Comnitted to Nuclear EellRcEY OF NIAT BERCH
- U1828 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Wednesday, May 5, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM) l Items Included in Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule in accordance with Ohe Freedom of Infaorma Act~xm6n t
FO1A,-/
4 l-aXM-1
.g I Cotmrin~ed to Nu/clear Eclec 5L0 I
t GF, C~fl~t~ittd NM D-X.EL ELE1
- E mm IEllCH
- U0RZU Point Beach Nuclear Plant U1R28 Refueling Outage Safety Topics for week of May 2-8,2004 Theme for the week This week's theme is Hand Protection. During the last week of April, there were a lot of minor hand injuries reported. Although we have come a long way in the last few years, we still have not eliminated hand injuries. It is time we hand protection to the next level.
Daily Safety Snippets Sunday "It's difficult to grip when your finger gets snipped" Could you imagine doing your job without your hands? We tend to take it too much for granted that we have two hands at our command, immediately ready to do what we want them to. They not only perform amazing manual tasks, but they also make us money. Just ask anyone who has lost the use of his or her hands.
Monday "Concerning fingers, do not ignore: Cut one off and you'll grow no more" Limmerk 1999, While lowering a 20001b. flow diffuser from the high pressure turbine, a worker lost a substantial portion of one finger when the cribbing and jack used to support the diffuser failed and pinned the worker's hand between the diffuser and an I-beam used as part of the cribbing.
Tuesdav "Safety gloves worn is a hand not torn" OEI 2632 Davis Besse, While performing a search, a security officer ran his hand between the front and back seat of a vehicle. A utility knife with the blade partially open cut the leather outer covering of the search glove, but the Kevlar liner gloves the officer had on protected his hand and prevented a serious injury.
Wednesday
'Where danger lingers, watch your fingers" Workers need to know accidents can happen in the strangest ways. Some accidents are simply bizarre. Others happen when no hazard is apparent. Doors were the source of more than 10,000 hand injuries a year In the US. Vending machines caused more than 100 lost-day hand injuries.
And 52 workers iniured their hands while walking, according to the statistics.
Thursday
'Practice safety until it fits like a glove" Do you consider gloves as much a part of your normal PPE as your hardhat, safety glasses, and hearing protection? If not, maybe you should be. Always carry a pair of gloves with you when in the plant and use them when operating the valve or picking up scrap metal.
Friday "A finger tip - don't leave work without theml" On April 4, 2001, a contract employee at Braidwood Station suffered a fractured right hand when an electric hoist disengaged from a crane hook and fell on to the new fuel storage rack. The electric hoist was being used to drag test new spent fuel racks being Installed at the station. Workers attached a load cell and the electric hoist to the auxiliary hoist of the fuel building overhead crane, and then connected the electric hoist to a test gage. As the crane operator lowered the auxiliary hook, the test gage hung up on the fuel rack and caused the rigging to move laterally. The electric hoist became disengaged because the safety latch on the auxiliary hook was not used.
Saturday "It's no hand live... Proper gloves protect all five" OSHA 1910.138(a): General requirements. Employers shall select and require employees to use appropriate hand protection when employees' hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical bums; thermal bums; and harmful temperature extremes.
2
I.
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 31
- Pat A.
Picture Meets Dnnpen't Meet Fxrceeds Outage Radiation Performance ivi i
c m u c
a dose r a s
a
=~i ndcao mesue cuuatv dos raito xouean y3 My4 total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Actual = 0.907 Cumulative = 51.104 Cumulative Forecast = 59.488 Meets:
Exceeds:
<=75 Rem
<=71 Rem Actual Cum.
Dose:
51.104 Rem Daily dose and PCE goals reforecasted on 4/23.
PCE #7 on 5/4, individual performing cut-out of valve I RC-526B was found to have 10,000 ncpm contamination on modesty bottom (and 2,000 ncpm on
_\\
,n Meets: <=18 Exceeds: <=12 Actual PCE's:
7 gvuy.
C.3 S
S.I Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure 20 18 Ad 16 C 14 0x 12 E0 C 10 C0!8 2
6 zE 4 2
0
-a@--Forecast
,, 000I 1
4 0 2 4 6 8 101214161820222426283032343638404244464850 C
0 It0 0
a a
- -4
-ctual Forecast Goal 0 2 4 6 8 1012141618202224262830323436384042
NMC Cofmmitted to Nuclear Exrcellnc 7 Outage Status Report Plant:
Point Beach Unit I Day:
Wednesday Todav's Date / Time:
5/05/04 1600
/
Outage Duration: Day 32 Of Refueling Outage Number UIR28 Safety Status Industrial -Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage
__I Summary-Radiological Dose to date 51.104 Projected to date
- 59.488 Outage Goal
- 75 R Difference
-8.384
- Reforecast on 4/23 Number of PCEs 7
Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
El Hot Standby (Mode 3)
E Hot Shutdown (mode 4) [
Cold Shutdown (Modes) 0 Refueling Shutdown (Mode 6)
RCS:
Temperature:
85 Pressure:
Vented to Atmosphere RV Level:
Refueling Height Time to Boil:
33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> Shutdown Safety Assessment Protected Equipment:
Maior Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
- RHR A Loop Work-Window
- IB42 MCC Bus and Bucket Work
- Remove Buckets from IB-42 MCC
- Restoration of IB-42
- IB42 MCC Vertical Bracing
- IP-ISB SI Pump Seal Repair
- MOB Package IWP-037-07
- Reactor Head Repair SI_
S SystemL M Testing Significant Outstanding Issues Date Issue Due Responsibility 4/28/04 1W-3B Shroud Fan Backdraft Damper FME 5/09/04 Terry Guay 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 Jim Schweitzer 5/04/04 CV-1296 Aux Charging Valve 5/06/04 Kevin Krause Upcoming Ma or Milestones Sclieduled Actual Scleduled Actual Date Time Date Time Date Time Date Time CooDdown <200 a
4m03/04 2100 4103/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21104 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 4
Point Beach Nuclear Plant PBNP SHUTDOW'N SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
May 5,2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
GREEN POWER AVAILABLE:
GREEN INVENTORY:
GREEN CONTAINMENT:
GREEN SFP COOLING:
NA PROTECTED EOUIPMENT:
COMMENTS:
RCS Time to Boil is 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> Adz Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1562 5
Rererences: NP 10.3.6 Revision? 10130/02 Pame5of9 NP 10.2.1
Defined Critical Path MAY U
ID DESCRIPTION OD RD Cal U SYS EQID TF 5
6 7
,l 14.6 8.l10l22l4 l6.l8,202210.2.4.6. 8.1002.14.16,18.202210.2.4 B. 8,10,H2.14.16,18,20.22 1 CE1600ROOI MOBILIZE REPAIR CREW, 91153 11 RC I R-1 2 ~M 041IIEREPAIR CREW. TRAINING AND BADGING TRAINING AND BADGING 91 lSIl 1 1IRC21347 6- 0
=-
hh -.
v JL
.i1.!
I EM0202527 1B42 ADD BRACES MR 35 31 1 1 480V B-42 0
M025271 -42 ADD BRACES MR 01-1286M/U1R28 01-128 M/U1R28 I ____
0202527- 06MAY04 18:5905MAY04 08:OOA 1 CE1600R005 OFF-LOAD REPAIR 28 27 1 1 RC R-1 0
E1600R00 F-LOAD REPAIR EQUIPMENT AND MOVE INTO CTMT EOUIPMENTANDMOVEINTO I
0213476- 06MAY04 14:5905MAY04 11:00A I
CEI600R010 SETUP EQUIPMENT FOR 43 43 1 1 RC R-1 0
CEI600RO0 ETUP EQUIPMENT FOR CUTTING THERMAL SLEEVE CUTTING THERMAL SLEEVE
_MAY04 12:01 0213476- 07MAY04 06:59 1T,
,1 I IE E
1 EM0202527C IB42 RE-INSTALL BUCKETS 15 15 1 1 480V B-42 0
EM0202527C1 B-42 RE-INSTALL BUCKETS MR 01 -128M/U1 R2 MR 01-128.MfU1R28 0202527- 07MAY04 09:5906MAY04 19 00 Ei
,'1lul UEX -.
is is8 1 CEI600R015 REMOVE THERMAL SLEEVE 12 12 1 1
RC R-1 0
CEI600R01 5REMOVE THERMAL SLEEVE (S
(_)
0213476- 07MAY04 18:5907MAY04 07:00' d EM0202527E 1B-42 PERFORM MEGGER 2
2 1 1 480V B-42 0
EM0202527E1B 42 PERFORM MEGGER TESTING (MR 01-128BMIUtR2 TESTING (MR 0202527- 07MAY04 11:5907MAY04 10:00K 1
T-7433-H 1 480V MR 01-128 18524218 1
1 1
1 480V MR 01-128 4
T-74334-1 480V MR 01-128 1B52-421B (SIl850B) OPS REVO (SI4850B) OPS REV0O1 I
0017433- 07MAY04 12:5907MAY04 12:001 1
T-7590-R I 480V MR 01-1281B-42 BUS 2
2 1
1 480V MR 01-128 0
T-7590-R1 480V MR 014128 1-B42 BUS BRACING EM REVO-1 BRACING EM REVO-1 0017590- 07MAY04 13:5907MAY04 12:00W 1 B42RESTORE RESTORE 1B-42 PER IWP 3
3 1
1 480V B42 0
B42RESTORERESTORE 1B42 PER IWP 014128'E-B 01-128-E-BR 07MAY04 16:5907MAY04 14:00_
1 B52-421B BUS STAB PMT'1SI-850B 2
2 1
1 480V B-42 0
B52.421BBUS STAB PMT "1SI-850B' 0202527- 07MAY04 18:5907MAY04 17:00m I
Run Date 05MAY04 13:531 LT-16 DEFINED CRITICAL PATH Sheet I of I C Prfmavera Systems, Inc.
I FLA16 DEFINED CRITICAL PATH SET I
Run Date 05MAY04 13:56 Work Activity Risk Assignment Sheet I of 2 Ul ACT WOlGRPl HPE EQUIPMENTl Activity Cal DUR START FINISH MAY ID ST RISK Descript~o toI1 0 6 O'2406t2 0
1 CEI600ROO0 21 CE8 DR-Y ML-Y R-1 MOBILIZE REPAIR CREW, 1
53 03MAY04 07MAYo4 IREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M TRAINING AND BADGING 12:OOA 16:59 213476 128CE 1
CEI600R005 21 CE8 DR-Y ML-Y R 1 OFF-LOAD REPAIR 1
27 05MAY04 06MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M EQUIPMENT AND MOVE 11:00A 14:59 213476 - 128CE i
CEI600R010 21 CE8 DR-Y ML-Y R-1 SETUP EQUIPMENT FOR 1
43 05MAY04 07MAY04 RCREACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CUTTING THERMAL SLEEVE 12:00 06:59
)213476 - 128CE 1
CEI600R007 21 CE8 DR-Y ML-Y R-1 PERFORM ADDITIONAL 1
4 05MAY04 05MAY04
]REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M GRINDING AND INSPECTION 13:00' 16:59 0213472 - 128CE 1
CE1600R015 21 CE8 DR-Y ML-Y R-1 REMOVE THERMAL SLEEVE 1
12 07MAY04 07MAY04 I
REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M (S) 07:00 18:59 0213476 - 128CE 1
2 CH0300494 76 CH DR-N ML-N HEM-SAMPLIN UNIT 2 St ACCUMULATOR Z
I 06MAY04 06MAY04 DMISC CHEMISTRY SAMPUNG ORT3-N R-M SAMPLING/
07:00-07:59 0300494 - B07A2 I
EM0216638A 76 EM DR-N ML-N P-001B-M P-1B RE-ASSEMBLY OF 1
27 01MAY04 06MAY04 IREACTOR COOLANT PUMP MOTOR ORT3-N R-M MOTOR 18:OOA 14:59 0301756 128EM 2
EM0305128 76 EM DR-N ML-N U2A-UV TEST U2 TRAIN A U
3 05MAY04 05MAY04 IN A 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 12:00' 14:59 305128 - B07A2
_b EM0305133 76 EM DR-N ML-N U2B-WV TEST U2 TRAIN B U
3 05MAY04 05MAY04
[1TRAIN B 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 15:00' 17:59 0305133 - B07A2 1
EM0305450 76 EM DR-N ML-N C-703 C-703 CLEAN AND INSPECT U
5 05MAY04 06MAY04 OP.37D DC EMERGENCY LO PUMP START CONTROL PANEL ORT3-N R-M P-037D CONTROL PANEL 20:00-00:59 0305450 - 128EM I
1C4.39STK 76 IC5 DR-V ML-Y IICP-04.039-1 ICP 4.39-1 GOVERNOR 5
40 05MAY0.4 09MAY04 RBNE VALVE CAUIBRATION/FUNCTII ORT3-N R-M VALVE STROKE 13:00-08:59 300976 - 1281C 2
IC9950117 76 IC5 DR-N ML-Y ICP-02.003 RP LOGIC TEST - TRAIN A Z
2 06MAY04 06MAY04 OREACTOR PROTECTION LOGIC ORT3-N R-M 07:00' 08:59 9950117 - B07A2 2
IC0301007 76 IC5 DR-N ML-Y ICP-02.005 SG LOGIC TEST - TRAIN A Z
2 06MAY04 06MAY04 DSAFEGUARDS LOGIC ORT3-N R-M 09:00' 10:59 0301007 - B07A2 3S 1
MM0303681A 76 MMV DR-Y ML-Y MS-02010 1MS-2010 - PERFORM MOD 5
10 03MAY04 06MAY04 HX-IA SG HEADER SAFETY ORT3-Y R-M FOR ROUNDED ENTRANCE 13:OOA 10:59 303681 128MM 1
MM0303681B 76 MMV. DR-Y ML-Y MS.02010 IMS-2010 - RE-INSTALL U
10 07MAY04 07MAY04 G1HX-1A SG HEADER SAFETY ORT3-N R-M VALVE AFTER MOD 10:00l 20:59 0303681 - 128MM 1
MM0303680B 76 MMV DR-Y ML-Y MS-02005 IMS-2005 - REINSTALL U
10 07MAY04 07MAY04 E1HX-1B SG HEADER SAFETY ORT3-N R-M VALVE AFTER MOD 13:00' 23:59 0303680 - 128MM 2
OP0301571 77 OPI DR-N ML-N O-TS-01OAB.1 TS-1 OA, U2C AIR LOCK 141 2 107MAY04 07MAY04 10U2 CONT AIR LOCK DOOR SEAL TEST ORT3-N R-M DOOR SEAL TEST J
00:00-01:59 0301571 - B07A2 NMC/WE ILT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL C Primavera Systems. Inc,
Run Date 05MAY04 13:56 Work Activity Risk Assignment Sheet 2 of 2 U
ACT IWO GRPI HPE EQUIPMENT Activity Cal OURI START FINISH A
ID lST RISK Description 1D I 2,
I Itd S
a Frl Z Sat 1 17u1 0,6121 a11 i Md 12i0.6 2
OP9917049 77 OP2 DR-N ML-N O-TS-006 TS-6, UNIT 2 CONTROL ROD 2
1 07MAY04 07MAY04 IUNIT 2 CONTROL ROD EXERCISE ORT3-N R-M EXERCISE 08:00-08:59 9917049 - B07A2
- Ia;lf l~El U
fl 0
OP0301447 77 OP3 DR-N ML-N O-TS-009 TS-9, CONTROL ROOM HN 3
24 05MAY04 08MAY04 Q:O N
T cONTRO L ROOM HEATINGNENTILATION SY!
ORT3-N R-M SYSTEM CHECKS 16:00' 18:59 0301447 - B07A2 lNE I
U 1
B42RESTORE OPS DR-N ML-N B-42 RESTORE 1B-42 PER IWP 1
3 07MAY04 07MAY04 U
ORT3-N R-M 01-128 E-BR 14:00 16:59 1280P l
t U-I T-2622-R WCC DR-N ML-N Y-04 1 Y Y-4 EM REVO-1 1
1 05MAY04 05MAY04 01 Y Y-4 EM REV0-1 ORT3-N R-M 16:00 16:59 0012622 - 1280P 1
T-6919-H WCC DR-N ML-N D72-17-03 1 125V IWP 00-037-01 EM U
I 05MAY04 05MAY04 01 125V IWP 00-037-01 EM REV0-1 ORT3-N R-M REVO-1 16:00 16:59 0016919 - 1280P NMC I WE LT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENT1AL 6: Pnimavera Systems. Inc.
after O5MA Y04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 U
ID IRESPM AP0215130A IlAPM wo ST 76 EQID X-02 DESCRIPTION X-02 CAL SUDDEN PRESSURE RELAY RD I ES EF RISK MAY Wed S Thu 6 Fril 7__
!.l Oil 214,16.15,20,2210, 2.4, 6, 8,1012,14,1618,202210, 2, 4-,6, 8,1 Oil 214160 1
1 2
07MAY04 107MAY04 08:00 1 09:59 DR-N ML-N ORT3-N R-N 0
0 AP0215130AX'0 2 CAL SUDDEN PR SSURE RELAI JXILIARY TRANS11ORMER021m I
UNIT A 2
1 AP0215118 APR 76 A-02 1A-02 CALIBRATE TECHj 9 SPEC RELAYS I
05MAY04 106MAY04 DR-N ML-N 09:OOA 11:59 ORT3-N R-N IA-W CAUBRATE TECH SPEC REU c E-3 1
AP0215119 APR 76 A-06 IA-06 CALIBRATE 10 06MAY04 07MAY04 DR-N ML-N 129 NON-TECH SPEC 13:00 13:59 ORT3-N R-N 4
1 AP0215131A APR 76 86X-.01 X-01 PROTECTIVE 2
07MAY04 07MAY04 DR-Y MLY 185 RELAY CALIBRATION 10:00 11:59 ORT3-Y R-N 5
1 AP0215122 APR 76 A52-04 P-lA UNDERFREO.
6 07MAY04 08MAY04 DR-N ML-N 0
RELAY FUNCTIONAL 15:00 11:59 ORT3-N R-N 1
1 BM-SC1A-CL BMS 76 7 SC-SA SC-IA S WATERBOX I
F 1 0MAY04 05MAY04 DR-Y ML-Y 694 PRCLOSEOUT HALL 20 005 1 20:59 ORT3-Y R-N 17 1 BM-SCIB-CL E3MS 76 lST-11 l SC-1RN-WATERBOX F
106MAY04 06MAY04 DR-Y ML-Y 296 IRCLOSEOUT A
2 20:00 1 20:59 ORT3-Y R-N 1 1 0 P
BM0300063 BMS 60 P VNSBCC INNSPECTAND 4 5 07MAY04 07MAY04 DR-N ML-N 0
MAINTAIN SBCCUAIR TS 1:0 08:59 ORT3-N R-N 19 40 CE0306041 CE3 77 INGAES-INDSEPC C5 30APR04 07MAY04 DR-V MI-V 389 INSTALL BUOYSPANG 10:OOA 16:59 ORT3-Y R-N 15 1 CE44CGATRX CE3 77 IST-SISI REM INSUL FOR FAC 245 01MAY04 063MAY04 DR-Y MI1-Y I 0
PROG - CTMT 44FT 160:OA 16:59 ORT3-Y R-N l 11lI I CE08TOHT I C0 I 77 1IST.SISI lREINSULATE -FAC l10 120APR04 1 0MAY04 IDR-Y ML-Y I631 I III I
IIPROG -TURB HALL 8 II15:OOA I21:59 1ORT3-Y R-NI I
112 1 1ICE26TGATI ICE3 I77 1IST.SISI IREINSULATE -FAC I10 128APR04 OS0MAY04 IDR-Y ML-Y I23 j III I
IlROG
-TRB3HALL 26 FT 09:00AI 21:591 ORT3-Y R-NI I
l13 l 1 lP1246-TI CE31l 87 lPIPING E8-lNDEIISI -REPLACE l5 l30APR04 OS0MAY04 lDR-Y ML.Y lo I III I
IIINSUL.
SUPPORTS I I 1100A I16:59 1ORT-Y R-NI 114 1 1IP1274.TI ICE3 I7n7 PIPING EB I NDEIISI-.REPLACE I5 130APR04 OS0MAY04 1DR-Y ML-Y I3891 I III I
IIINSUL - PIPING NEAR I 11 00AI 16 591 ORT3-Y R-NI 115 11I CE44TGATRX ICE3 I77 1IST-SISI REM INSUL FOR FAC I25 101MAY04 O 0MAY04 I DR-Y ML-Y I6281 I III I
IIROG
-TRB HALL 44 FI I10:00A I16 59 1ORT3-Y R-NI I
rn--
I-I AP0Z
- AP0215131AX-01 I IX-01 MAIN POWER XFN II AP02 PWRI I N4.16 KV BUS SW1TCHGEAR j15 11%A-06 CAULRATE NON-TECH I
k C.
'ROTECTIVE RELAY CAUBRATION R BACKUP LOCKOUT RELAY02151:
15122P-1A UNDERFREQ. RELAY FUl IO IP-lA REACTOR COOLANT PUMI C CLOSEOUT INSI ECTION kERATING)
,1B.CLSC.IB -WATERBOX CLOSEOI 030S7914CONDENSER (DE BM030006314SPECT AND MAII 0300063 SPEC RELAY!
IM4.16 K\\
HECKS PART 1K ICTIONAL TES 10215122K-"
IT INSPECTIOl kERATING)
TAIN SBCC All lVNSBCC SYS I M-SCIA-C S'C-IA -WATERBO:
030579mCONDENSER (DE BM-SC II I
CRIB.IN UOY~S AND FISt-AOLISECTCRB INSTAL Is
_mm 6l AC-GA M
LOR FAC PjOG - CTMT 44 FT GEN AREA
_I U
I I -
- TURB HALL 8 T OVERHD
= -1
__SEIC'ODUAR T IN; -eRVIC Ir4tlaSrmIurwa3Ujuj I
L EINSLILATE - FAC PRO3- - TRB HALL 26 FT GEN AREA SECONDARY INSERVICE INSPECdION0303636 E
NOESI.EPLACE INSUL, 3UPPORTS NEAI FW-476BB E DWATER CONT ISC VALVES TO STEAM GENERATOR I WDEISI.REPLACE INSUL PIPING NEAR F'k-476BB
_ROM CONT ISO TION VALVES TC FW HEADER 030:
JINSUFOR FAS LG-TRBHALL,44 FT GEN AREA
- =SECONDARY INSERVICIE D303876 177 INSPECTION 16 1
CE30000TI CE3 76 TG-01-T ENCAPSULATE INSULATION ON HP 10 01MAY04 05MAY04 DR-Y ML-Y 12:00A I 21:59 1 ORT3-Y R-N 0 XE3O QOTENCAPhULATE INSULAAON ON HP TURBIlE COVER HIGH PRESSUR TURBINE0302153 Run Date 05MAY04 13:15 LT-03 STANDARD PUBLICATION Sheet 1 of 22
© Pdimavera Systems. Inc.
I FL-03 Execution Publication Set I
after 05MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 I
MAY
- lU 0
I RESPF WO EQID DESCRIPTION RD1 ES EF RISK MF IMAYd Thu 2
Fri 7 ST I I
>@lol~z4,16.l182a221 0.2 *4.*6 *8.1012,14,1618.2tk22i 0, 2.4.*6.*8 *1011214i6-17 1
CE26TOHTI CE3 77 IST-SISI REINSULATE-FAC 90 04MAY04 10MAY04 DR-Y ML-Y 563 EINSULATE - FAC PROb - TURB HALL 26 FT OVERHD PROG -TLIRB HALL 26 20:00A 21:59 ORT3-Y R-N U
18 1
CE309512TI CE3 76 SW-02861 INSTALL INSULATION 8 05MAY04 05MAY04 DR-Y ML-Y 427 E -
NSTA3L INSULATION ¶1 -W2861 ISW-2861 12:00 19:59 ORT3-Y R-N 53B H2 SIDE SE AL OIL COOLER qUTLET RELIEF03 9512 19 1
CE44TOHTI CE3 77 IST-SISI REINSULATE - FAC 8
05MAY04 05MAY04 DR-Y ML-Y 0 E HEINSULATE - FAC PRO - TURB HALL 44 FT OVERHD PROG - TURB HALL 44 12:00 19:59 ORT3-Y R-N
_ECONDARY INSE VICE INSPECTIOWO303636 20 1
CE304280TI CE3 76 SW-00015A INSTALL INSULATION 10 05MAY04 05MAY04 DR-Y ML-Y 0 E3 NSTALL INSULATION F R 1SW-1SA FOR 1 SW-15A 12:00 21:59 ORT3-Y R-N HX-15A CONT R CIRC HX INLET CHECK0304280 21 1
CE44POHTI CE3 77 IST-SISI REINSULATE - FAC 12 05MAY04 06MAY04 DR-Y ML-Y 0 E p EINSULATE - FAC PR
- PAB 44 FT OVERHEAD PROG - PAB 44 FT 12:00 00:59 ORT3-Y R-N SECONDA INSERVICE INSOECTION0303636
-e
=
1:]11 E1&
22 1
CE26TOHSR CE4 77 IST-SISI REM SCAFF - FAC 37 01MAY04 07MAY04 DR-Y ML-Y 398 _E2 OHSRREM SCAFF FAC PR
- TURB HALL 26 FT OVERHD PROG - TURB HALL 26 09 OOA 08:59 ORT3-Y R-N U
_SECONDARYI 23 1 CE937787SR CE4 82 FD-02543A REMOVE 3
05MAY04 05MAY04 DR-Y ML-Y 432 9
7SRREMOVE SCAFFOLDINl; FOR 1 FD-2543A, SCAFFOLDING FOR 10 00A 14 59 ORT3-Y R-N HX-19B qP FWH 3B DRAIN 0o HX-17B CONTRSOL9937787 24 1 CE214113SR CE4 82 MS-02719 REMOVE 5
05MAY04 05MAY04 DR-Y ML-Y 430 RREMOVE SCAFFOLDIN FOR MS-2719 SCAFFOLDING FOR 10:O0A 16:59 ORT3Y R-N G
LAIND STEAM HEADEF SAFETY RELIEF6214113 25 1 CEO8TOHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 30 05MAY04 06MAY04 DR-Y ML-Y 405 C AFF-FAC
-ROG TURB HA'L 8 FT OVERHD PROG - TURB HALL B 10OOA 21.59 ORT3-Y R-N ISECONDARY IN ERVICE INSPI 26 1
P1133-SR CE4 77 PIPE RC 25 NDE/ISI - REMOVE 6
05MAY04 05MAY04 DR-Y ML-Y 359 Pi DMS1, REMOVE SCAFF )LD -PZR SPRAYNUNE SCAFFOLD - PZR 12:00 17:59 ORT3-Y R-N SPR'AY LINE FROM L OP TO PRESSURIZER0303887 27 1
CE214040SR CE4 82 FD-02400 REMOVE 8
05MAY04 05MAY04 DR-Y ML-Y 427 E2 040 EMgVE SCAFFOLDIN. FOR FD-2400 SCAFFOLDING FOR 12:00l 19:59 ORT3-Y R-N HX-19B LP FWH 31 CHANNELHEAD RELIEF0214040
_I I
28 1
CE301979SR CE4 87 SC-1A REMOVE 5
05MAY04 05MAY04 0 E3 197 %
Ey&6VE SCAFFOLDIN FOR IA TUBE PLUGGING SCAFFOLDING FOR IA 15:00-19:59 030197 sc
-NDENSER (DEA:RATING) 29 1
CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4
06MAY04 06MAY04 DR-Y ML-Y 298 CE44F1OHSfREMOVE SGAFF FOR FAC PROG - PAB 44 FT C IERHEAD FAC PROG - PAB 44 FT 01:00 08:59 ORT3-Y R-N 030363_
SECONDARY INSERVICE INSPECTI N 30 1
CE44TOHSR CE4 77 IST-SISI REM SCAFF - FAC 12 06MAY04 06MAY04 DR-Y ML-Y 528 CE44TOHS EMSCAF - FAC PROG - TULhB HALL 44 FT O ERHD PROG - TURB HALL 44 01:00-13:59 ORT3-Y R-N 010363
-_ SECONDAMY INSERVICE IN PECTION I
I-31 1
CESH78-SR CE4 PACKAGE 78 REMOVE 2
06MAY04 06MAY04 DR-Y ML-Y 76 CESH78-SRREMOVE CAFFOLDING FOR SHIELDING - C 296 SCAFFOLDING FOR 02:00-03:59 ORT3-Y R-N D J 32 1
CE214034SR CE4 82 CV-00370 REMOVE 6
06MAY04 06MAY04 DR-Y ML-Y 335 CE214034S E SCAFFOLDING POR CV-370 SCAFFOLDING FOR 04:00 10:59 ORT3-Y R-N 0214031HX-2 REGEN,HX CHARGING IN ET CHECK 33 1
P1246-SR CE4 87 PIPING EB-NDEtISI - REMOVE 6
06MAY04 06MAY04 DR-Y ML-Y 335 P12464 St-REMOVE SCAFFOLDSUPPORTS EAR FW-476E SCAFFOLD.SUPPORTS 04:00 10:59 ORT3-Y R-N 030387_FEEDWATER dONT ISOL VALVE TO STEAM G 34 1
CE2151685R CE4 82 CS-021809-REMOVE 5
06MAY04 06MAY04 DR-Y ML-Y 415 CE215168 VE SCAFFOLDING FOR CS-2189 SCAFFOLDING FOR 07:00' 11:59 ORT3-Y R-N 021516 P-28B SGFPDISCHARGE MO OPERATOR
_I I_
R aMAY04 13:15 LT-03 STANDARD PUBLICATION Shoot 2 of 22
© Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 05MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 Ii AJ ID RESPIJWO EQID SW-00015A DESCRIPTION REMOVE SCAFFOLDING FOR RD ES EF RISK M Weds 5Thu 6
IFri 7
!Ai01Z1416,1a2(2210, 2, 4,6, 8,1012,14,1618,2022I0O.4,46-t-8 1Z14,16l 35 l 1 l CE304280SR I CE4 76 5 I06MAY04I 06MAY04 DR-Y ML-Y 07:00 11:59 ORT3-Y R-N 295 36 1
CE213464SR CE4 87 CC-00779 REMOVE 4
06MAY04 06MAY04 DR-Y ML-Y 414 SCAFFOLDING FOR 09:00' 12:59 ORT3-Y R-N 37 1
CE302663SR CE4 76 FS-02852 REMOVE 10 06MAY04 06MAY04 DR-Y ML-Y 408 SCAFFOLDING FOR 09:00 18:59 ORT3-Y R-N 38 1
CE301980SR CE4 87 SC-1A REMOVE SCAFFOLD 9
06MAY04 06MAY04 0
FOR IB TUBE 11:00 19:59 39 1
CE214049SR CE4 87 HS-CS-02 REMOVE 5
06MAY04 06MAY04 DR-Y ML-Y 0
SCAFFOLDING FOR 12:00-16:59 ORT3-Y R-N 40 1
CE216164SR CE4 76 ISOL PHASE REMOVE 30 06MAY04 07MAY04 DR-Y ML-Y 263 SCAFFOLDING FOR 14:00-23:59 ORT3-Y R-N 41 1
CE214050SR CE4 87 HS-CS-03 REMOVE 4
06MAY04 06MAY04 DR-Y ML-Y 406 SCAFFOLDING FOR 17:00 20:59 ORT3-Y R-N 42 1
CE-871A-SR CE4 SI-00871A-REMOVE 5
06MAY04 06MAY04 DR-Y ML-Y 294 SCAFFOLDING TO 18:00 22:59 ORT3-Y R-N A3 1
CE301048SR CE4 82 LG-02563 REMOVE 8
06MAY04 07MAY04 DR-Y ML-Y 398 w
SCAFFOLDING FOR 21:00-08:59 ORT3-Y R-N 44 1
CE215202SR CE4 76 P-001A-M REMOVE 4
07MAY04 07MAY04 DR-Y ML-Y 317 SCAFFOLDING FOR 02:00 05:59 ORT3-Y R-N 45
- 1. CE212642SR CE4 76 FD-00225A REMOVE 8
07MAY04 07MAY04 DR-Y ML-Y 390 SCAFFOLDING FOR 09:00 16:59 ORT3-Y R-N 46 1
CE202527SR CE4 76 B-42 REMOVE 20 05MAY04 08MAY04 DR-Y ML-Y 377 ESCAFFOLDING FORR 10:00 09:59 ORT3-Y R-N 47 _
CE0212330A CE5 76 WT REROUTE tMEMCOR l11 l29APR04 l06MAY04 208 WIPIPE l
l07:OOA l14:59 48 1
CE0407589 CE5 76 T 026 T-026 - REPAIR LEAK l15 l30APR04 l06MAY04 DR-Y ML-Y ON BLOWDOWN TANK l l08:OOA l16:59 ORT3-Y R-N 49 1
CE0302503 CE5 76 SI-00843A 151-843A-VALVE l20 l05MAY04 l06MAY04 DR-Y ML-Y C
__LEAKS BY, REPLACE l l19:00-18:59 ORT3-Y R-N 50 1
CE0407589C CES 76 T-026
-026 BD TANK PIPING 16l 07MAY04 I 10MAY04 DR-Y ML-Y 0
_ INPINGMENT PLATE 07:00 14:59 ORT3-Y R-N II III IIII IIIII ISC CE30421 030 CE21 CE3C CE CE215 30SRR 5
EAOVE SCAFFOLDING FOR ISW-1 Si 428d_1 HX-15A CONT RECIRC HX INLE 3
E64SMOVE SCAFFdLDING FOR ICC' D2134& WIT-12 CC SPRGE TANK RELIE 12663S REMOVE SCAFFOLDING FOR I FS-,
D302661 P-30B CWP SEAL W}
E30198(S EMOVESCAPFOLD FOR 18 TU 0301 N9CONDENSER (DEA
-E2140 S EMOVE SCAFFOLDING FOR I 021 04 CONdENSATE LINE GB 1645RRpMOVE SCAFFOLPING FOR ISOL PIH rCHECK 79 F TO WASTE H-852 TER FLOW SV IE PLUGGING
'RATING)
S-CS-02 4 SNUBBER ASE BUS DUCI ILPHASE DUCT121613 1111119 CE-871A-S5
)X-22D MSR LEVE REACTOR COOLAI Hi-17A LP FWH 1AI 480V MOTOR CONTROL
- E214050SRREMOVE SCAFFOLDIN, lO02I4O5SCONDENSATE Lll 1EMOVE SCAFFOLNG TO REMOV I
I CE301048SRREMOVE SCAFFOLDI?
L GAUGE030104 CE215202SRREMOVE SCAFFOLDI fT PUMP MOTOR 0215202 CE212642SEEOVE SCAFFOLDII C-2505 LOWER IqOLATION 0212641 CE202527SRREMOVE SCAFFOU CENTER PAB SAWEGUARDS02025:
iFOR HS-CS-0 EGB-4 SNUBE TAG RH-715/
F0 FOR LG-2563 hG FOR P-tAMY G FOR FD.225A kING FOR 1B42
,*{
i
_I gE0I12330AREROUTE MEMCOR PDE I
11111111111110212330; IR LE 21gOa;2f -JREPAIR LEAK ON I
BLOWDOWN TA1K BLOVwDOWN TANK 040, IKS BY. REPLAOE e89
- E030250315S443A -VALVE LE 030250311111111111111 R
CE0407589CT4 Z SYSTEM KULTI AND/OR NC T--4A SI ACCUMULA OR LOCAL SA
'26 -BD TANK PIPlNG I INPINGMEPLATE REPAIF BLOWDOWN, TANK 040758 7
CE9929774INSTALLIMD PLATFORMW N-NUMBERED EdUIPMENT992927 I
51 1I CE9929774 ICE5 77 z
INSTALL/MOD 140 1 07MAY04 1 14MAY04 DR-Y ML-Y PLATFORMS I
09:00' l
08:59 ORT3-Y R-N 46 Run Date 05MAY04 13:t51 LT.03 STANDARD PUBLICATION Sheet 3 of 22 C Prlmavera Systems, Inc.
I FL-03 Execution Publication Set I
after O5MA Y04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00
- lu ID CE0210986 RESPI WO MAY ST EQID SEC DESCRIPTION SEC SUPPORT MR 99-011-B RD ES EF RISK MF 52 j 0 CE6 43 OSAPRO4 12MAY04 DR-N ML-N 07:OOA 14:59 ORT3-N R-N 176 l
l 531 0 CE0210989 CE6 76 SEC SEC, INSTALL NEW EQUIP MR 99-01 1E 43 05APR04 12MAY04 DR-N ML-N 08:OOA 14:59 ORT3-N R-N 176 l
54 1 0 CE0210990 CE6 CE8 76 m
21 SEC 3
R-1 SEC REM ABANDONED EQUIP MR 99-01 1F 68 03MAY04 18MAY04 DR-N ML-N 08:OOA 07:59 ORT3-N R-N 151 55 l1 i ICEI600ROO1 MOBILIZE REPAIR I 53 1 03MAY04 I 07MAY041 DR-Y MLY CREW. TRAINING AND I 12:00A l 16:59 ORT3-Y R-M l
561 CEI600R005 CE8 21 R-1 OFF-LOAD REPAIR 127 1 05MAY04 I 06MAY04 lDR-Y ML-Y EQUIPMENT AND MOVE l11:OA 14:59 j ORT3-Y R-M T
l l
l l
571 1 CEI600R010 CE8 l
21 R-1 SETUP EQUIPMENT 43 05MAY04 07MAY041 DR-Y ML-Y FOR CUTTING 12:00 06:59 ORT3-Y R-M l
5B 1
CEI600R007 I CE8 21 R-1 PERFORM ADDrITONALI 4 1 05MAY04 05MAY04 DR-Y ML-Y GRINDING AND 13:00' 16:59 ORT3-Y R-M Wed 5 ThUj 6 Fri 7
~.1 2,1oz4,16.1 8.20.2210. 2. 4. 6
- 8.1012.41R.0210.2.4 1Ol214,161 86SEC SUPPORT MR 99 89SEC, IlSTALL NEW EOU P MR 99-11WE (gSEC REM ABANDONED QUIP MR 99.O11*F Ej1601001IBIEREPAIRCRE, TRAINING AND:BADGING FF4 IR EQPMENT AND MOOE INTO CTMT REACTOR VESSEL AND A SEMBLY
.EI QR1 EQUIPMENT FOI CUTTING THERMAL SLEEVE RE ACTOR VESS El 0qnqeERFORM ADDITIONAL GRINDING AND INSPECTION
_ _REAqTOR VESSEL ANC ASSEMBLY02134.72 CEI600R0 5REMOVE THER AL SLEEVE (S
_021347 CS CL TSR 3A.5.2 wRS BORON SR 3.9..
3 CH0 np 9AST PORON TSR 3.5.1.
lMISC CH 8 7SGBDFO GAMMA SCAN MISC CH 2RE-229 ISOTOPIC ISMISC CH l
59 1 CEI600RO15 I CE8 21 77 R-1
>HEM-SAMPI.
REMOVE THERMAL SLEEVE(S)
RCS CL TSR 3.4.5.2 12 07MAY04 07MAY041 DR-V ML-Y 07:00-18:59 ORT3-Y R-M 60 j I CH0300360 CH 33103MAY04 108MAY04 I DR-N ML-N I l 05:00A 11:59 ORT3-N R-N 37!3 l
6111 CH0300373 CH 77
'HEM-SAMPI RCS DO TSR 3.4.5.1 33 03MAY04 1 08MAY041 DR-N ML-N 379 05:OOA 11:59 ORT3-N R-N 62 1
CH0300403 CH 77 i-EM-SAMPIRCS BORON SR 3.9.1.11 33 03MAY04 108MAY04 DR-N ML-N I 379 I
I I 05:OOA 11:59 ORT3-N R-N T
63 1 0 CH0300197 CH 77
'HEM-SAMPI.
BAST BORON TSR o16 l 03MAY04 l 07MAY04 I DR-N MI-N 1 203 3.5.1.2 I
I 07:OOA 11:59 ORT3-N R-N l64 1 CH0300387 CH 77 tHEM-SAMP SGBDFO GAMMASCAN 16103MAY04 07MAY04 GAMMA 07:OOA 11:59.
i DR-N ML-N l 203 ORT3-N R-N tI-I1 I4 651 1 CH0300442 CH 77
'HEM-SAMPI RE-229 ISOTOPIC 16 03MAY04 07MAY04 07:OOA 11:59 DR-N ML-N 1 203 ORT3-N R-N 66 2
CH0300483 CH-77 CHEM-SAMPL RCS BORON SR 3.9.1.1 16 03MAY04 07MAY04 DR-N ML-N 203 07:OOA 11:59 ORT3-N R-N 67 2
CH0300500 CH 77 HEM-SAMPL RCSCLTSR3.4.5.2 16 03MAY04 07MAY04 DR-N ML-N 203 07:OOA 11:59 ORT3-N R-N 68 2
CH0300513 CH 77 HEM-SAMPL RCS DO TSR 3.4.5.1 16 03MAY04 07MAY04 DR-N ML-N 203 07:OOA 11:59 ORT3-N R-N
- H0I00483RCS BbRON SR 3.9.1.1 I
MISC I
jWORCS CIL TSR 3.4.5.2 1
I
-A I
I m
-MISC CHE CHE CHIE Q6 "13RCS D6 TSR
34-5-l I
Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION I
Sheet 4 of 22 o Pdmavera Systems. Inc.
I FL-03 Execution Publication Set I
after 05MAY04 12:00 I
U1R28 WORKING SCHEDULE after O5MAY04 12:00 ID RESP U
CH wo ST EQID DESCRIPTION RD ES EF RISK MF 2
203 MAAV 691 2 CH0300526 77 CHEM-SAMPISGBDFO GAMMA SCAN 16 03MAY04 07MAY04 DR-N ML-N 07:OOA 11:59 ORT3-N R-N Wed5
-ThuG Fri 7
'111056SBI~
AM ASCAN I a~j~SOPc
~WMISC CHE 70 1 CH0300552 CH 77 CHEM-SAMPL RE-229 ISOTOPIC 161 03MAY04 07MAY041 DR-N ML-N 07:00A 11:59 ORT3-N R-N 203
-r-
.1 I
71 1 CHLORINATE CH 77 O-RF-070 CHLORINATION IN 8
05MAY04 05MAY04 DR-N ML-N 0
SUPPORT OF CTMT 12:00 19:59 ORT3-N R-N 72 0
CH0300233 CH 77 CHEM-SAMPL SFP BORON SR 3.7.1 1.1 1
06MAY04 06MAY04 DR-N ML-N 215 07:00 07:59 ORT3-N R-N 73 0
CH0300246 CH 77 CHEM-SAMP WASTEWATER I
06MAY04 06MAY04 DR-N ML-N 215 EFFLUENT COMPOSITE 07:00 07:59 ORT3-N R-N 74 1
CH0300462 CH 77 CHEM-SAMP RWST BORON SR 1 06MAY04 06MAY04 DR-N ML-N 215 3.05.04.3 07:00 07:59 ORT3-N R-N 75 2
CH0300494 CH 76 CHEM-SAMP UNIT 2 SI 1
06MAY04 06MAY04 DR-N ML-N 0
ACCUMULATOR 07:00 07:59 ORT3-N R-M 76 2
CH0300591 CH 77 CHEM-SAMP RWST BORON SR I
06MAY04 06MAY04 DR-N ML-N 215 3.05.04.3 07:00 07:59 ORT3-N R-N 1
CAMP-606 CH 77 CH CAMP-60 PERFORM CAMP-606.
3 06MAY04 06MAY04 DR-N ML-N 362 10:00 12:59 ORT3-N R-N 78 1
EM0407740X EM 76 P-001B-M P-1B PERFORMELOCALF 25 29APR04 06MAY04 DR-N ML-N 0
MOILTFOSHSRAS 19:OOA 14:59 ORT3-N R-N 79 1
EM0216164 EM 76 ISOLPHASE SOLPHASEBUSDUCT 11 29APR04 06MAY04 DR-Y ML-Y 2
INSPECTIONSAND I21:OA 13:59 ORT3-N R-N 80 1
EM0216638A EM 76 P-001B-M P21BRE-ASSEMBLYF 27 01MAY04 06MAY04 DR-N MLN-0 LINES AND MOTOR I18:OA 14:59 ORT3-N R-M 81 1
EM-8480GI EM 76 GRL1 CLEANCONOSEAL 11 03MAY04 05MAY04 DR-N ML-N 296 VPARTS A
08:OOA 23:59 ORT3-N R-N 82 1
EM-BMFP-15 EM 76 DP-028B-M P28BREINSTALLEOIL 4
04MAY04 05MAY04 DR-Y ML-Y 0
I I ILINES AND MOTOR I I10:00A I15:59 IORT3-N R-NI 83 0- EM0305376 IEM I77 IGLOVES REPLACE RUBBER I5 I05MAY04 OS0MAY04 IDR-N ML.N I333
__I I
IGLOVES AND ll08:OOA l16:59 lORT3-N R-Nl 84 0 EM0309136 IEM I76 ID-106 STATION BATTERY I 1I05MAY04 OS0MAY04 IDR-N ML-N I 0
INSP PER RMP 9046-1 10:OOA 12:59 ORT3-N R-N 85 1
EM0216165B EM 77 HX-001A REMOVE ECT POWER 2
S05MAY04 05MAY04 DR-N ML-N 369 INSIDE CONTAINMENT 1200 13:59 ORT3-N R-N CHL )RjN&UH ORINATION IN SUI
~F'IRE HOSE AND FII CH0300233SF1 0300233L11Y CH0300246WA 0300244EIV CH030046.11 030046 kt IC.H-0300494UN 0300494IPV CH0300591RVM 03005911,11v CAMP-SI 03004C
'PORT OF CTMT HOSE FLUSH tE STATION SURJEILLANCE TESTO
'BORON SR 3.7.11.1 ISC CHEMISTRY SAMPLING STEWATER EFFLUENT COMPOSITI ISC CHEMISTRY §AMPLING ST BORON SR 3.95.04.3 ISC CHEMISTRY SAMPLING T 2 SI ACCUMULATOR SAMPLINGI ISC CHEMISTRY tAMPLING ST BORON SR 3.05.04.3 ISC CHEMISTRY SAMPLING 6PERFORM CAMO-606.
lCONT ATMOS POST ACCIDEh OIL FLUSHS AS NECESSARY 1111REACTOh COOLANT PUMI NSPECTION AND:
_NISOL PHASE DUCT0216164
'MOTOR
_~REACTOI COOLANT PUMI IF
!15935 T SAMPLE SYC I MOTOR I MOTOR flm7q 4
k-1B ERFORM LOCAL EM0116164ISOL PHASE BUS DU EmoLsomp-1121hE-ASSEMBLY 1
L E
LEAN CONOSEAL PART REACTOR V SSEL AND ASSEMBLY0214134
-f £4 5P28B EINSTALL OIL U NES AND MOTOR' COVERS STEAMGENERATOR FE D PUMP MOTORq312035 EM EPLACE RUBBER GLOVES AND BLANKETS RUBBER GLOVES AND LANKETS0305376 I
I EM9136STATIIN BATTERY INSF PER RMP 9046-1:
125V DC STATION BATTERYO 09136 EMO 165BREMOVE ECT POWER NSIDE CONTAINMENT STEAM GdNERATOR021616 EMO 0 28TEST i2 TRAIN A UNDE OLTAGE AND TRAIN A'.46 KV AND 480 SWITCHGEAR RELAY TEST03051; 86 121 EM0305128 I EM 76 U2A-UV REL TEST U2 TRAIN A UNDERVOLTAGE AND 3
05MAY04 05MAY04 l DR-N ML-N 12:00-l 14:59 l ORT3-N R-M 01 5
Run Date 05MAY0413:16l LT-03 STANDARD PUBLICATION Sheet 5 of 22 0 Prlmavera Systems. Inc.
I FL-03 Execution Publication Set 7
afterO5MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00
- Ul ID lRESPl WO I EQID I
DESCRIPTION lRD ES EF RISK Wed 5 I
Thu 6AriY
- _ST,
,l I
I
_1 8,1 210 2. 4 6. 8,112,141__
_8,20M22A0,2.4.6.8,1OlY214Y M0IL:
9 IN POW ER TO IlL.72 11:
IE IM 4IIIIIII 1710 1EM030611481 EM 76 D72-17-03 IWP-037-01 SUPPLY TEMP POWER TO 3
05MAY04 05MAY04 DR-N ML-N 12:00 14:59 ORT3-N R-N 0
88 1
EM0306574 EM 76 MOB-004 MOB-004 BREAKER 4
05MAY04 05MAY04 DR-N ML-N 0
MAINTENANCE 12:00 15:59 ORT3-N R-N 89 1
EM0306575 EM 76 MOB-008 MOB-008 BREAKER 4
05MAY04 05MAY04 DR-N ML-N 0
MAINTENANCE 12:00 15:59 ORT3-N R-N 90 1
EM0306576 EM 76 MOB-049 MOB -049 BREAKER 4
05MAY04 05MAY04 DR-N ML-N 0
MAINTENANCE 12:00 15:59 ORT3-N R-N 91 1
EM0212805 EM 76 TE-00125 ITE-125 REPLACE 6
05MAY04 05MAY04 DR-N ML-N 311 I FLEXIBLE CONDUIT 12:00 17:59 ORT3-N R-N EMO EMO EMO EMO EM0 EMO
.14¶EWP.037401 SUPPLY TE IMPWRTOC-01 SAFEGUARE 0654MOB-Ob4 BREAKER MAII PWR To IMOB-8. 1MOB-1 5MOB-008 BREAKER MAII WPWR Tb I IR AEANCHA/On M6MOB *49 BREAKER MA 1PWRT9UI CONTVENTI jQgTE-125 REPLACE FLEX 1P-4B RCP SEAL WAT PVP-02*A BREAKER MAIt VIP POWER TO I-L1 2 S BUS A (IMOB-100. 1MOB-100306 ITENANCE 9 AND 11R YLG (YgLLOW) 0306574 ITENANCE NVFPA INST RECdPTACLE (YELL 031 INTENANCE SOLATION TRAIN:B0306576 BLE CONDUIT
- R INJECTION TEIAPERATURE RTD TENANCE 1200.49 (A52-07) 114 16575
)212805 92 1 0 EM0304872 EM 76 A52-DHVR-1 IP-025A BREAKER I 24 I 05MAY04 108MAY04 DR-N ML-N MAINTENANCE 1200-40 12:00 08:59 ORT3-N R-N 0
=
,O7U olq 93 0
EM0305218 EM 76 D-48 MONTHLY 4
05MAY04 05MAY04 DR-N ML-N 333 COMMUNICATION 13:00 16:59 ORT3-N R-N 94 2
EM0305133 EM 76 U2B-UV REL TEST U2 TRAIN B 3
05MAY04 05MAY04 DR-N ML-N 11 UNDERVOLTAGE AND 15:00 17:59 ORT3-N R-M
.95 1 EM0312035A EM 76 P-028B-M 1P-28B-M PERFORM 4
05MAY04 05MAY04 DR-Y ML-Y 0
7 POST MCE TEST 17:00 21:59 ORT3-N R-N EM0 EMO 03C EMO I...
Q5 P UONTHLY COMMUNICA1 l
TELEPHONE EQUIPMEI (051iLEST L2 TRAIN B UNDEI 4133ATRAIN B 4.16 KV AND.
120354P 28BM PERFORM PC 31203~STEAM GENERA I
R nm 14 AWP-037-01 REPLACE A ION BATTERY IN4P IT BATTERY0305a18 VOLTAGE AND 80 V SWITCHGEAR RELAY TEST iST MCE TEST TOR FEED PUMP PAOTOR
'OBS 100109 PWR TO C-01 SAFEGUARDS BUS A kER MAINTENAN;E 96 0
EM0306114A EM 76 D72-17-03 IWP-037-01 REPLACE MOBS 100-109 16 05MAY04 06MAY04 DR-N ML-N 17:00 08:59 ORT3-N R-N U
MUF I
v 97 1
EM0215241 EM 76 41/1E02 RMP 9308. DS-II 24 05MAY04 07MAY04 DR-N ML-N 174 BREAKER 18:00' 23:59 ORT3-N R-N 98 1
EM0305450 EM 76 C-703 C-703 CLEAN AND 5
05MAY04 06MAY04 DR-N ML-N 0
INSPECT P-037D 20:00 00:59 ORT3-N R-M 99 0
EM0306110C EM 76 b72-16-08 IWP-037-02 EM 1
06MAY04 06MAY04 DR-N ML-Y 125 COMPLETE PMT 01:00 01:59 ORT3-N R-N 100 1 EM0215199C EM 76 P-001A-M P-IA-M COMPLETE 8
06MAY04 06MAY04 DR-N ML-N 0
DE-ENERGIZED 07:00' 14:59 ORT3-N R-N 101 1
EM0400344 EM 76 P-028A-M 1P-28A-M PUMP END 10 06MAY04 06MAY04 DR-Y ML-Y 10 MOTOR BEARING 07:00' 16:59 ORT3-Y R-N 102 0 EM0215134 EM 77 COM GAI-TRONICS TEST 15 06MAY04 06MAY04 DR-N ML-N 794 07:00 22:59 ORT3-N R-N 103 2 EM0305136 EM 76 TG-01 HYDROGEN LEAK TEST 10 06MAY04 07MAY04 DR-N ML-N 323 08:00' 08:59 ORT3-N R-N 1021524IRMO 9308. DS41 BREA I
(IMOB-100 -1I El l
l 0215241'____________
EM03054500 -703 CLEAN AND 030545_P-37D DC E EMO3d6I1OCWP-037O2 1 030611IPWRTO I EM0215199CP-1 0215199,9 EM0400344 1 P' I
040034w I
EM0215134GA 0215134 EM0305136H I
0305134.
EM030611 03061' l
I NSPECT P-037D CONTROL PANEL lAERGENCY LO POMP START CONT
- M COMPLETE PIT (CV-1296)
-04 SAFEGUARDS BUS A (1MOB-1I A-M COMPLETE DE-ENERGIZED TE
_lREACTOR COOLANT PUMI 28A-M PUMP END MOTOR BEARIN(
_SSTEAM GENERATOR FE I-TRONICS TEST.
_=COM SYSTEM YDROGEN LEAK TEST I
i ROL PANEL STING I MOTOR
1041 0 I EM0306114C I EM 76 D72-17-03 IWP-037-01 PERFORM PMTFOR MOBS 1
06MAY04 06MAY04 DR-N ML-N 10:00 10:59 ORT3-N R-N 0
I CIWP.03 7-01 PEROORM PMT FOR A 4JPWR TO C-al 1AFEGUARDS BU Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION Sheet 6 of 22
© Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after 05MAY04 12:00 I U1R28 WORKING SCHEDULE after O5MA Y04 12:00 IE~W rWed.
Thuf6 Fri 7 STI 01 12¶4,16.1&.2Q2210.2.4.6 8.l12,14.1&18.od,2(12024 06.
1,10i12M6,16 1051 0 l EM0306114D EM 76 D72.17.03 IWP-037-01 RESTORE 1-WL-1723 TO PERM 4
06MAY04 06MAY04 13:00 16:59 DR-N ML-N ORT3-N R-N
. 0 106 1 EM0215202 EM 76 P-001A-M P-1A-M PERFORM OIL 10 06MAY04 07MAY04 OR-N ML-N 0
CHANGE 15:00 01:59 ORT3-N R-N 107 1
EM0301756 EM 76 P-001B-M P-1B-M INSPECT 20 06MAY04 07MAY04 DR-N ML-Y 0
FLYWHEEL AND 15:00 10:59 ORT3-N R-N 108 1 EM0216164D EM 76 ISOL PHASE POST-MAINTENANCE 3
06MAY04 06MAY04 DR-Y ML-Y 0
EGGER OF ISOPHASE 17:00 20:59 ORT3-N R-N 109 0 EM0306109A EM 04 D72-16-07 IWP-037-03 REPL MOBS 16 06MAY04 07MAY04 DR-N ML-N 0
1MOB-058 - 064 20:00 11:59 ORT3-N R-N 110 0 EM0306112A EM 76 D72-16-13 IWP-037-03 REPL 16 06MAY04 07MAY04 DR-N ML-N 0
1 MOB-065-068/084-089 20:00 11:59 ORT3-N R-N 111 1
EM0215201A EM 76 P-001A-M MANUFACTURE 2
07MAY04 07MAY04 DR-N ML-N 0
WEIGHTS (AS 00:00 01:59 ORT3-N R-N 112 1
EM0215199B EM 76 P-001A-M P-001A FINAL PMT PER 10 07MAY04 07MAY04 DR-N ML-N 0
9002-12 02:00 12:59 ORT3-N R-N 133 I
EM0215246 EM 76 621A01 CAL AND TEST 621A01 6
07MAY04 07MAY04 DR-N ML-N 0
4 RELAY PER IRMP 07:00 12:59 ORT3-N R-N 114 1
EM9604321A EM 78 FH-CTC-08 FH-CTC-08 PEPLACE 6
07MAY04 07MAY04 DR-N ML-N 507 CAVITY LGT FIXTURE 07:00-12:59 ORT3-N R-N 115 1
EM0216170 EM 76 FIRE-BARRI PERFORM RMP 58 FIRE 24 07MAY04 08MAY04 DR-N ML-Y 293 BARRIER 09:00-10:59 ORT3-N R-N 116 1
EM0215201 EM 76 P-00iA-M ADJUST BALANCE 2
07MAY04 07MAY04 DR-N ML-N 0
WEIGHTS (IF 11:00 12:59 ORT3-N R-N 117 1
EM0215205 EM 76 P-001B-M INSPECT AND 10 07MAY04 07MAY04 0
MAINTAIN REACTOR 11:00 20:59 118 1
EAMRCP-B1 EM 76 P-001A-M REPLACE A RCP 2
07MAY04 07MAY04 DR-Y MLY 389 FLOOR PANEL 13:00 14:59 ORT3-N R-N 119 0 EM0306109B EM 04 D72-16-07 IWP-037-03 EM PMT OF 2
07MAY04 07MAY04 DR-N ML-N 0
MOBS IMOB-058 - 064 13:00 14:59 ORT3-N R-N 120 0 EM0306112B EM 76 D72-16-13 IWP-037-03 EM PMT OF 2
07MAY04 07MAY04 DR-N ML-N 0
1MOB-065-068/084-089 13:00 14:59 ORT3-N R-N 121 1
EM0215203 EM 87 P-001A-M P-001A-M - 2ND MCE 3
07MAY04 07MAY04 DR-Y ML-Y 0
TEST (1A52-04/1A-01) 14:00 16:59.
ORT3-N R-N gM0306114LDWP-O I
03 I
El EM0301756 I
EM0216164 17-01 RESTORE ILWL.1723 TO PER POWER & Pl D6114IPWRTOC-01 SAFEGU4RDSBUSA(1F 102 15202P-1AM 0iERFORM OIL CHANGE 0215202_REACTOA COOLANT PUI
)-1B-M INSPECT FLYWHEEL AND IN. TALL SHOCK!
030175 _
REACTOR(
I POSTMAINTEnWCE MEGGER OF 0216164i-ISOL PHASE DUC M0306109AIWP-037-03 REPL MOB!
030610
_._I____
M0306112AIWP-037-03 REPL IMOB SOPHASE BU!
r 1MOB-058 - 0 d.* _U^A#I] TN U
rvvt l IU 065-068l084-Of E
-~~
UJ3U11iC
= tOKIu EM 2152O1AMANUFACTURE WEIGHTS AS REQUIRED RE4CTOR COOLANT UMP MOTOR 021 201U EM021519*BP-001A FINAL P T PER 9002-1:
REACTOR COOLA PUMP MOTR021519 -
EM021' 246CAL AND TESt 621A01 RELAY P R 1RMP 9302-1 IA-01 3US TIME DELAY JRELAY021524 EM 604321AFH-CTC-08 PEPLACE CAv LGT FIXTURE HYDREL CONTAINMENT RANSFER CANAb LIGHT9604321 EM02161 0PERFORM RMP $8 FIRE BARRIER URVEILLANCE FIRE B kRRIERS IN CONTAINMENT021617 EM 215201ADJUST BALANCE WEIGHT (F REQUIRED REA 'TOR COOLANT PUMP MOTORO2I5 01I EMO 1j5 20 _NSPECT AliD MAINTAIN REA TOR COOLAN REA TOR COOLANT PpMP MOTOR0215 05 EAMRCP81REPLACE 'A' RC FLOOR PANE1 Rl CTOR COOLANt PUMP MOTORO 15199w EM0305I09BlWP-037-03 gM PMT OF MOB IMOB-058 - 0 PWR TO 1C-03 SAFEGUA DS BUS A (1MOB'58 THROUGH 10 0610 U EM030 112BWP-3703 EM PMT OF IMOB 65-0681084-01 PWR ro 1CI-03 STMITU B AUX CTn BD (1PB5M-68/1MOo 06112i E 02 15203P 01A-~ -2NDMCETEST 1A52-041A-01 EACTOR COOLANT PUMP MOTOR 21520m EM0215122 SIST APR DURINb P-1A RELAYFU CTIONALTES' PWR D1P-1A REACTOR COOLANT PUM 0215122_
122 1
EM0215122 EM 76 A52-04 ASSIST APR DURING P-IA RELAY 6
07MAY04 08MAY04 DR-N ML-N 15:00 11:59 ORT3-N R-N 0
Run Date 05MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 7 of 22 O Pimavera Systems, Inc.
l FL-03 Execution Publication Set l
after O5MA Y04 12:00 I
U1R28 WORKING SCHEDULE after 05MAY04 12:00 ID lRESP WO EQID I A t
DESCRIPTION RD ES EF RISK IVF Wed 5 Thu 6 Fri 7 ST l1231 0 l EM0304874A I EM l 76 A52-DHVR-1 I1P-01A PM BKR T 4 1 07MAY04 I 07MAY04 I DR-Y ML-Y TESTING AT CUBICLE 17:00 21:59 ORT3-N R-N 256 U
0 EM0304874A1 01A PM BKR TESTING AT CUBICLE 200-31(A52-04 T 4.16 KV/1200 AMP VACUUM BREA ER030487*
I
___I 1241 1 EM0202527 EMV 76 B-42 1B-42 ADD BRACES MRI 31 05MAY04 106MAY04 DR-N ML-N 01-128-M/U1R28 08:OOA 18:59 ORT3-N R-N
- L - _ An-A nn PMA r M__ 14.198*MU1R289 125 1 EM0215186 EMV 76 SI-00871A-SI-871A-OACTUATOR 27 05MAY04 06MAY04 DR-N ML-N 0
REBUILD (SWAP) 09:OOA 14:59 ORT3-N R-N 126 1 EM0207539 EMV 76 B52-429DL 1B52-429DL/DR REPL 5
06MAY04 06MAY04 DR-V ML-Y 0
LINE-STARTER (XL-10) 19:00 23:59 ORT3-Y R-N 127 1 EM0202527C EMV 76 B-42 1 B-42 RE-INSTALL 15 06MAY04 07MAY04 DR-N ML-N 0
BUCKETS MR 19:00 09:59 ORT3-N R-N 128 1 EM0202527A EMV 76 B-42 1B-42VENDORTO 12 06MAY04 07MAY04 DR-N ML-N 857 REPLACE BUCKET 2 00A 07:59 ORT3-N R-N 129 1 EM0202527E EPV 76 B-42 I
B42 PERFORM 2
07MAY04 07MAY04 DR-N ML-N 0
10:00 11:59 ORT3-N R-N 10 EP0301910 EPI 77 JM-CONTAIN INSPECT CTMT AND 44 28APR04 10MAY04 DR-Y ML-Y 103 I
FEEDWATERS 08:OOA 15:59 ORT3-Y R-N 13 NG44CFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC 1
29APR04 07MAY04 DR-Y ML-Y 58
_PROG -CTMT 44FT 08:OOA 08:59 ORT3-Y R-N 132 1 NG44TFCIEV EPI n 7 IST-SISI ENG EVAL FOR FAC I 07MAY04 07MAY04 DR-Y ML-Y I 0
__PROG
-TURB HALL 44 _
07:00 07:59 ORT3-Y R.Nl 133 1 EP0302115A EPT 76 SC-1B ISC136-INSTALLCOND 1
205MAY04 07MAY04 DR-Y ML-Y 0
NTUBESHIELDS AIB) 109:OOA 12:59 ORT3-Y R-N 134 1 1 G-C1B-TP EPT 7
SC-i1A MAIN COND TUBE 3
04MAY04 05MAY04 DR-Y ML-Y 40 IIPWGGINGA(1B) 133:00 5
159 ORT3-Y R-N
'351 0 FG0300155 lFG1 77lMISC lREMOVE VEGETATIONl 27 l03MAY04 I OMAY04 IDR-Y ML-Y 1192 I
IN ISOLATION ZONES II07:OOA I14:59 1ORT3-Y R-NI
'361 1 lFG302663P lFG1 FS082 PITPPNO 0 4A0 5A0 RYM-I FS-2852 1106:OOA I2259 1ORT3.Y R-Nl 137 1 1lFG0212816 lFG1 76 ICPP.36 I1CPP-36 CLEAN RUST I27 104MAY04 107MAY04 IDR-Y ML-Y I 0 IIIII AND PAINT II18:OOA I1659 1ORT-Y R-Nl 13 lF2482P lFG1 82 IHX-021A I PAINT FD-2410 I11 10MY4105MAY04 IDR-Y ML-Y I479 I II II I :00 I23:59 1ORT3-N R-Nl SI-8 11A-0 ACTU EBUI I
EMO.
I EM020252 EM02(
EM0202527E1 B-42 480V MOTOR CONTROL 480V MOTOR CONTOL CENTEI fAP)
~P-14A CONT SPRAY PUMP SUCTION F
!0 75391B52-429DLYDR REPL LINE-STARTER (XL 0207539_PWR TO XL-1 (LD-10) El TC1B-42 RE-INSTALL BUCKETS MR 1-128MAlJI 020252,80V MOT 2527A1B-42 VENDOR TO REPLACE TUCKET ST/
020252 OV MOTOF PERFORM MEGOER TESTING (MR 1-128rMiU1 CENTER PAB SAfEGUARDS020254 7 I
'RC
.-10.
kAEI R21
'OR k
B!
L C(
EpojoiqgdNSPEdT CTMT AND FEE"WATER PENETKATIONS mm -
.1 __________________
I
4G4CFC1EyENG, EVAL FOR FAC PPOG - CTMT 44FT GEN AREA I
I~ :F(~ONflAR I
NG44TFCIEVENG I l
SECONDARY 3 - INSTALL COND TUBE SHIEM ICONDENSER (DEAERATING)
.C1TpMAIN COND TUBE PLU.
I CONDENSER (DEAERATI l
II VAL FOR FAC PRbG - TURB HALL, INSERVICE INSPqCTION030189-4j 1 FT GEN ARE SC-,
NG e
.DS (I B)
-GING (1B) 4G)0301981 II I
G9IoQIsSREMOYE VEGETATION I ISOLATON ZONPS I
~
F3266WPAINT'PIPING FOR 1FS-852
__P-30B CWP SEL WATER FLOW SWITCH 030265
_u1 2;l 4092pFAIN 3H D2410
_ 0
_2
~
HPFPEEDWAJER HEATER 5A0Z14082 Run Date 05MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet8of22
© Pnmavera Systems, Inc.
I FL-03 Execution Publication Set I
after 05MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 ID FG-LIGHT RESF FG1 wo ST EQID DESCRIPTION RD MAAV ES EF RISK MF 2
253 I391 0 MISC WALKDOWN OF 85 05MAY04 14MAY04 EMERGENCY LIGHTING I 07:OOA 15:59 1401 1 FG21 3064P FG1 76 1 MS-00010A PAINT VALVE 1MS-10AI 4 05MAY04 05MAY04 DR-Y ML-Y 18:00 21:59 ORT3-Y R-N 228 141 1
FG216557P FG1 82 FD-00282C PAINT 1FD-282C 8 105MAY04 06MAY04 DR-Y ML-Y 22:00 05:59 ORT3-Y R-N 284 I
I 1421 1 FG212642P FG1 76 1 FD-00225A PAINT FD-225A VALVE 1 4 1 06MAY04 I 06MAY04 DR-Y ML-Y 06:00 j 09:59 ORT3-Y R-N 0
143 0 FG0302076 FG1 77 MANHOLE PM PUMP ELECTRICAL MANHOLE SUMPS 8
07MAY04 07MAY04 DR.Y MLY 07:00 14:59 ORT3-Y R-N 850 1441 0 FG0303130 FG0216169 FG1 FG2 77 77 MANHOLE PM COM PUMP ELECTRICAL MANHOLE 12 07MAY04 10MAY04 DR-Y ML-Y 07:00 10:59 I ORT3-Y R-N 196 U
337 145 1 TEST ALL GAI-TRONICSj 4 06MAY04 06MAY04 DR-N ML-Y 07:00j 10:59 ORT3-N R-N Wed 5
,Thu 6
Erl 7
?.1002,14,16,15,02 Q, 2, 4, 6 1 8 1012.14,11118.2022 0. 2, 4, 6. 8,1011214,16.
FG4 GHTWALKDOWN OF EMERGE CV LGHTING F 213064pPAI TVALVE IMS-10 021306HP TURB STEA& SUPPLY INLET P(-2025 ROOT FG216567PPAINT IFD-282C 021655 7
HX-2C MSR LS-25301LC-2515 UPPER R OT ISOLATIOt I FG212642pPAI FD-225A VALVE 021264 HX-17A LP FWH 1A LC-2505 LO R ISOLATION FG030207 6'UMP ELECTRICAL M NHOLE SUMPS PORTAbLE ELECTRICAL ANHOLE SUMP IUMPS030207 I
FG03 31 3 0PUMP ELECTRICAL MANHOLE SUMPS-MTHLV PORTABLE ELECTRICAL ANHOLE SUMP PUMPS 0303133 I
FG0216169TE TALLGAI-TRON)CS 0216169L COM SYSTEM MULTI AND/OR NON-NUMBERED I
S FG9809817.LO8 MOD CKT PER RERS 9 -0077 #1 l
98098PWRTb EL 6 UNIT 1 CONT AREA LIG Hii=
ONTHLY RMS OPERATONAL TEST HEALT-H PHYSICS RADI TION MONITORING SYSTEM03018O 6
RE-2114B07RE-2111212 A R SAMPLE CHANIE OUT I
1C0407744 T 39 DRY LEG DRAIN CHECK l
040774-34A SI ACCUMULATOR LEVEL T RANSMITTER ics SECONDAR LEVEL CON`7OLLERS AND SWITI 1CO 209L~C-2514 REFURBISH a -;1 146 0
FG9808988 FG2 76 77 17-L-08 17-L-08 MOD CKT PER RERS 95-0077 #1 MONTHLY RMS OPERATIONAL TEST 4
06MAY04 06MAY04 DR-N ML-Y 12:00 1
15:59 ORT3-N R-N 332 1471 0 HP0301846 HP HP RMS 5 101MAY04 I05MAY04 DR-Y ML-Y 07:OOA 16:59 ORT3-Y R-N 352 148 0 RE-211-B07 HP HP RMS RE-211/212 AIR I1 06MAY04106MAY041 DR-Y ML-Y 888
_SAMPLE CHANGE OUT I 00:00 00:59 ORT3-Y R-N 149 l2lIC0407744 IC 76 LT-00939 ILT 939 DRY LEG DRAINl 3 l 06MAY04l06A4lDRYMY 87 l*CHECK 0:0 09:59 ORT3-Y R-N 10 1l C5.471 I
76 ICP-05.047 SECONDARY LEVEL 145 19APR04 09MAY04 DR-Y MLY-0 I l
]_CONTROLLERS AND 11:00A 0912:59 ORT3-Y R-N 1511 1 1C0302099 ICI 76 LC-02514 LC-2514 REFURBISH l45 1 19APR04 1 10MAY04 DR-Y MLY 1 1:00A l 06:59 l ORT3-Y R-N 21 1121 1 tC0305085 ICi 76 LS-02376 1LS-2376 SMALL 1 45 119APR04 110MAY041 DR-Y ML-Y STEAM LEAK ON LVL 11:00A l 06:59 l ORT3-Y R-N IC045085iLS-23i6 SMALL STEAM 0
.EAK ON LVL SW 1531 11 IC5.53 1
76 1 ICP-05.053 1 ICP 5.53 SECONDARY 1 30 1 02MAY04 1 08MAY04 I DR-Y ML-Y 1 40 HIGH PRESSURE 08:OOA l 08:59 ORT3-Y R-N l 5.53SE60DARY HI&~ESSR I
-I 1541 1 IC5.75 ICI 76 ICP-05.075 NI AUXILIARY CHANNELS - INSPECT 20 06MAY04 07MAY04 I DR-Y ML-Y 06:00 l
14:59 l ORT3-Y R-N 25 IC5.75NI AUARY CHANNkLS -INSPECT 1300R 88 a:
A Sheet 9 of 22 Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set I
© Puimavera Svstems, Inc.
- ------ I I
after 05MA Y04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 I
u ID 1C0408040 RESP WO ST EQID DESCRIPTION RD MAY ES EF RISK MF This A
.10n12.141 0,2.A.6R.
-Fri7 hLA.qnq22 fl.2. 4.6, 8.1011214.16.1 155 1 IC1 71 RT-128 RT-12B REPLACE RELAY 8 107MAY04 I07MAY04 DR-Y ML-Y 06:00-13:59 ORT3-Y R-N 0
15611 1 IC0408039 IICI1 71 RT-1OB RT-1OB REPLACE 18 07MAY04 07MAY041 DR-Y ML-Y 1 188 I
RELAY 08:00-15:59 ORT3-Y R-N I I
TRAINB TRAIl IC2.15 REAC IC408040RT-12B ROPLACE RELA REACTOR TRIP RELAY0408041)14>_
I PLACE RELAI IC.408039RT`10B IRPLAELAE I B REACTOR TRIp RELAY0408039 CP 2.15 RP PERMISSIVE/NI LOGIC PRE-CRIT TEl TOR PROTECTIOi SYSTEM LOGIC 1300807 J*
1571 1 IC2.15A IC1 76 ICP-02.015 ICP 2.15 RP 141 07MAY04 08MAY04 DR-Y ML-Y PERMISSIVE/NI LOGIC 14:00 06:59 ORT3-N R-N 22 1581 1 IC0306002 IC2 76 S-06050A 1S-6050A IOPS CH-1 OVERSPEED LIGHT 22 29APR044 7MY0 DR-V ML-Y 08:OOA l 04:59 ORT3-Y R-N 0 ICO*60021S4-6050A IOPS CH-1 OVE SPEED UGHT
~~~--._ ---
II11IRF~flFrFFPFNnF 1591 1
1C0303647 IC2 76 MMS ICP-06.037 CAL STEAM 15 I 02MAY04 1 06MAY04 I DR-Y MLY-PLT INDICATORS I
19:OOA l
21:59 ORT3-Y R-N 38 IC04 3 G47CP-06.d
xvow _.
v_. fl
].
URAQ ZVQ=U U 160 1
IC5.31 IC2 76 ICP-05.031 GENERATOR 15 05MAY04 06MAY04 DR-Y ML-Y 106 HYDROGEN GAS 18:00-21:59 ORT3-Y R-N 161 1
ICRKDR-ON IC2 RP INSTALL ANALOG RACK 4
05MAY04 05MAY04 DR-N MLYV 251 DOORS 19:00-22:59 ORT3-N R-N 162 1 IC0408035 IC2 76 TIT-02278B TIT-2278B 20 05MAY04 07MAY04 DR-Y ML-Y 45 5-REPAIR/REPLACE 19:00-03:59 ORT3-Y R-N 163 0
IC0300625 IC2 76 ICP-06.049 lBATTERY/INVERTER 40 05MAY04 10MAY04 DR-N ML-Y 311 ROOM TEMP 19:00-01:59 ORT3-N R-N 164 1
IC5.73RPR IC2 76 ICP-05.073 ICP-5.73 LT-935 RACK 10 05MAY04 06MAY04 DR-Y ML-Y 164 INSTRUMENT REPAIR 23:00-21:59 ORT3-Y R-N 1
,'11'1u1, 1-U ki1!
