Entergy Corrective Action, CR-IP2-205-03470
ML053180071
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/14/2005
From: Harrison C, Schwartz G
Entergy Nuclear
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0369 CR-IP2-2005-03470
Download: ML053180071 (1)


Text

-

Entergy I CORRECTIVE ACTION l CR-IP2-2005-03470 CA Number: 2 Group I It Name Assigned By: CRG/CARB/OSRC Harrison,Christine B Assigned To: Eng Project Mgmt Schwartz,Geoffrey E Subassigned To:

Originated By: Harrison,Christine B 9/7/2005 06:12:31 Performed By: Schwartz,GeoffreyE 9/14/2005 16:27:51 Subperformed By:

Approved By:

Closed By: SchwartzGeoffrey E 9/14/2005 16:27:51 Current Due Date: 09/28/2005 Initial Due Date: 09/28/2005 CA Type: DISP - CA Plant Constraint: #NONE CA

Description:

Please review and assign further corrective actions as required.

Response

The cause of this is that the soil under the cinderblock wall was not compacted when the FSB was built over 30 years ago.

There is no other area for this project where excavation activities beneath a wall will be required. The hole has been filled in and shored. The shoring will be removed at the appropriate time as the new loading bay floor is installed in 2005 and 2006.

There is no need to create an additional CA to track this since the new floor must be installed (cannot be cancelled) in order for the plant to function normally during refueling outages. No further action required.

Subresponse: