|
---|
Category:Press Release
MONTHYEARML23166A0212023-03-10010 March 2023 News Release-I-23-002: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant 2022 Performance ML22346A0552022-11-23023 November 2022 News Release-I-22-016: NRC Schedules Decommissioning Webinar for Nuclear Power Plant Emergency Preparedness and Security Requirements ML22346A0562022-11-21021 November 2022 News Release-I-22-015: NRC Names New Resident Inspector at Salem Nuclear Power Plant ML22346A0572022-11-10010 November 2022 News Release-I-22-014: West Virginia Hospital to Take Corrective Actions Under Settlement Agreement with NRC ML22305A5512022-10-14014 October 2022 News Release-I-22-013: NRC Imposes Civil Penalty to Pennsylvania Company ML22270A0832022-09-14014 September 2022 News Release-I-22-012: NRC Names New Resident Inspector at Peach Bottom Nuclear Power Plant ML22255A0872022-09-0909 September 2022 News Release-I-22-011: NRC to Conduct Pre-Decisional Enforcement Conference with a Connecticut Medical Facility ML22217A0572022-08-0505 August 2022 News Release-I-22-010: New NRC Senior Resident Inspector Assigned to Calvert Cliffs Nuclear Power Plant ML22215A2132022-07-28028 July 2022 News Release-I-22-009: NRC Names New Resident Inspector at Ginna Nuclear Power Plant Press Release-I-22-008, NRC Names New Resident Inspector at Limerick Nuclear Power Plant2022-06-22022 June 2022 Press Release-I-22-008: NRC Names New Resident Inspector at Limerick Nuclear Power Plant ML22153A1262022-05-26026 May 2022 News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants ML22131A1432022-05-0606 May 2022 News Release-I-22-006: NRC to Hold Public Meeting to Discuss Seabrook Station 2021 Safety Performance ML22131A1422022-05-0202 May 2022 News Release-I-22-005: NRC Proposes $3,500 Defense Health Agency Fine for Loss of Medical Purpose Radioactive Material ML22083A0522022-03-18018 March 2022 News Release-I-22-004: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant 2021 Performance ML22063A4642022-03-0202 March 2022 News Release-I-22-003: NRC Proposes $25,600 Fine for Pennsylvania Company ML22028A0502022-01-26026 January 2022 News Release-I-22-002: NRC Issues Confirmatory Order, $50,000 Civil Penalty to HDI Over Security-Related Violations at Oyster Creek Nuclear Power Plant Press Release-I-22-001, NRC Names New Senior Resident Inspector at Salem Nuclear Power Plant2022-01-10010 January 2022 Press Release-I-22-001: NRC Names New Senior Resident Inspector at Salem Nuclear Power Plant Press Release-I-21-010, NRC Proposes $150,000 Civil Penalty for Violations at New Jersey Nuclear Power Plant Undergoing Decommissioning2021-12-22022 December 2021 Press Release-I-21-010: NRC Proposes $150,000 Civil Penalty for Violations at New Jersey Nuclear Power Plant Undergoing Decommissioning Press Release-I-21-009, NRC Issues Confirmatory Action Letter to West Virginia Hospital2021-11-19019 November 2021 Press Release-I-21-009: NRC Issues Confirmatory Action Letter to West Virginia Hospital Press Release-I-21-007, NRC to Hold Public Meeting to Receive Comments on Indian Point Nuclear Power Plant Decommissioning Activities Report2021-07-19019 July 2021 Press Release-I-21-007: NRC to Hold Public Meeting to Receive Comments on Indian Point Nuclear Power Plant Decommissioning Activities Report Press Release-I-21-006, NRC Proposes $3,750 Fine for Connecticut Hospital Violations2021-06-0202 June 2021 Press Release-I-21-006: NRC Proposes $3,750 Fine for Connecticut Hospital Violations Press Release-I-21-005, NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants2021-06-0101 June 2021 Press Release-I-21-005: NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants Press Release-I-21-004, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant2021-05-24024 May 2021 Press Release-I-21-004: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant Press Release-I-21-003, NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance2021-03-11011 March 2021 Press Release-I-21-003: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance Press Release-I-21-002, NRC Names New Senior Resident Inspector at Indian Point Unit 3 Nuclear Power Plant2021-02-17017 February 2021 Press Release-I-21-002: NRC Names New Senior Resident Inspector at Indian Point Unit 3 Nuclear Power Plant Press Release-I-21-001, NRC Proposes $8,500 Civil Penalty to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges2021-01-14014 January 2021 Press Release-I-21-001: NRC Proposes $8,500 Civil Penalty to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges Press Release-I-21-011, NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant2020-12-28028 December 2020 Press Release-I-21-011: NRC Names New Resident Inspector for Nine Mile Point Nuclear Plant Press Release-I-20-023, NRC Names New Resident Inspector at Millstone Station2020-12-0707 December 2020 Press Release-I-20-023: NRC Names New Resident Inspector at Millstone Station Press Release-I-20-022, NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant2020-11-12012 November 2020 Press Release-I-20-022: NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant Press Release-I-20-021, NRC Names New Senior Resident Inspector at Seabrook Station2020-10-20020 October 2020 Press Release-I-20-021: NRC Names New Senior Resident Inspector at Seabrook Station Press Release-I-20-020, NRC Names New Resident Inspector at Beaver Valley Nuclear Power Plant2020-10-14014 October 2020 Press Release-I-20-020: NRC Names New Resident Inspector at Beaver Valley Nuclear Power Plant Press Release-I-20-019, NRC Names New Senior Resident Inspector at Susquehanna Nuclear Power Plant2020-09-28028 September 2020 Press Release-I-20-019: NRC Names New Senior Resident Inspector at Susquehanna Nuclear Power Plant Press Release-I-20-018, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Indian Point Nuclear Power Plant2020-09-0101 September 2020 Press Release-I-20-018: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Indian Point Nuclear Power Plant Press Release-I-20-017, NRC Names New Senior Resident Inspector at Beaver Valley Nuclear Power Plant2020-08-18018 August 2020 Press Release-I-20-017: NRC Names New Senior Resident Inspector at Beaver Valley Nuclear Power Plant Press Release-I-20-016, New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Power Plant2020-07-0909 July 2020 Press Release-I-20-016: New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Power Plant Press Release-I-20-015, NRC Senior Resident Inspector Newly Assigned to Limerick Nuclear Power Plant2020-07-0606 July 2020 Press Release-I-20-015: NRC Senior Resident Inspector Newly Assigned to Limerick Nuclear Power Plant Press Release-I-20-014, NRC Proposes $7,500 Fine to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges2020-06-25025 June 2020 Press Release-I-20-014: NRC Proposes $7,500 Fine to Puerto Rico Firm for Apparent Violation Involving Nuclear Gauges Press Release-I-20-013, NRC Names Resident Inspector at FitzPatrick Nuclear Power Plant2020-06-24024 June 2020 Press Release-I-20-013: NRC Names Resident Inspector at FitzPatrick Nuclear Power Plant Press Release-I-20-012, NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants2020-06-15015 June 2020 Press Release-I-20-012: NRC to Hold Virtual Meeting to Discuss 2019 Performance of FitzPatrick, Nine Mile Point and Ginna Nuclear Power Plants Press Release-I-20-011, NRC Names New Senior Resident Inspector at Indian Point Nuclear Power Plant2020-06-0505 June 2020 Press Release-I-20-011: NRC Names New Senior Resident Inspector at Indian Point Nuclear Power Plant Press Release-I-20-010, NRC Names New Resident Inspector at Hope Creek Nuclear Power Plant2020-06-0404 June 2020 Press Release-I-20-010: NRC Names New Resident Inspector at Hope Creek Nuclear Power Plant ML20149K5522020-05-28028 May 2020 Press Release I-20-009: NRC Names New Senior Resident Inspector at Peach Bottom Nuclear Power Plant Press Release-I-20-008, NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants2020-05-27027 May 2020 Press Release-I-20-008: NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants Press Release-I-20-007, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Salem and Hope Creek Nuclear Power Plants2020-05-21021 May 2020 Press Release-I-20-007: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Salem and Hope Creek Nuclear Power Plants Press Release-I-20-006, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant2020-05-20020 May 2020 Press Release-I-20-006: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant Press Release-I-20-005, NRC Proposes $7,500 Fine for West Virginia Engineering Firm2020-04-27027 April 2020 Press