ML060240226

From kanterella
Jump to navigation Jump to search
Distribution of Indian Point 3 Technical Specification Amendment 225 and 226 Corrections
ML060240226
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/14/2005
From:
Entergy Nuclear Indian Point 3
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IP-SMM-AD-103, Rev 0
Download: ML060240226 (8)


Text

14-OCT-05 Page: 1 DISTRIBUTION CONTROL LIST C ument Name: ITS/BASES/TRM CCNAME NAME DEPT LOCATION 1 OPS PROCEDURE GROUP SUPV. OPS PROCEDURE GROUP IP2 3 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY) IP2 5 CONTROL ROOM (FL) OPS (3PT-DO01/6 (IP3/IPEC) IP3 11 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY) 45-4-A 19 STEWART ANN LICENSING GSB-2D 20 CHEMISTRY SUPERVISOR CHEMI STRY DEPARTMENT 45-4-A 21 TSC(IP3) E1EC BUILDING IP2 22 SHIFT MGR. (LUB-001-GEN) OPS (UNIT 3/IPEC ONLY) IP3 23 LIS LICENSING & INFO SERV OFFSITE 25 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 48-2-A 28 RESIDENT INSPECTOR US NRC 88' ELEVATION IP2 32 EOF Ei-PLAN (ALL EP'S) EOF 47 CHAPMAN N BECHTEL OFFSITE 50 TADEIIY L. .I4A . WESTINGHOUSE ELECTRIC OFFSITE 55 GSB TECHNICAL LIBRARY A MCCALLION/IPEC & IP3 GSB-3B 61 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 48-2-A 69 CONROY PAT LICENSING/ROOM 205 GSB-2D 99 BARANSKI J (ALL) 'ST. EMERG. MGMT. OFFICE OFFSITE 106 SIMULATOR INSTRUCT AREA TRG/3PT-D001-D006 ONLY) #48

6) 164 CONTROL ROOM (FL) 207 TROY M C)PS (3PT-DO01/6 (IP3/IPEC)

PROCUREMENT ENG.

IP3 GSB-4B 273 FAISON CHARLENE NUCLEAR LICENSING WPO-12 319 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 354 L.GRANT (LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 357 L.GRANT(ITS/INFO ONLY) TRAINING - ILO CLASSES 48-2-A 424 GRANT LEAH (9 COPIES) (UNIT 3/IPEC ONLY) #48 474 OUELLETTE P ENG., PLAN & MGMT INC OFFS ITE MAINTENANCE ENG/SUPV 45-1-A 4#q CLOUGHNESSY PAT PLANT SUPPORT TEAM GSB-3B 492 FSS UNIT 3 OPERATIONS K-IP-I210 493 OPERATIONS FIN TEAM 33 TURBIN DECK 45-1-A 494 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY) WPO-12D 496 L.GRANT (LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 497 L.GRANT (LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 500 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 501 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 512 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 513 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 518 DOCUMENT CONTROL DESK NRC (ALL EP'S) OFFSITE 529 FIELDS DEBBIE OUTAGE PLANNING IP3/OSB 1oI

==IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0 EEnfergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1

-En tergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE: 1/4/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-1 03, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: IP3 ITS/BASESITRM DOC# REV# TITLE INSTRUCTIONS

                                • FOLLOW THE ATTACHED INSTRUCTIONS****************************
                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

NAME (PRINT) SIGNATURE SIGNATURE DATE DATE CC#

CC#

Page 1 of 1 Distribution of IP3 Technical Snecification Amendment 225 and 226 Corrections (Approved by NRC December 20, 2005)

Pages are to be inserted into your controlled copy of the IP3 Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.

REMOVE PAGES INSERT PAGES TAB - Facility Operating License Page 4 Insert new Page 4 Page 6 Insert new Page 6 TAB 3.3 - Instrumentation Page 3.3.1-13 (Amendment 225) Page 3.3.1-13 (Amendment 225 -

Corrected Page)

TAB 3.4 - Reactor Coolant System Page 3.4.16-1 (Amendment 226) Page 3.4.16-1 (Amendment 226 -

Corrected Page)

G. ENO shall fully implement and maintain in effect all provisions Letter of of the Commission-approved physical security, training and 10-28-04 qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and to the authority of 10 CFR 50.90 and CFR 50.54(p). The combined set of plans' for the Indian Point Energy Center, which contain Safeguards Information protected under 10 CFR 73.21, is entitled:

"Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0," and was submitted by letter dated October 14, 2004.

