ML053210402

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Nuclear Management Company LLC on the Results of the Nrc'S Review of the Perry Phase 2 Performance Improvement Initiative
ML053210402
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/16/2005
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML053210402 (3)


Text

November 16, 2005 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Perry Nuclear Power Plant, Unit 1 Docket No: 50-440 Date and Time of Meeting: Wednesday, December 14, 2005, at 3:00 p.m. (EST)

Location of Meeting: Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting: Public Meeting to Discuss the Results of the NRCs Review of the Perry Phase 2 Performance Improvement Initiative.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects S. Campbell, Project Manager, Office of Nuclear Reactor Regulation M. Bielby, Team Leader, PII Inspection Team R. Powell, Senior Resident Inspector, Perry M. Franke, Resident Inspector, Perry Others as designated Licensee Attendees:

W. Pearce, Acting Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry T. Lentz, Director, Performance Improvement Initiative, Perry Others as designated

Notice of Significant Licensee Meeting NOTES:

(1) Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by December 12, 2005.

(2) The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: /RA/

Eric R. Duncan, Chief Reactor Projects Branch 6

Notice of Significant Licensee Meeting Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR P. Habighorst (PJH2), Region III Coordinator, OEDO H. Nieh (HKN), Project Directorate, Division of Licensing and Project Management, NRR Project Manager, Project Directorate, Division of Licensing Project Management, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII G. Shear (GLS), Acting Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI. Perry DRS Branch Chiefs (JFL, DEH, RDL, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA