ML052860145
| ML052860145 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/30/2005 |
| From: | O'Connor T Constellation Energy Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NMP2L 2124, TAC MC6561 | |
| Download: ML052860145 (2) | |
Text
.
Constellation Energy-Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 September 30, 2005 NMP2L 2124 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Unit 2 Docket No. 50-410 Facility Operating License No. NPF-69 Withdrawal of License Amendment Request to Extend the Completion Time for One Emergency Uninterruptible Power Supply Inverter Inoperable (TAC No. MC6561)
Gentlemen:
By letter NMP2L 2120 dated April 1, 2005, Nine Mile Point Nuclear Station, LLC (NMPNS) requested an amendment to Nine Mile Point Unit 2 Operating License NPF-69. The proposed amendment would have revised Required Action A.1 of Technical Specification (TS) 3.8.7, "Inverters - Operating," to extend the Completion Time for one emergency uninterruptible power supply (UPS) inverter inoperable from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
Subsequent to the amendment request submittal, NMPNS has installed a redundant emergency UPS inverter unit in each of the two safety-related electrical divisions. This plant modification reduces the potential for a TS-required plant shutdown due to an inoperable inverter, since the redundant inverter unit can now be placed in service. Therefore, NMPNS hereby withdraws the license amendment request referenced above.
If you have any questions regarding this submittal, please contact James A. Hutton, Director Licensing, at (315) 349-1041.
1 General Manager TJO/DEV/sac
Page 2 NMP2L 2124 STATE OF NEW YORK TO WIT:
COUNTY OF OSWEGO I, Timothy J. O'Connor, being duly sworn, state that I am the Nine Mile Point Plant General Manager, and that I am duly authorized to execute and file this submittal on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine.Mile Point employees and/or consultants. Such information has been rev'ed in accor ance with company practice and I believe it to be reliable.
Ti yJ.O'Conor P
t General Manager Subscribed and sworn before me, a No Public in and for the State of New York and County of Oswego, this 3 O + day of zLhi
,2005.
WITNESS my Hand and Notarial Seal:
Hoery PublicsState of(New Yor co 6wgoQott Commission Expires IC z iNotary Public My Commission Expires: oJ/q5lo5 q13o61 5 Date cc:
Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. T. G. Colburn, Senior Project Manager, NRR (2 copies)
Mr. John P. Spath, NYSERDA