the week of August 21, 2006. The initial license examination scheduled for August 16,2004, has been scheduted and a chief examiner assigned to the examination. Because of a heavy work load, the examination requested for August 2005 was rescheduled to the week of September 19, 2005, per a telephone conversation between Mr. M. Carey, Dresden Station Operations Training Manager, and Mr. 0.McNeil of my staff. That examination has been scheduled and a chief examiner assigned to that examination. The examination requested for August 2006 will be scheduled as we approach that date.

On-site validation of the examinations will occur at Dresden Nuclear Power Station approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date.

As indicated in your RIS response letter, your staff will develop the examination. Your letter also indicated that you are training less than 10 candidates for each of the examinations.

Please inform us if the number of candidates rises above 10 as this will impact the examination schedule.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. C. Phillips of my staff at 630-829-9739.

C. Crane In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at htt~://www.nrc.qov/readina-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission Training Department

C. Crane In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readinq-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission Training Department OFFICE RIII:DRS I RIII:DRS RIII:DRS h:

NAME MABies:sd CPhillips RDLanksbury g)

DATE 02/24/04 02/24/04 03/ 9/04

J. Skolds In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readina-rm/adams.htmI(the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission DOCUMENT NAME: G:\DRS\Dre 11 03 DRS.wDd OFFICE RIII:DRS 1 0

RIII
DRS I C RI1I:DRS 13 NAME MABies:sd HAG CPhillips Lp RDLanksbury G93 DATE WQ 2lMA.w llu83 Jzy/oy ~yrfi/o$r

C. Crane ADAMS Distribution: .

AJM DFT MXB RidsNrrDipmlipb GEG HBC DRCI DRPlll DRSlll PLBI JRKI DCT M. A. Bies (concurrence copy)

www.exeloncorp cam ExeI n, An Exelon Company AmerCen Energy Company. LLC Nuclear 4300 Winfield Road Warrenvilie I1 60555 RS-04-093 2130-'04-20146 5928-04-20163 July 14, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 .

Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Response to RIS 2004-10 July 14. 2004 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary (RIS) 2004-10, Preparationand Scheduling of Operator Licensing Examinations, dated June 14, 2004.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to RIS 2004-10 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above.

The operator licensing examination informationfor each facility is provided on a separate NRC Form 536.

During Calendar Years (CYs) 2005 and 2008, a total of 6 candidates per year are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in Attachment 6. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and Attachment 8 for PBAPS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us Sincerely, Michael P. Gallagher Director, Licensing & Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 - Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Generating Statton Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 - Completed NRC Form 536 for Three Mile Island Nuclear Station Unit 1

~

Attachment 10 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response to R E 2004-10 Attachment 4 Page 1 of 1 U.S NUCLEAR REGULATORY COMMISSION APPROVEOBYOMB NO 31500131 EXPIRES OTi3112WC IC FORM 536 2003)

OPERATOR LICENSING EXAMINATION DATA

\CILITY I NRC REGION Dresden Nuclear Power Station, Units 2 and 3 111 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 PROPOSED NUMBER CY 2005 CY CY CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARE0 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE C Y m CY PROPOSED ~~

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPlLMHtlH DCCIIMBFR lis 1 IMATFD NUMBER OF 0 0 0 10 0 0 0 0 CANDIDATLS

Exdon Nuclear zoo txelon Way www exelo"corp.com Nuclear Kennett Square. PA 19198 RS-04-150 October 1, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Revised Response to NRC Regulatory Issue Summary 2004-10 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

1. NRC Regulatory Issue Summary (RIS) 2004-10, "Preparation and Scheduling of Operator Licensing Examinations," dated June 14, 2004.
2. Exelon/AmerGen Response to RIS 2004-10 dated July 14,2004 In Reference 1, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations. In Reference 2, Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) provided the operator licensing examination information for each Exelon and AmerGen facility on a separate NRC Form 536.

The attachment to this letter provides a revised response to RIS 2004-10 for Dresden Nuclear Power Station. The revised response is requesting a change in the date for the Calendar Year 2005 and 2006 NRC Initial Operator Licensing Examination schedule. Dresden is requesting the Examination currently scheduled during the week of September 19, 2005, be moved to the week of February 6, 2006. The revised Initial Operator Licensing Examination information is provided on the attached NRC Form 536.

If you have any questions or require additional information. please do not hesitate to contact us.

Sincerely, Michael P. Gallagher, Director Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachment - Completed NRC Form 536 for Dresden Nuclear Power Station

10 7fi 5 f i a #I) 10~77~2004 1 /:i Revised Response to RIS 2004-10 Atlachmenl Page 1 of 1 YRCFonY 536 U.S NUCLEAU AEGULATORV COYYlSXm 5.1003, OPERATOR LICENSING EXAMINATION DATA FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 111 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237and 50-249 A. PROPOSED EXAMINATION PREPARATIONSCHEDULE PROPOSEDNUMBER I CY= I CY= 1 CY= I C Y a ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED I 0 I 0 I 0 I 0 PROPOSED NUMBER CY 2005 CY 2M)6 CY 2007 CY 2008 NUMBER OF REACTOR OPERATORS I 0 I 0 I 2 I 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT I O I 5 I 6 I 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSEDDATES PRIMARY DATE N/A 2/6/06- 2/10/06 1\29/07 - 2/2/07 7114/08 - 7118/06 I

ALTERNATE DATE N/A 2/13/06 - 2/17/06 2/5/07 2/9/07

~ 7/21/08- 7/25/08 b.PROPOSEDGENERICFUNDAMENTALS EXAMINATION

~ ~~ ~

(GFE) SCHEWLE CY 2005 CY 2006 PROPOSED NUMBER MARCH 1 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 April 18, 2005 Mr. Christopher M. Crane President and Chief Nuclear Office1 Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION - CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION

Dear Mr. Crane:

In a letter (RS-04-150) dated October 1, 2004, which revised the letter (RS-04-093) dated July 14, 2004, your staff requested that the U. S. Nuclear Regulatory Commission reschedule an initial license operator examination from the week of September 19, 2005, to the week of February 6, 2006. Therefore, we have tentatively rescheduled the examination to occur during the week of February 6, 2006. On-site validation of the examination is tentatively scheduled to occur at the station during the week of January 9, 2006. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter of October 1, 2004, your staff will develop the examination. Your letter indicated that you are training approximately six candidates for the examination. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Charles Phillips of my staff at (630) 829-9739.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and

C. Crane Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://w.nrc.qov/readinq-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission C. G. Symonds, Training Director

C Crane Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readinq-rmladams.htm1.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission C. G. Symonds. Training Director ADAMS Distribution:

AJM MXB RidsNrrDipmhpb GEG KGO DRCI DRPlll DRSlll PLBI JRKI DCT MABI

Exelon Generation Company,LLC wwwexeloncorp corn Dresden Nuclear Power Station Nuclear 6500 North Dresden Road Morris. It 60450-9765 May 24,2005 SVPLTR # 05-0025 U. S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Faciliy Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Revised Dresden Nuclear Power Station Response to NRC Regulatory Issue Summary 2004-10, "Preparation and Scheduling of Operator Licensing Examinations"

References:

(1) NRC Regulatory Issue Summary (RIS)2004-10, "Preparation and Scheduling of Operator Licensing Examinations," dated June 14, 2004 (2) ExelodAmerGen Response to RIS 2004-10 dated July 14,2004 (3) Revised Response to NRC Regulatory Issue Summary 2004-10 "Preparation and Scheduling of Operator Licensing Examinations" dated October 1,2004 In Reference 1, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations. References 2 and 3 provided the responses to RIS 2004-10 for Exelon Generation Company, LLC (EGC) and Ameffien Energy Company, LLC (Ameffien) plants. Attachment 4 of Reference 2 provided the operator licensing examination information for Dresden Nuclear Power Station (DNPS) on NRC Form 536.

The current DNPS operator licensing class was expanded to include an additional Senior Reactor Operator candidate; therefore, the candidate is being added to the 2006 NRC Initial Operator Licensing Examination schedule. The Attachment to this letter provides a revised DNPS NRC Form 536 reflecting the revised operator licensing examination data.

