Withdrawal of an Amendment Request:
ML052990133
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/28/2005
From: Colburn T
NRC/NRR/DLPM/LPD1
To: Spina J
Nine Mile Point
Colburn T, NRR/DLPM, 415-1402
References
TAC MC6561
Download: ML052990133 (5)


Text

October 28, 2005 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NO. 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MC6561)

Dear Mr. Spina:

By letter dated April 1, 2005, you applied for an amendment to the Nine Mile Point Nuclear Station, Unit No. 2, Facility Operating License No. NPF-69. The proposed amendment would have modified the facility Technical Specifications (TSs) pertaining to Required Action A.1 of TS 3.8.7, Inverters - Operating, to extend the Completion Time for one emergency uninterruptible power supply inverter inoperable from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days. The associated Bases would also be changed to reflect the proposed TS change. Subsequently, by letter dated September 30, 2005, you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-410

Enclosure:

Notice of Withdrawal cc w/encl: See next page

ML052990133 OFFICE PDI-1/PM PDI-1\LA PDI-1\SC NAME TColburn SLittle RLaufer DATE 10/27/05 10/27/05 10/28/05 7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION NINE MILE POINT NUCLEAR STATION, LLC (NMPNS)

LONG ISLAND LIGHTING COMPANY DOCKET NO. 50-410 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of NMPNS (the licensee) to withdraw its April 1, 2005, application for proposed amendment to Facility Operating License No. NPF-69 for the Nine Mile Point Nuclear Station, Unit No. 2, located in Oswego County, New York.

The proposed amendment would have revised the Technical Specifications (TSs) pertaining to Required Action A.1 of TS 3.8.7, Inverters - Operating, to extend the Completion Time for one emergency uninterruptible power supply (UPS) inverter inoperable from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days. The associated Bases would also be changed to reflect the proposed TS change.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on May 10, 2005 (70 FR 24653).

However, by letter dated September 30, 2005, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated April 1, 2005, and the licensee's letter dated September 30, 2005, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site,

http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 28th day of October 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation

Nine Mile Point Nuclear Station, Unit No. 2 cc:

Regional Administrator, Region I Mr. Michael J. Wallace U. S. Nuclear Regulatory Commission President 475 Allendale Road Nine Mile Point Nuclear Station, LLC King of Prussia, PA 19406 c/o Constellation Energy Group 750 East Pratt Street Resident Inspector Baltimore, MD 21202 Nine Mile Point Nuclear Station P.O. Box 126 Mr. Carey W. Fleming, Esquire Lycoming, NY 13093 Senior Counsel Constellation Generation Group, LLC Mr. James R. Evans 750 East Pratt Street, 17th Floor LIPA Baltimore, MD 21202 P.O. Box 129 Lycoming, NY 10393 Mr. Peter R. Smith, President New York State Energy, Research, Supervisor and Development Authority Town of Scriba 17 Columbia Circle Route 8, Box 382 Albany, NY 12203-6399 Oswego, NY 13126 Ms. Deb Katz, Executive Director Mr. Paul D. Eddy Nuclear Security Coalition Electric Division c/o Citizens Awareness Network NYS Department of Public Service P.O. Box 83 Agency Building 3 Shelburne Falls, MA 01370 Empire State Plaza Albany, NY 12223 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW.