RS-03-173, Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from RS-03-173)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations
ML032730553
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane
Issue date: 09/26/2003
From: Gallagher M
AmerGen Energy Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-03-20244, 5928-03-20186, RIS-03-014, RS-03-173
Download: ML032730553 (13)


Text

ExekSn..

AmerGen SM Nuclear An Exelon/British Energy Company Exelon Generation www exeloncorp.com 4300 Winfield Road RIS 2003-14 Warrenville, IL 60555 RS-03-173 2130-03-20244 5928-03-20186 September 26, 2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-1 9 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 Y-l 0D2)

Response to RIS 2003-14 September 26, 2003 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatory Issue Summary 2003-14 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations," dated August 27, 2003.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to RIS 2003-14 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above.

The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Year CY 2005, a total of 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in Attachment 6. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach bottom Atomic Power Station (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and for PBAPS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Michael P. Gallagher Director, Licensing & Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response to RIS 2003-14 September 26, 2003 Page 3 cc:

Regional Administrator - NRC Region I wf.

Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Limerick Generating Station NRC Senior Resident Inspector - Oyster Creek Generating Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Senior Resident Inspector - Three Mile Island Nuclear Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station attachments SI

'a

Response to RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131t2005 (5-2003)

Estimated burden per response to comply with this voluntary hInformation collection request I hour. This Informnation collection Is used to plan budgets and resources for

~~atOP ERaminAT~Ons.

Send comentsregarding burdan simate to the Records (T-ES, US.

uclarRegulator Commission, Washingon.

OPERATOR LICENSING C20555001, or by Internet e-mail to focolecs'nrcov and to the Desk EXAMINATION DATA Offer2 Offie of Information anid R0 story Affa NEOB-16202, I

3150.0131)d kripse n Iforatin clletio dos nt dsply acurrently valid 0MB control nun5er th NbRC maynot

°ol~nduct oe~r soptondsor.

and a person Is not required to respond to. the Infomation collection.

FACIUTY NRC REGION Braidwood Station, Units 1 and 2 m

Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF UCENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 0

2 0

2 OPERATORS NUMBER OF SENIOR REACTOR 3

6 0

OPERATORS-INSTANT 6

NUMBER OF SENIOR REACTOR 1

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 7/12/04 -7/16/04 9/6/05 - 9/12/05 N/A 2/19/07-3/2/07 ALTERNATE DATE 7/6104-7/1204 9/12105-9/16/05 N/A 2/26/07 - 3/9/07 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 1 S8 T

0 0

0 0

0 NUMBER OF 0

8 S

CANDIDATES

Response to RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/3112005 (5-2003)

Estiimated burden per response to cornet y aith this voluntary formation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infornation collect on Is used to plan budgets and resources for

~raor

~ca~inlics.

endcoment rearIng burden estimate to the Records OPERATOR LICENSING aeranTE)SNueRegulatory Commi Washigon.

OPERATOR LICENING DC 2~S5000.

or by hiteme e-mail to lnfCnrlcts gov and to fthDeskr EXAMINATION DATA IomainedeualrAfis.N9616i&0, (3150.0131).

EXAMINATION DAnA norm ollectiondoews n~ot displ'aya currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to. the Information csollection.

FACILITY NRC REGION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR0808 OPERATORS 0

8 0

8 NUMBER OF SENIOR REACTOR 0

8 0

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 10/31/05 N/A 11/05/07 ALTERNATE DATE N/A 11/07/05 N/A 11/12/07 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

CANDIDATES

Response to RIS 2003-14 Page 1 of 1 I

NRC FORM 536 (5-2003)

U.S NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES 07/3112005 Estimated burden per response to comply with this voluntan Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets snd resources pr rqerator exanminations. Send acolments regarding burden estimate to the Rerords T-C ES), U.S. Nuclear Regulatory Comsnsionm WashingRor DC 20i555-0001. or by Interet e-mail to Info~oilecltsonroovi and to the ks Offioer. Office o Infmation and Regulator Afairg NEOB-1202, (3150-0131)

Office of Mtanagemesnt and Budget, Washin

Non, DC 20503. If a means used to Impose an Information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, andc a person Is not required to responda to, the Infrmation colleqtion.

FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 4

5 0

3 OPERATORS NUMBER OF SENIOR REACTOR 4

7 0

2 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

1 0

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES Weeks of Weeks of Week of PRIMARY DATE N/A 1/5&1/12 6/6&6/13 8/20 Weeks of Week of ALTERNATE DATE N/A N/A 6/13 &6/20 8/27 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEMBER ESTIMATED 2

0 0

0 0

0 0

0 CANDIDATES

Response to RIS 2003-14 Page 1 of 1

-...^

^*.

",^

v o.

^^.

Nmm FORM 5W (5-2003)

U.S NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07i31/2006 Estimated burden per response to comply vith this voluntary Iformation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send commenis regarding burden estimate to Oe Records mh(T E6), U.S. Nuclear Regulatory Commission Washington, C2u55-0i01, or by internet e-mail to lnfocollectsGnrc.gov, and to the Desk OffierOffce o Inormtio andR~uat~~l~NEOB-110202, (3150-0131),

Office8of Managemen sandBudget. Washington.

rt 20503. If a means used to Impose ran fonnation collection does not display a currently valid OMB control number, the NRC may not condct or sponsor, and a person Is not required to respond to. the kionbiation collection.

FACILITY Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-1 9 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR o

0 2

0 OPERATORS NUMBER OF SENIOR REACTOR 6

6 6

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

2 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/16/04 - 8/20/04 8/22/05-8/26/05 8/21/06-8/25/06 N/A ALTERNATE DATE 8/23/04-8/27/04 8t29/05-9/2/05 8/28/06-9/1t/6 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED

{

0 0 1 8

0 DEC NUMBER OF 1

8 I'-

I CANDIDATES

Response to RIS 2003-14 Page 1 of 1 NRC FORM S36 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2003 (F-200)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This hIformation collection Is used to plan budgets and resources for opoerator examinalons. Sendi comments regarding burden estimate to the Records OPERATOR SLIPCililENSING iManagment Branch tT4 ES). U.S Nuclear Regulatory Comuission Washigton.

EXAM;NA;ION DATA oci 20ssosfl ot Sgcis@Nn~~~~~~Onre~ov, ano to the Desk OPERATOR LICENSING oc 55.0001. or by

~~~~~~~~~~NOB-120 (3150-0131).

EXAMINATION DATA 2D503.t If a mstOy~fam.eans tsdt impse n lfofetjn clletio dos nt dsply acurrently valid 0MB control number athe iN°RnC may notconduct or nsponsor e~nd a person Is not required to respond to, the Information collectin.

FACIUTY NRC REGION LaSalle County Station, Units 1 and 2 in Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 0

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 0

6 6

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

0 0

o OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 02128/2005 11/1312006 NA ALTERNATE DATE N/A 03/07/2005 11/27/2006 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 6

E 0 0

0 l

0 l

1 l

0 NUMBER OF 6

0 00 0

0 1 2 BE0 E

CANDIDATES

________j____

Response to RIS 2003-14 Page 1 of I NRC FORM 536 (5-2003)

U.S NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131/05 Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collecton Is used to plan budgets and resources for erator examinations. Send ranmients regarding burden estimate to the Records DC gement Branch (T-6 ES), U.S. Nuclear Regulatory Commission Washington, D 2 ob e-gmail to lnfocolec ov to the Dek dInformation and Regulatory Afairs. NEDO10202, (3150-0131).

Office of Managemeent and Budget. fashington.

XC 20503. If a means used to Isose en informnation collection does not dispolay a currently valid OMB control numrberl the NRC may not conduct or sponsor, end a person Is not required to respors] to, the Information collection.

FACIUTY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I

PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 0

6 6

4 OPERATORS NUMBER OF SENIOR REACTOR 0

10 4

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

3 4

4 NUMBER OF SENIOR REACTOR 0

6 0

0 OPERATORS-UMITED PROPOSED DATES ILT 1/10-1/21 PRIMARY DATE N/A 5/15-5/26 10/01 -10/12 LSRO 5/30 -6/1 0 ALTERNATE DATE N/A LSRO 6/13-6/24 5/22 -6/02 10/08-10/19 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED

{

I B

DEC NUMBER OF 0

0 10 0

14 0

0 CANDIDATES

Response to RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COUMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/312005 (5-203)

Estimated burden per response to comply with this voluntary Information collecion request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collecton Is used to plan budgets and resources for gertor xamnatins.Sendcomentsregrding burden estmate to the Records OPERATOR LICENSING M

T E. U Nulear Regulatory Commission Washion=.

OPERATOR LICENSING

