3/31/05 D. Lochbaum, Ucs Letter Requesting Public Meeting Before Restart of the Hope Creek Generating Station
ML050900377
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/31/2005
From: Lochbaum D
Union of Concerned Scientists
To: Blough A
NRC Region 1
Shared Package
ML050900371 List:
References
Download: ML050900377 (2)


Text

March 31, 2005 Mr. A. Randolph Blough, Director - Division of Reactor Projects United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415

SUBJECT:

REQUEST FOR A PUBLIC MEETING BEFORE RESTART OF THE HOPE CREEK GENERATING STATION

Dear Mr. Blough:

On January 12, 2005, you and a large contingent of NRC staffers conducted a public meeting in the vicinity of the Hope Creek Generating Station. The major topics on the agenda for this public meeting were (a) to communicate the results from the NRCs special inspection into the October 10, 2004, steam pipe break at Hope Creek and (b) to communicate the results from the NRCs evaluation of the B recirculation pump vibration problems. Regarding the second topic, the NRCs presentation was documented in a letter dated January 10, 2005, from the NRC to the licensee (available in ADAMS under ML050100194 and distributed during the meeting). The third paragraph in Enclosure 1 to that NRC letter read:

In addition to the pump vibrations, there are vibrations on the associated RR [reactor recirculation] and RHR [residual heat removal] system piping which have resulted in damage to system sub-components (MOV handwheel and limit switches). To date none of the vibration-induced component problems have rendered any safety-related system inoperable. [emphasis added]

The recent shut down of the Hope Creek reactor to repair a 3 inch through wall flaw at the welded junction of the 4 inch diameter decon port and the 28 inch diameter B Reactor Recirculation Systems pump suction piping (NRC Daily Event Report No. 41536 dated March 28, 2005) undermines the basis for the NRCs decision to allow Hope Creek to operate until its next refueling outage with a badly vibrating B recirculation pump. Even if the pipe flaw was not initiated by the chronic vibration problems, it is difficult to contend that the high vibration levels did not hasten the growth of the crack and ultimate failure of the reactor coolant pressure boundary. The NRC staff explained during the public meeting in December and again in the January meeting that the B recirculation pump is non-safety related but that it has the safety related function of remaining intact as part of the reactor coolant boundary. It has now failed that safety related function.

Washington Office: 1707 H Street NW Suite 600

  • 202-223-6133
  • FAX: 202-223-6162 Cambridge Headquarters: Two Brattle Square
  • Cambridge MA 02238-9105
  • 617-547-5552
  • FAX: 617-864-9405 California Office: 2397 Shattuck Avenue Suite 203
  • Berkeley CA 94704-1567
  • 510-843-1872
  • FAX: 510-843-3785

March 31, 2005 Page 2 of 2 If the NRC intends to allow the Hope Creek reactor to restart from its current outage without replacing the B recirculation pump shaft, we respectfully request that the NRC conduct another public meeting in the vicinity of the plant prior to restart. The public deserves to be updated on why what appears to be a clear and present danger is not clear and/or not present and/or not a danger from the NRCs perspective. In other words, the public deserves to hear the NRCs revised rationale for allowing continued shake and break operation at Hope Creek.

Sincerely, David Lochbaum Nuclear Safety Engineer Washington Office