Jul. 07, 2005 Page 1

of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-28765 USER INEOM EMPL#:028401 CA#:

0363 Addre SA2 Pho#:2 TRANSMITTAL INFORMATION:

TO:

aFRTAr4*wb" 07/07/2005 LOCATIONT N

FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

TRM1 -

TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/27/2005 ADD MANUAL TABLE OF CONTENTS DATE: 07/06/2005 CATEGORY: DOCUMENTS TYPE: TRMl ID:

TEXT 3.3.4 REMOVE:

REV:0 ADD:

REV:

1 CATEGORY:

DOCUMENTS TYPE: TRM1 ID:

TEXT B3.3.4 REMOVE:

REV:0

Jul. 07, 2005 Page 2

of 2

ADD:

REV: 1 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS TYPE: TRM1 LOES REV:16 ADD:

REV: 17 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL

! Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:

07/06/2005 Procedure Name Rev Issue Date Chu TRM1 N/A 08/01/2003

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 (07/28/2003)

Lnge ID Change Number TEXT LOES 17

Title:

LIST OF EFFECTIVE SECTIONS 07/06/2005 I

TEXT TOC up,4W

l.

5 02/04/2005 MIAnT.V<

nr trnM~rrN"Q.

TEXT 1.1 0

11/18/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1

02/04/2005 ">;

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 3

/

12/14Ž2004

Title:

PLANT PROGRAMS AND SETPOINTS'INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 0

11/18/2002

Title:

TECHNICAL REQUIREMENT5 FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.2 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1

03/10/2005

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE

,-I TEXT 3.2.1 4

11/22/2004

Title:

CORE OPERATING LIMITS REPORT (COLR)

Page 1 of 15 Report Date: 07/06/05 Page I of 15 Report Date: 07/06/05

SSES MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • i TEXT 3.3.1

Title:

INSTRUMENTATION TEXT 3.3.2

Title:

INSTRUMENTATION TEXT 3.3.3

Title:

INSTRUMENTATION TEXT 3.3.4

Title:

INSTRUMENTATION 0

11/18/2002 RADIATION MONITORING INSTRUMENTATION 0

11/18/2002 SEISMIC MONITORING INSTRUMENTATION 0

11/18/2002 METEOROLOGICAL MONITORING INSTRUMENTATION 1

07/06/2005 TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 1

10/22/2003

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0

11/18/2002

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1

11/22/2004

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11

.1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 0

11/18/2002

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Report Date: 07/06/05 Page 2 of 15

SSES MANUAL

-! Manual Name:

TRM1

%anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 0

11/18/2002 COOLANT SYSTEM STRUCTURAL INTEGRITY 0

11/18/2002 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 1

12/14/2004 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/18/2002 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT PEXT 3.5.2 0

11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/18/2002.'.

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/18/2002'

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0

11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN Page 3 of 15 Report Date: 07/06/05 Paiqf 3 of 15 Report Date: 07/06/05

- s SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT 0

11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 0

11/18/2002 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 0

11/18/2002 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 0

11/18/2002 SYSTEMS C02 SYSTEMS TEXT 3.7.3.4

Title:

PLANT 0

SYSTEMS HALON SYSTEMS 11/18/2002 TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT TEXT 3.7.5.2

Title:

PLANT 0

11/18/2002 SYSTEMS FIRE HOSE STATIONS 0

11/18/2002 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/18/2002 SYSTEMS FIRE RATED ASSEMBLIES 1

01/12/2004 SYSTEMS FIRE DETECTION INSTRUMENTATION 0

11/18/2002 SYSTEMS SOLID RADWASTE SYSTEM 0

11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE N-Page 4 of 15 Report Date: 07/06/05 Page 4 of 15 Report Date: 07/06/05

SSES MANUAL Manual Name:

TRM1 manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.3 0

11/18/2002

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1

03/01/2005

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0

11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 1

12/14/2004

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0

11/18/2002

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1 1

02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1

Title:

ELECTRICAL CONTINUOUS 1

12/14/2004 POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

TEXT 3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT 3.8.3

Title:

ELECTRICAL TEXT 3.8.4

Title:

ELECTRICAL TEXT 3.8.5

Title:

ELECTRICAL 2

12/14/2004:

POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/18/2002 POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/18/2002 POWER 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/18/2002 POWER DEGRADED VOLTAGE PROTECTION Page 5 of 15

-Rt-Report Date: 07/06/05

SSES MANUAL Manual Name:

TRM1 Xauual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.6 0

11/18/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0

11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0

11/18/2002

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 0

11/18/2002

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 0

11/18/2002

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 0

11/18/2002

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 0

11/18/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0

11/18/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0

11/18/2002

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Page 6 of 15 Report Date: 07/06/05

SSES MANUAL

- Xanual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.5

Title:

RADIOACTIVE 1

12/14/2004 RADIOACTIVE LIQUID EFFLUENTS PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1

Title:

RADIOACTIVE 1

01/27/2004 EFFLUENTS DOSE RATE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS 0

11/18/2002 DOSE -

NOBLE GASES 0

11/18/2002 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS 1

05/20/2005 VENTILATION EXHAUST 2

12/14/2004 RADIOACTIVE GASEOUS TREATMENT SYSTEM.

EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3

Title:

RADIOACTIVE 0

11/18/2002 TOTAL DOSE EFFLUENTS TEXT 3.11.4.1

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE TEXT 3.11.4.3

Title:

RADIOACTIVE TEXT 3.12.1 1

12/14/2004 EFFLUENTS MONITORING PROGRAM 7'

1 12/14/2004 EFFLUENTS LAND USE CENSUS.

0 11/18/2002.

EFFLUENTS INTERLABORATORY.COMPARISON PROGRAM 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL Page 7 of 15 Report Date: 07/06/05 Page 7 of 15 Report Date: -07/06/05

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0 0

11/19/2002

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT tmEXT B3.1.3 1

03/10/2005

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0

11/19/2002

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1

02/04/2005

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 1

07/06/2005

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION Page 8 of 15 Report Date: 07/06/05 Page 8 of 15 Report Date: 07/06/05

SSES MANUAL l-Manual Name:

TRM1 Sanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.5

Title:

INSTRUMENTATION BASES TEXT B3.3.6

Title:

INSTRUMENTATION BASES TEXT B3.3.7

Title:

INSTRUMENTATION BASES TEXT B3.3.8

Title:

INSTRUMENTATION BASES TEXT B3.3.9

Title:

INSTRUMENTATION BASES TEXT B3.3.10

-\\,

Title:

INSTRUMENTATION BASES TEXT B3.3.11

Title:

INSTRUMENTATION BASES TEXT B3.4.1

Title:

REACTOR COOLANT SYSTE]

TEXT B3.4.2

Title:

REACTOR COOLANT SYSTEJ TEXT B3.4.3

Title:

REACTOR COOLANT SYSTE]

TEXT B3.4.4

Title:

REACTOR COOLANT SYSTE TEXT B3.4.5

Title:

REACTOR COOLANT SYSTE 0

11/19/2002 THIS PAGE INTENTIONALLY LEFT BLANK 2

12/14/2004 TRM ISOLATION ACTUATION INSTRUMENTATION 0

11/19/2002 MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 TRM REACTOR PROTECTION SYSTEM (RPS)

INSTRUMENTATION 1

11/22/2004 LPRM UPSCALE' ALARM INSTRUMENTATION 0

11/19/2002 REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 MVP ISOLATION INSTRUMENTATION:

0 11/19/2002 AM BASES REACTOR COOLANT SYSTEM CHEMISTRY-0 11/19/2002 CM BASES STRUCTURAL INTEGRITY 0

11/19/2002 M BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR' 0

11/19/2002 CM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/19/2002 M BASES REACTOR VESSEL MATERIALS Page 9 of 15 Report Date: 07/06/05 Page 9 of 15 Report Dat'e: 07/06i05

SSES MANUAL Manual Name:

TRM1 4anual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

'-Ij TEXT B3.5.1

Title:

ECCS AND RCIC TEXT B3.5.2

Title:

ECCS AND RCIC TEXT B3.5.3

Title:

ECCS AND RCIC TEXT B3.6.1 0

11/19/2002 BASES ADS MANUAL INHIBIT 0

11/19/2002 BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION 0

11/19/2002 BASES LONG TERM NITROGEN SUPPLY TO ADS 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 0

11/19/2002 FIRE SUPPRESSION WATER SUPPLY SYSTEM 0

11/19/2002 SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3

Title:

PLANT 0

11/19/2002 SYSTEMS BASES C02 SYSTEMS Page 10 of 15 Report Date: 07/06/05 Page 10 of 15 Report Date: 07/06/05

SSES MANUAL Manual Name:

TRM1 manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT 0

11/19/2002 SYSTEMS BASES HALON SYSTEMS 0

11/19/2002 SYSTEMS BASES FIRE HOSE STATIONS -

TEXT B3.7.3.6

Title:

PLANT 0

11/19/2002 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT SYSTEMS BASES SYSTEMS-BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3

Title:

PLANT 0

11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6

Title:

PLANT 1

03/01/2005 ESSW PUMPHOUSE VENTILATION SYSTEMS BASES TEXT B3.7.7 0

11/19/2002 -

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1

12/14/2004

Title:

PLANT SYSTEMS BASES SNUBBERS Page 11 of 15 Report Date: 07/06/05 Page 11 of 15 Report Date: 07/06/05

SSES MANUAL Manual Name:

TRM1 xanual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 1

09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

PROTECTION -

TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.9.1 0

11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM Page 12 of 15 Report Date: 07/06/05 Page 12 of 15 Report Date: 07/06/05

SSES MANUAL we Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.10.1

Title:

MISCELLANEOUS TEXT B3.10.2

Title:

MISCELLANEOUS TEXT B3.10.3

Title:

MISCELLANEOUS TEXT B3.10.4

Title:

MISCELLANEOUS TEXT B3.11.1.1 o

11/19/2002 BASES SEALED SOURCE CONTAMINATION 0

11/19/2002 BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 0

11/19/2002 BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) 0 11/19/2002 BASES LEADING EDGE FLOW METER (LEFM) 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 V>

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.1.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.1.4

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.2 0

11/19/2002 BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0

11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING 1

12/14/2004 BASES DOSE-RATE 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT B3.11.2.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM Page 13 of 15 Report Date: 07/06/05 Page 13 of 15 Report Date: 07/06/05

I SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.2

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTS TEXT B3.12.1

Title:

LOADS CONTROL PROGRAM TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM TEXT B3.12.3

Title:

LOADS CONTROL PROGRAM TEXT 3.1.1 0

BASES 3

BASES 1

BASES 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 05/20/2005 VENTILATION EXHAUST TREATMENT SYSTEM 01/27/2004 RADIOACTIVE GASEOUS EFFLUENT MONITORING 0

11/19/2002 BASES TOTAL DOSE 1

12/14/2004 BASES MONITORING PROGRAM 0

11/19/2002 BASES LAND USE CENSUS 0

11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 0

11/19/2002 BASES CRANE TRAVEL-SPENT FUEL STORAGE-POOL 0

11/19/2002 BASES HEAVY LOADS REQUIREMENTS 0

11/19/2002 BASES LIGHT LOADS REQUIREMENTS 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 4.1 0

08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION Page 14 of 15 Report Date: 07/06/05 Page 14 of 15 Report Date: 07/06/05

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.2

Title:

TEXT 4.3

Title:

TEXT 4.4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

TEXT 4.7

/

Title:

0 08/31/1998 CONTROLS REPORTABLE EVENT ACTION ADMINISTRATIVE ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 0

ADMINISTRATIVE CONTROLS 08/31/1998 SAFETY LIMIT VIOLATION 08/31/1998 PROCEDURES & PROGRAMS 08/31/1998 REPORTING REQUIREMENTS 08/31/1998 RADIATION PROTECTION PROGRAM 0

08/31/1998 CONTROLS TRAINING ADMINISTRATIVE Page 15 of 15 Report Date: 07/06/05 Page 15 of 15 Report Date: 07/06/05

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 2.0 3.0 3.1 3.2 3.3 TABLE OF CONTENTS USE AND APPLICATION

-Pages TRM /1.0-1 through TRM /1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM /2.0-2 and TRM /2.0-3 Page TRM /2.0-4 Page TRM / 2.0-5 Pages TRM /2.0-6 and TRM /2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM /2.0-14 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Pages TRM / 3.0-3 I

N Page TRM /3.0-4 REACTIVITY CONTROL SYSTEMS

) d Pages 3.1-1 through 3.1;6j.-

Pages TRM / 3.1-7 and TRM 13.1-8 Pages TRM / 3.1-9 apdTkM / 311-9a Page TRM / 3.1 -1

\\

CORE OPERATING LIMITS'REPORT Page TRM,/ 3.2-1,.

Pages TRM /3.2-2 through TRM / 3.2-38 INSTRUMENTATION

/'PagesTRM i 3.3-1 through TRM / 3.3-3 IPage',TRM / 3.3-4 Pages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Pages TRM / 3.3-13 and TRM / 3.3-14

' Page TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM /3.3-21 Page TRM / 3.3-22 Pages TRM / 3.3-22a through TRM / 3.3-22d Page TRM / 3.3-23 0112812005 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 1 1/1 52004 12/03/2004 11/15/2004 04/08/1999 03/15/2002 0410811999 08/31/1998 02125/2005 02/18/1999 02/18/1999 07/07/1999 11/15/2004 07/16/1999 11/28/2000 08/31/1998 12/17/1998 12/17/1998 06/02/2005 03/30/2001 12/14/1998 10/22/2003 06/27/2001 06/14/2002 1 0/222003 11/15/2004 11/1512004 12/0312004 I'

SUSQUEHANNA - UNIT 1 -

TRM / LOES-1 EFFECTIVE DATE 06/02/2005

SUSQUEHANNA STEAM ELECTRIC STATION '

PPL Rev. 17 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 05/16/2003 10122/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-11

- Page TRM / 3.4-12 Page 3.4-13 10/23/1998 08/31/1998 12/0312004 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3

- Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 01/28/2005 08/31/1998 04/1712000 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3.

Page TRM / 3.6-4

'Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 08/31/1998 01/0712002. '

08/31/1998 12/3112002 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Pages TRM / 3.7-4 through TRM /3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Pages TRM / 3.7-35 through TRM I 3.7-37 Pages 3.7-38 through 3.7-40 Pages TRM / 3.7-41 and TRM /3.7-41 a Pages 3.7-42 and 3.7-43 Page TRM / 3.7-44 Pages 3.7-45 through 3.7-48 Page TRM / 3.7-49 Pages TRM / 3.7-50 and TRM / 3.7-51 Pages TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 08/31/1998 08/02/1999 12/29/1999 08/02/1999 11/16/2001 01/09/2004 11/16/2001 10/0512002 02/01/1999 08/31/1998 02/14/2005 08/31/1998 12/0312004 10/13/1998 03/08/2003 03/0912001 12/03/2004 04/15/2003 07/29/1 999 3.8

ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 through TRM / 3.8-4 04/02/2002 01/28/2005 SUSQUEHANNA - UNIT 1

- TRM / LOES-2 UEFFECTIVE DATE 06/02/2005

SUSQUEHANNA STEAM ELECTRIC STATION -

PPL Rev. 17 UST OF EFFECTIVE SECTiONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.9 3.10 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM I 3.8-10 Page TRM 1 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Pages TRM / 3.8-15 through TRM /3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM I 3.8-23 Pages 3.8-24 and 3.8-25 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM /3.10-7 Page TRM /3.10-8 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-9 Page TRM / 3.11 -10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM /3.11-14 Pages 3.11-15 and 3.11-16 Pages 3.11-17 and 3.11-18 Page TRM / 3.11-19 Pages 3.11-20 and 3.11-21 Page TRM /3.11-22 Pages TRM /3.11-23 and TRM /3.11-24 Page 3.11-25 Pages TRM /3.11-26 through TRM /3.11-28 Page TRM /3.11 Pages TRM /3.11.30 through TRM / 3.11.32 Pages 3.11-33 through 3.11-37 Page TRM 3.11-38 Pages 3.11-39 through 3.11-44 Page TRM /3.11-45 Pages'3.11-46 and 3.11-47 04/02/2002 12/03/2004

-08/10/2004 12/03/2004 08/31/1998 04102/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 08/31/1998 08/31/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002 3.11 08/31/1998 12/03/2004 08/31/1998 09/011998 12/03/2004 09/01/1998 08/31/1998 01/21/2004 08/31/1998 04102/2002 05/13/2005 09/01/1998 01/21/2004 12/03/2004 01/21/2004 08/31/1998 12/03/2004 08/31/1998 12/03/2004 08/31/1998 SUSQUEHANNA-UNIT 1 TRM / LOES-3 EFFECTIVE DATE 06/02/2005

SUSQUEHANNA STEAM ELECTRIC STATION

.PPL-Rev. 17' UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Sectii 3.12 on Title Effective Date LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5

. ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 02/05/1999 4.0 08/31/1998 SUSQUEHANNA - UNIT 1 TRM I LOES-4 EFFECTIVE DATE 06/02/2005

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 UST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10

'Pages TRM / B 3.0-11 through TRM I B '3.0-15 08/31/1998 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM I B 3.1-1 through TRM I B 3.1-3 Page B 3.1-4 Page'TRM / B 3.1-5 Pages TRM / B 3.1.6 and TRM I B 3.1-7 Page TRM / B 3.1-8 I07/13/1999 08/31/1998 02/25/2005 07/13/1999 02/18/1999 B3.2 B 3.3

  • C CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 PagesTRM / B 3.3-3 and TRM I B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-6 Pages TRM / B 3.3-7 through TRM / B 3.3-9 Pages B 3.3-10 through B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM i B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3;3-17a through TRM / B 3.3-17f Pages TRM / B3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 04/07/2000 08/31/1998 01/31/2005 06/02/2005 03/30/2001 08/31/1998 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 I

08/31/1998 B 3.4 08/31/1998 10/15/1999 08/31/1998 B 3.5 B 3.6 '

ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM I B 3.6-4 '

  • 07/26/2001 02/01/1999
  • 08/31/1998

- 09/23/1999 SUSQUEHANNA --UNIT 1 TRIVI / LOES-5 EFFECTIVE DATE 06/02/2005

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.6-5 Pages TRM / B 3.6-6 Pages B.3.6-7 through TRM I B 3.6-11:

B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM I B 3.7-7a Pages TRM / B 3.7-8 through TRM I B 3.7-10 Page TRM / B 3.7-1 Oa Pages TRM / B 3.7-11 and TRM I B 3.7-11 a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM/B'3.7-21 and TRMIB 3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Page B 3.7-24 Page TRM / B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM /,B 3.7-34 Page TRM B 3.7-35 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM/ B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM I B 3.8-17 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM B 3.10-5 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 0211412005 04/07/2000 08/31/1998 12/0312004 08/31/1998 12/03/2004 03/09/2001 04/1512003 12/03/2004 07/05/2000 04/02/2002 01/28/2005 04/02/2002 04/0212002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 08/31/1998 08/31/1998 03/0812003 08123/1999 SUSQUEHANNA - UNIT 1 TRM / LOES-6 '

STEFFECTIVE DATE 06/02/2005

  • SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.10-6 and TRM / B 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.'11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 PageTRM/B3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM /B 3.11-25 Pages B 3.11-26 through B 3.11-28 Page TRM / B 3.11-29 and TRM / B 3.11-30 Pages B 3.7-31 through B 3.7-35 PageTRM/B3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 TRM1 text LOES 5QS05..

04/17/2002 08/30/1998' 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002

-05/13/2005 01/21/2004 08/30/1998 12/03/2004 8/30/19998 02/12/1999 02/05/1999 SUSQUEHANNA - UNIT I TRM / LOES-7 EFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation PPL Rev. 1 3.3.4 3.3 Instrumentation 3.3.4 TRM Post-Accident Monitoring Instrumentation TRO 3.3.4 The TRM post-accident monitoring instrumentation channels shown in.

Table 3.3.4-1 shall be OPERABLE.

APPLICABILITY:

According to Table 3.3.4-1

'ACTIONS r__

Separate condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Enter the Condition Immediately channel inoperable.

referenced in Table 3.3.4-1 for the channel B. As required by B.1 Initiate the preplanned

.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Required Action A.1 alternate method of and referenced in monitoring the Table 3.3.4-1.

appropriate parameter(s)

AND B.2 Restore the required 7 days channel to OPERABLE status.

C. As required by C.1 Restore the required 30 days Required Action A.1 channel(s) to OPERABLE and referenced in status.

Table 3.3.4-1 D. As required by D.1 Verify affected SRV Immediately Required Action A.1 position by alternate and referenced in methods.

AND Table 3.3.4-1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter I

SUSQUEHANNA - UNIT 1 TRM / 3.3-9 EFFECTIVE DATE 12/17/1998

PPL Rev. 1 TRM Post Accident Monitoring Instrumentation 3.3.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME -

AND D.2 Verify a minimum 14 of the associated acoustic monitor channels and 5 of the ADS SRV acoustic monitor channels are operable.

AND D.3.1 Verify SRV tailpipe temperature indication and alarm are available.

OR D.3.2 Restore SRV tailpipe temperature indication and alarm to functional status.

AND D.4.1 Restore the required channel(s) to OPERABLE status.

Immediately Immediately

-7 days I 30 days OR At next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

- z SUSQUEHANNA - UNIT I TRM / 3.3-9a STEFFECTIVE DATE 12/17/1998

PPL Rev. 1 TRM Post Accident Monitoring Instrumentation 3.3.4 TECHNICAL REQUIREMENT SURVEILLANCE NOT 1.'

Refer to Table 3.3.4-1 to determine which TRSs apply for each Post Accident Monitoring Function.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE FREQUENCY TRS 3.3.4A Perform CHANNEL CHECK 31 days TRS 3.3.4.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.4.3 Perform a CHANNEL CALIBRATION. The Trip 24 months Setpoint shall be less than or equal to 0.25 of the full open noise level.

TRS 3.3.4.4 Perform CHANNEL CALIBRATION 24 moniths SUSQUEHANNA - UNIT I TRM / 3.3-1 0 EFFECTIVE DATE 12/17/1998

- ~-

I

I '

TRM Post Accident Monitoring Instrumentation PPL Rev. 1 3.3.4 TABLE 3.3.4-1 TRM POST-ACCIDENT MONITORING INSTRUMENTATION APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS' ACTION A.1 SURVEILLANCE

1. Suppression Chamber Air Temperature 1,2 2

1/valve C

TRS 3.3.4.1 TRS 3.3.4.4

2. Main Steam Safety/Relief Valve Position Indicator (Acoustic Monitor)(c) '

1,2 D

TRS 3.3.4.1 TRS 3.3.4.2 TRS 3.3.4.3

3. Reactor Building Vent Noble Gas
Monitor
a. Mid Range(b) -
b. High Range(b) 1,2, (a)'

1,2, (a) 1 B

TRS 3.3.4.1 TRS 3.3.4.4

.TRS 3.3.4.1 I TRS 3.3.4.4 1

4.