U. S. Nuclear Regulatory Commission Page 2 Should you have any questions related to this matter, please contact Mr. Mark Otten, Initial License Training Group Lead, at 815-416-2170.

Sincerely, Dresddn Nuclear Power Station

Attachment:

Revised DNPS NRC Form 536

IC FORM &36 US WCLEAR REGULATORYCOMMISSION m)

OPERATOR LICENSING EXAMINATION DATA Dresden Nuclear Power Station, Units 2 and 3 111 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATEDNUMBER OF LICENSEEPREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRCPREPARED 0 0 0 0 EXAMINATIONS I I I I I. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR 0 2 0 OPERATORS 0 NUMBER OF SENIOR REACTOR OPERATORSINSTANT 0 6 6 NUMBER OF SENIOR REACTOR OPERATORSUPGRADE I 0 I 1 I 2 NUMBER OF SENIOR REACTOR OPERATORSUMITED I 0 I 0 I 0 PROPOSED DATES I PRIMARY DATE I NIA 2/6/08 - 2/10/06 I 1/29/07- 2/2/07 7114/60 - 714 8/01 ALTERNATE DATE I

I N/A I

2/13/06 - 2/17/06 II 2/5/07 - 2/9/07 7/24/08- 7/25/ot

2. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY= CY 2006 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEF ESTIMATED NUMBER OF 0 0 7 0 0 0 0 0 CANDIDATES

ixclon L m e l d t l O l l company LLC wwwexeloncorp corn Exelon, Dresden Nuclear Power Station Nuclear 6500 North Dresden Road Morris 11 60450 9765 September 28,2005 SVPLTR 05-0039 U. S. Nuclear Regulatory Commission Region 111 AlTN: Operator Licensing Branch 801 Warrenville Road Lisle, IL 60532-4351 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Docket Nos. 50-237 and 50-249

Subject:

Submittal of Initial Operator Licensing Examination Outlines Enclosed are the examination outlines supporting the Initial License Examination at Dresden Nuclear Power Station. The examinations are scheduled for the week of February 6.2006.

This submittal includes all appropriate Examination Standard forms and outlines in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards."

In accordance with NUREG 1021, Revision 9, Section ES-201, 'Initial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter. please contact Pedro Salas, Regulatory Assurance Manager, at 81546-2800. For questions concerning examination outlines, please contact Chuck Kolotka 815-416-4006.

Respectfully, Dresden Nuclear Power Station SEP 3 0 2005

Enclosures:

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline (Form ES-301-1)

Control Roomlln-Plant Systems Outline (Form ES-301-2)

BWR Examination Outline (Forms ES-401-1)

Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)

Scenario Outline (Form ES-D-1)

Record of Rejected WAS (Form ES-401-4)

Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc: (without attachments)

Chief, NRC Operator Licensing Branch NRC Senior Resident inspector - Dresden Nuclear Power Station

- I _ Exelen Nuclear RS-05-122 2130-05-20179 5928-05-20277 September 30, 2005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No.50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NAC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket NQ.50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Response to RIS 2005-19 September 30,2005 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-266

Subject:

Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary (RIS)2005-19, Preparation and Scheduling of Operator Licensing Examinations, dated August 24, 2005.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to RIS 2005-19 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Year (CY) 2007, a total of 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in Attachment

6. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and Attachment 8 for PBAPS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, David P. Helker Manager, Licensing & Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments Attachment 1 - Completed NRC Form 536 for Braidwood Station Attachment 2 - Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 - Completed NRC Form 536 for LaSalle County Station Attachment 6 - Completed NRC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 Attachment 10 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response to RIS 2005-19 Attachment 4 Page 1 of 1 mnc FORM s n

bZa61 OPERATOR LICENSING EXAMINATION DATA FACILITV NRC REQION Dresden Nuclear Power Station, Units 2 and 3 111 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2p96 CY CY 2998 CY 2009 ESTIMATED NUMBER OF LICENSEE.PREPARED 1 1 1 1 EXAMINATIONS ESTIMATEDNUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS PROPOSED NUMBER cy m CY CY CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT hUMBEROF SEhlOA REACTOR 0PERATORS.UPGRADE 1 1 2 2 NUMBER OF SEhlOR REACTOR OPEAATORS~LIMITED 0 I 0 I 0 I 0 PROPOSEDDATES PRIMARY DATE I