Release-I-20-005: NRC Proposes $7,500 Fine for West Virginia Engineering Firm Press Release-I-20-004, NRC Proposes $7,500 Civil Penalty for Company Violations at Puerto Rico Facility2020-04-24024 April 2020 Press Release-I-20-004: NRC Proposes $7,500 Civil Penalty for Company Violations at Puerto Rico Facility Press Release-I-20-003, NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance2020-04-0808 April 2020 Press Release-I-20-003: NRC to Meet with Connecticut Nuclear Energy Advisory Council to Discuss Millstone Nuclear Power Plant Performance Press Release-I-20-002, NRC to Conduct Public Webinar on April 21 to Discuss Indian Point Nuclear Power Plant Decommissioning Topics2020-04-0707 April 2020 Press Release-I-20-002: NRC to Conduct Public Webinar on April 21 to Discuss Indian Point Nuclear Power Plant Decommissioning Topics Press Release-I-20-001, NRC Names New Resident Inspector at R.E. Ginna Nuclear Power Plant2020-01-0909 January 2020 Press Release-I-20-001: NRC Names New Resident Inspector at R.E. Ginna Nuclear Power Plant 2023-03-10
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa.
Web Site: http://www.nrc.gov/OPA No. I-05-042 August 5, 2005
Contact:
Diane Screnci, 610/337-5330 E-mail: opa1@nrc.gov Neil Sheehan, 610/337-5331 NRC PROPOSES $3,250 FINE FOR N.J. FIRM FOR NUCLEAR GAUGE VIOLATIONS The Nuclear Regulatory Commission staff has proposed a $3,250 civil penalty for a Mays Landing, N.J.-based company for three violations of agency regulations involving the control, security and transportation of a nuclear gauge. The device, which contains radioactive material, is used for industrial purposes such as measuring the density of soil at construction sites.
The violations were identified as the result of an NRC special inspection conducted in response to an April 25th incident. On that date, a nuclear gauge owned by Craig Testing Laboratories, Inc., fell out of a truck driven by one of its employees and could not be located. The gauge, equipped with americium-241 and cesium-137 sources, was lost in Pocopson (Chester County), Pa. The employee had been performing work at a temporary job site in that town. Although the transport case holding the gauge had been chained to the truck, the chain had several feet of slack, the case was not locked and the vehicles tailgate was not closed to a locked position.
Approximately five days later, the gauge was recovered. A local citizen who read about the loss in an area newspaper found it, contacted the company and arranged for its return. The firm reported to the NRC that the gauge was recovered in good condition, with no visible damage.
Subsequent testing indicated there was no leakage and therefore no workers or members of the public were exposed to any radiation due to the event.
Craig Testing discussed the violations with NRC staff during a predecisional enforcement conference on June 23.
Based on information gathered during the inspection and provided by the company at the June 23rd meeting, the NRC has identified three violations of agency requirements. They are: a failure to control or maintain constant surveillance of licensed nuclear material that is in an unrestricted area and is not in storage; a failure to ensure that a portable nuclear density gauge or its outer container is locked; and a failure to comply with the applicable requirements of U.S. Department of Transportation regulations when transporting a nuclear gauge.
Although the source was in the shielded condition at the time the gauge was found by the member of the public, these violations are of concern to the NRC because (1) the failure to control
radioactive material resulted in the gauge being in the public domain for approximately five days; and (2) such sources can result in unintended radiation exposure to an individual if the source is not in the shielded position, NRC Region I Administrator Samuel J. Collins wrote in a letter to the company regarding the enforcement action.
Craig Testing has taken steps to prevent a recurrence, including reinstructing all of its nuclear gauge operators in proper security and handling procedures, as well as increasing required radiation safety officer visits to job sites to ensure compliance with regulatory requirements.
The company is required to provide the NRC with a written reply within 30 days.