Tech Spec Page for Amendment 165 Technical Specification Surveillance Requirement 3.7.6.1 for Turbine Bypass Value Cycling
ML050900102
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/29/2005
From:
NRC/NRR/DLPM
To:
Ray N, NRR/DLPM/LPD3, 415-2643
References
TAC MC5577
Download: ML050900102 (1)


Text

Main Turbine Bypass System and Moisture Separator Reheater 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify each main turbine bypass valve opens 120 days at least 5%.

SR 3.7.6.2 Verify one complete cycle of each main Once after each turbine bypass valve. entry into MODE 4 SR 3.7.6.3 Perform a system functional test. 18 months SR 3.7.6.4 Verify the TURBINE BYPASS SYSTEM RESPONSE 18 months.: I TIME is within limits.

FERMI - UNIT 2 3.7-17 Amendment No.jW4 165