Tech Spec Pages Corrected Pages for Amendment Nos. 136 & 115
ML051110619
Person / Time
Site: Vogtle  
Issue date: 04/15/2005
From: Gratton C
NRC/NRR/DLPM
To: Grissette D
Southern Nuclear Operating Co
Gratton C, NRR/DLPM, 415-1055
Shared Package
ML051120014 List:
References
TAC MC2225, TAC MC2226, TAC MC2227, TAC MC2228, TAC MC3090, TAC MC3091
Download: ML051110619 (2)


Text

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 5.6.7 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) (continued)

d.

The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.

EDG Failure Report If an individual emergency diesel generator (EDG) experiences four or more valid failures in the last 25 demands, these failures and any nonvalid failures experienced by that EDG in that time period shall be reported within 30 days.

Reports on EDG failures shall include the information recommended in Regulatory Guide 1.9, Revision 3, Regulatory Position C.4, or existing Regulatory Guide 1.108 reporting requirement.

PAM Report When a Report is required by Condition G or J of LCO 3.3.3, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

(continued) 5.6.8 Vogtle Units 1 and 2 5.6-5 Amendment No. 136 (Unit 1)

Amendment No. 115 (Unit 2)

Definitions 1.1 1.1 Definitions PHYSICS TESTS (continued)

a.

Described in Chapter 14 of the FSAR;

b.

Authorized under the provisions of 10 CFR 50.59; or

c.

Otherwise approved by the Nuclear Regulatory Commission.

PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

QUADRANT POWER TILT RATIO (QPTR)

RATED THERMAL POWER (RTP)

REACTOR TRIP SYSTEM (RTS) RESPONSE TIME The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, Cold Overpressure Protection System (COPS) arming temperature and the nominal PORV setpoints for the COPS, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.6.6. Unit operation within these operating limits is addressed in individual specifications.

QPTR shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.

RTP shall be a total reactor core heat transfer rate to the reactor coolant of 3565 MWt.

The RTS RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC.

(continued)

Vogtle Units 1 and 2 1.1-5 Amendment No. 136 (Unit 1)

Amendment No. 115 (Unit 2)