ML060240226

From kanterella
Jump to navigation Jump to search
Distribution of Indian Point 3 Technical Specification Amendment 225 and 226 Corrections
ML060240226
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/14/2005
From:
Entergy Nuclear Indian Point 3
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IP-SMM-AD-103, Rev 0
Download: ML060240226 (8)


Text

14-OCT-05 DISTRIBUTION CONTROL LIST C

ument Name:

ITS/BASES/TRM Page:

1 CCNAME NAME 1 OPS PROCEDURE GROUP SUPV.

3 PLANT MANAGER'S OFFICE 5 CONTROL ROOM (FL) 11 RES DEPARTMENT MANAGER 19 STEWART ANN 20 CHEMISTRY SUPERVISOR 21 TSC(IP3) 22 SHIFT MGR. (LUB-001-GEN) 23 LIS 25 SIMULATOR 28 RESIDENT INSPECTOR 32 EOF 47 CHAPMAN N 50 TADEIIY L.

.I4A.

55 GSB TECHNICAL LIBRARY 61 SIMULATOR 69 CONROY PAT 99 BARANSKI J (ALL) 106 SIMULATOR INSTRUCT AREA

6) 164 CONTROL ROOM (FL) 207 TROY M 273 FAISON CHARLENE 319 L.GRANT (LRQ-OPS TRAIN) 354 L.GRANT (LRQ-OPS/TRAIN) 357 L.GRANT(ITS/INFO ONLY) 424 GRANT LEAH (9 COPIES) 474 OUELLETTE P 4#q CLOUGHNESSY PAT 492 FSS UNIT 3 493 OPERATIONS FIN TEAM 494 AEOF/A.GROSJEAN(ALL EP'S) 496 L.GRANT (LRQ-OPS/TRAIN) 497 L.GRANT (LRQ-OPS/TRAIN) 500 L.GRANT (LRQ-OPS TRAIN) 501 L.GRANT (LRQ-OPS TRAIN) 512 L.GRANT (LRQ-OPS TRAIN) 513 L.GRANT (LRQ-OPS TRAIN) 518 DOCUMENT CONTROL DESK 529 FIELDS DEBBIE DEPT LOCATION OPS PROCEDURE GROUP UNIT 3(UNIT 3/IPEC ONLY)

OPS (3PT-DO01/6 (IP3/IPEC)

RES (UNIT 3/IPEC ONLY)

LICENSING CHEMI STRY DEPARTMENT E1EC BUILDING OPS (UNIT 3/IPEC ONLY)

LICENSING & INFO SERV TRAIN(UNIT 3/IPEC ONLY)

US NRC 88' ELEVATION Ei-PLAN (ALL EP'S)

BECHTEL WESTINGHOUSE ELECTRIC A MCCALLION/IPEC & IP3 TRAIN(UNIT 3/IPEC ONLY)

LICENSING/ROOM 205

'ST. EMERG.

MGMT.

OFFICE TRG/3PT-D001-D006 ONLY)

C)PS (3PT-DO01/6 (IP3/IPEC)

PROCUREMENT ENG.

NUCLEAR LICENSING LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

TRAINING -

ILO CLASSES (UNIT 3/IPEC ONLY)

ENG.,

PLAN & MGMT INC MAINTENANCE ENG/SUPV PLANT SUPPORT TEAM OPERATIONS 33 TURBIN DECK E-PLAN (EOP'S ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

LRQ (UNIT 3/IPEC ONLY)

NRC (ALL EP'S)

OUTAGE PLANNING IP2 IP2 IP3 45-4-A GSB-2D 45-4-A IP2 IP3 OFFSITE 48-2-A IP2 EOF OFFSITE OFFSITE GSB-3B 48-2-A GSB-2D OFFSITE

  1. 48 IP3 GSB-4B WPO-12
  1. 48
  1. 48 48-2-A
  1. 48 OFFS ITE 45-1-A GSB-3B K-IP-I210 45-1-A WPO-12D
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48 OFFSITE IP3/OSB 1oI

==IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0 EEn fergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1

-En tergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE:

1/4/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-1 03, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT:

IP3 ITS/BASESITRM DOC#

REV#

TITLE INSTRUCTIONS

                                • FOLLOW THE ATTACHED INSTRUCTIONS****************************
                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

NAME (PRINT)

SIGNATURE DATE CC#

Page 1 of 1 Distribution of IP3 Technical Snecification Amendment 225 and 226 Corrections (Approved by NRC December 20, 2005)

Pages are to be inserted into your controlled copy of the IP3 Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.

REMOVE PAGES INSERT PAGES Page 4 Page 6 TAB - Facility Operating License Insert new Page 4 Insert new Page 6 TAB 3.3 - Instrumentation Page 3.3.1-13 (Amendment 225)

Page 3.3.1-13 (Amendment 225 -

Corrected Page)

TAB 3.4 - Reactor Coolant System Page 3.4.16-1 (Amendment 226)

Page 3.4.16-1 (Amendment 226 -

Corrected Page)

G.

ENO shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and to the authority of 10 CFR 50.90 and CFR 50.54(p). The combined set of plans' for the Indian Point Energy Center, which contain Safeguards Information protected under 10 CFR 73.21, is entitled:

"Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0," and was submitted by letter dated October 14, 2004.