H. ENO shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Final Safety Analysis Report for Indian Point Nuclear Generating Unit No. 3 and as approved in NRC fire protection safety evaluations (SEs) dated September 21, 1973, March 6. 1979, May 2, 1980, November 18, 1982, December 30, 1982, February 2, 1984, April 16, 1984, January 7,1987, September 9, 1988, October 21, 1991, April 20,1994, January 5, 1995, and supplements thereto, subject to the following provision:

ENO may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

I. (DELETED) Amdt. 205 2/27/01 J. (DELETED) Amdt. 205 2/27/01 K. (DELETED) Amdt.49 5-25-84 L. (DELETED) Amdt. 205 2/27/01 M. (DELETED) Amdt. 205 2/27/01 N. (DELETED) Amdt. 49 5-25-84 I

' The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 225 Revised by letter dated December 20, 2005

trustee has first given the NRC 30 days prior written notice of the payment. In addition, the trust agreement shall state that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the Director, Office of Nuclear Reactor Regulation.

U. The decommissioning trust agreement shall Amdt. 203 provide that the trust agreement shall not be 11/27/00 I modified in any material respect without the prior written consent of the Director, Office of Nuclear Reactor Regulation.

V. The decommissioning trust agreement shall state Amdt. 203 that the trustee, investment advisor, or anyone 11/27/00 else directing the investments made in the trust shall adhere to a "prudent investments standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.

W. For purposes of ensuring public health and Amdt. 203 safety, ENIP3, upon the transfer of this license to 11/27/00 it, shall provide decommissioning funding assurance for the facility by the prepayment or equivalent method, to be held in a decommissioning trust fund for the facility, of no less than the amount required under NRC regulations at 10 CFR 50.75.

Any amount held in any decommissioning trust maintained by PASNY for the facility after the transfer of the facility license to ENIP3 may be credited towards the amount required under this paragraph.

X. ENIP3 shall take all necessary steps to ensure Amdt. 203 that the decommissioning trust is maintained 11/27/00 in accordance with the application for the transfer of this license to ENIP3 and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.

AA. The following conditions relate to the amendment approving Amdt. 205 the conversion to Improved Standard Technical Specifications: 2/27/01

1. This amendment authorizes the relocation of certain Technical Specification requirements and detailed information to licensee-controlled documents as described in Table R, uRelocated Technical Specifications Amendment No. 225 Revised by letter dated December 20, 2005

RPS Instrumentation 3.3.1 Table 3.3.1-1 (page 1 of 8)

Reactor Protection System Instrumentation APPLICABLE MODES OR OTHER FUNCTION SPECIFIED REQUIRED SURVEILLANCE CONDITIONS CHANNELS CONDITIONS REQUIREMENTS ALLOWABLE VALUE

1. Manual Reactor 1,2 2 B SR 3.3.1.14 NA Trip 3 (a), 4(a), 5(0) 2 C SR 3.3.1.14 NA
2. Power Range Neutron Flux
a. High 1,2 4UJ) D SR 3.3.1.1 <111% RTP SR 3.3.1.2 SR 3.3.1.7 SR 3.3.1.11
b. Low 1 (b), 2 41( E SR 3.3.1.1 S25% RTP SR 3.3.1.8 SR 3.3.1.11
3. Intermediate 1(b), 2(c) F SR 3.3.1.1 NA Range Neutron SR 3.3.1.8 Flux SR 3.3.1.11 (continued)

(a) With Rod Control System capable of rod withdrawal or one or more rods not fully inserted.

I (b) Below the P-10 (Power Range Neutron Flux) interlocks.

(c) Above the P-6 (Intermediate Range Neutron Flux) interlocks.

(J) Only 3 channels required during Mode 2 Physics Tests, LCO 3.1.8 INDIAN POINT 3 3.3.1-13 Amendment 225 Revised by letter dated December 20, 2005

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 The specific activity of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS loop average temperature (Tag) Ž 5000F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT I-131 ---------- NOTE ---------

> 1.0 pCi/gm. LCO 3.0.4.c is applicable I

A.1 Verify DOSE EQUIVALENT Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> I-131 within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE EQUIVALENT I-131 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> within limit.

B. Gross specific activity B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the reactor coolant Tan < 500 0F.

not within limit of SR 3.4.16.1.

(continued)

INDIAN POINT 3 3.4.16-1 Amendment 226 Revised by letter dated December 20, 2005

i IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0

--lnergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of I

--- Entergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE: 12/5/05 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: IP2 & IP3 Technical Requirements Manual DOC# REV# TITLE INSTRUCTIONS Effective 12/1/05 the 1P2 & 1P3 TRM will be updated on the IPEC Licensing Web Page. There will no longer be hardcopy distribution of the IP2 & IP3 TRM (except for the followin2 locations).

CONTROL ROOMS SHIFT MGR SIMULATOR SIMULATOR BOOTH LICENSING MGR Note: Please return your hard copy TRM binder to Document Control located in the EEC

                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT) SIGNATURE DATE CC#

CA4 CU9 O( t(-,~