K 165 1 IC5.50 1=5 76 tCP-05.050 ICP 5.50 SECONDARY 30 28APR04 08MAY04 DR-V MI-Y 40 MIDRANGE PRESSURE 09:OOA 08:59 ORT3-Y R-N 166 0 IC0300684 ICS 76 C-025 MONTHLY PM ON 2
05MAY04 05MAY04 DR-Y ML-Y 217 DMIMS SYSTEM 08:OOA 13:59 ORT3-Y R-N 167 1 IC0302663 IC5 76 FS-02852 I FS-2852 FLOW SW 8
05MAY04 06MAY04 DR-Y ML-Y 0
SETUP AND CAL 09:00A 08:59 ORT3-Y R-N 168 1 1IC4.10A IC5 76 1ICP-04.01 PT-5971 TURBINE 5
05MAY04 05MAY04 DR-Y MLY-108 PRESS XMTR CAL 12:00-16:59 ORT3-Y R-N IC5.31GENERATOR HYDRO4EN GAS SYSTEM' wInlvlo o l ^7 § wIv- *vll winnar w
I :RKDR-ONN$TALL ANALOG R l_RP SYSTEM M ICO408O3sTIT-2278B REPAIR/R 04080303 IC0O3OO6 25 81TERY1NVERTEF I -
-GENERATOR H'
kCK DOORS I
JLTI ANDIOR NON,-NUMBERED EaL EPLACE ULTI AND/OR DROGEN GAS IPMENT GFP SEAL WA ip-2Rn3 A l
ROOM TEMP SMITCHES
=.
_v_
l fll lf C7 i___
vw Ivv--
]
I r~
IC5.73RP1 CP2 573 LT 93 RACK INSTRUMENT REPAIR n-I
_ACCUMiwUL n ATORnLEVEL TRANS IC5-IrCP 5.50 SECONDARY MIDRA.GE PRESSURE,
CO O§8MNTHl-Y PM ON DMIMS SYSTEM NIT 1t2 LOOSE PARTS MONITORING CONTROL PANEL030068' 1F 82FLOW SW SET UP AND C AL 11 P-30B CWP SEAL WATER FLOW SV ITCH C4.1P 571 CURBINE PRESS, MTR CAL FIRST STAGE PRESSU E OUTAGE CALIBRATIONo300972 C4. 95 P
jCP 43i1 GOVERNOR V) LVE STROKE 009 1691 1 1C4.39STK IC1 76 1 1 ICP-04.03 ICP 4.39-1 GOVERNOR 40 1 05MAY04 I O9MAY04 I DR-Y ML-Y VALVE STROKE I
13:00' 08:59 ORT3-N R-M 0
1701 2 1IC9950117 IC5 76I ICP-02.003 RPLOGICTEST-TRAIJ 2 06MAY04 06MAY04 DR-N ML-Y 0
AA0700 08:59 ORT3-N R-M I.
IC9950117RP 99501170 IC03102212 03102213 LOGIC TEST - TRAIN A REACTOR PROTECTION LOGIC B1-6100 CHANNE. #7 VIBRATION
_T G-01 TG VIBRATION IN[
1711 2 IC0310221 IC5 76 VBI-06100 12VI8-6100CHANNEL#7 VIBRATION 8
06MAY04 06MAY04 DR-Y ML-Y 08:00-1 15:59 ORT3-Y R-N 342 ICATOR Run Date 05MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 10 of 22 Q Prmavera Systems, Inc.
I FL-03 Execution Publication Set I
after O5MA Y04 12:00 U1R28 WORKING SCHEDULE I
after 05MAY04 12:00 I
- I u*
1721 2 ID 1C0301007 IC0406275 RESP ii lCS WO ST 76 76 EQID ICP-02.005 MS-02706 DESCRIPTION 3G LOGIC TEST - TRAll A
RD ES EF 2
RISK 06MAY04 06MAY04 DR-N ML-Y 09:00' 10:59 I ORT3-NR-M MF U
212 3
30 IC030100 SG LOGIC TEST -TRAIN A 0301007=SAFEGUARDSLOGIC MAY Wed 5 Thu 6 Fri 7
'.14l1.1 s216.1a2l2, 2466S 25221 2.4 4 6 8L101l214t 6,11 1731 1 1MS-2706. POST 3
04MAY04 05MAY04l DR-Y MLY.
REPACK DIAGNOSTIC 03:OOA 20:59 ORT3-Y R-N l
1741 1 IC0216627 lCV 76 CV-01296 1CV-1296 POST MTN DIAGNOSTIC 10 04MAY04 l 05MAY04 DR-Y ML-Y 09:OOA 22:59 ORT3-N R-N 0
175171 IC0304454 IICVI 76 CV-00296-0 I ICV-296 CHECK IA SY 1 105MAY04 1 05MAY04 1 DR-N ML-N l 14 FOR FOREIGN MATL 07:OOA 12:59 j ORT3-Y R-N C
627 51MS-27 6, POST REPACQ l ;HP TURBINE DRAl 274CV-1246 POST MTN DIAC UXIIARY CH, 5 41CV-296 CHECK IA SY FO IHX-2 REGEN HX TO AUXILIA IC-294 POST REPACK C X1HX-2 REGEN lc
-25446 REPLACE UMIM
_ X
-19A LP FWH 3A DUN PZR LI9UID SPACE SAMF DIAGNOSTIC t4 EXTRACTION OUTLET CONTROL NOSTIC kRGING LINE ISOATION0216627 I FOREIGN MATL lY SPRAY OPERATOR0304454 IAGNOSTIC 4X TO AUXILIARY:SPRAY0407621 SW P TO CONDENSER CTL POS SW03 IC03033b2SC-953 POST M`
LE CONTAINMENT ISOLATION 0303 7406275 6887 N DIAGNOSTIC 182 176 I1 IC0407621 ICV 76 CV-00296 JICV.296 POST REPACK DIAGNOSTIC 10 05MAY04 I 05MAY04 I DR-Y ML-Y 07:OOA l 22:59 l ORT3-Y R-N 0
l ilt I 1C0306887 I ICV 176 IPOS-02544B FD-2544B REPLACE 1 5 1 05MAY04 l 05MAY04 DR-Y ML-Y I 0
LIMIT SW ClE 0800A 16:59 ORT3-Y R-N 1781 1 IC0303382 MM0214055 ICv mM 76 SC-00953 HX-015A SC-953 POST MTN DIAGNOSTIC HX-15A. MOTOR COOLING COIL 4
07MAY04 07MAY041 DR-Y MLIY 11:00-14:59 ORT3-N R-N 3
0 391 1 MM1 4 055HX15.. MOTOR COOUjOG COIL INTERNAL INSPECTION 76 281 26APR04 I 07MAY04 I DR-Y MLY 02:OOA 0
23:59 ORT3-N R-N 180 1 MM9924975A MM1 76 HS-1 HS-1. REBUILD & TEST 10 26APR04 06MAY04 DR-Y MLIY 7
SNUBBER (SHOP) 06:OOA 10:59 ORT3-N R-N 181 1 MM9934376A MM1 76 HS-15 HS-15. REBUILD &
15 02MAY04 06MAY04 DR-Y ML-Y 0
TEST SNUBBER (SHOP) 10:OOA 15:59 ORT3-N R-N 182 1 MM0408036 MM1 76 P-015B 1P-15B, 17 02MAY04 06MAY04 DR-N ML-N 47
_REPAIR/REPLACE SEAI 18:00A 04:59 ORT3-N R-N REBUILD & TES SNU8BER (SHOP)
IHX-IA SG MAIN STEAM LINE WE ST SNUBBER MM,H S.1$. REBUILD & TE T SNUBBER (SHCP)
TE COOTAINMENT SPRAY H -ADER SNUBI 0Q S3SP-158.
REPAIRR EAL gl yv.1C1; REPLACE SPRI ISOLATORS I
CONTAINMENT ACCIDENT RECI CULATION FA M W-1A REPLACE OA RAFT DAMPER 1831 1 MM0305397 MMI 76 W-401C1 W-1C1 REPLACE I10 103MAY04 106MAY04 I DR-Y MLY SPRING ISOLATORS I 06:OOA 10:59 ORT3-N R-N 27 184 1 MM9933444 IMMI1 76 W401C2-A W-1C2-A REPLACE 701 03MAY04 08MAY04 DR-Y MLYV 0
_1 W______
BACKDRAFT DAMPER 06:OOA 15:59 ORT3-N R-N I
1851 11 MM0214187A IMMI 76 C-2 INSPECT UPPER HATCH 17 04MAY04 06MAY041 DR-Y ML-Y 09:OOA 05:59 ORT3-N R-N 0
I 4 I57NSPCT UPF 186 0 MM0407886 MM1 76 PIPING IA-1298 BROKEN PIPE 10 06MAY04 06MAY04 DR-Y ML-Y 366 SUPPORT 08:00' 17:59 ORT3-N R-N 1
187 1 MM9934376B MMI 76 HS-15 HS-15. REINSTALL 2
06MAY04 07MAY04 DR-Y ML-Y 0
SNUBBER, AS-LEFT 16:00 06:59 ORT3-N R-N MM
'ER HATCpI PER ONNEL ACCESS:AIR LOCK021418 04T88'
-1298 BROKEN PiPE SUPPORT 040788 I
PIPING MULTI ANDIOF j
I MM99 4376BHS-15, REINSTALL SNUBBER 9934371 A-CC MM0214024ANSOECT LOWER HAT ESS AIR LOCK121402 NON-NUMBEI AS-LEFT VT-:
)NTAINMENT '
1881 1 MM0214024A MMt 76 c-1 INSPECT LOWER HATCH 20 06MAY04 08MAY04 DR-Y MLY 18:00 I
02:59 ORT3-N R-N 151 EQUIPMgNT ACC I
I Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION Sheet 11 of 22
© Primavera Systems, Inc.
I FL-03 Execution Publication Set I
afterO5MAY04 12:00 l
U1R28 WORKING SCHEDULE l
after 05MAY04 12:00 MAY
.1024,&16,la2Q2210,2.4.6.8,10~12.l4ll8.2(22l0,2,4,6,8,101121416
_I STOJ-l-- A I a[ EMI4 JIM Jil 189 1 MM9924975B MM1 76 HS-1 HS-1, REINSTALL 6
07MAY04 07MAY04 DR-YML-Y 169 MM9 24TiS REI L
B A
V SNUBBER, AS-LEFT 07:00 12:59 ORT3-N R-N HX4iA SG MAIN STEI M LINE WEST SNUBBER 9924975 190 1 MM0407701 MM1 28 CV-01296 CV-1296, REMOVE 1 07MAY04 07MAY04 DR-Y ML-Y 352 MM04077H1CV1L6. REMOVE CLTH FROM PIP CLOTH FROM PIPE 09:00 09:59 ORT3-N R-N AUXILIARY HARGING LINE 1$0LATION0407701 191 1
MM0407989 MM1 10 CPP-14B 1CPP-14B, ROTATE 10 07MAY04 07MAY04 DR-Y ML-Y 392 MMO40T9891CPP-l B. ROTATE PIPE ENDS DOWN FOR ME CONCER PIPE ENDS DOWN FOR 12:00 21:59 ORT3-N R-N UIC PIPE PENETRATION.
NTAINMENT PRESSURE TRAN 4C79 192 1
MM-8857A1 MMI 82 HX-015B HX-15B, PERFORM SW 6 07MAY04 08MAY04 DR-Y ML-Y 0
IMM.8857A1HX15
. PERFORM SW (EAK CHECK & IN TALL COVERS LEAK CHECK &
12:00 06:59 ORT3-N R-N W-1i1 ACCIDENT REC RC FAN MOTOR qOOLING COIL0241 O430 j
~IO M~n e
d
,IJ 1-LI t e
193 1 MM0304995 MM2 76 P-028B P-028B - OVERHAUL 65 130APR4 11MAY04 DR-Y ML-Y 0 _
Q OVERHAUL NFEED PUMP MAIN FEED PUMP 15:OOA 10:59 ORT3-N R-N II_
194 1
MM0407390 MM2 76 P-028B I1P-28B INSPECT 2
01MAY04 05MAY04 DR-Y ML-Y 129 3901P-20B INSPECT SPEED INCREASER SPEEDINCREASER 09:OOA 13:59 ORT3-N R-N ISTEAMGENERATOR FEED UMP0407390 195 0 MM0407967 MM2 78 K-026 K-26, AIR LINE LEAK 3
02MAY04 05MAY04 0I M 07 2'K-26 IR LINE LEAK 13:OOA 14:59 SCBAIEqA CHARGING CO PRESSOR04079g7 196 0 MM0201305 MM2 77 WELDING-EQ INSPECT FIRE 3
04MAY04 05MAY04 DR-Y ML-Y 823 05NSPECT FIRE EXTINGU SHERS EXTINGUISHERS 06:OOA 14:59 ORT3-N R-N LDIN(AND CUTTING E UIPMENTO2013d5 197 0 MM0309475 MM2 77 SERVICE STORAGE LOCKER 4
04MAY04 05MAY04 DR-Y ML-Y 822 M 09 sSTORAGE LOCKER INS ECTION INSPECTION 10:OOA 15:59 ORT3-N R-N MISC EQUIPMENT REPAI SERVICE0309475 198 1 MM0301121 MM2 77 TG-01 GREASE GOVERNOR I
05MAY04 05MAY04 DR-Y ML-Y 409 MMO30112GREASEGOVE NORPEDESTALANDHP PEDESTAL AND HP 22:00 22:59 ORT3-N R-N 03011Q1TiRBINEGEN RATOR (GENERIt; SEE COMPON 5)
I
_I_
199 1
MM0305790A MM2 76 SC-1A SC-1A-CLOSE 6
06MAY04 06MAY04 DR-Y ML-Y 11
'MM0305790AC
-CLOSEWATEFBOXESAFTER ISPECTION WATERBOXES AFTER 06:00 11:59 ORT3-N R-N 1
030579 -
CO NDENSER(DEAERATING)l 200 0
MM0301085 MM2 77 HX-234 CLEAN. INSPECT AND 4
06MAY04 06MAY04 DR-Y ML-Y 402 MM0301085CIA INSPECT AND MAINTAIN AC NIT MAINTAIN AC UNIT 07:00 10:59 ORT3-N R-N 030108 NSB WATER CHILLER 201 1
MM9919654 MM2 77 P-028B I P-28B STOP OIL 30 106MAY04 09MAY04 DR-Y ML-Y 26 MM99196!
P-28B STOP OIL LEAKI1NSTALL IAFFLE LEAK/INSTALL BAFFLE 10:00 06:59 ORT3-N R-N 99196 202 1 MM0305791A MM2 76 SC-1B I
SC-lB-CLOSE 6
07MAY04 07MAY04 DR-Y ML-Y 0
MM0305791 SC-lB-CLOSEWIATERBOXES A RINSPECTIOI WATERBOXES AFTER 06:00 11:59 ORT3-N R-N CON ENSER (DEAERArNG)0305791 203 2 MM0301159 MM2 76 P-011A CHANGE OIL, FLUSH 6
07MAY04 07MAY04 DR-N ML-N 0
MMo3l1l59CHANGEOILFLUSHBEARI S ANDCLEAP BEARINGS AND CLEAN 09:00 14:59 ORT3-N R-N COMPONE TCOOLING WA ER PUMP 03011 5 204 1
MM0213109 MMV 76 CS-00038C ICS-00038CBODYTO 10 19APR04 06MAY04 DR-Y ML-Y 14 1CS-00038C BODY TO B NNET LEAK I
BONNETLEAK 09:OOA 12:59 ORT3-N R-N lSGBD HX CLG FLCW REThURN TO 205 1 MM0214023 MMV 76 AF-00104 AF-104-INSP/
13 01MAY04 06MAY04 DR-YML-Y 9
M 3AF104 -INSPIMAINTAI CHECKVALVEOERRMP9158 MAINTAIN CHECK I 11:00A 15:59 ORT3-N R-N l1 P.38B 4FP DISCHARGE IHXB SGC Run Date 05MAY 1
LT-03 STANDARD PUBLICATION Sheet 12 of 22 O Pfimavera Systems, Inc.
I FL-03 Execution Publication Set
afterO5MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 U
ID RESP MM0303681A IMMV wo ST 76 EQID MS-02010 DESCRIPTION RD ES EF RISK MF MAY 2061 1 1MS-2010-PERFORM 10 I 03MAY04 06MAY041 DR-Y ML-Y MOD FOR ROUNDED 13:00A 10:59 ORT3-Y R-M 10 4
44 _4 2071 1 MM02141 10 MMV 76 MS-02018 MS-2018 -OPEN &
INSPECT VALVE -
24 03MAY04 06MAY04 DR-Y ML-Y 22:OOA 13:59 ORT3-N R-N 0
Wed 5Thu 6
,Fri 7
?.1001214.16j18a2Q220. 2.4. 6. 8,1012,14,1618,2Q2210.2. 4, 6. 8.10M12,14.16.
,AmMO3681 IMS-2010 - PERFORM 1AOD FOR ROUNDED ENTRANCE 1wx-XA SG HEADER SAFETY0303L81 AM 141OMS-20i8 - OPEN & INSP CT VALVE - RMPb309-1 U -
HX___-1--A SGHEADER MAINS EAM STOP CO M141 o9MS-2017 -INSPIMAI NTjNOPERATOR-fMP9309-2
- P r
K fi M"w{_
5 R
HX-1 BSG U
3M 3382SC-95i -CONT ISOLAN VALVELEAKSBY
-7 mm M ZR LlaUIC
~SMM444A SEAT LEAKA 2081 1 MM0214109 MMV 76 MS-02017-O MS-2017 - INSP /
MAINTAIN OPERATOR -
17 04MAY04 07MAY04 DR-Y ML-Y I 09:OOA 10:59 ORT3-N R-N 0
l 2091 1 MM0303382 MMV 76 SC-00953 SC-953 - CONT ISOLATION VALVE 171 04MAY04 07MAY04 DR-Y MI-V 09:OOA 10:59 ORT3-N R-N a
2101 i MM0216334 IMMV 76 SI-00844A 1SI-844A SEAT LEAKAGE 23 1 04MAY04 I 08MAY04 DR-Y ML-Y 09:OWA 07:59 ORT3-Y R-N 0
211 1 MM6400526 MMV 76 RC-00537 RC-537 -REPLACE 3
05MAY04 05MAY04 DR-N ML-N 0
RELIEF VALVE.
