ML051990379
| ML051990379 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/07/2005 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 028401 | |
| Download: ML051990379 (32) | |
Text
Jul. 07, 2005 Page 1
of 2
MANUAL HAI DOCI G
ACH*
EM E
Addre NUCSA2 Phon
-3194 MTa MTTMALTION:
RD COPY DISTRIBUTION JMENT TRANSMITTAL 2005-28862 MPL#:028401 CA#:
0363 TO:
07/07/2005 LOCATION: DJSNRC-T FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/27/2005 ADD MANUAL TABLE OF CONTENTS DATE: 07/06/2005 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM2 3.3.4 REV:0 ADD:
REV:
1 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS TYPE: TRM2 B3.3.4 REV:0 OD I
Jul. 07, 2005 Page 2
of 2
ADD:
REV: 1 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS LOES REV:15 TYPE: TRM2 ADD:
REV: 16 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
07/06/2005 Pri TR}
ocedure Name Rev Issue Date Chi 42 N/A 08/01/2003
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 (07/28/2003) mnge ID Coange Number TEXT LOES
Title:
TEXT TOC
Title:
16 LIST OF EFFECTIVE SECTIONS 07/06/2005 5
02/04/2005 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005\\<-'
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 4 /
05/06/2005
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 0;
11/19/2002
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1
'C 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1
03/10/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Page i of 15 Report Date: 07/06/05 Page 1 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.2.1 4
04/14/2005
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
TEXT 3.3.1
Title:
INSTRUMENTATION TEXT 3.3.2
Title:
INSTRUMENTATION TEXT 3.3.3
Title:
INSTRUMENTATION TEXT 3.3.4
Title:
INSTRUMENTATION TEXT 3.3.5
Title:
INSTRUMENTATION TEXT 3.3.6
Title:
INSTRUMENTATION 0
11/19/2002 RADIATION MONITORING INSTRUMENTATION 0
11/19/2002 SEISMIC MONITORING INSTRUMENTATION 0
11/19/2002 METEOROLOGICAL MONITORING INSTRUMENTATION 1
07/06/2005 TRM POST-ACCIDENT MONITORING INSTRUMENTATION 0
11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK 1
10/22/2003 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0
11/19/2002
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8
Title:
INSTRUMENTATION 1
10/22/2003 TRM RPS INSTRUMENTATION TEXT 3.3.9 1
11/22/2004
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10
Title:
INSTRUMENTATION TEXT 3.3.11 1
12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION Page 2 of 15 Report Date: 07/06/05
SSES MANUAL c
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.5.1 0
11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 0
11/19/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 1 12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/18/2002 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0
11/19/2002
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of 15 Report Date: 07/06/05 Page 3 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Y
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT o
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN o
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL o
11/19/2002 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM o
11/19/2002 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 SYSTEMS C02 SYSTEMS TEXT 3.7.3.4
Title:
PLANT 0
SYSTEMS HALON SYSTEMS 11/19/2002 TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT TEXT 3.7.5.1
Title:
PLANT 0
11/19/2002 SYSTEMS FIRE HOSE STATIONS 0
11/19/2002 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS FIRE RATED ASSEMBLIES 1
01/12/2004 SYSTEMS FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 07/06/05
SSES MANUAL s
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2
Title:
PLANT SYSTEMS TEXT 3.7.5.3
Title:
PLANT SYSTEMS TEXT 3.7.6
Title:
PLANT SYSTEMS TEXT 3.7.7 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 LIQUID HOLDUP TANKS 1
03/01/2005 ESSW PUMPHOUSE VENTILATION 0
11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 2
03/01/2005
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0
11/19/2002 i__>
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION PROTECTIVE DEVICES CONDUCTOR OVERCURRENT TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT 3.8.2.2
Title:
ELECTRICAL AUTOMATIC 1
12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
2 12/14/2004 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
TEXT 3.8.3 0
11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES TEXT 3.8.4 1
02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM Page 5 of 15 Report Date: 07/06/05 Page 5 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0
11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0
11/19/2002
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0
11/19/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0
11/19/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 0
11/19/2002
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE 1
12/14/2004 EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 1
01/27/2004 EFFLUENTS DOSE RATE 2
12/14/2004 EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
12/14/2004 EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3
Title:
RADIOACTIVE 0
11/19/2002 INTERLABORATORY COMPARISON PROGRAM EFFLUENTS TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM TEXT 3.12.2
Title:
LOADS CONTROL PROGRAM TEXT 3.12.3 0
11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL.
0 11/19/2002 HEAVY LOADS REQUIREMENTS 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 0
11/19/2002
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
TEXT B3.1.1 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES.ANTICIPATED TRANSIENT WITHOUT ROD INJECTION (ATWS-ARI)
INSTRUMENTATION APPLICABILITY SCRAM ALTERNATE TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 1
03/10/2005
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION Page 7 of 15 Report Date: 07/06/05 Page 7 of 15 Report Date: 07/06/05
l I
- l SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1
Title:
CORE OPERATING L TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION IMITS 0
11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 0
11/19/2002 BASES SEISMIC MONITORING INSTRUMENTATION 1
02/04/2005 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 1
07/06/2005 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 0
11/19/2002 BASES THIS PAGE INTENTIONALLY LEFT BLANK 2
12/14/2004 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 0
11/19/2002 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 1
11/22/2004 BASES LPRM UPSCALE ALARM INSTRUMENTATION 0
11/19/2002 BASES REACTOR RECIRCULATION PUMP MG SET STOPS Page 8 of 15 Report Date: 07/06/05 Page 8 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.11
Title:
INSTRUMENTATION TEXT B3.4.1
Title:
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0
11/19/2002 SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR 0
11/19/2002 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 0
11/19/2002 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0
11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5
Title:
REACTOR COOLANT TEXT B3.5.1 0
11/19/2002 SYSTEM BASES REACTOR VESSEL MATERIALS 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0
11/19/2002
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0
11/19/2002
Title:
ECCS AND RCIC BASES LONGTERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION of 15 Report Date: 07/06/05 Of _5 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 0
11/19/2002 FIRE SUPPRESSION WATER SUPPLY SYSTEM 0
11/19/2002 SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3
Title:
PLANT 0
11/19/2002 SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4
Title:
PLANT 0
11/19/2002 HALON SYSTEMS SYSTEMS BASES TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT 0
11/19/2002 SYSTEMS BASES FIRE HOSE STATIONS 0
11/19/2002 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES 1
01/12/2004 SYSTEMS BASES FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM Page 10 of 15 Report Date: 07/06/05 Page 10 of 15 Report Date: 07/06/05
SSES MANUAL M
lwanual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 MAIN CONDENSER -OFFGAS 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES 0
11/19/2002' LIQUID HOLDUP TANKS 1
03/01/2005 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0
11/19/2002'
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1
12/14/2004
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1
12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1
02/04/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0
11/19/2002-
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES' (MOV)
THERMAL OVERLOAD PROTECTION CONTINUOUS TEXT B3.8.2.2 1
09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION AUTOMATIC TEXT B3.8.3 0
11/19/2002'
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR'(DG) MAINTENANCE ACTIVITIES Page 11 of 15 Report Date: 07/06/05 Page 11 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2 Xanual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.4 0
11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0
11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1
02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0
11/19/2002
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0
11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE Page 12 of 15 Report Date: 07/06105 Page 12 of 15 Report Date: 07/06/05
SSES MANUAL x Manual Nam :
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION o
11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
BASES 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS 0
11/19/2002 BASES DOSE -
NOBLE GASES 0
BASES 11/19/2002 DOSE -
IODINE, TRITIUM, AND RADIONUCLIDES IN 0
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 3
05/20/2005 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1
01/27/2004.
BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING 0
11/19/2002 BASES TOTAL DOSE 1
12/14/2004 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS Page 13 of 15 Report Date: 07/06/05 Page 13 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM TEXT 3.11.1.5
Title:
RADIOACTIVE EFFLUENTS TEXT 3.11.2.2
Title:
RADIOACTIVE EFFLUENTS 0
BASES 0
BASES 0
BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL 11/19/2002 HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS 1
12/14/2004 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 0
11/19/2002 DOSE -
NOBLE GASES TEXT 3.11.2.3
Title:
RADIOACTIVE FORM 0
11/19/2002 DOSE -
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 4.1 0
11/19/2002 EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM 1
05/20/2005 EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM 0
11/19/2002 EFFLUENTS TOTAL DOSE 1
12/14/2004 EFFLUENTS MONITORING PROGRAM 0
09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION Page 14 of 15 Report Date: 07/06/05 Page 14 of 15 Report Date: 07/06/05
SSES MANUAL Manual Name:
TRM2
'Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE o
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 0
09/27/2003 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7
Title:
ADMINISTRATIVE o
09/27/2003 CONTROLS TRAINING Page 15 of 15 Report Date: 07/06/05 Page _5 of 15 Report Date: 07/06/05
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 tLST OF EFFECT7VE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 01/28/2005 1.0 USE AND APPLICATION Page TRM /1.0-1 Page TRM /1.0-2 Page TRM / 1.0-3 2.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM t 2.0-4 Page TRM /2.0-5 Pages TRM / 2.0-6 and TRM /2.0-7 Page TRM /2.0-8 Pages TRM /2.0-9 through TRM 2.0-14 3.0 APPLICABILITY Pages TRM /3.0-1 and TRM /3.0-2 Page TRM /3.0-3 Page TRM /3.0-4 3.1 3.2 3.3 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-6 Pages TRM / 3.1-7 and TJRM / 3.1-8_-
Pages TRM / 3.1-9 and;TRM 13.1-9a Page TRM /3.1-10
,>\\
CORE OPERATING IMITS REPORT Page 3.2-1
\\ "
Pages TRM/3.2-2 through TRM / 3.2-39 INSTRUMENTATION>
Pages TRM7 3.3-1 through TRM / 3.3-3 (a'g-e TRM 1 3.3-4 Pages.~3-5 through 3.3-8
.Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-1 Ia Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM /3.3-14 Page TRM / 3.3-15 Page TRM /3.3-16 Pages TRM /3.3-17 and TRM / 3.3-18 Pages TRM /3.3-19 and TRM /3.3-20 Page TRM /3.3-21 Pages TRM /3.3-21a through TRM / 3.3-21d Pages TRM 13.3-22 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 N
04/12/1999 11/15/2004
'I.
12/03/2004 7'
11/15/2004 04/08/1999 03/15/2002 04/08/1999 08/31/1998 02/25/2005 02/18/1999 02/18/1999 08/31/1998 03/03/2005 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 06/02/2005 03/30/2001 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/22/2003 11/1512004 11/15/2004 12/03/2004 I
SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title
'Effective Date Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 05/16/2003 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM /3.4-12 Page 3.4-13 10/23/1998 08/31/1998 12103/2004 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 01/28/2005 08/31/1998 04/17/2000 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Page TRM / 3.7-43 Pages 3.7-44 through 3.7-47 Page TRM / 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 01/09/2004 10/05/2002 02/01/1999 08/31/1998 02/14/2005 08/31/1998 12/03/2004 10/13/1998 03/08/2003 03/09/2001 12/03/2004 04/15/2003 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 0410212002 01/28/2005 01/31/2005 04/02/2002 SUSQUEHANNA - UNIT 2
.TRM / LOES-2 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 UST OF EFFECTAIE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM /3.8-23 Pages 3.8-24 and 3.8-25 12/0312004 08/10/2004 12/03/2004 08/3111998 01/2812005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.9 3.10 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM/ 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 08/31/1998 08/3011998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 Page TRM / 3.10-8 3.11 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM /3.11-14 Pages 3.11-15 and 3.11-16 Pages 3.11-17 and 3.11-18 Page TRM / 3.11-19 Pages 3.11-20 and 3.11-21 Page TRM / 3.11-22 Pages TRM /3.11-23 and TRM /3.11-24 Page 3.11-25 Pages TRM /3.11-26 through TRM /3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Pages 3.11-33 through 3.11-37 Page TRM /3.11-38 Pages 3.11-39 through 3.11-44 Page TRM /3.11-45 Pages 3.11-46 and 3.11-47 08/31/1998