Letter of 10-28-04 H.

ENO shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Final Safety Analysis Report for Indian Point Nuclear Generating Unit No. 3 and as approved in NRC fire protection safety evaluations (SEs) dated September 21, 1973, March 6. 1979, May 2, 1980, November 18, 1982, December 30, 1982, February 2, 1984, April 16, 1984, January 7,1987, September 9, 1988, October 21, 1991, April 20,1994, January 5, 1995, and supplements thereto, subject to the following provision:

ENO may make changes to the approved Fire Protection Program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

I.

(DELETED)

Amdt. 205 2/27/01 J.

(DELETED)

K.

(DELETED)

Amdt. 205 2/27/01 Amdt.49 5-25-84 L.

(DELETED)

M.

(DELETED)

Amdt. 205 2/27/01 Amdt. 205 2/27/01 N.

(DELETED)

Amdt. 49 5-25-84 I

' The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Amendment No. 225 Revised by letter dated December 20, 2005 trustee has first given the NRC 30 days prior written notice of the payment. In addition, the trust agreement shall state that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the Director, Office of Nuclear Reactor Regulation.

U.

The decommissioning trust agreement shall provide that the trust agreement shall not be modified in any material respect without the prior written consent of the Director, Office of Nuclear Reactor Regulation.

Amdt. 203 11/27/00 I

V.

The decommissioning trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investments standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.

W.

For purposes of ensuring public health and safety, ENIP3, upon the transfer of this license to it, shall provide decommissioning funding assurance for the facility by the prepayment or equivalent method, to be held in a decommissioning trust fund for the facility, of no less than the amount required under NRC regulations at 10 CFR 50.75.

Any amount held in any decommissioning trust maintained by PASNY for the facility after the transfer of the facility license to ENIP3 may be credited towards the amount required under this paragraph.

X.

ENIP3 shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for the transfer of this license to ENIP3 and ENO and the requirements of the order approving the transfer, and consistent with the safety evaluation supporting such order.

AA.

The following conditions relate to the amendment approving the conversion to Improved Standard Technical Specifications:

Amdt. 203 11/27/00 Amdt. 203 11/27/00 Amdt. 203 11/27/00 Amdt. 205 2/27/01

1.

This amendment authorizes the relocation of certain Technical Specification requirements and detailed information to licensee-controlled documents as described in Table R, uRelocated Technical Specifications Amendment No. 225 Revised by letter dated December 20, 2005

RPS Instrumentation 3.3.1 Table 3.3.1-1 (page 1 of 8)

Reactor Protection System Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS

1. Manual Reactor Trip REQUIRED CHANNELS 2

2 1,2 3(a),

4(a),

5(0)

CONDITIONS B

C SURVEILLANCE REQUIREMENTS SR 3.3.1.14 SR 3.3.1.14 ALLOWABLE VALUE NA NA

2. Power Range Neutron Flux
a. High
b. Low
3.

Intermediate Range Neutron Flux 1,2 1 (b), 2 1

(b), 2(c) 4UJ) 41(

D SR 3.3.1.1 SR 3.3.1.2 SR 3.3.1.7 SR 3.3.1.11 E

SR 3.3.1.1 SR 3.3.1.8 SR 3.3.1.11 F

SR 3.3.1.1 SR 3.3.1.8 SR 3.3.1.11

<111% RTP S25% RTP NA (continued)

(a) With Rod Control System capable of rod withdrawal or one or more rods (b) Below the P-10 (Power Range Neutron Flux) interlocks.

(c) Above the P-6 (Intermediate Range Neutron Flux) interlocks.

(J) Only 3 channels required during Mode 2 Physics Tests, LCO 3.1.8 not fully inserted.

I INDIAN POINT 3 3.3.1-13 Amendment 225 Revised by letter dated December 20, 2005

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 APPLICABILITY:

The specific activity of the reactor coolant shall be within limits.

MODES 1 and 2, MODE 3 with RCS loop average temperature (Tag)

Ž 5000F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT I-131


NOTE ---------

> 1.0 pCi/gm.

LCO 3.0.4.c is applicable A.1 Verify DOSE EQUIVALENT Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> I-131 within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE EQUIVALENT I-131 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> within limit.

B. Gross specific activity B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the reactor coolant Tan < 5000F.

not within limit of SR 3.4.16.1.

(continued)

I INDIAN POINT 3 3.4.16-1 Amendment 226 Revised by letter dated December 20, 2005

i IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0

-- lnergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of I

--- Entergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE:

12/5/05 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT:

IP2 & IP3 Technical Requirements Manual DOC#

REV#

TITLE INSTRUCTIONS Effective 12/1/05 the 1P2 & 1P3 TRM will be updated on the IPEC Licensing Web Page. There will no longer be hardcopy distribution of the IP2 & IP3 TRM (except for the followin2 locations).

CONTROL ROOMS SHIFT MGR SIMULATOR SIMULATOR BOOTH LICENSING MGR Note: Please return your hard copy TRM binder to Document Control located in the EEC

                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

CU9 CA4 O(

t( -,~