Main Turbine Bypass System and Moisture Separator Reheater 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify each main turbine bypass valve opens 120 days at least 5%.
SR 3.7.6.2 Verify one complete cycle of each main Once after each turbine bypass valve.
entry into MODE 4 SR 3.7.6.3 Perform a system functional test.
18 months SR 3.7.6.4 Verify the TURBINE BYPASS SYSTEM RESPONSE 18 months.:
TIME is within limits.