26/06 - 2/10/06 4/23/07 - 4/27/07 7114/08 - 7/18/08 1 10/11/09-10/15/09 ALTERNATE DATE Yl306 - 2/17/06 5/1/07 - 5/4/07 7/21/08 - 7/25/08 1 10/18/09 -

10/22/09 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY a MARCH 1 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 ZANOIOATES

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2 4 4 3 WARRENVILLE ROAD, SUITE 2 IO LISLE. ILLINOIS 60532-4352 October 14, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Dear C. Crane:

In a telephone conversation on September 21, 2005, between Mr. Chuck Phillips and Mr. Chuck Kolotka, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station the weeks of February 6 and 13, 2006. In addition, the NRC will make an examination validation visit to your facility the week of January 9, 2006.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it was necessary for your staff to furnish the examination outlines which we received on September 29, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by December 19, 2005. Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3)), an authorized representativeof the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302.

your staff should retain the original simulator performance data (e.g.. system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

C. Crane To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024).

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U S . Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Kolotka has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Chuck Phillips at 630-829-9739, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.aov/readina-rm/adams.html, Hkonori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 See Attached Distribution

C. Crane To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (3150-001a), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Kolotka has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Chuck Phillips at 630-829-9739, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htto://www.nrc.qov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 See Attached Distribution M L Q J 9 9 3 B/

DOCUMENT NAME:G:\DRS\Work in Progress\DRE 10-05 DRS.wpd 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive OFFICIAL RECORD COPY

C. Crane cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. Symonds, Training Department

C. Crane ADAMS Distribution:

GYS MXB RidsNrrDipmlipb GEG KGO DRCI DRPlll DRSlll PLBI JRKI DCT MABiesl

i v e l o n G m r r a t l o r l Cornpany. LLC

~

www.exelaniorp.ro-Exelan, Dresden Nuclear Power Statlon Nuclear 6500 North Dwiden Road Morris. It 6 0 q j o ~ g i 6 5 December 19,2005 SVPLTR # 05-0046 U. S. Nuclear Regulatory Commission - Region 111 ATTN: Operator Licensing Branch 2443 Warrenville Road - Suite 210 Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials in support of the Initial License Examination scheduled for the week of February 6, 2006, at the Dresden Nuclear Power Station. These examination materials have been developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the integrated examination outline in order to improve balance and content. These changes improve examination quality and are consistent with guidance in NUREG-1021, Revision 9.

Some modifications or adjustments to the examination material may be required due to procedural changes that occur after this submittal.

In accordance with NUREG 1021, Revision 9, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Mr. Pedro Salas, Regulatory Assurance Manager, at (815) 416-2800.

Enclosures:

(Hand delivered to Chief Examiner, NRC Region Ill)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Written Exam Quality Checklist (Form ES-401-6)

Examination Security Agreements (Form ES-201-3)

Control Room / In-Plant System Outline (Form ES-301-2)

BWR Examination Outline (Form ES-401-1)

Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)

Record of Rejected WAS (Form ES-401-4)

Scenario Outlines (Form ES-D-1) cc: NRC Document Control Desk - (w/o Enclosures)

NRC Senior Resident Inspector - (w/o Enclosures)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2 4 4 3 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 January 25, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville. IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Crane:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Dresden Nuclear Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Chris G. Symonds, Training Director.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." during the week of February 6, 2006. The NRC staff will administer the operating tests during the week of February 6, 2006.

Please contact Mr. Charles Phillips at 630-829-9739 if you have any questions or identify any errors or changes in the license level (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access

C. Crane and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html.

" Operations Hironori Peterson, Chief Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. G. Symonds, Training Director

C. Crane and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httP://www.nrc.aov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission C. G. Symonds, Training Director DOCUMENT NAME: G:\DRS\Work in Progress\DRE 01-06 DRS.wpd

C. Crane ADAMS Distribution:

GYS MXB RidsNrrDirslrib GEG KGO DRCI DRPlll DRSlll PLBI JRKI DCT MABI