12/03/2004 08/31/1998 09/01/1998 12/03/1004 09/01/1998 08/31/1998 01/21/2004 08/31/1998 04/02/2002 05/13/2005 09/01/1998 01121/2004 12/0312004 01/21/2004 08/31/1998 12/03/2004 08/31/1998 12/03/2004 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.12 4.0 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B3.0 B3.1 B3.2 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 03/15/2002 07/13/1999 08/31/1998 02/25/2005 07/13/1999 02/18/1999 08/31/1998 B 3.3 B3.4 B 3.5 B 3.6 INSTRUMENTATION BASES Page TRMIB 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM /B 3.3-9 Pages B 3.3-10 through B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-:19 Pages TRM / B 3.3-19a through TRM / B 3.3.19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 04/07/2000 08/31/1998 01/31/2005 06/02/2005 03/30/2001 08/31/1998 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999 08/31/1998 I
SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) t, Section Title Effective Date Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM I B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM/B 3.7-22 and TRMIB 3.7-23 Page B 3.7-24 Page TRM / B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 09/23/1999 01/07/2002 12/03/2004 12/3112002 08/31/1998 08/02/1999 08/0211999 08/02/1999 08/02/1999 08/02/1999 01/0912004 02/01/1999 08/31/1998 02/1412005 04/07/2000 08/31/1998 12/03/2004 08/31/1998 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/0512000 04/0212002 0112812005 04/02/2002 04/02/2002 04/02/2002 08/1 0/2004 08/31/1998 04/02/2002 0112812005 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 08/31/1998 03/08/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 06/02/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 16 LISTOFEFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.0-4 and TRM B 3.10-5 Pages TRM / B 3.10-6 and TRM /3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRMIB 3.11-11 and TRM/B 3.11-1 1a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM I B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-28 Page TRM / B 3.11-29 and TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM I B 3.12-3 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 01/21/2004 08/31/1998 12/03/2004 08/31/1998 02/12/1999 02/05/1999 TRM2 ted LOES.doc s2@as SUSQUEHANNA - UNIT 2 TRM /LOES-7 EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 1 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 APPLICABILITY:
The TRM post-accident monitoring instrumentation channels shown in Table 3.3.4-1 shall be OPERABLE.
According to Table 3.3.4-1 ACTIONS
~NOTr-Separate condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Enter the Condition Immediately channel inoperable.
referenced in Table 3.3.4-1 for the channel B.
As required by Required B.1 Initiate the preplanned 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Action A.1 and referenced alternate method of in Table 3.3.41.
monitoring the appropriate parameter(s)
AND 8.2 Restore the required channel 7 days to OPERABLE status.
C.
As required by Required C.1 Restore the required 30 days Action A.1 and referenced channel(s) to OPERABLE in Table 3.3.4-1 status.
D.
As required by Required D.1 Verify affected SRV position Immediately Action A.1 and referenced by alternate methods.
AND in Table 3.3.4-1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.3-9 EFFECTIVE DATE 12/17/1998
PPL Rev. 1 TRM Post Accident Monitoring Instrumentation 3.3.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME AND D.2 Verify a minimum 14 of the Immediately associated acoustic monitor channels and 5 of the ADS SRV acoustic monitor channels are operable.
AND D.3.1 Verify SRV tailpipe temperature indication and Immediately alarm are available.
OR D.3.2 Restore SRV tailpipe temperature indication and 7 days alarm to functional status.
AND D.4.1 Restore the required channel(s) to OPERABLE 30 days status.
OR At next outage with
-containment entry, not to exceed the next refueling outage for in-accessible containment components.
'i SUSQUEHANNA - UNIT 2 TRM / 3.3-9a EFFECTIVE DATE 12/17/1998
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 1 TECHNICAL REQUIREMENT SURVEILLANCE
_ru" I--
- 1. Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditiohs and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE FREQUENCY TRS 3.3.4.1 Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.
