Annual Assessment Letter - Byron Units 1 and 2
ML050620333
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/02/2005
From: Passehl D
NRC/RGN-III/DRP/RPB3
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-05-001
Download: ML050620333 (6)


Text

March 2, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2 (REPORT 05000454/200501; 05000455/200501)

Dear Mr. Crane:

On February 9, 2005, the NRC staff completed its end-of-cycle plant performance assessment of Byron Station, Units 1 and 2. The end-of-cycle review for Byron Station involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Overall, Byron Station Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance of Units 1 and 2 for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through September 30, 2006.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2006. The following infrequently performed inspections are planned to commence during the months shown: Temporary Instruction (TI) 2515/150, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (Unit 1) in March 2005, TI 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S.

Pressurized Water Reactors (Unit 1) in March 2005, Problem Identification and Resolution inspection in June 2005, TI 2515/150 (Unit 2) in September 2005, Biennial Heat Sink inspection in October 2005, and Modifications and 10 CFR 50.59 inspection in March 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9872 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dave Passehl, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission

C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9872 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dave Passehl, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission DOCUMENT NAME: G:\Branch TSS\EOC Ltrs\eoc 030205\Byron.wpd To receive a copy of this document, indicate in the box "C" = Copy w ithout att achment/enclosure "E" = Copy w ith attachment/enclosure "N "

= No copy OFFICE RIII NAME DPassehl:co DATE 02/ /05 OFFICIAL RECORD COPY

C. Crane ADAMS Distribution:

AJM GFD RidsNrrDipmIipb GEG KGO RAS CAA1 DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Byron 02/28/2005 08:14:29 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI/ISI - UNIT 1 ISI/TI-150/TI-160 INSPECTION 2 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 03/02/2005 03/18/2005 Safety Issues 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 03/02/2005 03/18/2005 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 03/02/2005 03/18/2005 Baseline Inspections IP 71121 - RP OUTAGE ACCESS CTRL/ALARA INSP 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/14/2005 03/18/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/14/2005 03/18/2005 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 06/13/2005 07/01/2005 Baseline Inspections 71114 - EP EXERCISE & EP PI INSP 2 1, 2 IP 7111401 Exercise Evaluation 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/18/2005 07/22/2005 Baseline Inspections ISI - UNIT 2 ISI INSPECTION/TI-150 2 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 09/26/2005 10/21/2005 Safety Issues 2 IP 7111108P Inservice Inspection Activities - PWR 09/26/2005 10/21/2005 Baseline Inspections FY 2006 - BYRON INIT PREP 10/2005 3 1 W90122 OL - INITIAL EXAM - BYRON - OCT/NOV 2005 10/03/2005 10/07/2005 Not Applicable OUTAGE - AC, ALARA, REMP 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/03/2005 10/14/2005 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/03/2005 10/14/2005 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 10/03/2005 10/14/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/03/2005 10/14/2005 Baseline Inspections HEATSKB - BIENNIAL HEAT SINK INSPECTION (DRS) 1 1, 2 IP 7111107B Heat Sink Performance 10/31/2005 11/04/2005 Baseline Inspections FY 2006 - BYRON INIT EXAM 10&11/2005 3 1 W90122 OL - INITIAL EXAM - BYRON - OCT/NOV 2005 10/31/2005 11/11/2005 Not Applicable IP 71121 - RP POST-OUTAGE ACCESS CTRL & ALARA INSP 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/09/2006 01/13/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 01/09/2006 01/13/2006 Baseline Inspections IP 71114 - EP NON-EXERCISE BASELINE INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/13/2006 03/17/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Byron 02/28/2005 08:14:29 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type M50.59 - MOD 50.59 INSPECTION 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/13/2006 03/31/2006 Baseline Inspections IP 71122 - RP LIQ/GAS EFFLUENT INSPECTION 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/22/2006 05/26/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 05/22/2006 05/26/2006 Baseline Inspections ISI - BYRON UNIT 1 ISI INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 09/11/2006 09/29/2006 Baseline Inspections IP 71121 - RP OUTAGE ACCESS CTRL/ALARA INSPECTION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.