MISCELLANEOUS CORRESPONDENCE FOR THE QUAD CITIES INITIAL EXAMINATION - MAY 2005

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 July 16, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF lNlTlAUREQUALlFlCATlON OPERATOR LICENSE EXAM I N AT1 0 N S

Dear Mr. Skolds,

In a telephone conversation on June 17,2003, between Mr. D. McNeil of my staff and Mr.

J. Bartlett, Quad Cities Station Training Manager, it was confirmed that Quad Cities Nuclear Generating Station had no requests for initial license examinations for the calendar year 2004.

Mr. McNeil and Mr. Bartlett also confirmed that the station is not scheduled for a licensed operator requalification training program inspection (IP 71 11 1.1 1B) until the calendar year 2005.

During the conversation Mr. Bartlett stated that he would like to schedule an examination during the month of April 2005. Mr. McNeil advised him that he should send a written request as soon as possible to schedule the examination as we have already 'filled our examinatidn schedule through March 2005. If you have any questions concerning this information, please contact Mr.

B. Palagi of my staff at 630-829-961 1.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://w.nrc.qovlreadinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger 0. Lanksbury, Chief Operations Branch Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

cc:

Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company R. Armitage, Training Department Operating Group Operating Group Operating Group

J. Skolds OFFICE RIII:DRS I.c. RI I I: DRS I C RIII:DRS I d I

NAME MABies:sd,-,,A~ BPalagi RDLanksbury 20 k DATE

'7

//L//03 97 ilftO3 7 /l6/03 cc:

Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company R. Armitage, Training Department Operating Group Operating Group Operating Group

ADAMS Distribution:

AJM DFT CFL RidsNrrDipmlipb GEG HBC KKB C. Ariano (hard copy)

DRPlll DRSl I I PLBI JRKl D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS

Exelon Generation Company, LLC www.exeloncorp.com Quad Cities Nuclear Power Station 22710 2O6lh Avenue North Cordova, IL 61242-9740 SVP-03-086 July 31,2003 Regional Administrator, Region 111 U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Request for Initial Operator License Examination Date Nuclear

Reference:

Letter from Roger D. Lanksbury (U. S. NRC) to John L. Skolds (Exelon Generation Company, LLC), Confirmation of InitiaVRequalification Operator License Examinations, dated July 1 6,2003 The referenced letter indicated that Quad Cities Nuclear Power Station (QCNPS) should submit a written request to schedule an initial operator license examination in 2005. With this letter, QCNPS is formally requesting an initial license examination from April 11, 2005 through April 22, 2005. The Station will be preparing the examination, and it is currently expected that the class will include three (3) Reactor Operator (RO) candidates, six (6) instant Senior Reactor Operator (SRO) candidates, and no SRO-Upgrade candidates. In the event that the requested examination date is not available, QCNPS requests an alternate date of May 2,2005 through May 13, 2005.

Should you have any questions concerning this letter, please contact Mr. W. J. Beck at (309) 227-2800.

Timothy J. Tulon Site Vice President Quad Cities Nuclear Power Station cc:

NRC Senior Resident Inspector - Quad Cities Generating Station Roger Lanksbury - Region 111 Bruce Palagi - Region I l l

Nuclear Exelon Generation w.exeloncorp.com 4300 Winfield Road Wanenville, IL 60555 RS-03-173 2 130-03-20244 5928-03-201 86 September 26,2003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 2055!5-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility opefating License No. NPF-62 NRC Docket No. 50461 Dresden Nudear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating ticense Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 56374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 FaciJity Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 An Exelon/British Energy Company RIS 2003-14

b Response to RIS 2003-1 4 September 26,2003 Page 2 Quad Cies Nudear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatory Issue Summary 2003-14

'Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary (RE) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations," dated August 27,2003.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, induding an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to AIS 2003-14 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants iden-above.

The operator licensing examination information for each facility is provided on a separate NRC Form 53tj.

During Calendar Year CY 2005, a total of 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indited in Attachment 6. The schedule for the indicated exam is as follows: the written exam and part of the operating e m will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach bottom Atomic Power Station (PSAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and for PBAFS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us.

Michael P. Gallagher Director, Licensing 8 Regulatory Affairs Exelon Generation Company, LLC Am8ffien Energy Company, LLC Attachments - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

1 Response to RIS 2003-14 September 26,2003 Page 3 cc:

Regional Administrator - NRC Region I wlattachments Regional Administrator - NRC Region ill NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nudear Power Station NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Limerick Generating Station NRC Senior Resident Inspector - Oyster Creek Generating Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Senior Resident Inspector - Three Mile fsland Nuclear Station NRC Senior Resident Inspector -Quad Cities Nuclear Power Station Y

Y I

Y Y

I Y

Y

  1. I Y
. ' Response to RIS 2003-14 0 Page 1 of 1 FAUUTY Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 OPERATOR LICENSING EXAMINATION DATA NRC REGION m

PROPOSED NUMBER cy 2004 CY 2005 STMATED NUMBER OF wNAm LICENSEEPREPARED 0

1 ESnMATED NUMBER Of-NRC-PREPARED 0

0 EXAMINAfK3(JS CY 2006 0

0 CY 2007 PROPOSE0 NUMBER CY 2004 cy Mo5 0

3 0

6 0

0 NUMBEflOFREACTm OPERATORS N W E A OF SENIOR REACTOF!

OPERATOf3S4sTAANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF S E N m FIEACTOR 0

0 OPERATOFSUWED PROPOSED DATES PRIMARY DATE NIA o5rW2005 ALTERNATE DATE NIA 0441 1m 1

CY 2006 CY 2ooT 0

3 0

6 0

1 0

0 N/A 04/02/2007 MA 04/23/2007 0

CY 2004 MARCH JUNE SEPTEMBER MCEMBEFI 9

0 0

0 CY xK)5 MARCH JUNE SEPTEMBER 0

0 0

PROPOSED NUMBER ESTIMATED NUMBER OF 2ANCNDAJE.5 DECEMBER 0

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 March 4, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS

Dear Mr. Crane:

In a letter dated September 26, 2003, your staff responded to NRC Regulatory Issue Summary (RE) 2003-14, Preparation and Scheduling of Operator Licensing Examinations, for all Exelon Nuclear Stations. This letter responds to the request for initial license examinations at Quad Cities Nuclear Power Station, Units 1 and 2.

Initial license examinations were requested for the week of May 2, 2005, and for the week of April 4,2007. The examination requested for the week of May 2,2005, has been scheduled and a chief examiner assigned to that examination. The initial license examination requested for April 2007 will be scheduled as we approach that date.

On-site validation of the examinations will occur at Quad Cities Nuclear Power Station approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements te administer the examinations at a mutually acceptable date.

As indicated in your RIS response letter, your staff will develop the examinations. Your letter also indicated that you are training 10 or fewer candidates for the examinations. Please inform us if the number of candidates increases above 10 as this will impact the examination schedule.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. B. Palagi of my staff at 630-829-961 1.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httrx//www.nrc.crov/readina-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear Training Department Operating Group Operating Group Operating Group MidAmerican Energy Company

C. Crane OFFICE RIII:DRS I

RIII: DRS I

RIII: DRS N

NAME MABies:sd BPalagi RDLanksbury 29 j DATE 02/24/04 1 1 /24/03 03/61 I04 I

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.aov/readina-rmladams. html (the Public Electronic Reading Room).

Sincerely, Roger D. ianksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

h e r Exel n, www exeloncorp corn An Exelon Company AmerCen Energy Company, LLC 4300 Winfield Road Warrenville. IL 60555 RS-04-093 2 1 30-04-20 1 46 5928-04-201 63 Nuclear July 14, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Response to RIS 2004-10 July 14, 2004 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Response to NRC Regulatory issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC Regulatory Issue Summary (RIS) 2004-1 0, Preparationand Scheduling of Operator Licensing Examinations, dated June 14, 2004.

In the Reference letter, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 through 10 provide the responses to RIS 2004-10 for the Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) plants identified above.

The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Years (CYs) 2005 and 2008, a total of 6 candidates per year are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated in. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 6 for LGS only and for PBAPS references Attachment 6.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Michael P. Gallagher Director, Licensing & Regulatory Affairs Exelon Generation Company, LLC AmerGen Energy Company, LLC Attachments - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station

Response to RIS 2004-10 PROPOSED NUMBER CY 2005 ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 1

ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED 0 0 Page 1 of 1 CY=

CY=

CY 2008 0

1 0

0 0

0 I NRC FORM 536 U S NUCLEAR REGULATORY COMMISSION I APPROVEDBYOMB NO 3150-0131 EXPIRES 07/31/2006 PROPOSED NUMBER CY 2005 CY=

2 0

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR 5

0 OPERATORS-INSTANT 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 05/02/2005 N/A ALTERNATE DATE 04/11 /2005 N/A (5-2003)

CY=

CY=

3 0

6 0

1 0

0 0

04/02/2007 N/A 04/16/2007 N/A OPERATOR LICENSING EXAMINATION DATA MARCH JUNE SEPTEMBER DECEMBER 0

0 0

0 FACILITY MARCH JUNE SFPTEMBER DECEMBER 9

0 0

0 Estirnared burden per response lo comply wth lhis volunlary information collection requesl 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> This lnlorrnalion COlleCltOn is used lo plan budgels and resources lor o erator exarninalims Send cornmenis regarding burden eslimale lo Ihe Records

$ana men1 Branch (1-6

6) U S Nuclear Regulalor Cornmissom. Washin ton DC 2%55 0001 or by inlernet e mall io lnlocollectsBnrc ov and io the aeS<

Ofiicer Oflice ol Inlormalion and R ulalory Afiairs. NEOi 10202 (3150 0131)

Oifice of Management and Budget 3ashin on CC 20503 If a means used to Impose an 8nlormatim colleclion does no1 %piay a currenlly vahd OMB conlrol number the NRC may not conducl or sponsor. and a person is no1 requtred IO respond 10 !he nlorrnalion colleclion NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 I11 I

PR 0 POSED NUMBER ESTIMATED NUMBER OF CANDl DAT ES CY2006

Exel nI SVP-04-108 December 20,2004 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 21 0 Lisle, IL 60532-4352 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Submittal of Integrated Initial License Training Examination Outlines Enclosed are the examination outlines that support the Initial License Examination scheduled for May 2, 2005 through May 9, 2005 at Quad Cities Station.

This submittal includes all appropriate Examination Standard forms and outlines in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.

In accordance with NUREG-1021, Revision 9, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Mr. W. J. Beck, Regulatory Assurance Manager, at (309)-227-2800. For questions concerning examination outlines, please contact Mark Jensen at (309)-227-3438 or Mike Kaufman at (309)-227-4173.

Respectfully, Timothy J. Tulon Site Vice President Quad Cities Nuclear Power Station

December 20,2004 U.S. Nuclear Regulatory Commission Page 2

Enclosures:

(Hand delivered to Nicholas A. Valos, Chief Examiner, NRC Region Ill)

Examination Security Agreement - Form ES-201-3 Administrative Topics Outline (RO) - Form ES-301-1 Administrative Topics Outline (SRO) - Form ES-301-1 Control Room/ln-Plant Systems Outline (RO) - Form ES-301-2 Control Room/ln-Plant Systems Outline (SRO) - Form ES-301-2 BWR Examination Outline (RO & SRO) - Forms ES-401-1 and ES-401-3 Record of Rejected WAS - Form ES-401-4 Scenario Outlines (4) - Forms ES-D-1 Completed Checklist:

Examination Outline Quality Checklist - Form ES-201-2 Transient and Event Checklist - Form ES-301-5 Competencies Checklist - Form ES-301-6 cc:

Chief, Operations Branch - NRC Region Ill (without attachments)

NRC Senior Resident Inspector - Quad Cities Station (without attachments)

Nicholas A. Valos Nuclear Regulatory Commission Region I11 2443 Warrenville Road, Suite 21 0 Lisle, I11 60532 December 20,2004 Jon Bartlett Training Director Quad Cities Station 227 10 206h Avenue North Cordova, IL 6 1242

Subject:

ILT Exam validation schedule change request.

I would like to revise the agreed upon schedule regarding the upcoming Validation week for Quad Cities Initial Operator Licensing Exam. I am requesting to change the days that you come to our station for validation.

Originally, we had planned on performing the Validation durin the week of April 4'to the Sth, 2005. I would like to change it to the week of April 11' to the 15*, 2005. We are confident that this change, if implemented, will not adversely affect our ability to incorporate any validation comments or changes. and therefore will not affect the administration of the exam, beginning May 2"d. 2005.

Fl I understand that on December 9,2004, Mike Bielby discussed this proposed schedule change with Mark Jensen, Exam Author, and that Mike indicated the desired change would not present a problem to the validation team. This letter is being sent per Mike Bielby's request.

Respectful 1 y, p-=k&-

Jon Bartlett Training Director

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVllLE ROAD, SUITE 2 10 LISLE, llLlNOlS 60532-4352 December 23, 2004 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

Dear Mr. Crane:

In a telephone conversation on December 22, 2004, between Mr. Roger Armitage, Training Manager, and Mr. Nicholas Valos, of my staff, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Power Station the week of May 2, 2005.

In addition, the NRC will make an examination validation visit to your facility the week of April 11, 2005.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 24, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by March 17, 2005.

Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the wriien examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090),

medical certifications (OMB approval number 31 50-0024),

and waiver requests (if any) (OM6 approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (1-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Armitage has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Nicholas Valos at 630-829-9761, or me at 630-829-9631.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htt~://www.nrc.aov/readina-n/adams.html.

Sincerely, Roger 0.

Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution

C. Crane OFFICE RIII:DRS I C RIII:DRS 1.'

I NAME NValos:sd RDLanksbury @) 1 DATE 1 2/22 /04 1 d2 1/04 I

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Armitage has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Nicholas Valos at 630-829-9761, or me at 630-829-9631.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.nov/readinq-rm/adams. html.

Sincerelv.

mi' doger

. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30

cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company J. Bartlett, Training Department Operating Group Operating Group Operating Group

cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear J. Bartlett, Training Department Operating Group Operating Group Operating Group MidAmerican Energy Company ADAMS Distribution:

AJM DFT LWR DCT RidsNrrDipmlipb GEG HBC KGO KKB DRPl I I DRSlll PLBl JRKI M. Bies (Concurrence Copy)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 April 18, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville. IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Crane:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Quad Cities Nuclear Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Roger 0. Armitage, Training Director.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of May 2, 2005. The NRC staff will administer the operating tests during the week of May 2, 2005.

Please contact Mr. Nicholas A. Valos, at (630) 829-9761, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinR-rm/adams.html.

YHironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution

cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company R. 0. Armitage, Training Director Operating Group Operating Group Operating Group

A p r i l 18, 2005 OFFICE NAME DATE Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555 Rlll IC/ Rlll I E Rlll 1N I

M A B i e s : t r H NValos $ad HPetejson &

04/18'/05 041 I t r 105 04/ 1q05 vfl

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Crane:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Quad Cities Nuclear Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Roger 0. Armitage, Training Director.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of May 2, 2005. The NRC staff will administer the operating tests during the week of May 2, 2005.

Please contact Mr. Nicholas A. Valos, at (630) 829-9761, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htttx//www.nrc.qov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 See Attached Distribution

cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company R. 0. Armitage, Training Director Operating Group Operating Group Operating Group ADAMS Distribution:

AJ M LWR RidsNrrDipmlipb GEG KGO KKB DRPlll DRSlll PLBI JRKI DCT MAB 1