Public Meeting NRC Slides Byron End-of-Cycle Plant Performance Assessment
ML051260278
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/19/2005
From:
NRC/RGN-III
To:
References
Download: ML051260278 (21)


Text

Byron Annual Assessment Meeting Reactor Oversight Program - CY 2004 Nuclear Regulatory Commission - Region III Lisle, IL

Purpose of Todays Meeting A public forum for discussion of the licensees performance

! NRC will address Byron performance issues discussed in the March 2, 2005 Annual Assessment Letter

! Licensee Remarks

Agenda Introduction

! Review of Reactor Oversight Process

! National Summary of Plant Performance

! Discussion of Plant Performance Results

! Licensee Response and Remarks

! NRC Closing Remarks

! NRC available to address public questions

NRC Representatives Mark A. Satorius, Director, Division Reactor Projects (DRP)

- (630) 829-9600

! Steven Reynolds, Deputy Director, DRP

- (630) 829-9600

! David Passehl, Branch Chief

- (630) 829-9872

! George Dick, Project Manager, NRR

- (315) 415-3019

! Rick Skokowski, Senior Resident Inspector

- (815) 234-5451

! Pete Snyder, Resident Inspector

- (815) 234-5451

! Thomas Tongue, Senior Project Engineer

- (630) 829-9613

Region III Organization Jim Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Mark A. Satorius Cynthia D. Pederson Director Division of Reactor Projects Director Division of Reactor Safety Steven Renyolds Roy J. Caniano Deputy Director Deputy Director David Passehl Regional Specialists Branch Chief Byron Project Engineer Resident Inspectors Thomas Tongue Rick Skokowski Pete Snyder

NRC Performance Goals Safety:Ensure protection of the public health and safety and the environment

! Security: Enhance the secure use and management of radioactive matrerials

! Openness: Ensure openness in our regulatory process

! Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely

! Management: Ensure excellence in agency management to carry out the NRCs strategic objective

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections Equipment Alignment ~92 hrs/yr

! Triennial Fire Protection ~200 hrs every 3 yrs

! Operator Response ~125 hrs/yr

! Emergency Preparedness ~80 hrs/yr

! Public Radition Protection ~100 hrs every 2 yrs

! Worker Radiation Protection ~100 hrs/yr

! Corrective Action Program ~200 hrs every 2 yrs

! Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Management Involvement with Licensee Management Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total Units 102

National Summary

! Performance Indicator Results (at end of CY 2004)

< Green 1834

< White 6

< Yellow 0

< Red 0

! Total Inspection Findings (CY 2004)

< Green 778

< White 11

< Yellow 0

< Red 0

Byron Assessment Results (Jan 1 - Dec 31, 2004)

Licensee Response Column All Inspection Findings were Green

< Very Low Significance

! All Performance Indicators were within the Green band

Byron Inspection Activities (Jan 1 - Dec 31, 2004)

! Baseline Inspection

! Unit 2 Refueling Outage

! Other Inspections

Byron Inspection Activities (Jan 1 - Dec 31, 2004)

Completed Baseline Inspections Routine Integrated Inspections

! Triennial Fire Protection Inspection

! Maintenance Rule Inspection

! Modifications and 10 CFR 50.59 Inspection

! Emergency Preparedness Inspection

! Radiation Protection Inspection

! Licensed Operator Requalification Inspection

Byron Inspection Activities (Jan 1 - Dec 31, 2004)

Completed Other Inspections TI 2515/152 Reactor Pressure Vessel Lower Head Penatration Nozzles

! TI 2515/154 Spent Fuel Material and Accounting Inspection

! TI 2515/156 Offsite Power System Operational Readiness Inspection

Byron Performance (Jan 1 - Dec 31, 2004)

All Performance Indicators in the Green Band

! 14 Green Findings

Byron Annual Assessment Summary January 1- December 31, 2004 Exelon operated Byron in a manner that preserved public health and safety

! All cornerstone objectives were met

! In 2005, NRC plans baseline inspections

Licensee Response and Remarks Steve Kuczynski Site Vice President Byron Station

Contacting the NRC Report an emergency

< (301) 816-5100 (call collect)

! Report a safety concern:

< (800) 695-7403

< Allegation@nrc.gov

! General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs

Reference Sources

! Reactor Oversight Process

< http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

! Public Electronic Reading Room

< http://www.nrc.gov/reading-rm.html

! Public Document Room

< 1-800-397-4209 (Toll Free)