Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 001 1-014-01-013 0535-006-04-013 Task

Title:

Raise Reactor Power To 10. Amps JPM No.: 2005 NRC JPM S1 WA

Reference:

001 A2.11 (4.414.7) 001 AA1.05 (4,314.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A reactor startup is in progress in accordance with 1OM-50.4.0, Reactor Startup From Mode 3 To Mode 2. The following conditions exist:

All shutdown bank rods are fully withdrawn.

. Control Bank D is at 90 steps.

The estimated critical position is 110 steps on Control Bank D.

Task Standard: The reactor is tripped in response to inappropriate continuous control rod motion.

Required Materials: Estimated Critical Position & 1/M Plot General

References:

1OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 43 1OM-53C.4.1.1.3, RCCA Control Bank Inappropriate Continuous Movement, Rev. 9 Handouts: 1OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 43 Estimated Critical Position & 1/M Plot Initiating Cue: The Unit Supervisor directs you to withdraw control rods to criticality in accordance with 10M-50.4.D, Reactor Startup From Mode 3 To Mode 2, beginning at Step IV.D.15.f.

Time Critical Task: NO Validation Time: 16 minutes BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

_____ ~______

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-PW = NJPM Select FAST speed on NR-45 BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

C

~~~

Appendix C page 3 of Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 WHEN the Inverse Count Rate Ratio is less than 0.25, Reduce rod withdrawal intervals to 25 step increments.

(Step 1V.D.15.f)

Standard: Candidate initiates rod withdrawal at less than 25 step increments.

CUE: The ICRR is less than 0.25. Withdraw control rods to take the reactor critical.

Comment:

Performance Step: 2 Verify both source ranges HV Manual ON/OFF switches are in the NORMAL position.

(Step IV.D.16.a)

Standard: Candidate locates and verifies both source range HV MANUAL CONTROL switches in NORMAL.

Comment:

Performance Step: 3 Record Source Range Neutron Level indications:

(Step IV.D.16.b) [NI-NI-31A] CPS

[ NI- N 1-32A] CPS Standard: Candidate locates and records SR counts for N31 and N32.

Comment:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Verify annunciators A4-85 and A4-87 NIS SOURCE RANGE CH l ( 2 ) DETECTOR VOLTAGE TROUBLE, are ON.

(Step IV.D.16.c)

Standard: Candidate locates and verifies A4-85 and A4-87 in alarm Comment :

Performance Step: 5 Select both IR channels to indicate on recorder NR-45.

(Step IV.D.16.d)

Standard: Candidate locates and places NI SYS RECORDER SEL SW 1 N45 and 2N45 to record IR channels N35 and N36.

Comment:

Performance Step: 6 BLOCK the source range hi flux trip by placing the Block Source Range Trip Train A and Train B control switches to BLOCK.

(Step IV.D.16.e)

Standard: Candidate locates and places BLOCK SOURCE RANGE TRIP TRAIN NTRAIN B control switches in Block.

Comment:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Verify the Source Range High Voltage is de-energized.

(Step IV.D.16.f)

Standard: Candidate locates and verifies Source Range DETECTOR VOLTS indicate zero.

Comment :

Performance Step: 8 Verify annunciators A4-85 AND A4-87, NIS SOURCE RANGE CHl(2) DETECTOR VOLTAGE TROUBLE, are OFF.

(Step IV.D.16.g)

Standard: Candidate locates and verifies A4-85 AND A4-87 not in alarm Comment :

Performance Step: 9 If the Source Range High Flux Trip signal is blocked prior to criticality, perform the following: (Otherwise N/A)

(Step IV.D.17.a)

Suspend performance of the l / m plot.

Standard: Candidate directs suspending the l / m plot.

CUE: The l / m Plot is suspended.

Comment :

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION

.( Performance Step: 10 Continue incremental rod withdrawal (at a rate determined by the SM, but not to exceed 25 step increments) until the reactor is (Step IV.D.17.b) critical as indicated by a stable positive startup rate, with no rod motion, on the intermediate range instrumentation once the prompt jump has receded.

Standard: Candidate continues withdrawing control rods to obtain a stable startup rate.

CUE: If asked, inform Candidate to withdraw rods at no more than 25 step increments to obtain a stable startup rate.

Comment:

I NOTE: The following step begins the alternate path portion of the JPM.

Performance Step: 11 Determine that rods are withdrawing with NO demand signal.

Standard: Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing with NO demand signal.

Comment:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 12 Trip the reactor in response to inappropriate continuous rod motion.

(AOP-1.1.3,Step 1 RNO)

Standard: Candidate trips the reactor in response to inappropriate continuous rod motion.

NOTE: Candidate may refer to AOP-1.1.3 and determine that a reactor trip is required based on Step 1 RNO.

Comment:

Terminating Cue: When the Candidate trips the reactor, the evaluation for this JPM is comdete.

STOP TIME:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 NRC S1 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

ResuIt: Sat isf acto ry/Unsat isf acto ry Examiners Signature: Date:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A reactor startup is in progress in accordance with 1OM-50.4.D, Reactor Startup From Mode 3 To Mode 2. The following conditions exist:

All shutdown bank rods are fully withdrawn.

. Control Bank D is at 90 steps.

The estimated critical position is 110 steps on Control Bank D.

INITIATING CUE: The Unit Supervisor directs you to withdraw control rods to criticality in accordance with 1OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, beginning at Step IV.D.15.f.

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 0531-005-05-013 Task

Title:

Perform SI Termination IAW ES-1.1 JPM No.: 2005 NRC JPM S2 WA

Reference:

E02 EA1.3 (3.8/4.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinu:

Simulated Performance: Actual Performance: X Class room Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: . The reactor was tripped and safety injection was actuated due to low RCS pressure.

The crew has entered ES-1.1, SI Termination.

Task Standard: High head safety injection is aligned to provide flow to the RCS Required Materials: None General

References:

1OM-53A.1.ES-1.1, SI Termination, Issue 1C, Rev. 4 Handouts: 1OM-53A.1.ES-1.1 SI Termination, Issue 1C, Rev. 4 Initiating Cue: The Unit Supervisor directs you to perform the steps to terminate safety injection in accordance with ES-1.1 SI Termination.

I Time Critical Task: NO Validation Time: 20 minutes BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

~~~ ~~~

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-192 PW = NJPM I

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

t Performance Step: 1 Reset SI (Step 1)

Standard: Candidate locates and depresses SI ReseVOverride Train A/Train B pushbuttons.

Standard: Candidate verifies Status Light Panel 62-4C is off and 62-4D is on.

Comment :

Performance Step: 2 Reset CIA and CIB (Step 2)

Standard: Candidate locates and depresses CIA ReseVOverride Train A/

Train B and CIB Reset Override Train NTrain B switches.

Standard: Candidate verifies A1 -72, Containment Isolation Phase B clears.

Comment:

Performance Step: 3 Stop All But One Charging Pump (Step 31 Standard: Candidate locates and places 1CH-P-1A or 1B control switch in stop.

Standard: Candidate verifies white trip light on and red running light off.

Cornment :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Check RCS Pressure - STABLE OR RISING (Step 4)

Standard: Candidate locates RCS pressure indication and verifies stable or rising.

Comment :

Performance Step: 5 Isolate The BIT (Step 5.a) Close [MOV-1SI-867A, B]

Standard: Candidate locates MOV-1SI-867A, B control switches and places in Close.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment :

Performance Step: 6 Isolate the BIT (Step 5.b) Close [MOV-1SI-867C, D]

Standard: Candidate locates MOV-1SI-867C, D control switches and places in Close.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Establish Normal Charging Flow (Step 6.a) Close [FCV-1CH-1221 Standard: Candidate locates FCV-1CH-122 controller and places in Manual and closes valve.

Standard: Candidate verifies valve controller indicates 100% (Shut)

Comment :

Performance Step: 8 Establish Normal Charging Flow (Step 6.b) Open [MOV-1CH-3101 Standard: Candidate locates MOV-1CH-310 control switch and places in open.

Standard: Candidate verifies red open light on and green close light off.

Comment :

Performance Step: 9 Establish Normal Charging Flow (Step 6.c) Open [MOV-1CH-2891 Standard: Candidate locates MOV-1CH-289 control switch and places in open.