Standby Gas Treatment System Vent Noble Gas Monitor

a. Mid Range b 1,2, (a)
  • 2 B (Both Ch. Inop)

C (One Ch. Inop)

b. High Range(b) 2 TRS 3.3.4.1 TRS 3.3.4.4 TRS 3.3.4.1 TRS 3.3.4.4
  • B (Both Ch mnop)

C (One Ch. Inop)

5. Turbine Building Vent Noble Gas Monitor
a. Mid Range~b 1,2 2

B (Both Ch. Inop) TRS 3.3.4.1 C (One Ch. Inop) TRS 3.3.4.4

b. High Range-b 1,2 2

'B (Both Ch. Inop)

C (One Ch. Inop)

TRS 3.3.4.1 TRS 3.3.4.4

,.SUSQUEHANNA-UNIT 1 TRM / 3.3-11 EFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation 3.3.4 PPL Rev. 1 TABLE 3.3.4-1 (continued)

-TRM POST-ACCIDENT MONITORING INSTRUMENTATION

.1 APPLICABLE CONDITIONS MODES OR OTHER REFERENCED SPECIFIED REQUIRED FROM REQUIRED REQUIRED FUNCTION CONDITIONS CHANNELS ACTION A.1 SURVEILLANCE

6. Standby Gas Treatment System Post Accident Vent Stack Sampling System (PAVSSS)
a.

Effluent System 1,2, (a) 1 C

TRS 3.3.4.1 flow rate monitor~b TRS 3.3.4.4

b. Sampler flow rate monitor()

1,2, (a) 1 C

TRS 3.3.4.1 TRS 3.3.4.4

7. Turbine Building Post Accident Vent Stack Sampling System (PAVSSS)
a. Effluent System 1,2 1

-C TRS 3.3.4.1 flow rate monitor~b TRS 3.3.4.4 TRS 3.3.4.1

b. Sampler flow rate monitoreb 1,2 1 -C TRS 3.3.4.4 (a)

When moving irradiated fuel in the secondary containment.

(b)

The provisions of TRO 3.0.4 are not applicable.

(c)

Alternate monitoring methods listed in Bases.

SUSQUEHANNA - UNIT 1 TRM / 3.3-1 1 a EFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation B 3.3.4' PPL Rev. I B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO The primary purpose of the TRM PAM instrumentation is to display plant variables that provide information required by the control room operators during accident situations. The OPERABILITY of the TRM PAM instrumentation ensures that the identified information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97 Revision 2, Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and following an Accident," and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations." It should be noted that the Technical Specifications LCO 3.3.3.1 contains all Category 1, non-type A, instruments and Regulatory Guide 1.97 Type A instrument (References 1 and 2). This TRO requires instruments outside of these criteria.

Table 3.3.4-1 identifies the following required Functions. Suppression Chamber Air Temperature provides a post accident indication of problems with the primary containment pressure suppression system. The Suppression Chamber Air Temperature loops are comprised of the following instruments for the purpose of this TRM. The recorders are the primary method of indication used by the operator during an accident; therefore, the PAM specification deals specifically with this portion of the instrument.