12:00 14:59 ORT3-N R-N 212 1 MM0400525 MMV 76 RC-00523A RC-523A - REPLACE 3
05MAY04 05MAY04 DR-N ML-N 0
RELIEF VALVE 13:00 15:59 ORT3-N R-N 213 1 MM0400527 MMV 76 RC-00545D RC-545D - REPLACE 3
05MAY04 06MAY04 DR-N ML-N 0
RELIEF VALVE 14:00 07:59 ORT3-N R-N 3J4 1 MM0400528 MMV 76 RC-00546D RC-546D - REPLACE 3
05MAY04 06MAY04 DR-N ML-N 0
Il I
RELIEF VALVE 15:00 08:59 ORT3-N R-N 215 1 MM0214141 MMV 76 SC-00991 SC-991 - REPLACE 3
05MAY04 05MAY04 DR-Y ML-Y 16 WITH PRETESTED 19:00 21:59 ORT3-N R-N
!216 1 MM0407697A MMV 76 WG-01788-O 1WG-1788-0 AIR LEAK, 10 05MAY04 06MAY04 0
REPLACE DIAPHRAGM 19:00 19:59 217 1 MM0407698A MMV 76 WG-01789-0 1WG-1789-O AIR LEAK, 10 05MAY04 06MAY04 0
REPLACE DIAPHRAGM 19:00 19:59 218 1 MM0407597 MMV 76 MS-00228 I MS-228 REPACK 12 05MAY04 06MAY04 DR-YML-Y 8
VALVE 19:00 21:59 ORT3-N R-N 219 1 MM0400529 MMV 76 RC-00547D RC-547D - REPLACE 3
06MAY04 06MAY04 DR-N ML-N 0
RELIEF VALVE 07:00 09:59 ORT3-N R-N 220 1
MM0406193 MMV 76 MS-02084 IMS-2084, REPACK 8
06MAY04 06MAY04 DR.Y ML-Y 0
VALVE 07:00 14:59 ORT3-N R-N 221 1
MM0214035 MMV 76 CW FLUSH CW SYSTEM 28 06MAY04 10MAY04 DR-Y ML-Y 0
AND CLEANINSPECT 07:00' 07:59 ORT3N R-N 222 1
MM0400530 MMV 76 RC-00548D RC-548D - REPLACE 3
06MAY04 06MAY04 DR-N ML-N 14 RELIEF VALVE 08:00 10:59 ORT3-N R-N
'AMC VWM
,AM(
VWC Q0526RC-537 - REPLACE REU IRC-500J)K REACTOR VESc 100515RC-52iA - REPLACE REI IR-1 RVLEVEL INDICATOF ioqR7RC-545D - REPLACE REI n
{14 RP EI 10051gvC 546;D - REPLACE REI EF VALVE EL LT-447/447A THERMAL RELO40O JEF VALVE OVERPRESSURt PROTECTION R JEF VALVE
-IA SG COLD LEG CHANNELHEAC JEF VALVE IX-1B SG HOT LEG CHANNELHEAC iTH PRETESTED VALVE
)UID SMPL PIPE PENETRATION TH K, REPLACE DIA??HRAGM PmI1 16 RCDT SAMPLI K, REPLACE DIAPHRAGM I.
nlh9fl p
_mww vs MI MI M0214141SC-991 - REPLACE V 021414iMCPP-28B PZR LP 1O407697AL4IG-1788-O AIR LEI 040769 10407698 AIR LE 040769 M04075971M
.228REPACK VA h
i26 400525 VENT OVERPI VENT OVERPI RMAL TO. Z46 GA I!
TO Z46 GA I
- R DRAIN AND
) VENT OVER ION CONTROL
,SH FLOAT VAI lr4
- 4r nenwr cw^zsn 040759 7597
-I MM0400529RC 040052(11 MM04061931M M 46193=
MM0214035FLUISH C 021403D.0 MMO400530R 040053(1 1I MMO:
-!IHHX-lA SG HEAE
- 547D - REPLACE IREUIEF VALVE lHX-IA SG HOT LEG CHANNELHEJ
-2084, REPACK VALVE HX-1B SG SAMPLE ISOLA W SYSTEM AND dLEANItNSPECT N
- l A
I~
U
,-548D - REPLACE REUEF VALVE ElHX-1B SG COLD LEG CHANNELt 03681B1 MS-2010 r RE-INSTALL VAI HX-IA SG HEADER SAFETY030361 2231 1 l MM0303681B 1MMV 76 MS-02010 1MS-2010 - RE-INSTALLI 10 07MAY04 07MAY04I DR-Y ML-Y VALVE AFTER MOD 10:00, 20:59 ORT3-N R-M 0
EAD VENT OVI 1E AFTER MOE 1_
l l
Run Date 05MAY04 13:16 LT-03 STANDARD PUBLICATION Sheet 13 of 22 o Pnmavera Systems, Inc.
FL-03 Execution Pubilcatlon Set I
after 05MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 ID IRESPI WO Ik AJ EQID DESCRIPTION RD ES EF RISK MF L I,,,.
I Weds 5 Thu 6 Fri 7
-I ST
!tMlZ1416ja2022[Qi 2 4,6i 8 1012il4l6l8.2(12210,2.4,6,8,lOllZl4,16,1 224 1 1 MM0303680B MMV 76 MS-02005 1MS-2005 - REINSTALL VALVE AFTER MOD 10 07MAY04 1 07MAY04 DR-Y ML-Y 13:00' I 23:59 ORT3-N R-M 5
49 MMl 30368091 MS-2005 - REINSTALL VAL E AFTER MOE HX.1B SG HEADER SAFETY0. 0368d_
2251 1 lNG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROG-26 26APR04 08MAY04 DR-Y ML-Y CONTAINMENT 44 FT 08:00A 07:59 ORT3-Y R-N 04FCDND4 FOR FAC PROG. CONTAINMENT 4I FT GEN AREA
.
I 226 1 EP0301909 NDE.77 Ul-CONTAIN VISUAL INSPECTION 76 30APR04 14MAY04 DR-Y ML-Y 71 OF CTMT LINER PLATE 08:OOA 07:59 ORT3-Y R-N 227 1 NG44TFClND NDE 77 IST-SISI NDE FOR FAC PROG -
15 03MAY04 06MAY04 DR-Y ML-Y 0
TRB HALL 44 FT GEN 09:OOA 16:59 ORT3-Y R-N E
SUAl INSPECTION OF E
PLAfE Em F
4 LVNE IO FAC PROG R AL4 FT GEN AREA
- E-n
_1 c
=PA.-Arsv
- AIC'=ntIlP 2281 1 ND0407589A 0P0301237 NDE OPO 76 77 T-026 T-026 -NDE /
RADIOGRAPHY OF 10 06MAY04 07MAY04 DR-Y ML-Y 100 17:00' 02:59 ORT3-Y R-N ND04075S 2291 0 O-PC-073.4 FP VALVE POSION.4 1 05MAY04 05MAY041 DR-N ML-N VERIFICATION CHECK II12:00 I
15:59 ORT3-N R-N 822 OP0 I
I 230 0 OP0301252 OPO 77 O-PC-072.3 FIREEXTINGUISHER 16 07MAY04 07MAY04 DR-NML-N 771 CHECK I
07:001 23:59 ORT3-N R-N D1l 0
OP0301254 OPO 77 O-PC-075.1 PERFORM I 32 07MAY04 08MAY04 DR-N ML-N 755 MAINTENANCE ON THE 07:00' 16:59 ORT3-N R-N allFP VAlVE POSmON VEI
!FP CO@TROL VALVE PO.
II, PS OF OUTSIDE/OFFICE AREA l PERIODIC MAIN RRRRNNECtNDJARY INSERVI%
9AT-026 - NDE I RADIOGRAPHY OF F 040767BLOWDC tIFICATION CHEC mON VERIFICAT(ON0301237 OP031252FIRE EXTiNG FIRE EXTINGUISHER EO0301252U IDP0301254PERFOhM MAINTENANCI TENANCE OF TH4 SCBA03012543
)P0309956PMT 1Gl07 ROD DRIVE MC ROD CONTROL MG SET030995E
.1S INSPECTION EPAIRED AREI
'WN TANK
- UISHER CHECI
' ON THE SCBA
> SET IAW 01 31 U
TIE25356 232 E2 2331 1
0 0P0309956 0P0215356 OPO OPI 82 77 G-07 PMT 1G-07 ROD DRIVE MG SET IAW Of 31 2
07MAY04 07MAY04 DR-N ML-N 09:00' 10:59 1 ORT3-N R-N 0
I I
O-PC-MIDS OPERATIONS MID SHIFT WEEKLY 71 30APR04 06MAY04 DR-N ML-N 00:OOA 06:59 ORT3-N R-N 253 DP4115 3S6OPE114TION~!S MIDT SlfWEEKLY ROUTINE
_nn 234 0 OP0301304 OPI 77 TS-EP-001 POWER AVAILABILITY I
06MAY04 06MAY04 DR-N ML-N 259 VERIFICATIONS 00:00' 00:59 ORT3-N R-N 235 2 OP0301571 OPI 77 O-TS-010AB TS-1OA. U2C AIR LOCK 2
07MAY04 07MAY04 DR-N ML-N 251 DOOR SEAL TEST 00:00' 01:59 ORT3-N R-M 236 0 OP0301292 OP1 77 O-PC-MIDS OPERATIONS MID 49 07MAY04 13MAY04 DR-N ML-N 204 SHIFT WEEKLY 00:00' 06:59 ORT3-N R-N 237 0 OP0301331 OP2 77 O-PC-DAYS OPERATnONS DAY 21 03MAY04 08MAY04 DR-N ML-N 241 SHIFT WEEKLY 08:OOA 11:59 ORT3-N R-N 238 0
OP0212330 OP2 76 WT WT PRETREATMENT 12 06MAY04 06MAY04 870 CHEMICAL CLEANING 07:00' 18:59 OP0301304POWER AVAI 03cII304POWER AVA U2 CdNT AIR LOCK DO(
I OP OPERATIONS MID SHIFT WEE ERATIONS MID SHIFT WEEKLY ROI LABILITY VERIFIdATiONS dLABILITY VERIFIOATIONS
)P0301571 TS-10A.,U2C AIR LOCK DC
)R SEAL TEST030IS71U 3301292OPERATIONS MID SHIFT WE KLY ROUTINE030,4292 OR SEAL TES KLY ROUTINE OpIO1 3 31OPERATIONS DAY SHIF WEEKLY ROUT1hE mu m
Ii
==w t
OP0212330lV PR!
EN1 CHEMICAL CLEA 021233
_W T SYSTEM MULTI i l 0 P917g 0 4 9TS-,:UNIT 2 CONTROL UNIT 2 CONTROL ROD E4ERCISE99170491 4ING ND/OR NON-N ROD EXERCIS 2391 2 OP9917049 OP2 77 O-TS-006 TS-6. UNIT 2 CONTROL ROD EXERCISE I
07MAY04 107MAY04 DR-N ML-N 08:00' 08:59 ORT3-N R-M 251
.j _ _ __ __ __I__
I _ _ _ _ _
I Run Date 05MAY0413:16l LT-03 STANDARD PUBLICATION Sheet 14 of 22
© Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after O5MA Y04 12:00 U1R28 WORKING SCHEDULE after O5MA Y04 12:00
- l U ID RESPI WO I EQ1D I
DESCRIPTION RD ES EF RISK MF MThAY F
ST g l
l l
1011Z14,16,12a221 0, 2.4, 6,8,1012,14,16 18,2(,2210,.2, 4.6,8,1011214l16
-lJ ltJu~
i i
- 4 240 0 OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE 7
22APR04 05MAY04 DR-N ML-N 894 P LEAN SERVICE WATES STRAINERS WATER STRAINERS 16:OOA 18:59 ORT3-N R-N SERVICE WATER STRAINERS021S624i CH C
SI:
A 2:9 O T3NRN-1 241 0
OP0301387 OP3 77 O-PC-001.4 PAB VENTILATION 21 04MAY04 07MAY04 DR-N ML-N 245 P0 0138PB VtNTILATION CHE KS
_CHECKS 16:OOA 22:59 ORT3-N R-N 242 2 OP0301635 OP3 77 O-PC-025A.
SECURE RECIRC OF 1
05MAY04 OSMAY04 DR-N ML-N 265 OP0 0163LSECURE RECIRC OF RW 3TIRESTORE SFP RWST1RESTORE SFP 16:00-16:59 ORT3-N R-N 0 1635DSECdRING RECIRC OF RWSTIRESTORE iFP PURIFICATIO J 243 0 OP0301447 OP3 77 O-TS-009 TS-9. CONTROL ROOM 24 05MAY04 08MAY04 DR-N ML-N 242 OP0 0144 TS-9, ONTROL ROOM V fV SYSTEM CHECbS HNV SYSTEM CHECKS 16:00-18:59 ORT3-N R-M 0 1 444 244 0
OP0301393 OP3 77 O-PC-SWING OPS SWING SHIFT 49 05MAY04 11MAY04 DR-N ML-N 217 OP0 01393E:S SWING SHIFT WEE LY ROUTINE WEEKLY ROUTINE 16:00 22:59 ORT3-N R-N 0
g 1
3 9
245 2 U2GNDR012 OP3 O-PC-021.3 DRAIN U2 MAIN 1
06MAY04 06MAY04 DR-Y ML-Y 0
U2GNDR012DR IN U2 MAIN ELEC RICAL GENERAT R PER PC 21.
ELECTRICAL 19:00 19:59 ORT3-Y R-N
[Tn 246 0 OP0301389 OP3 77 O-PC-009.7 OPERATE WASTE GAS 1
07MAY04 07MAY04 DR-N ML-N 251 C PO301 389OPERATE WASTE GAS C MPRESSOR TC COMPRESSOR TO 16:00-16:59 ORT3-N R-N WAS GAS COMPRESbOR PERIODIC R N0301389 247 O OP0301391 OP3 77 O-PC-075.2 INVENTORY FIRE 1
07MAY04 07MAY04 DR-N ML-N 251 0 oP 3091INVENTORY FIRE BRIGADE NOUT GEAF BRIGADE TURNOUT 16:00' 16:59 ORT3-N R-N FIRE IGADE TURNOUT GEAR INVENTO Y03013911 I-I I
EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
05MAY04 05MAY04 DR-Y ML-Y 315 P AOPE"ATING SUPPORT )F INmAL RCS rALKDOWN OF INITIAL RCS 12:00-15:59 ORT3-N R-N REACTOR COOLANT SY' rEM (RCS) PRESSURE TEST - INI 03494 249 1 RF-070 OPS 77 O-RF-070 RF-70, CTMT FIRE 8
05MAY04 05MAY04 DR-N ML-N 49 F RF-70, CThAT FIRE HOSE SU VEILLANCE HOSE SURVEILLANCE 12:00-19:59 ORT3-N R-N F__
F)RE HOSE AND Fl E STATION SUR\\tEILLANCE TESTO 15935 250 1 0135AG02-A OPS G-02 IWP-037-01 ALIGN G02 1
05MAY04 05MAY04 DR-N ML-N 0 013.Go.WP-0,7-01 AUGN G02 0lAOS & 2A05 P1R 01-35 TO 1A05 & 2A05 PER 15:00 15:59 ORT3-N R-N 001 91 I1 125V IWP 00-037-01 EM REVO-1
_I_
251 1
OP0300945 OPS 76 SC-00955-0 SC-955 PMT STROKE 1
05MAY04 05MAY04 DR-Y ML-Y 0 OP 300945SC-995 PMT STROKE P R IT 330 PER IT 330 17:00' 17:59 ORT3-N R-N 30094ERC ACOT LEG SAMPLE SOLATION OPERpTOR I
I 252 2 Ol-17B-2 OPS Ol-17A RESTART U-2 LDGS 2
05MAY04 05MAY04 DR-N ML-N 894 1-17B-2RESTART U-2 LDGS 17:00 18:59 ORT3-N R-N m
253 1 O-RT-066C OPS 77 O-RT-066C LLRT CONT PRESSURE 3
05MAY04 OSMAY04 DR-N ML-N 392 0- T.066CLLRT ONT PRESSURE TRANSMITTER LINE TRANSMITTER LINE 17:00-19:59 ORT3-N R-N 215999C4ONTAINMENT PR SSURE (P-32A) 254 1
O-RT-035B OPS CPP-28A LLRT HOT LEG SAMPLE 4
05MAY04 05MAY04 DR-N ML-N 305
-RT-035BLLRT HOT LEG SAM LE UNE - POST ORT LINE - POST ORT 19:00 22:59 ORT3-N R-N MHOT LEG SAM LE LINE 255 1
OP0216627 OPS 76 CV-01296 ICV-1296 PMT STROKE 1
05MAY04 O5MAY04 DR-Y ML-Y 0
OP02166 271CV-1296 PMT STROKE PER IT320 PER IT 320 23:00-23:59 ORT3-N R-N 0216,627AUXILIARY C ARGING LINE ISpLATION 256 1
OP0407621 OPS 76 CV-00296 1CV-296 PMT STROKE 1
05MAY04 05MAY04 DR-Y ML-Y 0
OP0407 6211CV-296 PMT ITROKE PER IT 320 PER IT 320 23:00 23:59 ORT3-Y R-N 0407b21I1HX-2 REGEN HX TO AUXILIARY SPRAY 257 1
O-RT-034B OPS 77 O-RT-034 POST LLRT OF 4
06MAY04 06MAY04 DR-N ML-N 0
O-RT-b34 OST LLRT F NORMAL CHARGING NORMAL CHARGING 00:00 03:59 ORT3-N R-N 0215972_N0RM L CHARGING LINE (P-26)
Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION Sheet 15 of 22 C Ptimavera Systems, Inc.
FL-03 Execution Publication Set
after 05MAY04 12:00 I
U1R28 WORKING SCHEDULE after 05MAY04 12:00
- lul ID RES W
QD I
DECITO RD ES IEF RISK
~MF[WMAY1 2581 1 O-RT-046B OPS 77 O-RT-046 POST LLRT FOR AUX 4
06MAY04 06MAY04 DR-N ML-N CHARGING 01:00 04:59 ORT3-N R-N 111 259 0 OPS-037-01 OPS 76 D72-17-03 IWP-037-0t ALIGN 2
06MAY04 06MAY04 DR-N ML-N 0
MOBS AND RESTORE 11:00 12:59 ORT3-N R-N 260 i O-RT-059 OPS 77 O-RT-059 LIRT TRAIN A CONT 8
06MAY04 07MAY04 DR-N ML-N 0
SPRAY CIV 19:00 02:59 ORT3-N R-N 261 1
O-RT-060 OPS 77 O-RT-060 LIRT TRAIN B CONT 8
07MAY04 07MAY04 DR-N ML-N 33 SPRAY CIV 03:00 11:59 ORT3-N R-N 262 1 OP0309955 OPS 82 G-06 PMT OF 1G-06 ROD 2
07MAY04 07MAY04 DR-N ML-N 0
DRIVE MG SET IAW Of 07:00-08:59 ORT3-N R-N 263 2 AC-377-IA OPS P-011A ENTER TSAC 3.7.7.A 0
07MAY04 07MAY04 DR-N ML-N 786 FOR 2P-lA 08:00 07:59 ORT3-N R-N 264 1 O-RT-055A OPS 77 O-RT-055 PRE LIRT HX-1A 4
07MAY04 07MAY04 DR-N ML-N 0
BLOWDOWN 13:00 16:59 ORT3-N R-N 265 1 O-RT-067B OPS 77 O-RT-067 OST LLRT EX LTDN H) 8 07MAY04 07MAY04 DR-N ML-N 250 CCW LINES 13:00 21:59 ORT3-N R-N I6 1 B42RESTORE OPS B-42 RESTORE 18-42 PER 3
07MAY04 07MAY04 DR-N ML-N 0
IWP 01-128-E-BR 14:00 16:59 ORT3-N R-L 267 0 OPS-037-03 OPS 76 D72-16-13 IWP-037-03 OPS PMT & 1 07MAY04 07MAY04 DR-N ML-N 51
_IGNMENT POST MOD 15:00 15:59 ORT3-N R-N 268 2 OP0301159 OPS 76 P-011A 2P-11APMT RUN 1
07MAY04 07MAY04 DR-N ML-N 0
16:00 16:59 ORT3-N R-N 269 2 AC-377-1Z OPS P-011A EXIT TSAC 3.7.7.A FOR 0
07MAY04 07MAY04 DR-N ML-N 777 2P-11A 17:00 16:59 ORT3-N R-N 270 1 B52-424F OPS 76 B-42 BUS STAB PMT 1
07MAY04 07MAY04 DR-N ML-N 310
- 1SI-841B 17:00 17:59 ORT3-N R-N 271 1
852-421B OPS 76 B-42 BUS STAB PMT 2
07MAY04 07MAY04 DR-N ML-N 0
_1SI-850B 17:00 18:59 ORT3-N R-N 272 1 B52-424J OPS 76 B-42 BUS STAB PMT 2
07MAY04 07MAY04 DR-N ML-N 0
_ICC-738B 17:00 19:59 ORT3-N R-N 273 1 B52-428H OPS 76 B-42 BUS STAB PMT -D-24 2
07MAY04 07MAY04 DR-N ML-N 68 17:00 19:59 ORT3-N R-N p-O-RT.046BPOST LLRT 0215981 _AUXIt OPS-034 0306 I
4B PUMP/SI-p62B DISCH CHK/'
OPc A STEAM O-RT-067B CCW TO AND FROM I FOR AUX CHARGING 1ARY CHARGING LINE (P-32C)
-011WP-037-01 AIJGN MOBS AND RI 1UPWR TO CI1 SAFEGUARDS I O.RT.059LLRT TRAIN A CONT 021599 P-14A Pt O-RT.060LLRT TRAIN B C 1-864B ISOL (P-55@02159935 309955PMT OF IGd06 ROD DRIVE M(
ROD CONTROL ?hG SET030995N AC-37741PENTER TSAC 3.7.
O-RT-055APRE LLRT HX-GENERATOR BLOWDOWN (P-51)0:
'OST LLRT EX LTpN HX CCW LINE!
XCESS LETDOWN HX (P-19/P-20)0 M2RESTORERESTORE 1B42 PER I
- 7. 31WP-037-03 OPS PMT & ALIGNM
-URB AUX CTL BD (1MOB-65-6811M(
OP0301159 2 OMPONENT COqLING WATER PU AC-377-1ZEXIT TSAC 3.7.
B52-424FBUS STAB CONTROL CENT&R PAB SAFEGUAI B5~24 2 13BUS STAB B5j.424JBUS STAB F CONTROL CENTER PAB SAFEGUA B52.428H8US S7 CONTROL CENTgR PAB SAFEGUAI
!RFORM PMT OF 1-42 BUCKETS FC
'STORE P-038)
US A (1 MOB-11 SPRAY CIV MP/SI-862A Df
)NT SPRAY CIJ SET IAW 01 31 rA FOR 2P-.11 A BLOWDOWN 1599d_
CONTINGENC 1600cId NVP 01-128-E-B
-NT POST MOD 03061121
-11A PMT RUN IP0301159j rA FOR 2P-11P
'MT "ISI-841B ZDS0202527I 2MT "1SI-850B 0202527U MT "ICC-738B" ZDS02025271-AB PMT 'D-24 tDS0202527*-
R DRAINDOWN m
480V MOTOF 480V MOTOr 48W MOTOF B42-PMTPI 274 1 B42-PMT OPS B-42 PERFORM PMT OF 1B42 BUCKETS FOR 10 07MAY04 08MAY04 17:00 02:59 0
I I
-I I
n I
IIII II I
I I
I Le
= I 1,
II IR 275 1 l AC-375C-2A PPG MILESTONE I TSAC 3.7.5.C P-038A 0
05MAY04 I 05MAY04 DR-N MIL-N oCfSC-2AlTSAC 3.7.5.C P-038A O4S TO UNIT 2 I
OOS TO UNIT 2 15:00 14:59 ORT3-N R-N l rP-038AeLECTRICDRIVENFUXFEEDPUMP' Run Date 05MAY04 j
LT-03 STANDARD PUBLICATION Sheet 16 of 22 o Primavera Systems, Inc.
FL-03 Execution Publication Set I
afterO5MAY04 12:00 U1R28 WORKING SCHEDULE after 05MAY04 12:00 ID RESP Wo ST EQID DESCRIPTION RD ES EF MAY RISK MF Wed 5 Th'6 0 Fri7 M102,I14,16,1&2t,22I 0, 2 4.
6, 8 1012,14,1618,202Ji 0, 2. 4A,-6,.0i1214A6,1 2761 1 AFA11A PPG MILESTONE START ELECTRIC I 0 1 05MAY04 05MAY04 DR-N ML-N DRIVEN TRAIN A AUX 15:00 14:59 ORT3-N R-N 1
277 1 AC-375C-2H PPG
SUMMARY
TSAC 3.7.5.C P-038A 324' 05MAY04 19MAY04 DR-N ML-N 0
OOS TO UNIT 2 15:00 02:59 ORT3-N R-N 278 1 CVXO2Z PPG MILESTONE END CVCS LOW 0
05MAY04 05MAY04 DR-N ML-N 76 PRESSURE LETDOWN 17:00 16:59 ORT3-N R-N 279 1 CVX03Z PPG MILESTONE END CVCS NORMAL 0
06MAY04 06MAY04 DR-N ML-N 65 CHARGING WORK 04:00 03:59 ORT3-N R-N 280 1 AFAD1Z PPG MILESTONE END ELECTRIC DRVEN 06MAY04 06MAY04 DR-N ML1N 3
TRAIN A AUX FEED 13:00 12:59 ORT3-N R-N 281 1 SIA PPG MILESTONE CLOSE CTMT SPRAY A 0
07MAY04 07MAY04 DR1N ML4N 93 TRAIN P-14A WINDOW 03:00 02:59 ORT3-N R-N 28 0110 PRES 77 RESP6.2/6 VERIFYNRCSFLOW 3 2 06MAY04 06MAY04 DR-N ML-N 214 WRATEL-TECH SPEC 07:00I 08159 ORT3-N R-N 9
1 CTMTPHONE1R TP I
MISC STALLPHOV ENE.I I 105MAY04 05MAY041 DR-YML-Y 1 119 1
1 II THROUGH66'HATCH I I 12:00'9 I 12:59 1 ORT3-Y R-N I I
1 RPSH078-R IRP1 PAKG 78RMV HEDIG3_MY40MA0 RYM-
¢ ]=!.%SXLI
=
- iL.
25 ISD-1600-30 1 SDM l I1MOD FOR HEAD I265 1 03MAY04 06MAY04 l 0
i I
I.
I-I REPAIR PACKAGE II07:OOA I13:591 2861 SD-1600-10 ISDMI PREPARE PACKAGE 6 104MAY04 105MAY04 1
° III I
IIFOR REMOVE/REPL II08:00A I17:5911 1
2871 SD-1600-20 ISDMI IREVIEW AND APPROVE 24 OSMAYO4 O6MAY04I 131 III I
llTHERMAL SLEEVE II18:00 1 17:5911 1
2881 SD-1600-40 ISDMI MOD FOR HEAD 127106MAY04107MAY04l 141 III I
llREPAIR PACKAGE ll14:00 l16:5911 1
- I*C im w1 1A t I ISISI l
WALKDOWN -SUM 08:OOA l159lORT3-Y R-NI I
I-*S il 17-r--- 1 e9 Z111 I1 29l1I TGUPOT ITGGI TG-01-T lPROVIDECRANE, I 67 l113APR04 I110MAY04 l DR-Y ML-Y I288 llI I
Il RIGGER. AND ll09:OOA l18:59 lORT3-Y R-NI dIASTART ELECTRIC DRIVEN I I 75C-2HrSAC 3.7.5.C P-038A OC
'VX02ZEND CVCS LOW PRESS IEND &VCS NORMAL LE l
CVX03ZEND C1 I
IEND C\\
lII AFA1 I
ED I
II END WORK C TRAIN A AUX FEED WORK O
T IS TO UNIT 2 JRE LETDOWN WORK
-DOWN WORK CS NORMAL CHARGING WORK CS NORMAL CHARGING WORK 1END ELECTRIC DRIVEN TRAIN A A IA02ZCLOSE CTNMF SPRAY A TRAIN UvT SPRAY A TRAIN P-1 4A
=
IX FEED WORI P-14A UWNDOW
.C It PR03001101VEIFY RCS FLOW IATE >= TECH SPI 03001 1 dRCS FLOW RATE YERIFICATION
'PHONEIINS I
'ALL PHONE UNO THROUGH 66 HATCH RPSH078;RREMOVE SHIE fDING ON REGEN FOR CV-296 311141oo.3OOD FOR HEA mm s
_00PREPARE PAC 11 0213475
)4600.20REVIEW AN 0Z34 o REPAIR KAGE PREPARATION 0
2 1 34 T5 KAGE FOI REMOVElREPL 4HERMAL SLEEVE j
II 0 APPROt ThERMAL SLEEVE PACKAGES SD-1600 tMOD FORHEAD P
213473 I
S D2134750 I -
PREPARATIO1 P
DSIN191ENGINEERING WALKI(C W - SUMP INTRIQSION ISSUES El
-
I -
rGs PPORROOIDE CRANE,RIG ER.ANDTOOLRtOMSUPPORTI
=
Run Date 05MAY04 13:161 LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set I
Sheet 17 of 22 0O Prdmavpr Sv-fi-mq Inr-
after 05MAY04 12:00 U1R28 WORKING SCHEDULE after O5MA Y04 12:00 U
ID RESPI WO I EQID I
DESCRIPTION RD ES EF RISK MF MAY ST Ied Tht 6 FrI7
_1MI I
I I
I
.101214118R2a2210.2.4.68.8112,14,1618,2n22j 0. 2.4.6,8,10ilI41,1 291 I
TG0302140 TGG 76 PIPING CRO I CROSSUNDER PIPING 3 1 20APR04 O5MAY04 I DR-Y ML-Y INSPECTION/.
I 1:OOA 14:59 ORT3-Y R-N 0
rGO 4OCROSSUNDER PIPING IN WHP TURBINE EXHAUST TO 02130LO OVERHAUL SEI SPECTION I REPAIRS(PT2)
MSR'S030240 L OIL REUEF VAtVE l
292 1 I TG0302130 TGG 76 L0-00258 LO-258 - OVERHAUL SEAL OIL RELIEF 15 27APR04 I 07MAY04
_ 07:00A 13:59 DR-Y ML-Y ORT3-Y R-N 1
-p i
EP'QA!
l 293
. 1 TG-30875 TGG 76 TG-01-T PRESTRESS HP TURBINE CASING 23 04MAY04 06MAY04 DR-Y ML-Y 07:OOA 14:59 ORT3-Y R-N nCA
- RNA, PRESTRESS HPT B
BOLTING iltEf
- h_
i
_~
l w
294 1 TGO302i44 TGG 76 RO-02721 RO-2721 - INTERSTAGE 4
ORIFICE INSPECTION 05MAY04 06MAY04 DR-Y ML-Y 08:OOA 07:59 ORT3-Y R-N 0
0144RO-2791 - INTERSTAGE (
a 295 1 TGO213965 TGG 76 MS-02729 INSTALL X-UNDER LINE 3
05MAY04 05MAY04 DR-Y ML-Y 0
FLUSHING FIXTURE 10:OOA 14:59 ORT3-Y R-N 296 1 TGO213966 TGG 76 MS-02730 INSTALL X-UNDER LINE 3
OSMAY04 05MAY04 DR-Y ML-Y 0
FLUSHING FIXTURE 10:00A 14:59 ORT3-Y R-N 297 1
TG0302114B TGG 76 SC-lA COND FINAL INTERNAL 2 05MAY04 05MAY04 DR-Y ML-Y 15 INSP (IA) 12:00 13:59 ORT3-Y R-N 298 1
TG0302115B TGG 76 SC-1B COND FINAL INTERNAL 2
05MAY04 05MAY04 DR-Y ML-Y 33 INSP (IB) 16:00 17:59 ORT3-Y R-N 49p9 1 TG-8377B TGG 76 HX-023B HX-023B - CLOSE 10 05MAY04 06MAY04 DR-Y ML-Y 0
O TURBINE LUBE OIL 17:00 02:59 ORT3-Y R-N 300 1 TG0403278 TGG 10 Z-008 GAS LEAK DOWN 20 05MAY04 07MAY04 DR-Y ML-Y 0
STREAM OF TEST 17:00-02:59 ORT3-Y R-N 301 1
TG-XUND-FL TGG 76 PIPING CRO FLUSH CROSSUNDER 24 06MAY04 10MAY04 DR-Y ML-V 0
PIPING 07:00 14:59 ORT3-Y R-N 302 1 TG0302145 TGG 76 RO-02732 RO-2722 - GS INLET AT 7
06MAY04 06MAY04 DR-Y ML-Y 0
HP ORIFICE 08:00 14:59 ORT3-Y R-N 303 1 TG-30940 TGG 76 TG-01-T RECONNECT MS INLET 15 06MAY04 07MAY04 DR-Y ML-Y 309 PIPING TO HP TURBINE 15:00 09:59 ORT3-Y R-N 304 1 TG-30880 TGG 76 TG-01-T TIGHTEN HP CYLINDER 40 06MAY04 10MAY04 DR-Y ML-Y 0
COVER BOLTING 15:00 14:59 ORT3-Y R-N 305 1 TG0302146 TGG 76 RO-02737 RO-2737 - GS LEAKOFF 7
07MAY04 07MAY04 DR-Y ML-Y 0
DRAIN ORIFICE 07:00 13:59 ORT3-Y R-N 306 1 TG0302114 TGG 76 SC-1A SC-1A - CONDENSER 10 07MAY04 07MAY04 DR-Y MLY 777 INTERNAL INSPECTION 07:00 16:59 ORT3-Y R-N rGo rGo GQ0 rGO rO TG TG C39659NSTALL X-UNDER UNE MHX-22ANd MSR CROSSUNC 966dNSTAlfL X-UNDER UNE HX-22BID MSR CROSSUNC Z114BCON6 FINAL INTERNAL ICONDEN<ER (DEAERATING 02115jCONv FINAL INTERNAL 1211 CONDENSER (DEAERP
.8377BHX-023B - CLOSE TURE 2 139 TRBINE 403278GAS LEAK DOWN STRE IIHIGH PRESSURE TURBINI IRIFICE INSPECTtON 3-01 HP TURBINE;INTRASTAGE DR LUSHING FIXTURE (MS-2729)
ER PIPING DRAIN CONTROL02139(
LUSHING FIXTUqE (MS-2730)
ER PIPING DRAIN CONTROL02139f INSP (1A) 0302114 INSP (1B)
TING)
NE LUBE OIL cObLER LUBE OIL COOLtR AM OF TEST SOLENOID 0302153 IN ORIFICE 10327h Tl)RBINE GENE TG-XUND-FLI 0302141 T00302145R 0302145; TG-3 HIGH PRESSURE TURBIN HIGH P4ESSURE TURBINI TG0302146f
- -01 HP TURB GLAND STEAM L TG03021 COIN TG0302147f
- r n4m upn Ion fm Aki ISH CROSSUNDEW PIPING ns
_§ Urn
)-
2722 - GS INLET AT HP ORIFICE I SPECTION
_UGLAND STEAM INLET DRA N AT HP TURB
) 940RECONNECT MS INLET PIPING TO HP TURBIN
- 030215 G.3 08oTIGHTE4 HP CYUNDER C 1ER BOLTING E
Fnl l
0-2737 - GS LEAIOFF DRAIN ORIF SPECTIO EAKOFF DRAIN ORIFICE0302146 14SC-1A - CONDEkJSER INTERNAL ISPECTION (1A DENSER (DEAERhTING)03021 I
- 0-2738 - GS LEAKOFF DRAIN ORIFI E INSPECTION h0TFA&& I CAWP=F MOAM nAlIr f n4A-AL 307 1
TG0302147 TGG 76 RO-02738 RO-2738 - GS LEAKOFF nDAIKM nIrlrs 7
07MAY04 10MAY041 DR-Y MLY 4A1 nn 4f A,.
I nTqV OL 18
_ unnfl.
m_
- u.
K-s IWI nr S lDu1L J
%J oflS~
L Il-J tIr sfl u
sunIr S.
c JUL -
8 I rW I
E I E 'u I
I 308 l 1j CL-2B NCC i
CL 2B MODE 6 TO MODE 5 529 25APR04 19MAY04 DR-N ML-N 0
- BMODE 6 TOIMODE 5 CHECK I
K CHECKLIST 08:OOA 04:59 ORT3-N R-N Run Date 05MAY0413:16l LT-03 STANDARD PUBLICATION Sheet 18 of 22
© PrImavera Systems, Inc.
I FL-03 Execution Publication Set I
afterO5MAY04 12:00 U1R28 WORKING SCHEDULE I
after 05MAY04 12:00
- Ul ID lRESPl WC)
EQID DESCRIPTION RD ES EF RISK WedI5 MAY F17 SI
-JI I
jOl '112,14,16A
,122210, 2 4, 6, 8 *1012,14,16118,2022i 0, 2, 4. 6* 68.1 Oil2,141,16,1 I
_I 30 1 CL-2E S
O CLM 2E__MODE_3_TOMODE__2_501_02MAY04_26MAY04__DR-NML-N 3091 I CL-21E wCC CL 2E MODE 3 TO MODE 2 CHECKLIST 501'1 02MAY04 1 26MAY04 I DR-N ML-N 19:OOA 08:59 ORT3-N R-N
-I.
mann-yr TainnF 7 tEuFt*If IT n'1I 4
.9-310 1 CL-2F wcc CL 2F MODE 2 TO MODE 1 CHECKLIST 521 02MAY04 I 27MAY04 DR-N ML-N 19:00A 04:59 ORT3-N R-N n9-I 311 1
T-0475-R WCC SC-955 1 SC SC-955 IC REV0-1 1
05MAY04 05MAY04 5
12:00 12:59 312 1 T-8439-R WCC RC-526B 1 RC RC-526B MM 1 05MAY04 05MAY04 324 REV0-1 12:00 12:59 313 1 T-8378-R WCC P-2A 1 CV P-2A MM REV0-1 2
05MAY04 05MAY04 DR-N ML-N 134 12:00 13:59 ORT3-N R-N 314 0 T-8731-R WCC K-26 0 EBA K-26 MM REV0-1 1 05MAY04 05MAY04 598 15:00 15:59 315 1 T-2078-R WCC CW SYSTEM I CW CW SYSTEM EPT I
05MAY04 05MAY04 113 REV0-1 16:00 16:59 316 1 T-2622-R WCC Y-04 I Y Y-4 EM REV0-1 1 05MAY04 05MAY04 0
16:00 16:59
,3S7 1 T-6919-H WCC D72-17-03 1 125V IWP 00-037-01 1 05MAY04 05MAY04 (D
EM REVO-1 16:00 16:59 318 1 T-7048-H WCC P-28B 1 CS P-28B EM REV2-1 I
05MAY04 05MAY04 DR-Y ML-Y 0
16:00 16:59 ORT3-N R-N 319 1 T-8806-H WCC S-6050A 1 IOPS S-6050A IC 1 05MAY04 05MAY04 0
REV1-1 16:00.
16:59 320 1 T-8808-R WCC P-28B 1 CS P-28B EM 1 05MAY04 05MAY04 DR-Y ML-Y 142 REV0.3-1 16:00 16:59 ORT3-N R-N 321 1
T-8765-R WCC POS-2544B 1 FD POS-2544B IC I
05MAY04 05MAY04 129 REV0-1 17:00 17:59 322 1 T-8826-R WCC S-6050A I IOPS S-6050A IC 1 05MAY04 05MAY04 396 REV1.1-1 17:00 17:59 323 1 T-7048-R WCC P-28B 1 CS P-288 EM REV2-1 3
05MAY04 06MAY04 DR-Y ML-Y 123 22:00 00:59 ORT3-N R-N 324 1 T-8771-R WCC CV-1296 1 CV CV-1 296 MMV 1 06MAY04 06MAY04 0
REV2-1 00:00 00:59 325 1 T-2724-R WCC C-703 1 TLJ C-703 EM REV0-1 2
06MAY04 06MAY04 149 01:00 02:59 L-ODE 2 TO MODE 1 CHECKUST 7-04 R1 SC SC.955 IC REVO-1 r1 SC SC-95 IC REVO-1001041 5 r^
R1 RC RC.>268 MM REV0.1 1 RC RC-52,B MM REVD-1001 39 83 1 CV P-2A MM REV0.1 I
1 CV P-2A:MM REVO-1 00183 8 T 1 EBA K-26 MM REVO-1 I
001 73110 EBA K-26 MM REVO-1 T-75-ICW CW SYSTEM EPT RW0-1 0C 207A 1 CWiCW SYSTEM EPT REVD-1 T-224?YYY4'EMREV0-1 0
262 1 Y Y 4 EM REV0-1 I
T4 919.I 125V IWP 00-037.01 EM REVO-1 0 691 1 125V IWP 00-037-01 E REVO-1 T-. US.H1 CS P-,28 EM REV2.1 0 704I1 CS P-28B EM REV2-11 T
064-IOPS S-6050A IC REVI.I 0 880611 IOPP S-6050A IC REV -1 T
08.R1 CS P-28B EM REV0.3-1 0o 880;1 CS P-28B EM REV0.3-1 I
765-FD ?OS-2544B IC RE 0-1 01876 1 FD POS-2544B IC RE 0V-1 826 1lOPs S-6050A IC REV.1-1 o018;s41 101S S-6050A IC RE'1.1-1 T-7048RlC P-28B EM FEV2.1 001704in 1 CS P-28B EM REV2-1 T-8771.RICV CV-129 MMV REV2.1 0011771111 CV CV-1216 MMV REV2.1 T.1724 I TU C.703 'M REV0.1 001272U1 TU C-73 EM REVO-1
- T.8188.W TU TG
.I-T REV10-1
06MAY04 06MAY04 03:00 I 03:59 51 IJ
_ _ _ _ _ _ _ _ _ _ _ _ _ _ L.. I _ _ _ _ _ _
Run Date 05MAY04 13:16 LT.03 STANDARD PUBLICATION Sheet 19 of 22 0 Prlmavera Systems, Inc.
FL-03 Execution Publication Set
after O5MA Y04 12:00 U1R28 WORKING SCHEDULE I
after 05MAY04 12:00 I
I RD-MAY
- 'u to EI D I
ESCRIPTIO~N RD ES EF RISKTu6Fi7 I
ID~
EP I
10 11, 221.24
.811,461,020
.6 1141.
~mi______ I 327l 1 T-9668-R wcc C-2 1 CONT C-2 MM REV1-1 1
06MAY04 06MAY04 06:00 06:59 62 328 1 T-6919-R WCC D72-17-03 1 125V IWP 00-037-01 1
06MAY04 06MAY04 a
EM REV0-1 09:00 09:59 329 1 T-1643-H WCC RMP-9133 1 AF RMP-9133 EM I
06MAY04 06MAY04 267 REVO-1 12:00 12:59 330 1 0135AGOZ-8 WCC G-01 IWP-037-01 ALIGN G01 1
06MAY04 06MAY04 DR-N ML-N 16 TO lA05 PER 01-35A 13:00 13:59 ORT3-N R-N 331 1 T-2709-R WCC MS-2018 1 MS MS-2018 MMV 1
06MAY04 06MAY04 28 REVO-1 14:00 14:59 332 1 T-7109-H WCC TG-01G I TLI TG-01-G EM 1
06MAY04 06MAY04 DR-Y ML-Y 0
REV4-1 14:00 14:59 ORT3-Y R-N 333 1 T-7149-H WCC 1F52-122 1 345KV lF52-122APS I
06MAY04 06MAY04 DR-N ML-N 2
REV3-1 14:00 14:59 ORT3-Y R-N 334 1 T-3310-R WCC P-001A-M 1 RC P-1A-M RMP 1
06MAY04 06MAY04 10 9002-1 EM REVI-1 15:00 15:59
&35 1 T-7108-R WCC TG-01-G 1 TU TG-01-G EM 1
06MAY04 06MAY04 DR-Y ML-Y 0
O REV3-1 15:00 15:59 ORT3-Y R-N 336 1 T-7941-R WCC MS-2084 1 MS MS-2084 REVO-1 2
06MAY04 06MAY04 38 15:00 16:59 337 1 T-8885-R WCC SI-00871A 1 SI SI-871A EM REV2-1 3
06MAY04 06MAY04 DR-Y ML-Y 0
15:00 17:59 ORT3-Y R-N 338 1 T-8809-R WCC TG-01-T 1 TU TG-01-T REV8.1-1 1
06MAY04 06MAY04 0
16:00 16:59 339 1 T-6930-H WCC 072-16-07 1 125V IWP 00-037-03 3
06MAY04 06MAY04 0
EM REVO-1 17:00 19:59 340 1 T-8874-R WCC T-34A I SI T-34A MMV REV2-1 I
06MAY04 06MAY04 332 19:00 19:59 341 1 T-8598-R WCC WG-1788-O 1 WG WG-1788-0 MM 1
06MAY04 06MAY04 DR-Y ML-Y 38 REVO-1 20:00 20:59 ORT3-N R-N 342 1 T-8599-R WCC WG-1789-0 1 WG WG-1789-O MM 1
06MAY04 06MAY04 DR-Y ML-Y 38 REVO-1 20:00 20:59 ORT3-N R-N 343 1 T-7109-R WCC TC-01-G I
06MAY04 06MAY04 DR-Y ML-Y REV4-1 21:00 21:59 ORT3-Y R-N IT-9668 I cc OOO966R1 C T-6919-IR 0016919 T-16 001 0135A
- 1
.1 AF RMP-9133 EM REVO-1 164311 AF RMP-9133 EM REV0-1 302.WP-O37-O1 'LUGN G01 TO lA f691941 125V IW, 00-037-01 EM RE
.2709-RI MS MS-2018 MMV REVO-1 01270911 MS MSt2018 MMV REVO-
.7109.IjLTU TG-01 -G EM REV4-1 017109I1 TU TG 1-G EM REV4-1
-7149-Hi 345KV 1t52-122 APS REV.
01714911 345KV,%F52-122 APS REI T-3310 RC P-1^-M RMP 9002-1 E 001331 Il1 RC P41A-M RMP 9002-1 T-7108 1 TU TG-bi.G EM REV3-1 00171 Ii TU T-01-G EM REV3-1 T-79414 MS MSL2084 REVO-1 0017941 MS MS-2084 REV0-1 T-88854 SI SI-8t1A EM REV2-1 0018881 SI SI-871A EM REV2-T-8809. I TU T01 -T REV8.1-1 001 8084i1 TUtG-01-T REV8.1-1 T-6930-HI 125Y IWP 00-037-03 EI 0016930=1:125V IWP 00-037-T-8874RIS* T-34A MMV REV.
001887411,SI T-34A MMV RE T-8598.RIWG WG-1788-O 001859E1 WG WG-1788-0 T 8599-Ri:WG WG-1789-O0 0018599(1 WGWG-1789-O T-7109.R1 TU TG-01 -G EM 001710921 TU TG-01-G El T-7150.- 1 345KV 1F52-122 001715(11 345KV 1F52-12 15 PER 01-35A tVo-V-1 3-1 M REVI-1 EM REV1-1 I
A REVO-1 33 EM REV0-1 t-1 V2-1 M REVO-1 MM REV0-1 M REV0 1 MM REV0-1 REV4.1 p REV4-1 APS REV2-1 2 APS REV2-1 344 1 T-7150-H wCC 1F52-122 1 345KV 1F52-122 APS 1
06MAY04 06MAY04 REV2-1 21:00 21:59 0
Run Date 05MAY04 13:16i LT-03 STANDARD PUBLICATION Sheet 20 of 22 O Primavera Systems, Inc.
I FL-03 Execution Publication Set I
I
after 05MAY04 12:00 I
U1R28 WORKING SCHEDULE after O5MA Y04 12:00
- j U ID EQID DESCRIPTION RD ES EF l
RISK MF Wed 5 I
IIII C
CY
_M14,1612G2210.2.
MAY Thu 6 Fri 7
.1 i 9.qA1 RI.9fl99l n.9. A. A. A i.1Ah19.R.11 345 1
T-7783-H wCC TG7Ot-G I TU TG-01-G EM REV4.1.1 I 106MAY04 1 06MAY04
_ 21:00 21:59 90 I
346 1
T-7147-R WCC 1F52-122 1 345KV 1F52-122APS I
06MAY04 06MAY04 112 REVI-1 22:00 22:59 347 1
T-8001-R WCC B52-429DL 1 480V B52-429DL/DR 1
07MAY04 07MAY04 461 EM REVO-1 00:00 00:59 348 1
T-7373-R WCC Z-8 1 TU Z-8 TGG REVO-1 1
07MAY04 07MAY04 861 03:00 03:59 349 1 T-7043-R WCC P-028A-M 1 CS P-28A.M EM 1
07MAY04 07MAY04 DR-Y ML-Y 0
REVO-1 04:00 04:59 ORT3-Y R-N 350 1
T-7047-H WCC P-028A-M 1 CS P-28A-M EM 1
07MAY04 07MAY04 DR-Y ML-Y 0
REV1-1 04:00 04:59 ORT3-Y R-N 351 1
T-0964-H WCC 62VA01 1 MRR 62VA01 RMP 1
07MAY04 07MAY04 1
9302-1 EM REVO-1 05:00 05:59 352 1
T-8806-R WCC S-6050A 1 IOPS S-6050A IC I
07MAY04 07MAY04 360 REV1-1 05:00 05:59
,3§3 2
T-7690-H WCC P-011A 2CC P-IA MM REVO-1 1
07MAY04 07MAY04 0
08:00-08:59 354 1 T-7047-R WCC P-028A-M 1 CS P-28A-M EM 1
07MAY04 07MAY04 DR-Y ML-Y 77 REVi-1 09:00 09:59 ORT3-Y R-N 355 1 T-3180-H WCC P-001A-M 1 RC P-1A-M BALANCE I
07MAY04 07MAY04 0
EM REV0-1 10:00 10:59 356 1 T-1832-R WCC HX-15B 1 VNCC HX-159 MM 2
07MAY04 07MAY04 0
REVI-1 10:00 11:59 357 1 T-2086-R WCC EM REV1-1 I RDC EM REV1-1 2
07MAY04 07MAY04 72 11:00 12:59 358 1 T-6930-R WCC D72-16-07 1 125V IWP 00-037-03 1
07MAY04 O7MAY04 0
EM REVO-1 12:00 12:59 359 1 T-7433-H WCC MR 01-128 1 480V MR 01-128 1
07MAY04 07MAY04 4
1B52421B (SI-850B) 12:00 12:59 360 1 T-7590-R WCC MR 01-128 1 480V MR 01-128 1t-42 2 07MAY04 07MAY04 a
BUS BRACING EM 12:00 13:59 361 1
T-9669-R WCC CW SYSTEM 1 CW CW SYSTEM MM 3
07MAY04 07MAY04 61 REVO-1 12:00 14:59 1;345KV 1F52-122A I 480V B52-429D01 I
IIIC 1Cs 1Cs j I MRR 62/AO1 RI 1101 IlI T-7783.W TU TG-01-G EM 0017783;1 TU TG-01-G E T.7147.RE345KV 1F52-1 PS REV1-1001714t1 T48001-R1 480V B52-4290 REM REVO-1 00180011 T -7334ITU Z-8
- 0017373U1 TUZ T.7043-R1 CS P-2 P-28A-M EM REV1- 00170431 YT-7047441 CS P-2E P-28A-M EM REV1-1 00170471 T-0964-H1 MRR 62tA01 RMP 93 P 9302-I EM RE'0.1 0010964 t-8806-R1 IOPS S6 S S-6050A IC REV1 01oo880(
- T-7690sH2 CC P.
2 CC P-11A MM REVO-1 001769d1 T-7047-R1 CS P-28 1 CS P-28A-M EM REV1-1 0017047 T-3180-Hi RC P-IA-M BALA
- -1A-M BALANCEFM REVO-1001311 T-j 832-R1 VNCC HX-1 VNCC HX-15B MM REV1-100118, T-2086-R1 I I RDC EM REV1-1 0012 T-6930-R1 125V IWP 00-0:
125V IWP 00-037-03 EM REVO-1 001 i1 480V MR 01-12; 1B52-421B (St8!
B52-421B (Sl-850B) OPS REV0-1 001 R1 480V MR 01-12b 8-B42 BUS BRAC I B42 BUS BRACItOG EM REV0-1 001 T-9619-R1 CW CW SYS 1 CW CW SYSTEM MM REV0-1 00c T-0964-R1 MkR 62VA01 RMP 93
&R 621AOl RMP 93p2-1 EM REV0-1 0(
REV4.1-1 I REV4.1-1 2 APS REV 1-JOR EM REVO-tGG REV0-1 3 TGG REVO-1 A-M EM REVO-1
&MEM REV1-1 12.1 EM REVO-1 050A IC REVI-1 21A MM REV0.1 A-M EM REVI-1 CE EM REVO-'
58 MM REVI-DC EM REV1-7-03 EM REVO 193(1 OB) OPS REVC 74331 ING EM REVO-1 59 ME MM REVO-66in I)2.1 EM REV0-1 09g4 1 RC I
I T77433-480V MR 01-1281 T-7590 1 480V MR 01-128 I MI 362 1I I
T-0964-R WCC 621A01 I MRR 62A01 RMP 9302-1 EM REV0-1 I
07MAY04 07MAY04 DR-Y ML-Y 13:00 13:59 ORT3-Y R-N 82 I I I_
_ _ _ _ _ _ _ _ _ __I_
I I_
I_
_ _ _ _ +/- _ _ _ _ _ _ _ _
I.
..L...UI l
Run Date 05MAY04 13:16l LT-03 STANDARD PUBLICATION Sheet 21 of 22 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
after O5MA Y04 12:00 I
U1R28 WORKING SCHEDULE after 05MAY04 12:00 U
ID lRESP WO EQID DESCRIPTION RD ES EF RISK MF MAY STj Wed 5 Thu 6 Fri 7 I I I ST l
_~~~1 Z.1O21I6,I S2a221 0. 2.4.6.8.lO12,l4l6 18,2(22I O. 2. 4.6. 8.101121416,1 363 1
T-3180-R WCC P-001A-M 1 RC P-1A-M BALANCE 1
07MAY04 07MAY04 552.
T-31 80R1 RC P-1A-M BALA CE EM REVO-EM REVO-1 13:00 13:59 1 RC P-1A-M BALANCE EM REV0-10 13184 364 1
T-3322-R WCC P-401A-M RC P-IA-M RMP 9002-1 1
07MAY04 07MAY04 0
T.33224AC P.IA-M RMP 90 2-1 EM REV2-1 EM REV2-1 13:00 13:59 1 C P-1A-M RMP 90P2-1 EM REV2-10 13322 365 1
T-2407-H WCC RMP 1 4.16KV RMP 9364.1 1
07MAY04 07MAY04 0
T-2407.
4.16KV RMP 9364-1 UMBIUCAL C RD EM REVO-1 UMBILICAL CORD EM 14:00 14:59
- 1 4.16KV RMP 9 64-1 UMBILICAL LORD EM REVO-1 012407!M 366 2 T-7690-R WCC P-O1 IA 2CC P-1 1A MM REVO-1 1
07MAY04 07MAY04 0
- T.7690-R 2 CC P-IA MM REVO-1 15:00 15:59 5
2Cq P-I IA MM REVO- 001769c1 367 1 T-7441-H WCC MR 01-128 1 480V MR 01.128 1
07MAY04 07MAY04 0
T-744.1 11 480V MR 01-128 1B52-424J (CC.7 86) OPS REVO
_1B52-424J (CC.738B) 16:00 16:59 1 480V MR 01 1281B52-424J (C&-738B) OPS REV 100174411 368 1 T-7471-H WCC MR 01-128 1 480V MR 01-128 1
07MAY04 07MAY04 DR-Y ML-Y 0
T.7471-H 480V MR 01-128 jB52-4210F (SW-2 80) OPS REVO I B52-421 OF (SW-2880) 17:00 17:59 ORT3-Y R-N I 480V MR 01 128 1B352-4210F (SW-2880) OPS RE 0-1 0017471,1 369 1 T-7484-H WCC MR 01-128 1 480V MR 01-128 1
07MAY04 07MAY04 DR-Y ML-Y 0
T-7484-H1 480V MR 01-128 IB52-4210C (SW-2 08) OPS REVO 1B52-4210C (SW-2908) 17:00 17:59 ORT3-Y R-N 1 480V MR 01 128 1B52-4210C (tW-2908) OPS RE 10-10017484 370 1 T-0460-H WCC
. MS-5958 1 MS MS-5958 IC 2
07MAY04 07MAY04 21
T-8606-R1 SWTURB E OPS REV1.
REV1-1 17:00 LNM19:59 1 SWWTURBINE OPS R4j1. 001860 Run Date 05MAY04 13:16j LT-03 STANDARD PUBLICATION Shoot 22 of 22 C Primavera Systems, Inc.
IFL-03 Execution Publication Set