Standard: Candidate verifies red open light on and green close light off.

Comment:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Establish Normal Charging Flow (Step 6.d) Adjust [FCV-1CH-1221 to maintain required PRZR level Standard: Candidate locates FCV-1CH-122 controller and opens valve to re-establish charging flow.

Comment:

Performance Step: 11 Control Charging Flow to Maintain PRZR Level (Step 7 )

Standard: Candidate observes PRZR level indication and adjusts charging flow, as necessary to maintain PRZR level greater than 18%.

Comment :

Performance Step: 12 Energize Stub Busses (Step 8.a) Check 41 60V stub busses - ENERGIZED Standard: Candidate locates and verifies ACB-1E5, 1AE stub bus red closed light on and white trip light off.

Comment :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 13 Energize Stub Busses (Step 8.a) Check 41 60V stub busses - ENERGIZED Standard: Candidate locates and verifies ACB-1 F5, 1DF stub bus red closed light on and white trip light off.

Comment:

Performance Step: 14 Energize Stub Busses (Step 8.b) Check 480V stub busses - ENERGIZED Standard: Candidate locates and verifies either boric acid transfer pumps or containment vacuum pumps indicating lights are lit.

Comment :

Performance Step: 15 Verify CNMT Instrument Air - AVAILABLE (Step 9.a) Check Station Instrument Air Header Pressure - GREATER THAN 100 PSlG Standard: Candidate locates and verifies PI-1IA-106 pressure indicates greater than 100 psig.

Cornment :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 16 Verify CNMT Instrument Air - AVAILABLE (Step 9.b) Verify [TV-1IA-4001 - OPEN Standard: Candidate locates TV-1 IA-400 and verifies red open light on and green closed light off.

Comment :

Performance Step: 17 Verify CNMT Instrument Air - AVAILABLE (Step 9.c) Check CNMT instrument air header pressure - GREATER THAN 85 PSlG Standard: Candidate locates and verifies PI-1 IA-l06A indicates greater than 85 psig.

Comment:

Performance Step: 18 Check If LHSl Pumps Should Be Stopped:

(Step 10.a) LHSl pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST Standard: Candidate locates and verifies 1SI-P-1A and 1B running Standard: Candidate verifies red running light on for each pump.

Standard: Candidate locates and verifies MOV-1SI-862NB open Standard: Candidate verifies red open light on and green closed light off for each valve.

Comment:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 19 Check If LHSI Pumps Should Be Stopped:

(Step 10.b) Stop LHSI pumps and place in AUTO Standard: Candidate locates and places 1SI-P-1A and 1B control switches in Stop.

Standard: Candidate verifies white trip light on and red running light off for each pump.

Comment :

Performance Step: 20 Reset SI Auto Recirc Changeover (Step 11)

Standard: Candidate locates and depresses SIS Auto Recirc Reset Train A/Train B pushbuttons.

Comment:

Performance Step: 21 Verify SI Flow Not Required (Step 12.a) RCS subcooling based on core exit TCs - GREATER THAN 46°F

[54"F ADVERSE CNMT]

Standard: Candidate locates ICCM display and verifies su bcooling greater than 46°F.

Comment:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 22 Verify SI Flow Not Required (Step 12.b) PRZR level - GREATER THAN 18% [37% ADVERSE CNMT]

Standard: Candidate locates and verifies PRZR level indicates less than 18%.

Standard: Candidate determines that PRZR level is dropping and refers to RNO column step 12.b.

Comment:

NOTE: The following step begins the alternate path portion of the JPM.

.( Performance Step: 23 Adjust charging flow to restore PRZR level (Step 12.b RNO)

Standard: Candidate locates and adjusts FCV-1CH-122 to restore PRZR level.

Comment:

.( Performance Step: 24 IF PRZR level can NOT be restored, THEN manually start SI (Step 12.b RNO) pumps and align valves as necessary.

Standard: Candidate manually starts SI pumps and aligns valves, as necessary.

NOTE: Candidate may choose to manually re-initiate SI based on SI Reinitiation Criteria on Foldout Page.

Cornment :

Terminating Cue: When the Candidate starts the SI pumps manually or re-initiates SI, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 11 of 12 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 NRC S2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

ResuIt: Satisfacto ry/Unsatisfactory Examiner's Signature: Date:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 12 of 12 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: . The reactor was tripped and safety injection was actuated due

. to low RCS pressure.

The crew has entered ES-1.1, SI Termination.

INITIATING CUE: The Unit Supervisor directs you to perform the steps to terminate safety injection in accordance with ES-1.1, SI Termination.

BVPS-1 NRC JPM S2 NUREG 1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility : BVPS Unit 1 Task No.: 01 11-01 1-01-013 Task

Title:

Isolate SI Accumulators Durina a LOCA JPM No.: 2005 NRC JPM S3 KIA

Reference:

009 EA1.13 (4.4/4.4)

Examinee: NRC Examiner:

FaciIit y Eva1uator: Date:

Method of testina:

Simulated Performance: Actual Perf o rmance : X Class room Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be sat isf ied.

Initial Conditions: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

Task Standard: SI Accumulators A and B are isolated. SI Accumulator C is vented.

Required Materials: Shorting Bars (3)

General Refe rences : 1OM-53.A.1.ES-1.2, Post LOCA Cooldown and Depressurization, Issue l C , Rev. 5 1OM-1 1.4.H, Venting Safety Injection Accumulator [l SI-TK-1A (16) (1C)]

Handouts: 1OM-53A.1.ES-1.2, Post LOCA Cooldown and Depressurization, Issue l C , Rev. 5 1OM-11.4.H, Venting Safety Injection Accumulator [l SI-TK-1A (16) (1C)]

1OM-53A.1.6-A, 0 F Plus Subcooling Based on Core Exit TCs, Issue 1C, Rev. 0 Initiating Cue: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

Time Critical Task: NO Validation Time: 12 minutes BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet PW = NJPM BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 RCS subcooling based on core exit TCs - GREATER THAN SUBCOOLING LISTED ON ATTACHMENT 6-A (Step 25.a)

Standard: Candidate locates ICCM display and verifies RCS subcooling based on core exit TCs is greater than subcooling listed on Attachment 6-A.

CUE: Provide Candidate with a copy of Attachment 6-A.

Comment:

Performance Step: 2 PRZR level - GREATER THAN 18% [37% ADVERSE CNMT]

(Step 25.b)

Standard: Candidate locates and verifies PRZR level indication is greater than 18%.

Comment:

Performance Step: 3 Power to [MOV-1SI-865A, B, C] - AVAILABLE.

(Step 25.c)

Standard: Candidate locates and verifies power available to MOV-1SI-865A, B and C.

Standard: Candidate verifies red open light on for each valve.

Comment :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 4 Insert shorting bars into jacks for [MOV-1SI-865A, 6 ,and C]

(Step 25.d)

Standard: Candidate locates and inserts shorting bars into jacks for MOV-1SI-865AI 6 , and C.

CUE: Provide Candidate with shorting bars as needed.

Comment:

Performance Step: 5 Close [MOV-lSI-865A, B, C].

(Step 25.e)

Standard: Candidate locates MOV-1SI-865A and B control switches and places in Close.

Standard: Candidate verifies green close light on and red open light off for each valve.

Comment :

4 Performance Step: 6 Close [MOV-1SI-865A, B, C].

(Step 25.e)

Standard: Candidate locates MOV-1SI-86% control switch and places in Close.

Standard: Candidate verifies red open light remains on indicating valve NOT closed.

NOTE: Valve is overridden in the Open position.

Comment :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION I NOTE: The following step begins the alternate path portion of the JPM. I Performance Step: 7 Verify at least one station air compressor or the diesel air compressor is RUNNING.

(Step 25.e.l RNO)

Standard: Candidate locates and verifies 1SA-C-1A or 1B running Standard: Candidate verifies red running light on for at least one station air compressor.

Comment :

Performance Step: 8 Verify [TV-1IA-4001 OPEN.

(Step 25.e.2 RNO)

Standard: Candidate locates and verifies TV-1 IA-400 is open.

Standard: Candidate verifies red open light on and green closed light off Comment:

Performance Step: 9 Check CNMT instrument air header pressure - GREATER THAN 85 PSIG.

(Step 25.e.3 RNO)

Standard: Candidate locates PI-1IA-l06A and verifies containment instrument air header pressure indicates greater than 85 psig Cornment :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Vent any unisolated accumulators to atmospheric pressure.

Refer to 1OM-l1.4.H, Venting Safety Injection Accumulators (Step 25.e.4 RNO)

[l SI-TK-1A(B) (C)].

Standard: Candidate refers to 10M-11.4.H to vent 1SI-TK-1 C.

CUE: Provide Candidate with a copy of 1OM-1 1.4.H.

Comment :

Performance Step: 11 Check [HIC-1Sl-9361 SI ACC N2 Vent to Atm control, output is adjusted to Zero percent. (BB-A)

(Step IV.l)

Standard: Candidate checks HIC-19-936 output is adjusted to zero percent.

Standard: Candidate locates and verifies HIC-1Sl-936 indicates zero percent.

CUE: If asked, inform Candidate that Radiation Protection does not require a nitrogen gas sample.

Cornment :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 12 Close [ l Sl-691, Nitrogen Supply to S.I. Accumulators (Aux Bldg, 768 near B.A Batch Tank).

(Step IV.2.a)

Standard: Candidate dispatches local operator to direct closing 1SI-69.

CUE: Local operator reports that 1SI-69 is closed.

Comment:

Performance Step: 13 If desired by the SWUS, Close [l Sl-4371, Nitrogen Supply to Overpressure Protection System, (CNMT, At 1C SI ACC-692).

(Step IV.2.b)

Standard: No action required.

CUE: As Unit Supervisor, inform Candidate it is NOT desired to close 1Sl-437.

Comment:

.I Performance Step: 14 Open [MOV-1SI-853C1, (1C) SI Acc N2Sup lsol Vlv. (BB-A)

(Step IV.3)

Standard: Candidate locates and opens MOV-1SI-853C.

Standard: Candidate verifies red open light on and green closed light off.

Comment :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION

.( Performance Step: 15 Open [TV-1SI-101-11, SI Acc N2Sup lsol Vlv. (BB-A)

(Step IV.4)

Standard: Candidate locates and opens TV-1SI-1 01 -1.

Standard: Candidate verifies red open light on and green closed light off Comment:

Performance Step: 16 Open [TV-1SI-101 -21, SI Acc N2Sup lsol Vlv. (BB-A)

(Step IV.5)

Standard: Candidate locates and opens TV 101 -2.

Standard: Candidate verifies red open light on and green closed light off.

Comment :

.( Performance Step: 17 Operate [HIC-1Sl-9361 (BB-A) to lower accumulator to the desired pressure as indicated on [PI-1SI-921 & 923 (925 & 927) (929 &

(Step iV.6) 931)]. (VB-A)

Standard: Candidate locates and operates HIC-1Sl-936 to lower accumulator pressure.

Standard: Candidate verifies PI-1Sl-929 & 931 indicate accumulator pressure is lowering.

Comment :

Terminating Cue: When the Candidate verifies that accumulator pressure is lowering, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S3 NUREG 1021. Revision 9

-~ ~~

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S3 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Result: Satisfactory/Unsatisfactory Examiners Signatu re: Date BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

INITIATING CUE: The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 021 1-012-01-013 0531 -009-05-011 Task

Title:

Initiate Natural Circulation Cooldown JPM No.: 2005 NRC JPM S4 K/A

Reference:

002 A4.02 (4.3/4.5)

EO9 E A l . l (3.U3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Class room Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: .. A reactor trip has occurred and all RCPs were tripped.

. The crew has transitioned to ES-0.2, Natural Circulation Cooldown.

The plant is stable with condenser steam dumps in automatic in the steam pressure mode.

Task Standard: RCS cooldown in progress using residual heat release valve Required Materials: None General

References:

1OM-53A.1.ES-0.2, Natural Circulation Cooldown, Issue 1.C, Rev 4 1OM-53A.1.5-C, CRDM Fans Running - Natural Circulation Cooldown Subcooling Requirements Handouts: 1OM-53A.1 .ES-0.2, Natural Circulation Cooldown, Issue 1.C, Rev 4 lOM-53A.1.5-C, CRDM Fans Running - Natural Circulation Cooldown Subcooling Requirements Initiating Cue: The Unit Supervisor directs you to initiate an RCS cooldown in accordance with ES-0.2, Natural Circulation Cooldown, beginning at Step 5.

Time Critical Task: NO Validation Time: 15 minutes BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-194 PW = NJPM Setup IPC RCS cold leg temperature trend BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Maintain cooldown rate in RCS cold legs - LESS THAN 25"F/HR (Step 5.a)

Standard: No action required.

Comment :

Performance Step: 2 Initiate a trend of RCS cold leg temperature and pressure (Step 5.a.l)

Standard: Candidate initiates a trend of RCS cold leg temperature and pressure.

CUE: Inform Candidate that an IPC trend has been setup to trend RCS temperature and pressure.

Comment:

Performance Step: 3 Initial every half hour (Step 5.a.2)

Standard: Candidate notes trending frequency requirement.

NOTE: Inform Candidate that another operator will be responsible for trending and initialing.

Comment :

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Maintain RCS temperature and pressure - WITHIN LIMITS OF ATTACHMENT 5-C IFANY CRDM FAN RUNNING - 0 R - WITHIN (Step 5.a.3)

LIMITS OF ATTACHMENT 5-B IF NO CRDM FAN RUNNING Standard: Candidate locates and verifies at least 1 CRDM fan running Standard: Candidate verifies red running light on and white trip light off.

Standard: Candidate refers to Attachment 5-C for temperature/pressure limits.

CUE: Provide Candidate with a copy of Attachment 5-C.

Comment:

Performance Step: 5 Maintain SG narrow range level - BETWEEN 30% - 5090 (Step 5.b)

Standard: No action required.

CUE: Inform Candidate that another operator will be responsible for controlling SG levels.

Comment:

Performance Step: 6 Check MSlVs - AT LEAST ONE OPEN (Step 5.c.l)

Standard: Candidate locates and verifies at least one MSlV open.

Standard: Candidate verifies red open light on and green closed light off.

Comment:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Check condenser available (Step 5.c.2)

Standard: Candidate locates and checks status light C-12, COND AVAIL (Panel 622) is on.

Comment:

4 Performance Step: 8 Place condenser steam dump controller in MANUAL.

(Step 5.c.3)

Standard: Candidate locates and places AM-1 MS-464B, COOLDOWN VLVS CONTROL in Manual.

Standard: Candidate verifies red light on Comment:

Performance Step: 9 Verify demand - ZERO (Step 5.c.4)

Standard: Candidate locates and verifies AM-1 MS-464B demand indicates zero.

Comment:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 Place steam dumps in STM PRESS Mode.

(Step 5.c.5)

Standard: No action required per JPM Initial Conditions.

Com ment :

Performance Step: 11 Check Tavg - GREATER THAN 5419F (Step 5.c.6)

Standard: Candidate locates and checks status light D-11, 2/3 Lo-Lo Tavg (Panel 622) is NOT on.

Com ment :

4 Performance Step: 12 Gradually raise steam dump rate (Step 5.c.7)

Standard: Candidate locates AM-1MS-4645 controller and depresses raise pushbutton to open steam dump valves.

Standard: Candidate determines that steam dump valves do NOT open NOTE: Candidate may attempt to open steam dump valves in AUTO. If so, valves will NOT open.

NOTE: Steam dump controller is overridden to prevent dump valves from opening.

CUE: As the Unit Supervisor, acknowledge steam dump failure and direct Candidate to use HCV-1MS-104 to dump steam.

Comment:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION NOTE: ~~

The followina steD beains the alternate path portion of the JPM.

~~

1

.( Performance Step: 13 Manually or locally dump steam using:

(Step 5.c RNO) SG Atm Dump Vlvs -0R-Residual Heat Release Control Valve Standard: Candidate locates HCV-1MS-104, Residual Heat Release Valve and opens to manually dump steam.

Standard: Candidate verifies valve open indication.

CUE: As the Unit Supervisor, direct the Candidate to use the RHR valve to continue the cooldown.

