Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island Task No.:
0010120101 Task
Title:
Perform Reaulatina Group Transfer JPM No.:
2005 NRC JPM A Operations tolfrom the Auxiliary Power SUDDI~
WA
Reference:
001 2.1.23 3.9 / 4.0 Facility Bank JPM 013 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testin&
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
0 The Reactor is at 100% power.
0 Group6 control rods were transferred to the Auxiliary Power Supply IAW OP-TM-622-451, Transferring Rods to Aux Power Supply, while technicians completed a surveillance procedure on the Group-6 normal programmer.
ICs was placed in TRACK with the Feedwater Loop Masters, the Diamond Rod Control Panel, the Reactor Master, SG/Rx Master and the SG N B Load Ratio all in HAND to support performance of the surveillance procedure.
The surveillance is now complete and approved, as required.
0 0
Task Standard:
Group 6 control rods are on their normal power supply, the Diamond Rod Control Station is in MANUAL, and RUN speed is selected.
Required Materials:
OP-TM-622-451 with Section 4 completed.
General
References:
OP-TM-622-451, Transferring Rods to Aux Power Supply, Revision 0 Initiating Cue:
Return all Group6 rods to their normal power supply in accordance with OP-TM-622-451, Section 5.0.
2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Job Performance Measure Form ES-C-1 Worksheet Time Critical Task:
NO Validation Time:
7 minutes 2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP Exam SetuP: IC 259 P
Initialize the trainer at IC 15, 16, or 17.
P On the console, transfer the following ICs stations to HAND:
Reactor Master e
Diamond (Manual) a SIG I Rx Master a
SG A/B Load Ratio
> Place all Group6 control rods on the Auxiliary Power Supply, and return the Diamond Rod Control Panel to MANUAL sequence mode of operation in RUN speed.
2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Page 4 of 9 PERFORMANCE INFORMATION Form ES-C-1 L
(Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Locate procedure.
Standard:
0 Locates OP-TM-622-451, Section 5.0.
0 Reviews Section 3.0 (PRECAUTIONS, LIMITATIONS, AND PREREQUISITES)
Comment:
Evaluators Cue:
Provide a copy of the procedure with Section 4.0 completed.
Performance Step: 2 Standard:
Verify MAN selected on AUTO/MAN switch.
Verifies Diamond Rod Control Panel in MAN.
v Comment:
.( Performance Step: 3 Ensure SEQ-OR selected on SEQ/SEQ/OR switch.
Standard:
Comment:
Note:
SEQ/SEQ OR pushbutton depressed and SEQ O R lamp illuminated.
SEQ lamp will remain illuminated after SEQ OR is selected.
4 Performance Step: 4 Ensure desired group selected on GROUP SEL SWITCH.
Selects 6 using the GROUP SELECT SWITCH.
Standard:
Comment:
2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Page 5 of 9 PERFORMANCE INFORMATION Form ES-C-1
.( Performance Step: 5 Ensure desired rod or ALL selected on SINGLE SELECT SWITCH.
Selects ALL using the SINGLE SELECT SWITCH.
Standard:
Comment:
.(
Performance Step: 6 Select AUXIL on GROUP-AUXIL switch.
Standard:
Comment:
GROUP / AUXIL pushbutton depressed and AUXIL lamp illuminates.
4 Performance Step: 7 Ensure JOG speed selected.
Standard:
Selects JOG using the JOG/RUN speed selector switch.
Comment:
Performance Step: 8 Standard:
Verifies SY lamp illuminated.
Verify SY lamp comes ON.
Comment:
4 Performance Step: 9 Press CLAMP and verify CLAMP light on.
Standard:
Comment:
2005 NRC JPM A Depresses CLAMP / CLAMP REL push-button and verifies CLAMP lamp illuminates.
NUREG 1021, Revision 9
Appendix C Page 6 of 9 PERFORMANCE INFORMATION Form ES-C-1 4 Performance Step: 10 Press MAN Trans.
Standard:
Depresses MAN TRANS pushbutton and verifies all Group 6 CONTROL ON lights extinguished.
Comment:
Performance Step: 11 Standard:
If no rods remain on Aux Power Supply, then verify TR CF lamp OFF.
Verifies TR CF lamp extinguished.
Comment:
Performance Step: 12 Press CLAMP REL and verify CLAMP REL lamp ON.
Standard:
Depresses CLAMP / CLAMP REL push-button and verifies CLAMP REL lamp illuminates.
Comment:
.( Performance Step: 13 Select GROUP on GROUP/AUXIL switch.
Standard :
Depresses GROUP / AUXIL push-button and verifies GROUP lamp illuminated and SY lamps extinguished.
Comment:
Performance Step: 14 Standard:
Place SINGLE SELECT SWITCH to OFF.
SINGLE SELECT switch rotated to the OFF position Comment:
2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Page 7 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 15 Place GROUP SELECT SWITCH to OFF.
Standard:
GROUP SELECT SWITCH switch rotated to the OFF position.
Comment:
Performance Step: 16 Press TRANS RESET.
Standard:
Depress TRANS RESET push-button and/or verifies TRANS RESET lamp illuminated.
Comment:
Performance Step: 17 following:
If no rods remain on the Aux Power Supply, then perform the 0
Verify transferred group Diamond Panel CONTROL ON lamp OFF Standard:
Comment:
0 Verify TRANS RESET lamp ON.
Verifies Group 6 CONTROL ON lamp is extinguished and TRANS RESET lamp is illuminated.
.(
Performance Step: 18 Select RUN speed.
Standard:
RUN /JOG speed selector switch rotated to the RUN position.
Comment:
Terminating Cue:
When the candidate reads GO TO controlling procedure:
this JPM is complete.
STOP TIME:
2005 NRC JPM A TIME CRITICAL STOP TIME:
NUREG 1021, Revision 9
Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2005 NRC JPM A Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiner's Signature:
Date:
2005 NRC JPM A NUREG 1021, Revision 9
Appendix C Page 9 of 9 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
The Reactor is at 100% power.
Group6 control rods were transferred to the Auxiliary Power Supply IAW OP-TM-622-451, Transferring Rods to Aux Power Supply, while technicians completed a surveillance procedure on the Group4 normal programmer.
ICs was placed in TRACK with the Feedwater Loop Masters, the Diamond Rod Control Panel, the Reactor Master, SG/Rx Master and the SG N B Load Ratio all in HAND to support performance of the surveillance procedure.
The surveillance is now complete and approved, as required.
0 0
INITIATING CUE:
\\.-
2005 NRC JPM A Return all Group6 rods to their normal power supply in accordance with OP-TM-622-451, Section 5.0.
NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1
~~~
~
Facility:
Three Mile Island Task No.:
004C030101 Task
Title:
Manuallv Initiate the Engineered JPM No.:
2005 NRC JPM B Safeguards Actuation Svstem K/A
Reference:
006 A4.07 4.4 / 4.4 Facility Bank JPM 165 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testinrr:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
L Initial Conditions:
0 0
A loss of off-site power caused a reactor trip from 100% power.
RCS leakage has been steadily rising since the reactor tripped.
The crew has just implemented RULE 1, Loss of Subcooling Margin.
Task Standard:
HPI manually initiated with all available flow to the RCS.
Required Materials:
OP-TM-EOP-010, RULE 1 OP-TM-EOP-010, GUIDE 2 General
References:
OP-TM-EOP-010, RULE 1, Loss of Subcooling Margin, Revision 3 OP-TM-EOP-010, GUIDE 2, HPI/LPI Initiation, Revision 3 Initiating Cue:
Perform the actions of RULE 1.
Time Critical Task:
N/A Validation Time:
5 minutes 2005 NRC JPM B NUREG 1021. Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 L
SIMULATOR SETUP Exam Setup: IC 258 0 100% power I/C.
0 MALF for Loss of Off-Site Power (ED 01) 0 Block AUTO and Manual ESAS Actuation (ESOlNESOl B, ES04AlES04B) 0 Introduce LOCA that will progressively lower RCS pressure to < 160W.
0 Perform EOPs (minimize cooldown such that RULE 1 will apply at FREEZE point).
0 Freeze simulator just below 160W.
0 SNAP.
02A4566-ZD1 PB1 RCA ON PBIIRCA - OFF 02A4567-ZDl PBI RBA ON PBI/RBA - OFF 03A4SOI-ZDl PBI RCB ON PBI/RCB - OFF 03A4S02-ZDl PB1 RBB ON PBIIRBB - OFF 2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION L
(Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Standard:
Verify it has been more than two minutes since RCP start.
Recognizes no power to RCPs.
Comment:
P e r f m ~ n c e Step: 2 Standard:
Ensure all RCPs are shutdown.
Verifies no RCPs running or continues based on prior step.
Comment:
Performance Step: 3 Ensure 1600# ESAS has been actuated.
Standard:
Determines RCS Pressure by depressing the MANUAL pushbuttons for 1600 psig ESAS Actuation Channels A and B.
Recognizes manual actuation failure as indicated by the three Amber RESET lights illuminated and/or no changes on the ES Status Panel. Refers to RNO column.
160W and attempts manual initiate Comment:
Performance Step: 4 Standard :
Enters GUIDE 2.
Locates copy of OP-TM-EOP-010, GUIDE 2.
Comment:
Examiners Cue:
Provide a copy of GUIDE 2.
2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 4 Performance Step: 5 OPEN MU-V-14A and MU-V-14B.
Standard:
Opens MU-V-14A and MU-V-14B as indicated by red OPEN indications illuminated on pushbutton.
Comment:
4 Performance Step: 6 Ensure 2 MU Pumps are operating in the ES mode.
Standard:
Startsherifies MU-P-1A and MU-P-1C or MU-P-1 B and MU-P-1 C running as indicated by red running lights illuminated for two pumps.
Comment:
- 4 Performance Step: 7 Open MU-V-16A and MU-V-16B and MU-V-16C and MU-V-16D.
Standard:
Opens MU-V-l6A, B, C, and D as indicated by the red OPEN light illuminated on the pushbutton for each valve.
Comment:
4 Performance Step: 8 Close MU-V-18, Standard:
Comment:
Closes MU-V-18 as indicated by the green CLOSED pushbutton illuminated.
2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 L
.I Performance Step: 9 Standard:
Comment:
.I Performance Step: 10 Standard:
Close MU-V-36 and MU-V-37.
Closes MU-V-36 and MU-V-37 as indicated by the green CLOSED pushbutton illuminated for each valve.
Start DC-P-1A and DC-P-1 B.
Starts DC-P-1A and DC-P-1 B as indicated by the red running light illuminated for each pump.
Comment:
.( Performance Step: 11 Start DR-P-1 A and DR-P-1 B.
Standard:
Starts DR-P-1A and DR-P-1 B as indicated by the red funning light illuminated for each pump.
Comment:
Performance Step: 12 Standard:
Open DH-V-SA and DH-V-5B.
Opens DH-V-5A and DH-V-5B as indicated by the red OPEN pushbutton illuminated for each valve.
Comment:
Performance Step: 13 Standard:
Start DH-P-1A and DH-P-1B.
Starts DH-P-1A and DH-P-1 B as indicated by the red running light illuminated for each pump.
Comment:
2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 L
Performance Step: 14 Standard:
Open DH-V-4A and DH-V-4B.
Opens DH-V-4A and DH-V4B as indicated by red OPEN indications illuminated on pushbutton.
Comment:
Terminating Cue:
STOP TIME:
2005 NRC JPM B When the candidate returns to RULE 1: This JPM is complete.
TIME CRITICAL STOP TIME:
NUREG 1021, Revision 9
Appendix C Page 7 of 8 form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2005 NRC JPM B Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiner's Signature:
Date:
2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
A loss of off-site power caused a reactor trip from 100%
power.
RCS leakage has been steadily rising since the reactor tripped.
The crew has just implemented RULE 1, Loss of Subcooling Margin.
INITIATING CUE:
Perform the actions of RULE 1.
2005 NRC JPM B NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island Task No.:
00580501 01 Task
Title:
Shift DHR Train A To The DHR JPM No.:
2005 NRC JPM C Omrating Mode and Initiate a Cooldown K/A
Reference:
005 A4.01 3.6 / 3.4 Facility Bank JPM 01 5, Modified Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
u Initial Conditions:
0 0
0 RC-P-1 B operating.
A plant shutdown and cooldown is in progress.
RCS temperature is 215 O F.
RCS pressure is 285 psig.
OP-TM-212-111, SHIFTING DHR TRAIN A FROM DHR STANDBY TO DHR OPERATING MODE is in progress through Step 4.7.1.
Task Standard:
DHR Train A in service with cooldown initiated and flow < 3500 gpm.
Required Materials:
None General
References:
0 OP-TM-212-111, SHIFTING DHR TRAIN A FROM DHR STANDBY TO DHR OPERATING MODE, Revision 2 TEMPERATURES, Revision 2 OP-TM-212-451, CONTROL OF DH TRAIN A FLOW AND Handouts:
0 OP-TM-212-111, signed off through Step 4.7.1 OP-TM-212-451 2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:
Beginning at OP-TM-212-111, Step 4.7.2, place DHR Train A in service for cooldown.
Time Critical Task:
NO Validation Time:
15 minutes 2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 SIMULATOR SETUP Exam Setup: IC 257 NOTE:
IC for placing DHR in service for cooldown.
All OP-TM-212-111 Prerequisites met.
Perform OP-TM-212-111 through Step 4.7.1, ENSURE DH-V-19A throttled open or OPEN.
Change PPC plant mode to Cold Shutdown - Go to operator entriedplant modeldecay heat cooling.
Heat-up and Cooldown Curve on screen.
FREEZE and SNAP.
SIMULATOR OPERATOR will be required to operate DH-V-19A and provide A 0 communications.
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Locate procedure.
Standard :
Reviews procedure provided.
Comment:
Evaluators Cue:
Provide a copy of OP-TM-212-111, signed off through Step 4.7.1.
Performance Step: 2 Throttle OPEN DH-V4A for approximately 8 seconds.
Standard:
Depresses OPEN PB for DH-V-4A for approximately 8 seconds (CLOSED light should extinguish).
Comment:
4 Performance Step: 3 Start DH-P-1A.
Standard:
DH-P-1A started as indicated by red running light illuminated.
Comment:
Performance Step: 4 Standard:
Monitor pump discharge pressure for oscillations which indicate possible vapor binding.
Verifies stable discharge pressure on DH-P-1 A.
Comment:
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 5 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 5 Standard:
If flow on DH-FI-802A exceeds 3500 gpm then throttle closed DH-V-4A to achieve 2500-3500 gpm.
Verifies flow < 3500 gpm.
Comment:
4 Performance Step: 6 Shift Decay Heat flow control to DH-V-19A as follows:
0 0
Establish communications with an operator at DH-V-19A.
If DH flow > 3100 gpm then throttle closed DH-V-19A until DH flow has dropped approximately 300 to 400 gpm.
Throttle open DH-VaA until DH flow I 3500 gpm.
Repeat previous two steps until DH-V-4A is full open and flow rate is 2500 - 3500 gpm.
0 0
Communicates/coordinates with field operator until DH-V4A is full OPEN and flow is between 2500 - 3500 gpm.
Standard:
Comment:
Evaluators Cue:
Simulator Operator Remote Function DHRl2 Note:
Simulator Operator will provide field operator communications and operate DH-V-19A.
Performance Step: 7 Standard :
Depress ALARM ON PB for Loop A on DH-l-MS to energize low flow alarm.
Depresses ALARM ON PB for Loop A.
Comment:
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 6 of 9 PERFORMANCE INFORMATION Form ES-C-1 1
Performance Step: 8 Standard:
Comment:
Evaluators Cue:
Adjust DC-V-2A and DC-V-65A as required to control temperature IAW OP-TM-212451, CONTROL OF DH TRAIN A FLOW AND TEMPERATURES.
0 0
Initiate a cooldown to 190°F. Assume that DHR Train Provide a copy of OP-TM-212-451.
A is in the operating mode per OP-TM-212-000, Decay Heat Removal System.
Performance Step: 9 Enter OP-TM-212-451.
Standard:
Reviews copy provided.
Comment:
Evaluators Cue:
Maintaining back pressure with DH-V-4A will not be required at this time.
I PerFormance Step: 10 If maintaining back pressure with DH-V-4A is not required, then open DH-V-4A and throttle DH-V-19A as necessary to maintain DH Train A flow as follows:
0 2500 - 3500 gpm as indicated by DH-FI-802A for normal DH operations.
IAW ATT. 7.1 during drained down - - -.
0 Standard:
Comment:
Condition should have been established in OP-TM-212-111.
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 7 of 9 PERFORMANCE INFORMATION Form ES-C-1
-v PROCEDURE NOTE:
Closing DC-V-2A while opening DC-V-65A will raise RCS temperature while maintaining DC System flow.
4 Performance Step: 11 Throttle DC-V-2A and DC-V-65A as necessary to maintain the following:
0 Desired RCS temperature as Indicated by DH2TI1.
Standard:
Comment:
0 Decay Closed System flow approximately 3300 gpm on Manipulates DC-V-2A and DC-V-65A to establish a temperature reduction.
DC-FI-26.
Terminating Cue:
When cooldown has been established: This JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 8 of 9 form ES-C-I VERIFICATION OF COMPLETION Job Performance Measure No.:
2005 NRC JPM C Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET v
INITIAL CONDITIONS:
0 0
0 RC-P-1 B operating.
A plant shutdown and cooldown is in progress.
RCS temperature is 215 O F.
RCS pressure is 285 psig.
0 OP-TM-212-111, SHIFTING DHR TRAIN A FROM DHR STANDBY TO DHR OPERATING MODE is in progress through Step 4.7.1.
INITIATING CUE:
Beginning at OP-TM-212-111, Step 4.7.2, place DHR Train A in service for cooldown.
2005 NRC JPM C NUREG 1021, Revision 9
Appendix C Page 1 of 7 Form ES-C-1 PERFORMANCE INFORMATION Facility:
Task
Title:
WA
Reference:
Examinee:
Facility Evaluator:
Method of testina:
Three Mile Island Unit 1 Task No.:
03900801 04 Initiate a natural circulation JPM No.:
NRC JPM D cooldown usina the OTSG Atmospheric Dump Valves (ADV).
041 A4.06 (2.9/3.1)
NRC Examiner:
Date:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Initiating Cue:
Time Critical Task:
0 Loss of off-site power resulted in a reactor trip.
0 The Emergency Diesel Generators are each providing power to their respective bus.
The RCS is borated to the cold shutdown concentration.
0 PZR Heater Bank 9 is on the Emergency Power Supply (IS 480V Bus).
0 Subcooling Margin is between 30 and 40 'F.
0 Natural Circulation and Primary to Secondary Heat Transfer have been verified.
Cooldown initiated using the Backup Loader ADV control station.
0 EOP-010, Guide 10 - NATURAL CIRCULATION EOP-010, Guide 11 - COOLDOWN RATE LIMITS LIMITS 0
EOP-010, FIGURE 1 - RCS PRESSURE-TEMPERATURE OP-TM-411-451, MANUAL CONTROL OF TBVs/ADVs, Rev. 3 Reduce OTSG pressures to establish a cooldown rate of 5 'F per hour.
Observe the limits of EOP-010, GUIDE 10 - NATURAL CIRCULATION and GUIDE 11-COOLDOWN RATE LIMITS.
No
Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION L
Validation Time:
8 minutes
Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION SIMULATOR SETUP Setup per assigned IC e
e e
e e
e e
e e
e Reactor trip due to loss of off-site power.
Both EDGs supplying their respective bus.
PZR Heater Group 9 on I S 480V Bus.
RCS borated to CSD value.
MS-V4A and MS-V-46 both in AUTO at 101 0 PSIG.
Both OTSG levels at approx. 50% on Operating Range.
RCS Pressure in normal range.
RCS temperature, PZR level, and MU Tank level stable in normal range.
Fail MS-V-4A and 48 at the current position Set the Backup Loader demands at 100%.
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk)
Performance Step: 1 Standard:
Comment:
Evaluator Cue:
Performance Step: 2 Standard:
Comment:
Performance Step: 3 Standard:
Comment:
Evaluator Cue:
Review Guide 1 O/Plant Conditions Determines limits on cooldown ratelfigure 1.
0 0
Provide a copy of GUIDE 10, GUIDE 11 and FIGURE 1.
As Control Room Supervisor, provide feedback as necessary throughout JPM performance.
Adjusts the AUTO setpoint for MS-V4A and MS-V-4B to establish a cooldown rate.
Performs actions and recognizes that neither valve responded.
It is acceptable for the candidate to begin at the next step.
Enters OP-TM-411-451.
Locates OP-TM-411-451 0
Provide a copy of OP-TM-411-451.
0 Assume that all PREREQUISITES are met.
0 (If necessary) All Auxiliary Operators are performing priority tasks.
Perfom~nce step: 4 Places MS-V-4A and MS-V-48 in HAND and adjusts the demand to establish a cooldown rate.
Standard:
Performs actions and recognizes that neither valve responded.
Comment:
Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 Standard :
Comment:
d Performance Step: 6 Standard:
Comment:
Performance Step: 7 Standard:
Comment:
Determines Backup Loader control is necessary.
Moves to Step 4.3 and reads NOTE: B/U Loader pushbutton selects both MS-V-4A/B thumb wheels for control.
VERIFY MS-V-4A and MS-V-4B Backup Loader demands are set for 0% demand or equal to currenthequired ICs station demands (CC).
Adjusts the settings to ZERO or matches ICs demand.
PRESS B/U LOADER pushbutton Presses BIU LOADER pushbutton
.I Performance step:
- MAINTAIN Turbine Header pressure within limits by adjusting MS-V-4A andlor MS-V4B BIU Loader thumb wheel.
Standard:
Comment:
Terminating Cue:
Adjusts MS-V-4A and/or MS-V-46 B/U Loader thumb wheel to establish a cooldown rate 550 "F/hour.
When the candidate is in control of the cooldown rate: This JPM is complete.
Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: TMI 2005 NRC JPM D Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiner's Signature:
Date:
Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
0 0
0 0
Loss of off-site power resulted in a reactor trip.
The Emergency Diesel Generators are each providing power to their respective bus.
The RCS is borated to the cold shutdown concentration.
PZR Heater Bank 9 is on the Emergency Power Supply Subcooling Margin is between 30 and 40 'F.
Natural Circulation and Primary to Secondary Heat Transfer have been verified.
(1 s 4aov BUS).
INITIATING CUE:
Reduce OTSG pressures to establish a cooldown rate of 5 "F per hour. Observe the limits of EOP-010, GUIDE 10 - NATURAL CIRCULATION and GUIDE 11-COOLDOWN RATE LIMITS.
Appendix C
~
~~
Job Performance Measure Form ES-C-1 Worksheet Facility:
Three Mile Island u
Task No.:
0220070401 Task
Title:
Perform the Rewired Actions If JPM No.:
2005 NRC JPM E Containment Temperature Cannot Be Controlled Within SDecific Limits KIA
Reference:
022 A4.04 3.1 13.2 Facility Bank JPM 079 Examinee:
Facility Evaluator:
Method of testincl:
NRC Examiner:
Date:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Task Standard:
Required Materials:
General
References:
Initiating Cue:
Time Critical Task:
L Validation Time:
2005 NRC JPM E The Plant is at 100% power.
ICs is in full AUTO.
There is a small steam leak inside Containment.
The Director, Operations is informed of the situation.
RB Emergency Cooling is initiated with system pressure maintained 55-60 psig.
1104-38, Section 3.2 1 104-38 Reactor Building Emergency Cooling Water System, Rev. 57 The Control Room Supervisor has directed you to initiate Reactor Building Emergency Cooling with RR-P-1A and the A Cooler using 1 104-38, Reactor Building Emergency Cooling Water System.
NIA 10 minutes NUREG 1021, Revision 9
Appendix C Job Performance Measure FOITII ES-C-1 Worksheet SIMULATOR SETUP Exam Setup: IC 256 IC-17 MALFUNCTIONS:
0 0
0 0
MSOZA at 0.1 % severity MSOZB at 0.1 % severity RW08 at 0% severity (to close RR-V-6)
Reduce power as necessary to maintain power less than 100%.
0 FREEZE the simulator.
2005 NRC JPM E NUREG 1021, Revision 9
Appendix C
~
Page 3 of 8 PERFORMANCE INFORMATION Form ES-C1 v
(Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Locates procedure.
Standard:
Determines 1104-38, Section 3.2 applies.
Comment:
Evaluators Cue:
0 0
Provide a copy of 1104-38, Section 3.2 only.
Assume that all Section 2.0 LIMITS AND PRECAUTIONS are met.
PREREQUISITES 3.2.1.1 and 3.2.1.2 are met 0
Performance Step: 2 Standard:
Verifies via Evaluator Cue.
Verify system aligned for E.S. standby per 3.1.1 and 3.1.2.
Comment:
Examiners Cue:
2005 NRC JPM E Reactor Building Emergency Cooling Water is aligned for E.S. standby.
NUREG 1021, Revision 9
Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Procedure Note:
Performance Step: 3 Evaluators Cue:
Standard:
Comment:
Evaluator or Booth Operator Cue:
Performance Step: 4 Standard:
Comment:
Evaluator or Booth Operator Cue:
4 Performance Step: 5 Standard:
Comment:
2005 NRC JPM E Unless starting of RR Pumps is for emergency operations, verify NS-V-8 and NS-V-85 are closed prior to starting.
Close NS-V-85 and insure NS-V-8 is closed.
(If necessary) This is NOT an emergency situation.
Contacts A 0 to close NS-V-85 and verify NS-V-8 is closed.
NS-V-85 is closed and NS-V-8 is closed.
Contacts A 0 to checkherify RR-P-1A packing leak off.
Verifies via Evaluator Cue.
Packing leakoff on RR-P-1A is sufficient to maintain gland temperature < 200°F.
Start RR-P1A and insure recirc valve RR-V-1OA opens.
0 RR-P-1A started by rotating the extension control in the clockwise direction and verifying red light illuminated on CC.
RR-VIOA verified open by amber light illuminated on PCR.
(4 NUREG 1021, Revision 9
Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 4 Performance Step: 6 Open RR-V-3A.
Standard:
RR-V3A opened by depressing the OPEN pushbutton and verifying red OPEN light illuminated.
Comment:
4 Performance Step: 7 Open RR-V-4A.
Standard:
RR-V-4A opened by depressing the OPEN pushbutton and verifying red OPEN light illuminates.
Comment:
4 Performance Step: 8 Open RR-V-1A and insure RR-V-1 OA shuts.
Procedure Caution:
Maintain single RR Pump flow (as indicated by total of Computer Points A1049, A1050 and A1051) less than or equal to 5800 gpm if ISPH Pump bay water level (as indicated by SR-LI-1172) is > 277 or less than or equal to 5600 gpm if bay water is I 277. This assures adequate NPSH is achieved, especially if RR-V-6 fails open or if RR-V-5 is throttled open to control backpressure. Normal ISPH Pump bay water level is > 277.
Standard:
Comment:
Evaluators Cue:
0 RR-V-1A opened by depressing the OPEN pushbutton and verifying red OPEN light illuminates. (4)
RR-V-1OA verified closed as indicated by blue light illuminated.
0 ISPH Pump Bay Water Level is 280.
2005 NRC JPM E NUREG 1021, Revision 9
Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION
\\~
d Performance Step: 9 Control system pressure by job button for RR-V-5 (55-60 psig) as indicated on CR, if necessary.
Recognizes RR-V-6 is failed closed.
Utilizes the RR-V-5 OPEN and CLOSE pushbuttons to maintain 55-60 psig on PI 224 while maintaining total flow I 5800 gpm.
Standard:
Comment:
Terminating Cue:
When system pressure and flow are stabilized using RR-V-5:
This JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM E NUREG 1021. Revision 9
Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:
2005 NRC JPM E Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
b
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM E NUREG 1021, Revision 9
Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET L
INITIAL CONDITIONS:
0 The Plant is at 100% power.
0 ICs is in full AUTO.
0 0
There is a small Steam leak inside Containment.
The Director, Operations is informed of the situation.
INITIATING CUE:
2005 NRC JPM E The Control Room Supervisor has directed you to initiate Reactor Building Emergency Cooling with RR-P-1A and the " A Cooler using 1 104-38, Reactor Building Emergency Cooling Water System.
NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 L
Facility:
Three Mile Island Task No.:
06480001 01 Task
Title:
ODerate the Station Blackout Diesel JPM No.:
2005 NRC JPM F Generator WA
Reference:
APE 056 AA2.37 3.7 / 3.8 Facility Bank JPM 131 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testincl:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
- Initial Conditions:
Task Standard:
Required Materials:
General
References:
\\
0 0
0 0
OP-TM-EOP-001 has been completed.
0 0
0 The plant was experiencing problems with the grid.
The Turbine tripped due to the power load unbalance relay actuating.
The Turbine Trip resulted in a Reactor Trip.
A loss of offsite power occurred 5 minutes ago.
It has been 30 minutes since the Reactor tripped.
OP-TM-AOP-020, Loss of Station Power is in progress.
The SBO Diesel Generator has energized both 1C 4160V Bus and 1 J 480V Bus and GN-P-1 is operating.
OP-TM-864-901 signed off through step 3.3.2 and all of Sections 4.1 and 4.2 marked N/A.
OP-TM-AOP-020 Attachment 1 Section 4.3 (ONLY)
OP-TM-AOP-020, Loss of Station Power, Revision 6 OP-TM-864-901, Revision 2, SBO Diesel Generator Operations, Revision 4 2005 NRC JPM F NUREG 1021, Revision 9
Appendix C
~~
Job Performance Measure Form ES-C-1 Worksheet L
Initiating Cue:
The Control Room Supervisor has directed you to energize 1 C 41 60V Bus in accordance with OP-TM-864-901, SBO Diesel Generator Operations, Section 4.3.
Time Critical Task:
NO Validation Time:
15 minutes 2005 NRC JPM F NUREG 1021, Revision 9
Appendix C Job Performance Measure
~~
~
Form ES-C-1 Worksheet SIMULATOR SETUP Exam Setup: IC 255 e
e e
e e
e
-.--/
e e
e e
e e
MALF to set Frequency outside of 59 - 61 HZ.
Insert the following Malfunctions to control EFW:
9 FW19A - EF-V-30A, Severity 19%.
9 FW19B - EF-V-30B, Severity 19%.
9 W19C - EF-V-30C, Severity 0%.
9 MI1 9D - EF-V-30D, Severity 0%.
9 Set Constant EGNSB05ET to 88" Return to 90" Post scenario.
Set Remote Function EGR24 to 55.
Insert Malfunction ED01, Electrical Blackout.
OPEN MU-V-14A Start MU-P-lA, DC-P-?A, and DR-P-1A.
Start IA-P-1A.
Verify IA-V-2104NB OPEN FAIL GN-P-2 ( 05A3S3 - ZDICSGNPZ (2) OFF, (5) ON)
Ensure a fire pump is operating.
Initiate Global Silence.
Freeze the Simulator.
Verify Visual Effects are enabled.
2005 NRC JPM F NUREG 1021, Revision 9
Appendix C
~
Page 4 of 10 PERFORMANCE INFORMATION
~
~~
Form ES-C-1
~
~
~
~
~~
~
(Denote Critical Steps with a check mark) u START TIME:
Evaluators Cue:
Provide a copy of OP-TU-864-901, marked up IAW instruction on the cover page.
Performance Step: 1 Standard:
Verify 1C 4160V bus is de-energized.
Reads CAUTION prior to Step 1: Starting EG-Y-4 before the loads to be applied to the 1C 4160V bus have been determined may result in diesel damage. Avoid diesel operation for an extended period of time without load.
Verifies no voltage on I C 4160V bus at meter on panel PR.
Comment:
Performance Step: 2 Standard:
Verify FS-P-1, FS-P-2 OR FS-P-3 is operating.
Verifies Fire Service header pressure on panel PL.
Comment:
4 Performance Step: 3 CLOSE Tl-C2.
Standard:
Comment:
2005 NRC JPM F Closes Tl-C2 by turning pistol grip clockwise and verifies red light illuminates.
NUREG 1021, Revision 9
Appendix C Page 5 of 10 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 4 Ensure the following breakers are OPEN:
- a.
- b.
- d.
1K-02 Standard:
Comment:
- e.
- f.
1M-02 Openskhecks open the following breakers by verifying green lights illuminated:
- a.
- b.
- d.
- e.
- f.
1M-02 SAT Performance Step: 5 Place the following breakers in PTL:
- a. CW-P-1C
- b. CW-P-1F
- c.
co-P-1c
- d. CO-P-2C
- e.
HD-P-1C Places the pistol grip in PTL for the following breakers:
- a.
CW-P-1C SAT
- b.
CW-P-1F SAT
- c.
co-P-1c SAT
- d.
CO-P-2C SAT
- e. HD-P-1C SAT Standard:
Comment:
2005 NRC JPM F NUREG 1021, Revision 9
Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION L
4 Performance Step: 6 Press SBO Diesel Generator Start PB.
Standard :
Starts SBO DG as indicated by running light illuminated.
Comment:
Note:
May request an A 0 to go to SBO diesel. Role play as necessary.
Performance Step: 7 If generator voltage is NOT between 4.1 and 4.3 KV, then adjust Unit Voltage Rheostat (SBO: Inside rear of Exciter Control Cabinet, Key 21).
Verifies voltage 4.1 KV - 4.3KV.
Standard:
Comment:
4 Performance Step: 8 If generator frequency is NOT between 59 and 61 Hz, then adjust governor.
Standard :
Comment:
2005 NRC JPM F Recognizes Generator Frequency outside band and adjusts governor to obtain 59 - 61 Hz.
NUREG 1021, Revision 9
Appendix C Page 7 of 10 PERFORMANCE INFORMATION Form ES-C-1 L
4 Performance Step: 9 Close G2-12 (EG-Y-4 output breaker).
Standard:
G2-12 is closed as indicated by red light illuminated Comment:
Evaluator's Cue:
0 When 1C 4160V Bus is energized, direct the candidate to energize 1 J 480V Bus IAW OP-TM-AOP-020, Attachment 1, Section 4.3.
0 All PREREQUISITES are met.
0 Provide a copy of OP-TM-AOP-020 Attachment 1, Section 4.3.
Standard:
Performance Step: 10 Place the following switches in PTL:
- a.
EHC-P-1B
- b. GN-P-SB C.
IA-P-4
- d. SC-P-1B The pistol grips for the following are in PTL:
- a.
EHC-P-1B SAT
- b. GN-P-SB SAT C.
IA-P-4 SAT
- d.
SC-P-16 SAT Comment:
Performance Step: 11 Standard:
OPEN 1 D TURBINE PLANT MCC Unit 4D for "SA-P-1 B" Contacts A 0 to open breaker SA-P-1 B.
Comment:
Evaluator or Booth Operator Cue:
Breaker SA-P-1 B breaker (1 D TP MCC Unit 40) is OPEN.
IC0 - OQAZOSOS-ZLOSAP 1 B( 1) GRN SAP1 B OFF 2005 NRC JPM F NUREG 1021, Revision 9
Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION
.I Performance Step: 12 Standard:
Comment:
4 Performance Step: 13 Standard:
Comment:
Terminating Cue:
If 1 C 41 60V bus is energized, CLOSE 1 J-02.
Closes 1 J-02 as indicated by red light illuminated.
When 1 J 480V bus is energized:
IAAT GN-P-2 is NOT operating, then start GN-P-1.
Using the pistol grip, starts GN-P-1 as indicated by red light illuminated.
When GN-P-1 is running: This JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM F NUREG 1021, Revision 9
Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:
2005 NRC JPM F Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM F NUREG 1021, Revision 9
Appendix C Page 10 of 10 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
0 0
The plant was experiencing problems with the grid.
The Turbine tripped due to the power load unbalance relay actuating.
The Turbine Trip resulted in a Reactor Trip.
0 0
OP-TM-EOP-001 has been completed.
0 0
0 A loss of offsite power occurred 5 minutes ago.
It has been 30 minutes since the Reactor tripped.
OP-TM-AOP-020, Loss of Station Power is in progress.
INITIATING CUE:
2005 NRC JPM F The Control Room Supervisor has directed you to energize 1C 4160V Bus in accordance with OP-TM-864-901, SBO Diesel Generator Operations, Section 4.3.
NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island Task No.:
0120090101 Task
Title:
Reset Reactor Protection JPM No.:
2005 NRC JPM G Channelk) after a Trip K/A
Reference:
012 A4.04 3.3 / 3.3 Facility Bank JPM 124 Examinee:
Facility Evaluator:
Method of testina:
NRC Examiner:
Date:
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
0 Both Main Feedwater Pumps Tripped resulting in a Reactor Trip.
Hot Shutdown conditions have been established in preparation for plant recovery.
The "A" RPS Cabinet tripped during the plant transient.
Task Standard:
"A" RPS cabinet reset.
Required Materials:
OP-TM-641-421 with Section 3.3 and steps 5.1 and 5.2 initialed.
General
References:
OP-TM-641-421, Tripping and Resetting RPS Channels, Revision 0 Initiating Cue:
The Control Room Supervisor directs you to reset RPS Channel " A IAW OP-TM-641-421. Assume that all PRECAUTIONS, LIMITATIONS, AND PREREQUISITES are met and that Steps 5.1.1 and 5.2 have been completed.
Time Critical Task:
N/A Validation Time:
10 minutes L
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP Exam Setup: IC 254 e
Any At Power Initial Condition.
a Trip the reactor (do NOT use the DSS pushbutton) and allow RCS pressure to stabilize greater than 1900 psig.
a In the A RPS Cabinet, ensure the following are tripped:
P Lo Press Trip bistable Reactor Trip Subsystem EVENT TRIGGERS:
NIA MALFUNCTIONS:
NIA REMOTE FUNCTIONS:
NIA OVERRIDES:
NIA MONITOR:
NIA I
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)
START TIME:
Performance Step: 1 Locate procedure.
Standard :
Locates OP-TM-641421 and determines Section 5.0 applies.
Comment:
Evaluators Cue:
Provide a copy of the procedure marked up in accordance with the cover page instructions.
Performance Step: 2 Perform ATTACHMENT 7.1 :
+/PN bistable.
Standard:
Verifies $/PN bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
ATTACHMENT 7.1 corresponds to JPM Steps 2 - 15.
Performance Step: 3 POWER IMBALANCE FLOW bistable.
Standard:
Verifies POWER IMBALANCE FLOW bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
Performance Step: 4 Standard:
Check HIGH BLDG. PRESS. Contact buffer.
Presses TEST Reset and/or verifies INPUT STATE lamps extinguished.
Comment:
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 5 HIGH FLUX TRIP bistable.
Standard:
Verifies HIGH FLUX TRIP bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
Performance Step: 6 FLUX > 10% FP bistable.
Standard :
Comment:
Verifies FLUX > 10% FP bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Performance Step: 7 TURB TRIP BYPASS bistable.
Standard :
Verifies TURB TRIP BYPASS bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
Performance Step: 8 W P TRIP BYPASS bistable.
Standard:
Comment:
2005 NRC JPM G Verifies FWP TRIP BYPASS bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
NUREG 1021, Revision 9
Appendix C Page 5 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 9 TURB TRIP Contact Buffer.
Standard:
If > 45% NI Power, then verify Input State Lamp OFF (N/A STEP
- NOT > 45% Power).
Comment:
Performance Step: 10 FWP TRIP Contact Buffer.
Standard:
If > 7% NI Power, then verify input State Lamp OFF (N/A Step -
Not > 7% power).
Comment:
Performance Step: 11 Standard:
SHUTDOWN BYPASS bistable.
N/A - not in S/D Bypass.
u Comment:
Evaluator Cue:
If necessary - Shutdown Bypass is NOT selected.
Performance Step: 12 HI PRESS Trip bistable.
Standard:
HIGH PRESSURE TRIP bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION b
.( Performance Step: 13 LOW PRESS Trip bistable.
Standard:
Comment:
Evaluator Note:
Momentarily depresses the reset toggle switch for LO PRESS Trip bistable and verifies reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
When this step is performed the RTM sub-system trip lamp will go dim.
Performance Step: 14 PRESSmEMP trip bistable.
Standard:
Pressureflemperature trip bistable reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
Performance Step: 15 HI TEMP Trip bistable.
Standard:
Verifies HIGH TEMPERATURE TRIP reset as indicated by the OUTPUT STATE and OUTPUT MEMORY lamps illuminating in the DIM condition.
Comment:
.( Performance Step: 16 Press Reactor Trip Module (RTM) SUBSYSTEM Reset Switch.
Depresses reset toggle switch for Channel A.
Standard:
Comment:
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 17 Verify the following:
0 0
RTM SUBSYSTEM TRIP lamp dim.
PROTECTIVE SUBSYSTEM lamp on outside of each RPS cabinet is dim.
Standard:
0 Verifies RTM SUBSYSTEM TRIP lamp dim.
0 Verifies PROTECTIVE SUBSYSTEM lamp on outside of each RPS cabinet is dim.
Comment:
Terminating Cue:
After verifying lamps outside Channel A cabinet(s): This JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 u
Job Performance Measure No.: 2005 NRC JPM G Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM G NUREG 1021, Revision 9
Appendix C Page 9 of 9 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
Both Main Feedwater Pumps tripped resulting in a Reactor Trip.
Hot Shutdown conditions have been established in preparation for plant recovery.
The "A" RPS Cabinet tripped during the plant transient.
INITIATING CUE:
2005 NRC JPM G The Control Room Supervisor directs you to reset RPS Channel "A" IAW OP-TM-641-421. Assume that all PRECAUTIONS, LIMITATIONS, AND PREREQUISITES are met and that Steps 5.1.1 and 5.2 have been completed.
NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island Task No.:
0000580504 Task
Title:
ResDond to Loss of A DC Bus JPM No.:
2005 NRC JPM I WA
Reference:
063 G2.1.30 3.9 / 3.4 Facility Bank JPM 067 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testinq:
Simulated Performance:
X Actual Performance:
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
b Initial Conditions:
The plant is at 100% power.
A loss of the entire A DC distribution system just occurred.
The operating crew has implemented EP 1202-9A, Loss of A DC Distribution System.
EG-Y-1A was not operating when the loss of A DC system occurred.
Task Standard:
Starting air receiver isolated and EG-Y-1A fuel rack tripped.
Required Materials:
1202-9A General
References:
1202-9A, Loss of A DC Distribution System, Revision 44 Initiating Cue:
Another operator has been dispatched to DC Switchgear to investigate the cause. Perform the immediate MANUAL actions of 1202-9A at the affected Emergency Diesel Generator.
Time Critical Task:
N/A Validation Time:
5 minutes 2005 NRC JPM I NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1
~
~~
SIMULATOR SETUP:
NIA 2005 NRC JPM I NUREG 1021, Revision 9
Appendix C Page 3 of 6 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark) u START TIME:
Evaluator Note:
The candidate may selectlrequest safety equipment required for entering the room of a running EDG. If so: Assume that you are wearing the proper safety equipment for a running EDG.
The candidate is expected to perform the immediate manual actions from memory. At the conclusion and if requested, provide a copy of 1202-9A and allow time to verify actions.
Self-correction of errors meets the critical task requirement.
4 Performance Step: 1 Close EG-V-15A to allow lube oil booster pump to refill and starting air receiver to re-pressurize.
EG-V-15A is located and closed by rotating the handle 90".
Standard:
Comment:
Evaluator's Cue:
Inform candidate that EG-V-15A is closed if correctly located and operated.
Performance Step: 2 Verify starting air pressure gages EG-PI-535NB labeled "Starting Air Pressure" on the Engine Mounted Instrument Panel (EMIP) decrease to 0 psig.
EG-PI-535NB labeled "Starting Air Pressure" on the Engine Mounted Instrument Panel located and pressure verified as decreasing to 0 psig.
Standard:
Comment:
Evaluator's Cue:
As each gage is located (EG-PI-535A and EG-PI-5356):
Indication is decreasing to 0 psig.
2005 NRC JPM I NUREG 1021. Revision 9
Appendix C Page 4 of 6 PERFORMANCE INFORMATION Form ES-C-1 L
4 Performance Step: 3 Trip EG-Y-1A fuel rack.
Standard:
EG-Y-1A fuel rack trip pushbutton located and depressed.
Comment:
Evaluators Cue:
Inform candidate that the fuel rack is tripped if correctly located and tripped.
Terminating Cue:
After the fuel rack is tripped: This JPM is complete.
STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM I NUREG 1021, Revision 9
Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION
\\-
2005 NRC JPM I Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM I NUREG 1021, Revision 9
Appendix C Page 6 of 6 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
The plant is at 100% power 0
0 A loss of the entire " A DC distribution system just occurred.
The operating crew has implemented EP 1202-9A, Loss of
" A DC Distribution System.
EG-Y-1A was not operating when the loss of "A" DC system occurred.
INITIATING CUE:
2005 NRC JPM I Another operator has been dispatched to DC Switchgear to investigate the cause. Perform the immediate MANUAL actions of 1202-9A at the affected Emergency Diesel Generator.
NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island - Unit 1 Task No.:
0000600501 Task
Title:
Take Corrective Action For An JPM No.:
2005 NRC JPM J Unauthorized Waste Gas Release WA
Reference:
System 071 G2.1.30 3.9 / 3.4 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testina:
Simulated Performance:
X Actual Performance:
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
1 Initial Conditions:
0 The unit is at 100% power.
An authorized release is in progress from Waste Gas Decay Tank "A.
Three sets of readings have been completed on 1104-27, Waste Disposal - Gaseous, ENCLOSURE 2.
Task Standard:
Release alignment terminated.
Required Materials:
N/A General
References:
1 104-27, Waste Disposal - Gaseous, Revision 73 Initiating Cue:
Perform the fourth set of 1104-27, ENCLOSURE 2 readings at the local panel.
Handouts:
1104-27, ENCLOSURE 2, with three sets of prior readings 1104-27, Section 3.17 (to be provided to candidate after the problem is recognized) 2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Job Performance Measure Worksheet Form ES-C-1
.---- Time Critical Task:
N/A Validation Time:
10 minutes 2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-I
~
~~
~~
(Denote Critical Steps with a check mark) b START TIME:
Performance Step: 1 Review handout.
Standard:
Reviews 1104-27. ENCLOSURE 2.
Comment:
Evaluators Cue:
Provide a copy of ENCLOSURE 2 with three sets of prior readings.
Performance Step: 2 Enter the RCA and proceed to the Waste Gas Panel.
Standard:
v Comment:
Evaluators Cue:
Evaluators Note:
Observes proper RCA entry requirements and locates Waste Gas Panel.
Locate each instrument or simulate communications and I will then provide a reading value.
As each instrument is located or the control room is contacted, provide the instrument reading cues as listed for Time 4 on the attached EVALUATOR ENCLOSURE 2.
2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Page 4 of 7 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 3 Standard:
Logs readings.
Locate each instrument on the local panel and simulate contacting the control room for the radiation monitor readings.
0 Informs control room.
Implements section 3.17.
Recognizes unexplained pressure drop in Waste Gas Decay Tank "B".
Comment:
Evaluator's Cue:
Provide a copy of 1104-27, Section 3.17 when necessary and as shift management, direct the candidate to implement the required actions.
Performance Step: 4 Bleed off air from WDG-V-47 Standard:
Comment:
Evaluator's Cue:
Bleeds off air from WDG-V-47 by turning the control valve (knob) on the panel in the counter-clockwise direction.
The WDG-V47 bleed control valve is open and pressure is lowering to ZERO.
4 Performance Step: 5 Close WDG-V-47 by depressing the CLOSE pushbutton (PB).
Depresses WDG-V-47 CLOSE PB and verifies closed indication.
Standard:
Comment:
Evaluator's Cue:
If the bleed valve was opened in the previous step -
WDG-V-47 indicates closed.
2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Standard:
Reset WDG-FR-123 setpoint to ZERO.
Adjusts WDG-FR-123 setpoint to ZERO.
Comment:
Evaluators Cue:
WDG-FR-123 is set at ZERO.
4 Performance Step: 7 Close and lock closed the applicable manual outlet valve on the tank being released. (N/A the valves not open.)
WDG-V-30 for WDG-T-1A WDG-V-31 for WDG-T-1 B WDG-V-32 for WDG-T-1 C Locates and simulates closing WDG-V-30 by turning it in the clockwise direction.
Discusses re-installing the locking device.
May choose to locate and simulate checking WDG-V-31 closed.
Standard:
Comment:
Evaluators Cue:
Closing WDG-V-30 is the critical task.
Provide valve closed and locking device status cues for any valve operated.