LOOP A'

  • TE-1 5703
  • TT-15703 TR-15795A LOOP B e.TE-15725 TT-15725
  • TR-15795B Main Steam Safety/Relief Valve Position Indicators (Acoustic Monitors) provide indication when the valves are functioning. Alternate methods for monitoring SRV position are:

Suppression Pool Level Suppression Pool Temperature RPV Level RPV Pressure SRV Tailpipe Temperature (7 day restoration of requirement applies)

The required channels for REACTOR BUILDING VENT Noble Gas Monitor, Standby Gas Treatment System Vent Noble Gas Monitor, and Turbine Building Vent Noble Gas Monitor provide information regarding the release of radioactive materials to allow for early indication of the need to initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat. For the Noble Gas Monitors the only required channels are the mid range and high range.

.(continued)

I SUSQUEHANNA - UNIT I TRM / B3.3-4 EFFECTIVE DATE 06/02/2005

- - -_ - I - - -I -

- - __.- -, - -., -

_ ___  1-.- - - -- --

__ -... -- ---...I..

.k 1.

... - -1.

TRM Post Accident Monitoring Instrumentation B 3.3.4 PPL Rev. 1 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES TRO For the Standby Gas Treatment System Vent Noble Gas Monitor and the (continued)

Turbine Building Vent Noble Gas Monitor, the "2" required channels for each Function consist of: the one channel of System Particulate, Iodine, and Noble Gas (SPING), which includes a Mid-Range monitor and a High-Range monitor, and the one channel of the Post Accident Vent Stack Sampling System (PAVSSS), which includes a Mid-Range monitor and a High-Range monitor.

Functions 6 and 7 describe the requirements for determining PAVSSS effluent flow via sample flow instrumentation. For all the PAVSSS Channels, (Functions 4, 5, 6 and 7) the channels may be considered OPERABLE if they

-are ready for service even though sample flow is not established and Control Terminal monitoring is not initiated.

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

Action D requirements were determined by balancing the safety significance of the system with the impact of the actions on the operating unit. The loss of 1 or 2 channels of acoustic monitors is not safety significant providing the diverse and redundant alternate methods of determining SRV position are available. System components in the control room are restorable within 30 days without unit operation impact. Components located in containment require a unit shutdown to gain access to individual components. The system channels shall be restored to operable condition at earliest opportunity.

Noble gas monitoring may be interrupted for up to 30 minutes to perform particulate filter/iodine cartridge changeout required by TRM Table 3.11.2-1 without entering the TRO ACTIONS.

Components of alternate SRV position systems may be taken inoperable for routine surveillances and periodic maintenance providing the appropriate LCO requirements are met during this action statement A TRM requirement of 7 days for restoring concurrent failures of the SRV tailpipe temperature monitoring for channels with failed acoustic monitors is added to ensure prompt restoration. Tailpipe temperature is the direct process monitoring, alternate method and is not covered by Technical Specification LCO's as are the other alternative methods.

(continued)

SUSQUEHANNA - UNIT 1 TRM I B 3.3-5 UAMEFFECTIVE DATE 06/02/2005

TRM Post Accident Monitoring Instrumentation PPL Rev. 1 B 3.3.4 B 3.3.4 TRM Post Accident Monitoring (PAM) Instrumentation BASES (continued)

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM PAM Function is maintained OPERABLE.

TRS 3.3.4.1 Performance of the CHANNEL CHECK once every 31 days ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between instrument channels could be an indication of excessive instrument drift in one of the' channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

Agreement criteria, which are determined by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.

REFERENCES

1.

Regulatory Guide 1.97 Revision 2, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident1,"

2.

"NUREG-0578, -TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations

3.

Technical Specification Amendment No. 100 to License No. NPF-22 for failed Unit 2 "S acoustic monitor.

4.

Technical Specification Amendment No. 169 to License No. NPF-14 for failed Unit 1 DS" acoustic monitor

5.

Proposed amendment No. 183 to License No. NPF-22 failed Unit 2 "J" acoustic monitor.

i.

. II SUSQUEHANNA - UNIT I -

TRM / B 3.3-6 UEFFECTIVE DATE 06/0212005