Comment :

Terminating Cue: When the Candidate initiates a cooldown using the RHR valve, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature: Date:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET INIT1AL CONDITIONS: .. A reactor trip has occurred.

.. All RCPs are tripped.

The crew has transitioned to ES-0.2, Natural Circulation Cooldown The plant is stable with condenser steam dumps in automatic in the steam pressure mode.

INITIATING CUE: The Unit Supervisor directs you to initiate an RCS cooldown in accordance with ES-0.2, Natural Circulation Cooldown, beginning at Step 5.

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 001 1-006-01-013 Task

Title:

Manually Actuate CIB JPM No.: 2005 NRC JPM S5 WA

Reference:

026 A3.01 (4.3j4.5) 026 A4.01 (4.34.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinqL Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: . A reactor trip and safety injection have occurred due to a large break

. LOCA.

The actions of E-0 are being performed.

Task Standard: Manually initiate CIB, start 1QS-P-1A and stop the RCPs Required Materials: None General

References:

1OM-53A.1.1-K, Verification Of Automatic Actions, Issue 1C, Rev. 2 1OM-53A.1.1-E, Containment Isolation Phase B Checklist, Issue 1C, Rev. 2 Handouts: 1OM-53A.1.1-K, Verification Of Automatic Actions, lssue 1C, Revision 2 1OM-53A.1.1-E, Containment Isolation Phase B Checklist, Issue 1C, Rev. 2 Initiating Cue: The Unit Supervisor directs you to perform Attachment 1-K, Verification Of Automatic Actions, Step 8 to check CIB and Containment Spray status.

Time Critical Task: NO Validation Time: 10 minutes BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-195 PW = NJPM BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Check CIB and Containment Spray Status (Step 8) Containment pressure - HAS REMAINED LESS THAN 8 PSlG Standard: Candidate locates PI-1LM-1OOA and 1OOB, Containment Pressure Indicators, or PR-1LM-1OOA, Containment Pressure Recorder.

Standard: Candidate determines that containment pressure has NOT remained less than 8 psig.

NOTE: Containment pressure is > 8 psig.

Comment :

I NOTE: The followinq step beqins the alternate path portion of the JPM. I Performance Step: 2 Verify CIB initiated:

(Step 8.a RNO) Check BLUE CIB marks - LIT Standard: Candidate checks components properly aligned and determines CIB components not positioned as required and CIB NOT actuated.

Comment:

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 3 Verify CIB initiated:

(Step 8.a RNO) IF NOT, THEN manually initiate CIB (both pushbuttons for both trains). Check BLUE CIB marks - LIT Standard: Candidate locates and depresses both pushbuttons for Train A CIB.

Standard: Candidate locates and depresses both pushbuttons for Train B CIB.

NOTE: Candidate may actuate either train first followed by the opposite train.

Cornment :

4 Performance Step: 4 Verify CIB initiated:

(Step 8.a RNO) -

IF CIB actuated, THEN manually align equipment. If necessary, refer to Attachment 1-E, Containment Isolation Phase B Checklist.

NOTE: If requested, provide Candidate with a copy of Attachment 1-E.

Standard: Candidate checks all indicating lights with BLUE CIB marks LIT.

Standard: Candidate identifies 1QS-P-1A, Quench Spray Pump failed to start.

Standard: Candidate locates 1QS-P-1A control switch and places in Start.

Standard: Candidate verifies red running light on and white trip light off.

Standard: Candidate locates and verifies discharge pressure and motor amps for each pump.

NOTE: Candidate should recognize time delays for 1-RS-P1A and 1-RS-P2A, Recirc Spray Pumps following CIB actuation.

Cornment :

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 5 Verify CIB initiated:

(Step 8.b RNO) Stop all RCPs.

Standard: Candidate determines that all RCPs are running Standard: Candidate locates and places control switches for 1RC-P-1A, 1B and 1C in Stop.

Standard: Candidate verifies white trip light on and red running light off for each pump.

NOTE: Candidate may choose to place control switches in Pull-To-Lock after stopping pumps.

Comment:

Performance Step: 6 Request BV-2 operator verify CREVS equipment actuation (Step 8.c RNO)

Standard: Candidate contacts Unit 2 to verify proper CREVS equipment operation.

CUE: Inform Candidate as Unit 2 Operator that all CREVS equipment is functioning properly.

Comment:

Terminating Cue: When the Candidate stops the RCPs, the evaluation for this JPM is cornp lete.

STOP TIME:

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S5 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactoqdUnsatisfactory Examiner's Signature: Date:

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: . A reactor trip and safety injection have occurred due to a large

. break LOCA.

The actions of E-0 are being performed.

INITIATING CUE: The Unit Supervisor directs you to perform Attachment 1-K, Verification Of Automatic Actions, Step 8 to check CIB and Containment Spray status.

BVPS-1 NRC JPM S5 NUREG 1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 0362-005-06-013 Task

Title:

Svnchronize and Load EDG No. 2 JPM No.: 2005 NRC JPM S6 WA

Reference:

064 A4.06 (3.913.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is operating at power. 1OST-36.2, Diesel Generator No. 2 Monthly Test is in progress.

Task Standard: No. 2 diesel generator synchronized and running at minimum load Required Materials: None General

References:

1OST-36.2, Diesel Generator No. 2 Monthly Test, Rev 43 Handouts: 1OST-36.2, Diesel Generator No. 2 Monthly Test, Rev 43 Initiating Cue: The Unit Supervisor directs you to synchronize and load Diesel Generator No. 2 in accordance with 1OST-36.2, Diesel Generator No. 2 Monthly Test, Steps 27 - 31. All of the preceding procedure steps have been completed.

Time Critical Task: NO Validation Time: 12 minutes BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet I Simulator Setup: Initialize IC-PW = NJPM BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

.I Performance Step: 1 Position the No. 2 Diesel Generator Synchroscope Selector Switch to the 1F9 position to compare the diesel generator (Step V.27) frequency to the frequency on bus 1DF. (Generator Section of the Benchboard)

Standard: Candidate locates and places EMERG GEN 2 SYNCHRONIZING SELECTOR SW in the 1F9 position.

Standard: Candidate locates and compares diesel generator frequency to bus 1DF frequency.

Comment:

Performance Step: 2 Verify A9-16, ACB 1F7 OR 1F9 IN SYNCHRONIZING MODE alarms when the Synchroscope Selector Switch is moved from (Step V.27.a) the OFF position.

Standard: Candidate verifies A9-16 in alarm.

Comment :

4 Performance Step: 3 Using the No. 2 diesel Generator Governor Control Switch, (Step V.28) adjust generator speed until the synchroscope needle is rotating very slowly in the FAST direction. (Generator Section of the Benchboard)

Standard: Candidate locates and adjusts EMERG GEN 2 GOVERNOR control switch.

Standard: Candidate verifies synchroscope needle is rotating slowly in the fast di rection.

Comment :

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

~ ~~~ ~ _________

Appendix C Page 4 o t 7 Form ES-C-1 PERFORMANCE INFORMATION d Performance Step: 4 Using the No. 2 Diesel Generator Voltage control Switch, match generator voltage (Incoming) with the voltage on bus 1DF (Step V.29)

(Running).

Standard: Candidate locates and adjusts EMERG GEN 2 VOLT ADJUST control switch to match voltages.

Standard: Candidate verifies incoming and running voltages indicate approximately 120 - 122 volts.

Comment:

d Performance Step: 5 Close the Motor Operated Ground Switch by positioning the No 2 Diesel Generator Motor Operated Ground Switch control to (Step V.30)

CLOSE. (Generator Section of the Benchboard).

Standard: Candidate locates and closes EMERG GEN 2 MOTOR OPERATED GND SW DS2.

Standard: Candidate verifies red close light on and green open light off.

Comment:

Performance Step: 6 Verify that ANN. A9-10, DIESEL GENERATOR NO. 2 M.O.

GROUND SWITCH NOT FULLY OPEN is ON.

(Step V.30.a)

Standard: Candidate verifies A9-10 in alarm.

Comment:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION d Performance Step: 7 When both synchronizing lights are completely dark AND the synchroscope needle is at the 12 oclock position, place the No.

(Step V.31) 2 Diesel Generator Breaker control to CLOSE. (Red light)

(Generator Section of the Benchboard)

Standard: Candidate locates and places EMERG GEN 2 CIRCUIT BREAKER ACB 1E9 in Close at 12 oclock position.

Standard: Candidate verifies red close light on and green open light off.

Comment:

4 Performance Step: 8 Pick up a small amount of load by moving the No. 2 Diesel Generator Governor Control Switch, intermittently, to the RAISE (Step V.31.a) position.

Standard: Candidate locates EMERG GEN 2 GOVERNOR control switch and places in the Raise position.

Standard: Candidate verifies EMERG GEN 2 WATTS indicates increasing load.

Comment :

Performance Step: 9 Turn synchroscope selector switch to OFF.

(Step V.31.b)

Standard: Candidate locates and places EMERG GEN 2 SYNCHRONIZING SELECTOR SW in Off.

Comment :

Terminating Cue: When the Candidate turns the synchroscope selector switch off, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.: 2005 JPM S6 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Response

Result: Satisfactory/Unsatisfactory Examiners Signature: Date:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: The plant is operating at power. 1OST-36.2, Diesel Generator No. 2 Monthly Test is in progress.

INITIATING CUE: The Unit Supervisor directs you to synchronize and load Diesel Generator No. 2 in accordance with 1OST-36.2, Diesel Generator No. 2 Monthly Test, Steps 27 - 31. All of the preceding procedure steps have been completed.

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet FaciIit y : BVPS Unit 1 Task No.: 0021 -004-01-013 Task

Title:

Remove Power Ranae Instrument From JPM No.: 2005 NRC JPM S7 Service WA

Reference:

015 A3.03 (3.9j3.9) 015 A4.03 (3.8j3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: The plant is operating at power.

All systems are normal with the exception of one Power Range

. Nuclear Instrument which has failed.

The required actions to stabilize the plant have been taken. Reactor,

. turbine power and T A v are

~ stable. TAVG Control Rods are in Manual.

is within one degree of TREF.

Task Standard: The failed nuclear channel is bypassed in accordance with AOP-1.2.1C .

Required Materials: None General

References:

1OM-53C.4.1.2.1C, Power Range Channel Malfunction, Issue 3A, Rev. 7 Handouts: 1OM-53C.4.1.2.1C, Power Range Channel Malfunction, Issue 3A, Rev. 7 Initiating Cue: The Unit Supervisor directs you to bypass the failed power range channel using AOP-1.2.1C and report when complete.

Time Critical Task: NO Validation Time: 10 Minutes BVPS-1 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup: Initialize IC-182 PW = NJPM IMF NIS03A 0 BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Check If Malfunction Of One Power Range Channel (N-41, N-42, N-43, N-44) Has Occurred.

(Step 1)

Standard: Candidate locates and determines that 2NMP-N141B and/or NIS Rack N41, drawer A indicates channel has failed.

Standard: Candidate verifies that no other power range channel has failed.

NOTE: Power Range channels read as follows:

N-41: 0%

N-42: 4ay0 N-43: 48%

N-44: 48%

Comment :

Performance Step: 2 E Power Range Channel 4 (N-44) fails, THEN perform the following:

(Step 1.b.l)

Place Control Rod Group Selector switch in MAN.

Standard: No action required.

NOTE: Candidate may choose to verify that Control Rod Group Selector switch is in Manual.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 3 E Power Range Channel 4 (N-44) fails, THEN perform the following:

(Step l.b.2)

Place [2FWS*FCV479,489,499], 21 A (6) (C) SG Feedwater Bypass Control Vlvs in MANUAL.

Standard: No action required.

NOTE: Candidate may choose to verify that 2FWS"FCV479,489,499 are in Manual.

Comment :

4 Performance Step: 4 At NIS Rack N50, "Detector Current Comparator," turn Rod Stop Bypass Switch to BYPASS on the failed channel.

(Step 1.c)

Standard: Candidate locates and places rod stop bypass switch in Bypass PR N-41 position.

Comment:

Performance Step: 5 Verify appropriate Status Light, "Overpwr Rod Stop Bypass" (Status Light Panel 308, A-14, 8-14, C-14, 0-14) - LIT FOR (Step 1.c.l)

FALED CHANNEL Standard: Candidate locates and verifies A-14 status light on Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 6 Check reactor power - GREATER THAN 50%

(Step 1.d)

Standard: Candidate locates and verifies reactor power indicates less than 50%.

Comment :

4 Performance Step: 7 At NIS Rack N37/N46, Comparator and Rate, turn Comparator Channel Defeat Switch to failed channel.

(Step 1 Standard: Candidate locates and places comparator channel defeat switch in N41 position.

Comment :

Performance Step: 8 Ensure vertical board recorders are selected to monitor only operable detectors.

(Step 1.g>

Standard: Candidate locates and places NIS RECORDER SELECTOR UPPER 1N45 or LOWER 2N45 in N42, N43, or N44 position NOTE: Normally, only 1 recorder is set to monitor power range indication.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 9 Report task complete to the Unit Supervisor.

Standard: Candidate reports Power Range Channel N-41 is bypassed NOTE: As Unit Supervisor, acknowledge report that channel is bypassed.

Comment:

Terminating Cue: When the Candidate selects an operable recorder to the detector, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION JPM No. 2005 JPM S7 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners Signatu re: Date:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: .. The plant is operating at power.

All systems are normal with the exception of one Power Range Nuclear Instrument which has failed.

. The required actions to stabilize the plant have been taken.

Reactor, turbine power and TAVG are stable. TAVGis within one

. degree of T R E ~ .

Control Rods are in Manual.

INITIATING CUE: The Unit Supervisor directs you to bypass the failed power range channel using AOP-1.2.1C and report when complete.

BVPS-1 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: BVPS Unit 1 Task No.: 0071-025-01-013 Task

Title:

Perform Manual MakeuD to the VCT JPM No.: 2005 NRC JPM S8 WA

Reference:

004A4.01 (3.813.9) 004A4.07 (3.913.7) 004A4.04 (3.213.6)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: X Actual Performance:

Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

w The plant is at 100% power.

Core burnup is 500 MWDIMTU.

RCS boron concentration is 1550 ppm.

The inservice Boric Acid Tank concentration is 7380 ppm w VCT level is 24%.

Task Standard: Makeup flow initiated at 100 gpm through the blender.

Required Materials: CB-29 General

References:

1OM-7.4.P, Blender Manual Makeup Operation, Rev. 5 Handouts: 1OM-7.4.P, Blender Manual Makeup Operation, Rev. 5 Initiating Cue: The Unit Supervisor directs you to raise VCT level to 40% at 100 gpm by performing a manual makeup in accordance with 1OM-7.4.P, Blender Manual Makeup Operation. All Initial Conditions are met. The addition is to be batched, therefore the total volume change does not need to be calculated.

Time Critical Task: No Validation Time: 13 minutes BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 2 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 Simulator Setup: Initialize IC-10 PW = NJPM Ramp ACVCVCTW, 7000,20,0 to set VCT level to 24%

Update blender setpoint to 1550 ppm.

Update inservice BAT placard to 7380 ppm.

Do not enter setpoint data.

Reset Boric Acid and Total Flow Totalizers to ZERO.

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Obtain the existing RCS boron concentration obtained from (Step IV.A.1) Chemists sample.

Standard: No action required per JPM Initial Conditions.

CUE: If asked, inform Candidate that current RCS boron is 1550 ppm.

Comment :

Performance Step: 2 If the plant is operating at power, Obtain the B-10 Correction (Step IV.A.2) Factor from Curve Book 29, Otherwise Contact Reactor Engineering to obtain a B-10 Correction Factor.

Standard: Candidate locates and determines a correction factor from CB-29 of 0.977.

CUE: Provide Candidate with a copy of CB-29 (attached).

Comment:

Performance Step: 3 Calculate Corrected Boron Concentration AND record in the (Step IV.A.3) Daily Journal.

Standard: Candidate calculates a corrected boron concentration of 1514 ppm. 1550 x 0.977 = 1514 CUE: If asked, inform the Candidate that another operator will make the Daily Journal log entry.

Comment:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 Performance Step: 4 Obtain the inservice Boric Acid Tank boron concentration (Step IV.A.4) obtained from Chemists sample.

Standard: No action required per JPM Initial Conditions.

CUE: If asked, inform Candidate that current BAT boron is 7380 ppm.

Comment:

Performance Step: 5 Determine the desired boric acid flow controller setpoint as (Step IV.A.5) follows AND record in the Daily Journal.

Standard: Candidate calculates the required boric acid flow as:

1514pprn X 100gpm

= 20.Sgpni 7380 CUE: If asked, inform the Candidate that another operator will make the Daily Journal log entry.

Comment :

4 Performance Step: 6 Place 1MU to STOP for greater than 1 second to allow the (Step IV.A.6) blender to unarm.

Standard: Candidate locates and places 1MU switch in Stop for greater than 1 second.

Standard: Candidate verifies makeup control green light is on.

Comment :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 5 Of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 4 Performance Step: 7 Adjust Boric Acid to Blender FCV [FCV-1CH-113AI controller (Step IV.A.7) (BB-A) to the calculated desired boric acid flow setpoint.

Standard: Candidate locates and sets FCV-1CH-113 for the desired flow:

20.5 gpm x 25 units/gpm = 513 units k 2 units Comment:

4 Performance Step: 8 Set [YIC-1CH-1131, Boric Acid Integrator, for desire quantity (Step IV.A.8.a) (BB-A).

Reset [YIC-1CH-1131, Boric Acid Integrator Standard: Candidate locates and sets YIC-1CH-113 to the desired value.

NOTE: Batch amounts are at the operators discretion.

Total volume change is approximately 225 gallons including approximately 46 gallons of boric acid.

Cornment :

Performance Step: 9 Adjust Primary Water to Blender FCV [FCV-1CH-l14A] controller (Step IV.A.9) (BB-A) to the desired blender total flow.

Standard: Candidate locates and sets FCV-1CH-114A for the desired total flow setpoint: 100 gpm = 625 units.

Comment :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 4 Performance Step: 10 Set [YIC-1CH-168A1, Blender Output Integrator, for desired (Step IV.A.1O.a) quantity (BB-A).

Reset [YIC-1CH-l68A], Blender Output Integrator Standard: Candidate locates and sets YIC-1CH-168A to the desired value.

NOTE: Batch amounts are at the operators discretion.

Total volume change is approximately 225 gallons.

Comment :

Performance Step: 11 Log the flow totalizer indication and add to it the number of (Step IV.A.11) gallons set into the batch integrator for [YIC-1CH-1131, Boric Acid Integrator AND [YIC-1CH-l68A], Blender Output Integrator.

Standard: Candidate sums the totalizer and integrator values, then records the summed values.

Comment:

Performance Step: 12 Prior to the start of AND at least once every hour during a (Step IV.A.12) reduction in the RCS boron concentration: (Tech. Spec. 4.1.1.3, 4.9.8.1.b) (N/A if raising or maintaining RCS boron concentration)

Standard: No action required. Step is N/A Comment :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATlO N 2005 NRC S8 Performance Step: 13 If in Mode 4, 5 or 6, align PG water to the blender by unlocking (Step IV.A.13) and opening either of the following valves: (Blender Room)

Standard: No action required. Plant is in Mode 1 .

Comment :

4 Performance Step: 14 Place 43/MU to MAN. (66-A)

(Step IV.A.14)

Standard: Candidate locates and places 43/MU switch in Manual.

Comment :

4 Performance Step: 15 Place 1MU to START. (BB-A)

(Step IV.A.15)

Standard: Candidate locates and places 1MU switch in Start.

Standard: Candidate verifies makeup control red light is on and inservice boric acid pump Fast light is on.

Comment:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC S8 4 Performance Step: 16 Place Blender Outlet to Chg Pumps FCV [FCV-1CH-11361 (Step IV.A.16) control switch to OPEN. (BB-A)

Standard: Candidate locates and places FCV-1CH-1136 switch in open.

Standard: Candidate verifies red open light is on and green closed light is off.

Comment :

Performance Step: 17 Verify boric acid to Blender flow on [FR-1CH-1131, Boric Acid (Step IV.A.16.a) Flow. (VB-A)

Standard: Candidate locates and verifies FR-1CH-113 indicates boric acid flow.

Comment:

Performance Step: 18 Verify PG Water to Blender flow on [FR-1CH-1131, Boric Acid (Step IV.A.16.b) Flow. (VB-A)

Standard: Candidate locates and verifies FR-1CH-113 indicates PG water flow.

Comment:

Terminating Cue: When the Candidate verifies flow to the blender, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC S8 JPM No.: 2005 NRC S8 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature: Date:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 JPM CUE SHEET 2005 NRC S8 INITIAL CONDITIONS: . The plant is at 100% power.

.. Core burnup is 500 MWDIMTU.

RCS boron concentration is 1550 ppm.

The inservice Boric Acid Tank concentration is 7380 ppm VCT level is 24%.

INITIATING CUE: The Unit Supervisor directs you to raise VCT level to 40% at 100 gpm by performing a manual makeup in accordance with 1OM-7.4.P, Blender Manual Makeup Operation. All Initial Conditions are met. The addition is to be batched, therefore the total volume change does not need to be calculated.

BVPS-1 NRC JPM S8 NUREG 1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet FaciIit y : BVPS Unit 1 Task No.: 0461-012-01-012 Task

Title:

Locallv StartuD a Containment Hvdroaen JPM No.: 2005 NRC JPM P1 Analvzer W A

Reference:

028 Al.01 (3.4/3.8) 028 A4.01 (4.014.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinq Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: A reactor trip and safety injection occurred 10 minutes ago due to a LOCA. A wide range hydrogen analyzer is to be placed in service. The 120VAC and 125VDC electrical distribution systems are operable.

Task Standard: The containment hydrogen analyzer is in sewice and a containment hydrogen concentration is calculated.

Required Materials: Fluke Thermometer (Simulated)

Gene ral Refe rences: 1OM-46.4.G, Placing Wide Range Containment Hydrogen Monitoring System in Operation, Rev. 3 Handouts: 1OM-46.4.G, Placing Wide Range Containment Hydrogen Monitoring System in Operation, Rev. 3 Initiating Cue: The Unit Supervisor directs you to place the Train B wide range hydrogen analyzer in service and obtain a containment hydrogen sample using 1OM-46.4.G. Steps 1 - 3 of the procedure are complete.

Report your results when completed.

Time Critical Task: Yes Validation Time: 15 minutes BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 2 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Open [PNL-H2-101B,], Wide Range Hydrogen Analyzer cabinet (Step IV.A.4.a)

Standard: Candidate locates [PNL-H2-101B] and opens the cabinet door.

(Service Building West Wall 713)

Comment:

Performance Step: 2 Verify the STANDBY/OFF switch in the STANDBY position.

(Step IV.A.4.b)

Standard: Candidate locates and verifies or places the STANDBY/OFF switch is in STANDBY.

CUE: The STANDBYIOFF switch is in STANDBY.

Comment:

4 Performance Step: 3 Place the ON/OFF switch in the ON position.

(Step IV.A.4.c)

Standard: Candidate locates and places the ON/OFF switch in ON CUE: The ONlOFF switch is in ON.

NOTE: If the ON/OFF Switch is not placed to ON within 25 minutes, then the UFSAR assumption has not been met and the JPM is UNSAT.

Comment:

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 Performance Step: 4 Verify the amber STANDBY indicator is On.

(Step IV.A.4.d)

Standard: Candidate locates and verifies the STANDBY indicator is ON.

CUE: STANDBY indicator is On.

Comment:

Performance Step: 5 Verify the following:

(Step IV.A.4.e.l) Blue READY indicator is On.

Standard: Candidate locates and verifies the Blue READY indicator is On.

CUE: Blue READY indicator is On.

Comment :

Performance Step: 6 Verify the following:

(Step IV.A.4.e.2) Green ON indicator is On.

Standard: Candidate locates and verifies Green indicator is On CUE: Green ON indicator is On.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 Performance Step: 7 Within four minutes after the green ON indicator comes On, (Step IV.A.4.f. 1 - 9) Verify the following:

Standard: 0 Red H2 indicator is OFF.

CUE: H2 indicator is OFF.

Standard: 0 Yellow CAUTION indicator is OFF.

CUE: CAUTION indicator is OFF.

Standard: 0 Red HI indicator is OFF.

CUE: HI indicator is OFF.

Standard: 0 Green SAFE indicator is ON.

CUE: SAFE indicator is ON.

Standard: 0 Percent hydrogen meter is <1 YO (dependent on plant conditions).

CUE: Meter reading is 1.6%.

Standard: 0 PRESS ALARM indicator is OFF.

CUE: PRESS ALARM indicator is OFF.

Standard: 0 FLOW ALARM indicator is OFF.

CUE: FLOW ALARM indicator is OFF.

Standard: 0 TEMP ALARM indicator is OFF.

CUE: TEMP ALARM indicator is OFF.

Standard: 0 SYSTEM STATUS ALARM is OFF.

CUE: SYSTEM STATUS ALARM is OFF.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1 Performance Step: 8 Obtain local temperature of the applicable Cable Vault (735')

(Step IV.B.l.a) using a calibrated Fluke Thermometer (or equivalent).

Standard: Candidate obtains local temperature of the Cable Vault (735')

CUE: 4 minutes have elapsed. (Refer to Note prior to step IV.B.l)

CUE: The Cable Vault temperature is 87°F (simulated reading from Fluke Thermometer).

Comment :

Performance Step: 9 Observe the indicated hydrogen concentration (Step IV.B.1.b)

Standard: Candidate observes hydrogen concentration.

CUE: Hydrogen concentration is 1.6%.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P1

.\, Performance Step: 10 Subtract the appropriate correction factor as determined from (Step IV.B.1.c) Figure 1.

Standard: Candidate calculates actual hydrogen concentration by subtracting the correction factor found on Figure 1 from the indicated hydrogen concentration.

CUE: Containment pressure is 10 psia.

Standard: Candidate reports hydrogen concentration is 1% (+/- 0.2%)

NOTE: 1.6% - 0.6% = 1.0%

(Indicated - Correction = Actual)

Comment :

Terminating Cue: When the Candidate reports the hydrogen concentration, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC P1 JPM No.: 2005 NRC P1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Response

Result, Satisfactory/Unsatisfactory Examiner's Signature: Date:

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 JPM CUE SHEET 2005 NRC P1 INITIAL CONDITIONS: A reactor trip and safety injection occurred 10 minutes ago due to a LOCA. A wide range hydrogen analyzer is to be placed in service. The 120VAC and 125VDC electrical distribution systems are operable.

INITIATING CUE: The Unit Supervisor directs you to place the Train B wide range hydrogen analyzer in service and obtain a containment hydrogen sample using 1OM-46.4.G. Steps 1 - 3 of the procedure are complete. Report your results when completed.

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 Facility: BVPS UNIT 1 Task No: 0241-024-01-043 Task

Title:

Reset TDAFW PumD TriD Throttle Valve JPM No: 2005 NRC JPM P2 WA

Reference:

061 A2.04 (3.413.8) 2.1.30 (3.9/3.4)

Examinee: NRC Examiner: N/A Facility Evaluator: Date:

Method of Testina:

Simulated Performance: X Actual Performance Classroom: SimuIator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When YOU complete the task successfully, the objective for this Job Performance Measure will be satisfied. '

Initial Conditions: The Unit is at 50% power.

1FW-P-2, Steam Driven Auxiliary Feedwater Pump has tripped on overspeed. The Turbine Bldg. Operator has verified that the trip throttle valve is closed and no start signals exist for the pump.

TV-1MS-105A and TV-1MS-105B are closed. MOV-1MS-105 is open.

Task Standard: TDAFW pump trip throttle valve is reset IAW 1OM-24.4.V.

Required Materials: None General

References:

1OM-24.4.V, [l FW-P-21Trip Throttle Valve Resetting, Rev. 4 Handouts: 1OM-24.4.V, [l FW-P-21Trip Throttle Valve Resetting, Rev. 4 Initiating Cue: The Unit Supervisor directs you to reset the Turbine Driven AFW Pump trip throttle valve in accordance with 1OM-24.4.V.

Time Critical Task: NO Validation Time: 15 minutes BVPS-1 NRC JPM P2 NUREG-1021. Revision 9

Appendix C Page 2 of 7 Form ES-C-1 JOB PERFORMANCE MEASURE

_ _ _ _ _ ~

2005 NRC P2 (Denote Critical Steps with a check mark)

START TIME:

Performance Stem 1 Close or Verifv Closed [TV-1MS-l05A], Turb Steam Sup A Trn (Step IV.A.1.a) Trip Vlv.

Standard: No action required. (Valve is closed per the Initial Conditions.)

Comments:

Performance Step: 2 Close or Verify Closed [TV-1MS-l05B], Turb Steam Sup B Tm Trip (Step IV.A.1.b) Vlv.

Standard: No action required per the JPM Initial Conditions.

Comments:

Performance Step: 3 Open or Verify Open [MOV-1MS-1051, AFW Turb Steam Is01 Vlv.

(Step IV.A.l .c)

Standard: No action required per the JPM Initial Conditions.

Comments:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 4 Performance Step: 4 Press the Manual Emergency Trip Lever to verify that the Overspeed (Step 1V.A. 2) Trip Mechanism is tripped.

Standard: Candidate locates the trip mechanism and indicates it is in the tripped position.

CUE: The overspeed trip mechanism is tripped.

Comments:

Evaluator Note: Figure 1 depicts the overspeed trip device mechanism and may be referred to by the Candidate to assist in explaining the actions in the following steps.

Performance Step: 5 Verify that [l MS-4651, 1FW-T-2 Inlet Stm IsoI, is unlatched.

(Step IV.A.3)

Standard: Candidate indicates that the valve is unlatched.

CUE: 1MS-465 is unlatched.

Com ments:

4 Performance Step: 6 Turn [l MS-4651, 1FW-T-2 Inlet Stm Isol, handwheel in the clockwise (Step IV.A.4) direction until the sliding nut and trip lever rise to the upper limit of travel.

Standard: Candidate simulates turning 1MS-465 in the clockwise direction until the sliding nut and trip lever reach the upper limit.

CUE: The sliding nut and trip lever are at their upper limit.

Comments:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2

.( Performance Step: 7 Reset the Overspeed Trip Mechanism by performing the following:

(Step IV.A.5)

Standard: Candidate simulates the following steps to reset the trip mechanism:

Hold the overspeed trip connecting rod to the left.

. Verify the overspeed tappet washer flat side directly faces the

. overspeed trip lever.

Release the connecting rod and allow the spring tension to

. maintain the reset condition.

Verify the flat side of the washer is flush against the vertical side of the overspeed trip lever.

. Verify the trip lever is engaged with the trip hook CUE: The overspeed trip mechanism is reset.

Comments:

.( Performance Step: 8 Slowly Open [l MS-4651, 1FW-T-2 Inlet Stm Isol, by turning the (Step IV.A.6) handwheel counterclockwise.

Standard: Candidate simulates turning the handwheel counterclockwise.

CUE: 1MS-465 is open.

Comments :

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 Performance Step: 9 Verify that the pump does NOT accelerate in an uncontrolled manner.

(Step IV.A.6)

Standard: Candidate indicates that the pump is not accelerating uncontrollably.

NOTE: The Candidate may explain that the pump will accelerate due t o residual steam pressure in the steam supply line when 1MS-465 is opened.

Comments:

Performance Step: 10 WHEN Open, THEN adjust [l MS-4651, 1 FW-T-2 Inlet Stm Isol, (Step IV.A.7) 114 turn off of the backseat.

Standard: Candidate simulates turning 1MS-465 until 1/4 of a turn off the backseat.

CUE: 1MS-465 is 1/4 of a turn off its backseat.

NOTE: If requested, inform the Candidate that another Operator will perform a concurrent verification of the valve position.

Comments:

Performance Step: 11 Notify the Unit 1 Control Room Operator that [l FW-P-21, Steam (Step IV.A.8) Driven Auxiliary Feedwater Pump, is available.

Standard: Candidate informs the Control Room of the pump status.