Performance Step: 8 Standard:
Notify the control room to update the locked valve entry.
Comment:
Terminating Cue:
After the control is notified to update the locked valve entry, this JPM is complete.
L-STOP TIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.: 2005 NRC JPM J Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
v
Response
Resu I t :
SAT UNSAT Examiner's Signature:
Date:
2005 NRC JPM J NUREG 1021, Revision 9
Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:
0 The unit is at 100% power 0
An authorized release is in progress from Waste Gas Decay Tank " A.
Three sets of readings have been completed on 1104-27, Waste Disposal - Gaseous, ENCLOSURE 2.
0 INITIATING CUE:
2005 NRC JPM J Perform the fourth set of 1104-27, ENCLOSURE 2 readings at the local panel.
NUREG 1021, Revision 9
TMI - Unit 1 Operating Procedure v
Title Waste DisDosal - Gaseous
- 1.
Number 1 104-27 Revision No 73 ENCLOSURE 2 Page 1 of 1 Waste Gas Release Data Sheet Permit If at any time any other gas tank has an unexplained pressure decrease other than the tank being released then perform the following: (N/A this step if no pressure drop occurs)
Inform Shiff Management of the problem.
Go to section 3.17 to terminate the gas release DATA
\\
Release Complete Operator Signature Date 62
Number TMI - Unit 1 0 pe rat i ng Procedure Title Waste Disposal - Gaseous 11 04-27 Revision No.
73 Waste Gas Release Data Sheet Permit
- 1.
If at any time any other gas tank has an unexplained pressure decrease other than the tank being released then perform the following: (N/A this step if no pressure drop occurs)
Inform Shift Management of the problem.
Go to section 3.17 to terminate the gas release.
Release Complete Operator Signature Date 1
62
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Three Mile Island Task No.:
056A010104 Task
Title:
Place 8 Staae Heatinn On-Line JPM No.:
2005 NRC JPM K K/A
Reference:
039 G2.1.30 3.9 / 3.4 Facility Bank JPM 099 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testina:
Simulated Performance:
X Actual Performance :
Classroom Simulator Plant X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
- Initial Conditions:
0 A plant startup is in progress following a maintenance outage.
0 The feedwater system is cold.
Task Standard:
8 Stage Feedwater Heating String A in Service.
Required Materials:
OP-TM-421-102 with all Prerequisites signed.
General
References:
OP-TM-421-102, Placing 8 Stage Feedwater Heating String A in Service, Revision 0 Initiating Cue:
Place 8 Stage Feedwater Heating String A in service in accordance with OP-TM-421-102. Assume that you have all required equipment.
Time Critical Task:
N/A Validation Time:
15 Minutes 2005 NRC JPM K NUREG 1021, Revision 9
Appendix C Page 2 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark) i-START TIME:
v Performance Step: 1 Locates procedure.
Standard:
Locates OP-TM-421-102 and verifies PREREQUISITES are signed.
Comment:
Evaluators Cue:
Provide a copy of the procedure marked up in accordance with the cover sheet directions.
Performance Step: 2 Standard:
Proceeds to the 8m stage heating panel.
Located directly north of the 8th stage heaters 4th floor turbine building.
Comment:
May establish communications at this time.
Performance Step: 3 Verify the following:
Standard:
0 AS-V-?A AUTO/MANUAL station is in MANUAL and 0 psig setting on the manual gauge.
AS-V-1 B AUTO/MANUAL station is in MANUAL and 0 psig setting on the manual gauge.
Auxiliary Steam Heating Switch to OFF (AS-V-1114).
AS-V-1A and AS-V-1B AUTOIMANUAL stations in MANUAL with 0 psig on the manual gauge.
Auxiliary Steam Heating Switch to OFF (AS-V-1114).
0 0
0 0
Comment:
Evaluators Cue:
If the as found condition is different than above then provide the necessary feedback when the proper position is selected.
2005 NRC JPM K NUREG 1021, Revision 9
Appendix C Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 4
Performance Step: 4 Open AS-V-213A.
Standard:
Locates and opens AS-V-213A by rotating the handwheel in the counter-clockwise direction.
Comment:
Evaluators Cue:
The valve has stopped rotating in the counterclockwise direction.
J Performance Step: 5 Open AS-V-13A.
Standard:
Comment:
Evaluators Cue:
Locates and opens AS-V-13A by rotating the handwheel in the counter-clockwise direction.
The valve has stopped rotating in the counter-clockwise direction.
Performance Step: 6 Standard:
Simulates radio contact.
Establish communications between the CR and the Auxiliary Boiler Operator.
Comment:
Evaluators Cue:
When the candidate simulates establishing communications, inform him/her that communications are established and you will provide all feedback.
2005 NRC JPM K NUREG 1021, Revision 9
Appendix C Page 4 of 7 PERFORMANCE INFORMATION Form ES-C-1 4
Performance Step: 7 Open CO-V-3756.
Standard:
Locates and opens CO-V-3756 by rotating the handwheel in the counter-clockwise direction.
Comment:
Evaluators Cue:
The valve has stopped rotating in the counter-clockwise direction.
Performance Step: 8 Standard:
Comment:
Evaluators Cue:
Performance Step: 9 Standard:
Comment:
Evaluators Cue:
4 Performance Step: 10 Standard:
Comment:
Contacts Control Room to close CO-V-3B.
0 Locally verify valve closed.
Locates and verifies CO-V-3B closed or describes indication that the valve is closed.
CO-V3B indicates closed.
Contacts control room to verify closed the following:
EX-V-5A EX-V-56 EX-V-SC EX-V-SD Contacts control room to verify EX-V-SA through D closed or performs local position verification.
EX-V-SA, B, C, and D are all closed.
Place AS-V-1114 to ON (Auxiliary Steam Heating Switch).
Selects Auxiliary Steam Heating Switch to the ON position.
2005 NRC JPM K NUREG 1021, Revision 9
Appendix C
~~
Page 5 of 7 PERFORMANCE INFORMATION Form ES-C-1 Evaluators Cue:
If the as found condition is different than above then provide the necessary feedback.
d Performance Step: 11 Slowly raise AS-V-1 A MANUAL LOADER setting until steam flow is established.
AS-V-1A MANUAL LOADER setting is slowly raised until steam flow is established and then held at that point.
Standard:
Comment:
Evaluators Cue:
Terminating Cue:
If steamlcontrols alignment has been performed properly then -the Auxiliary Boiler Operator reports that boiler steam flow is slowly rising.
When steam flow is established and being held, this JPM is complete.
- STOPTIME:
TIME CRITICAL STOP TIME:
2005 NRC JPM K NUREG 1021, Revision 9
Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:
2005 NRC JPM K Examinees Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
u
Response
Result:
SAT UNSAT Examiners Signature:
Date:
2005 NRC JPM K NUREG 1021, Revision 9
Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET
-1 INITIAL CONDITIONS:
e A plant startup is in progress following a maintenance outage.
e The feedwater system is "cold" INITIATING CUE:
2005 NRC JPM K Place 8* Stage Feedwater Heating String " A in service in accordance with OP-TM-421-102. Assume that you have all required equipment.
NUREG 1021, Revision 9