TRS 3.3.4.4
-Perform CHANNEL CALIBRATION 24 months TR 3...
4mnh SUSQUEHANNA - UNIT 2 TRM / 3.3-1 0 EFFECTIVE DATE 12/17/1998
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 1 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS
- ACTION A.1 SURVEILLANCE
- 1.
Suppression Chamber Air Temperature
- 2.
Main Steam Safety/Relief Valve Position Indicator (Acoustic Monhor)c) 1,2 1,2 2
l Iavave C
D TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.2 TRS 3.3.4.3
- 3.
Reactor Building Vent Noble Gas Monitor
- a. Mid Range b
- b. High Range "b 1,2, (a) 1,2, (a) 1 B
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 1
B
- 4. Standby Gas Treatment System Vent Noble Gas Monitor
- a. Mid Range b
- b. High Range b 1,2, (a) 1,2, (a) 2 B (Both Ch. Inop)
C (One Ch. Inop) 2 B (Both Ch. Inop)
C (One Ch. Inop)
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4
- 5.
Turbine Building Vent Noble Gas Monitor
- a. Mid Range°b
- b. High Range "b
- 1,2 1,2 2
B (Both Ch. Inop)
C (One Ch. Inop) 2 B (Both Ch. Inop)
C (One Ch. Inop)
TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4 SUSQUEHANNA - UNIT 2 TRM I 3.3-11 EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 1 TABLE 3.3.4-1 (continued)
TRM POST-ACCIDENT MONITORING INSTRUMENTATION I
APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE
- 6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
- a. Effluent System 1,2, (a) 1 C
TRS 3.3.4.1 flow rate monitor(b)
TRS 3.3.4.4
- b. Sampler flow rate 1,2, (a) 1 C
TRS 3.3.4.1 monitor(b)
TRS 3.3.4.4
- 7. Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
- a.
Effluent System 1,2 1
C TRS 3.3.4.1 flow rate monitor(b)
TRS 3.3.4.4
- b. Sampler flow rate 1,2 1
C TRS 3.3.4.1 monitor(b)
TRS 3.3.4.4 (a)
When moving irradiated fuel in the secondary containment.
(b) The provisions of TRO 3.0.4 are not applicable.
(c) Alternate monitoring methods listed in Bases.
SUSQUEHANNA - UNIT 2 TRM / 3.3-11 a EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation PPL Rev..
B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," and NUREG-0578, uTMI-2 Lessons Leamed Task Force Status Report and Short-Term Recommendations.t It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A instruments and Regulatory Guide 1.97 Type A instrument (References I and 2). This TRO requires instruments outside of these criteria.
Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for
'the purposes of this TRM. The recorders are the primary method of indication used by operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.
LOOP A LOOP B TE-25703 TE-25725 TT-25703 TT-25725 TR-25795A TR-25795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Altemate methods for monitoring SRV position are:
Suppression Pool Level Suppression Pool Temperature RPV Level RPV Pressure SRV Tailpipe Temperature (7 day restoration of requirement applies)
The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of (continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.3-4 EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev. 1 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO (continued) radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range. For the Standby Gas Treatment System Vent Noble Gas Monitor and the Turbine Building Vent Noble Gas Monitor, the U2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor; and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.
Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of 1 or 2 channels of acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.
Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement A TRM requirement of 7 days for restoring concurrent failures of the SRV tailpipe temperature monitoring for channels with failed acoustic monitors is added to ensure prompt restoration.
Tailpipe temperature is the direct process monitoring, -alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B3.3-5 EFFECTIVE DATE 06/02/2005
TRM Post Accident Monitoring Instrumentation PPL Rev. I B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.
TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
REFERENCES
- 1.
Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident,"
- 2.
NUREG-0578, -TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations"
- 3.
Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S" acoustic monitor.
- 4.
Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 US" acoustic monitor.
- 5.
Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.
SUSQUEHANNA - UNIT 2 TRM / B3.3-6 EFFECTIVE DATE 06/02/2005