CUE: As Control Room Operator, acknowledge report that the TD AFW pump is available.

Com ments:

- BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Terminating Cue: When the Candidate notifies the Control Room that 1FW-P-2 is available, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC P2 JPM No.: 2005 NRC P2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's signature:

BVPS-1 NRC JPM P2 NUREG-1021. Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2005 NRC P2 INITIAL CONDITIONS: The Unit is at 50% power.

1FW-P-2, Steam Driven Auxiliary Feedwater Pump has tripped on overspeed. The Turbine Bldg. Operator has verified that the trip throttle valve is closed and no start signals exist for the pump.

TV-1MS-105A and TV-1MS-105B are closed. MOV-1MS-105 is open.

INITIATING CUE: The Unit Supervisor directs you to reset the Turbine Driven AFW Pump trip throttle valve in accordance with 1OM-24.4.V.

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 Facility: BVPS Unit 1 Task No: 0361-019-01-013 Task

Title:

BV-1 Actions To Establish Station JPM No: 2005 NRC JPM P3 Blackout Cross-tie to Unit 2 WA

Reference:

055 EA1.06 (4.U4.5) 055 EA2.03 (3.914.7) 055 G2.1.30 (3.913.4)

Examinee: NRC Examiner:

Facility Evaluator: N/A Date:

Method of Testina:

Simulated Performance: X Actual Performance:

Classroom: Simulator: Plant: X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When vou comDlete the task successfully, the objective for this Job Performance Measure will be satisfied. '

Initial Conditions: A tornado strike has caused a partial loss of the switchyard. Unit 2 is without normal and emergency AC power. The Unit 2 Control Room has requested Unit 1 to establish a station blackout cross-tie from 4KV Bus 1DF.

Task Standard: Station cross-tie has been established in accordance with EOP Attachment A-1.14.

Required Materials: Cubicle Pictures General

References:

1OM-53A.1.A-1.14, BV-1 Actions To Establish Station Blackout Cross-tie To BV-2, Issue 1C, Rev. 2 Handouts: 1OM-53A.1.A-1.14, BV-1 Actions To Establish Station Blackout Cross-tie To BV-2, Issue 1C, Rev. 2 Tools: Racking Tool and Gear (Simulated)

Key No. 30 (Simulated)

Initiating Cue: The Unit Supervisor directs you to perform EOP Attachment A-1.14, Steps 11 and 12 to establish a station blackout cross-tie to Unit 2.

Time Critical Task: NO Validation Time: 20 minutes BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-1 JOB PERFORMANCE MEASURE 2005 NRC P3 (Denote Critical Steps with a check mark)

START TIME:

NOTE: Remind Candidate to simulate all actions and NOT to reach inside any switchgear or relay panel cabinets.

NOTE: Relay Panels and Bus UV cubicles are NOT to be opened. Provide Candidates with a picture of cabinet internals as appropriate.

.( Performance Step: 1 To Defeat Diesel Generator Trips, perform the following:

(Step 11.a) Open Knife Switch 3-771 (Loss of Field) on left inside [PNL-REL-211, (Relay Room)

Standard: Candidate locates Relay Room Panel 21 [PNL-REL-211 Standard: Candidate locates and opens Knife Switch 3-771 (Loss of Field).

CUE: Knife Switch 3-771 is open.

NOTE: Refer to attached picture.

Comments :

4 Performance Step: 2 To Defeat Diesel Generator Trips, perform the following:

(Step 11.a) Open Knife Switch 2-688 (Rev Pwr) on left inside [PNL-REL-221, (Relay Room)

Standard: Candidate locates Relay Room Panel 22 [PNL-REL-221.

Standard: Candidate locates and opens Knife Switch 2-688 (Reverse Power).

CUE: Knife Switch 2-688 is open.

NOTE: Refer to attached picture.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021! Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 d Performance Step: 3 To defeat 4KV emergency bus undervoltage trip, open 125 VDC (Step 11.b) control breaker in Cubicle F8A (1 DF bus).

Standard: Candidate locates 4KV Bus 1DF, Cubicle F8A.

Standard: Candidate locates and opens 125VDC control power breaker.

CUE: 125VDC control power breaker is open.

Comments:

d Performance Step: 4 To defeat 480V emergency bus undervoltage trip, open 125 VDC (Step 11.c) circuit breaker Bus U/V DC (1 P bus)

Standard: Candidate locates 480V Bus 1P.

Standard: Candidate locates and opens 125 VDC circuit breaker Bus UIV DC CUE: 125VDC circuit breaker is open.

Comments:

d Performance Step 5: Open [ACB-1D3] 480V Substation 1-2 Bus 1D And 480V Substation (Step 12.a) 1-4 Bus 1H Breaker.

Standard: Candidate locates and opens ACB-1 D3 using the control switch.

CUE: ACB-1 D3 is open.

Comments:

. ~ ~~

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 Performance Step: 6 Open [ACB-1D13], Air Conditioning Chilled Water Unit [ l VS-E-3CI.

(Step 12.b)

Standard: Candidate locates and opens ACB-1 D13 using the control switch or local pushbutton.

CUE: ACB-1013 is open.

Comments:

NOTE: Prior to racking in breaker, Candidate may verbalize donning flash suit and 4KV switching gloves. Candidate may open ACB-1A8 cubicle door to demonstrate actions to be taken or provide the Candidate with a 4KV breaker diagram (attached).

.( Performance Step: 7 With Key 30, [1D5] SBO Bkr, remove padlock from [ACB-1DEI], Unit 1 (Step 12.c.l) To Bus 1D Cross-tie.

Standard: Candidate obtains Key No. 30.

CUE: Use of the key is simulated.

Standard: Candidate locates ACB-1 D5 and removes padlock using Key 30 CUE: Padlock is removed.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 4 Performance Step: 8 Verify DC Control Power - OFF (Step 12.c.2)

Standard: Candidate locates and opens DC control power breaker.

CUE: Control power breaker is off.

Comments :

d Performance Step: 9 Verify charging springs are discharged by pulling the manual close (Step 12.c.3, 4 & 5) lever.

Standard: Candidate locates and then holds down the manual trip button.

Standard: Candidate locates and pulls the manual close lever.

Standard: Candidate releases the manual trip button.

CUE: Charging springs are discharged.

Comments:

Performance Step: 10 Verify that the breaker mechanical indicator is in the OPEN position.

(Step 12.c.6)

Standard: Candidate locates and verifies the mechanical flag indicates open CUE: Mechanical flag is in the open position.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021. Revision 9

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3

.( Performance Step: 11 Rack the breaker to the CONNECT position.

(Step 12.c.7)

Standard: Candidate turns the lock release lever to the left, inserts racking tool and turns clockwise until reaching the connect position.

CUE: Breaker is in the connect position.

Comments:

Performance Step: 12 Verify charging spring motor disconnect toggle switch - ON (Step 12.c.8)

Standard: Candidate locates and verifies the charging spring motor disconnect switch is on.

CUE: Charging spring motor disconnect switch is on.

Comments:

4 Performance Step: 13 Close DC control power breaker.

(Step 12.c.9)

Standard: Candidate locates and closes the DC control power breaker CUE: DC control power breaker is closed and the closing springs are charged.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021~ Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 t Performance Step: 14 Manually close [ACB-1D5], Unit 2 To Bus 1 D Cross-tie using (Step 12.c.10) breaker control switch.

Standard: Candidate locates and closes ACB-1 D5 using the control switch Standard: Candidate verifies red light is on.

CUE: Breaker is closed.

NOTE: Ensure the breaker door is shut and fastened.

Comments:

Terminating Cue: When the Candidate completes the actions to close breaker ACB-1 D5, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 JPM No.: 2005 NRC P3 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

~~

Result: Satisfactory/Unsatisfactory Examiner's signature: Date:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS: A tornado strike has caused a partial loss of the switchyard Unit 2 is without normal and emergency AC power. The Unit 2 Control Room has requested Unit 1 to establish a station blackout cross-tie from 4KV Bus 1DF.

INITIATING CUE: The Unit Supervisor directs you to perform EOP Attachment A-1.14, Steps 11 and 12 to establish a station blackout cross-tie to Unit 2.

BVPS-1 NRC JPM P3 NUREG-1021 Revision 9