May 11, 2005 LICENSEE: Exelon Nuclear FACILITY: Byron Station

SUBJECT:

SUMMARY

OF THE APRIL 19, 2005, PUBLIC MEETING TO DISCUSS THE BYRON END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 19, 2005, a public meeting was held at the Byron Forest Preserve, 7993 North River Road, Byron, IL 61010. The meeting was between the Nuclear Regulatory Commission (NRC) and the Byron Station management and staff. The purpose of the meeting was to discuss NRCs assessment of the Byron Stations performance for the period of January 1, 2004 through December 31, 2004. In addition, Mr. Steve Kuczynski, the Site Vice-President, gave a brief presentation.

During the NRC presentation, an overall assessment of Byron Stations performance was provided. As explained in the Annual Assessment letter from NRC to Mr. Christopher M. Crane, dated March 2, 2005, (reference ADAMS accession number ML050620333), the Byron Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives.

During the licensees presentation, Mr. S. Kuczynski, discussed Byron Accomplishments in 2004, Performance Issues, Top Priorities for 2005, and Key Events for 2005.

The meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML050900213, ML051260278, and ML051260270 respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

Before adjourning the meeting, the NRC provided the opportunity for members of the public to ask questions. One member of the public posed questions and concerns about Byron performance to the NRC. The NRC responded during the meeting and met with the individual after the meeting. The NRC was also interviewed by two local television news organizations and one local newspaper reporter.

/RA/

David Passehl, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

As Stated See Attached Distribution

LICENSEE: Exelon Nuclear FACILITY: Byron Station

SUBJECT:

SUMMARY

OF THE APRIL 19, 2005, PUBLIC MEETING TO DISCUSS THE BYRON END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 19, 2005, a public meeting was held at the Byron Forest Preserve, 7993 North River Road, Byron, IL 61010. The meeting was between the Nuclear Regulatory Commission (NRC) and the Byron Station management and staff. The purpose of the meeting was to discuss NRCs assessment of the Byron Stations performance for the period of January 1, 2004 through December 31, 2004. In addition, Mr. Steve Kuczynski, the Site Vice-President, gave a brief presentation.

During the NRC presentation, an overall assessment of Byron Stations performance was provided. As explained in the Annual Assessment letter from NRC to Mr. Christopher M. Crane, dated March 2, 2005, (reference ADAMS accession number ML050620333), the Byron Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives.

During the licensees presentation, Mr. S. Kuczynski, discussed Byron Accomplishments in 2004, Performance Issues, Top Priorities for 2005, and Key Events for 2005.

The meeting notice, NRC presentation, and licensee presentation can be found in ADAMS as ML050900213, ML051260278, and ML051260270 respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

Before adjourning the meeting, the NRC provided the opportunity for members of the public to ask questions. One member of the public posed questions and concerns about Byron performance to the NRC. The NRC responded during the meeting and met with the individual after the meeting. The NRC was also interviewed by two local television news organizations and one local newspaper reporter.

/RA/

David Passehl, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

As Stated See Attached Distribution DOCUMENT NAME: G:\Branch TSS\EOC Mtg. Notices 2005\Mtg. Summaries/Byron.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME JRobbins:co DPassehl DATE 05/11/05 05/ /05 OFFICIAL RECORD COPY Exelon Nuclear cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station

Exelon Nuclear ADAMS Distribution:

GYS GFD RidsNrrDipmIipb GEG KGO RAS CAA1 DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC D. Passehl, Chief, Branch 3, Division of Reactor Projects R. Skokowski, Senior Resident Inspector, Prairie Island EXELON NUCLEAR Steve Kuczynski, Site Vice President Dave Hoots, Plant Manager Bill Grundmann, Reg Assurance Manager Joe Bauer, Licensing, Cantera Bill Kouba, Byron NOS Manager Stan Kerr, Chemistry Manager Bob Kartheiser, Communications, Tracey Fluck, NRC Coordinator.