~~~~~~DC 2 555-0001. or by kitemnet e-mail to Infocoilet nrc govantoheDs 0

a~~~~n andrW to the EXAMINATION DATA Ofie.Ofc fItmainadRusoyAfdsN 1~62ai, (3150-0131).

kXAM Ie enTA informaon collectiondoes not Display a currentty valid OMB control number the NRC may not conduct or sponsor, and a person Is not required to respond to. the information collection.

FACILITY NRC REGION Oyster Creek Generating Station I

Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1

0 0

0 EXAMINATIONS B. INfITAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 3

0 4

0 OPERATORS NUMBER OF SENIOR REACTOR 8

0 0

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

0 4

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 04/2004 N/A 04/2006 N/A ALTERNATE DATE N/A N/A 05/2006 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I1

Response to RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COUMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 071312006 (5-2003)

Estimated burden per response to corny with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This kitormation collection Is used to plan budgets and resources for opator examinations. Send comments regarding burden estimate to the Records OPERATOR LICENSING l~a ntBrnh T-E),US.NulerRegulatory Conmmissio Washiiion.

OPERATOR LICENSING DC 2Sen or nrby it m~et ie-ma~i to iloecoiltec'ts~nrcgov and to tile esik EXAMINATION DATAicer, Office of Inforation end Reutoy Affairs. NEOB-1 (3150.0131).

t205ashington, C

03 if a means used to ln~se n Iforatin clletio dos nt dsply acurrently valid 0MB control number the NRC may enootcnonduct oor soptonsorand a person Is not required to respondi to, the information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I

Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 0

6 5

0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0

NUMBER OF SENIOR REACTOR 0

2 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 27 - 2/18 5122-6/2 N/A ALTERNATE DATE N/A N/A 6/5-6/16 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 10 0

0 0

0 0

CANDIDATES See Attachment 6

Response to RIS 2003-14 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315010131 EXPIRES: 07/31i2005 (2003)

Estimated burden per response to comply with this voluntary Infrmation coilection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Inbformation collection is used to plan budgets and resources for oerator examinations. Send commynents regarding burden estimate to the Records OPERATOR LICENSING

~

~

~

~ ~ ~

Brnc

T4ES,

.SNulerRegulatory Coninission Washington, OPERATOR LICENSING DCna2855-0001. or by nt Branc ierne~tu e-mailu to Irnf~ootectsOnregov and to the Des EXAMINATION DATA

~

~

~

ficr Ofceo Itnntoned eultryfaiNEOBf-1&202, (3150.0131).

EXAMINATION DATA Office of Management and Budget, Washington, DC 20503 i a means used to Impose an Inbrmatlon collection does not display a currently valid OMB control numbr te NC ma no coduc or ponoranda person Is not required to respond to, the Informaton collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I

Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED O

0 0

0 0

0 j

0 CANDIDATES

'Response to RIS 2003-14 0 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131a0o5 (5-2003)

Estimated burden per response to copnly with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for Opeato exm~nt~os.

andcoment rearing burden estimate to the Records OPERATOR LIaentBra nch(T4 ES

. NulearRegulatory Comnission Wash[Inton, OPERATOR LICENSING DC 2055COOl, or by Internet e-masil to infocollects NEcroSv60. ac oteUs EXAMINATION DATA Onoonnatlon and (Re\\usto Affks 3150-0131).

Ipzose an Information ~ollectifon does not splay a currently valid OMB control number the NRC may not conduct or sponsor, and a person Is not required to repond to. the Information colection.

FACIUTY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 ESTIMATED NUMBER OF UCENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 0

3 0

3 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6

NUMBER OF SENIOR REACTOR 0

0 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE N/A 05/02/2005 N/A 04/02(2007 ALTERNATE DATE N/A 04/11/2005 NA 04/23/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE