RAI Relief Request MC-SRP-NS-01, Comprehensive Pump Test
ML050560326
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/24/2005
From: James Shea
NRC/NRR/DLPM/LPD2
To: Gordon Peterson
Duke Energy Corp
SHea J, 415-1388, NRR/DLPM
References
TAC MC4507, TAC MC4508
Download: ML050560326 (4)


Text

February 24, 2005 Mr. G. R. Peterson Vice President McGuire Nuclear Station Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: RELIEF REQUEST MC-SRP-NS-01, COMPREHENSIVE PUMP TEST (TAC NOS. MC4507 AND MC4508)

Dear Mr. Peterson:

By letter to the Nuclear Regulatory Commission (NRC) dated August 12, 2004, as supplemented by letter dated on November 18, 2004, pursuant to Title 10 of the Code of Federal Regulations, Section 50.55a(a)(3), you requested the use of an alternative to the American Society of Mechanical Engineers Operating and Maintenance Code, for McGuire Nuclear Station, Units 1 and 2. The NRC staff has reviewed your submittal and has determined that additional information is required.

Our questions are provided in the Enclosure. We discussed these questions with your staff on February 2, 2005. Your staff indicated that a response could be provided within 45 days of the date of this letter.

If you have any further questions on this matter, please call me at (301) 415-1388.

Sincerely,

/RA/

James J. Shea, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

Request for Additional Information cc w/encl: See next page

ML050560326 NRR-088 OFFICE PDII-1/PM PDII-1/LA DE/EMEB/SC PDII-1/SC NAME JShea CHawes DTerao JNakoski DATE 2/8/05 2/9/05 2/22/05 2/24/05

REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST MC-SRP-NS-01 ALTERNATIVES TO AMSE OM CODE DUKE ENERGY CORPORATION MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 1.

Have the Containment Spray (CS) Pumps ever been operated at design conditions? If so, provide copies of test data and test conditions.

2.

How many hours have the pumps been run since full flow testing? Include test data for all tests performed since the last time the CS pumps were operated at design conditions.

3.

Provide a maintenance and corrective action history for the CS pumps since the last time they were operated at design conditions and provide justification or reasons stating why maintenance and corrective actions have not affected pump performance.

4.

Provide technical justification that shows how operation at lower flow rates equates to the ability to operate at design flow rates. Also, discuss how the limiting acceptance criteria at the proposed lower flow rates relate to operations at the higher flow rates.

5.

Provide a basis for relief in accordance with 10 CFR 50.55a(a)(3)(ii) to show that compliance with the American Society of Mechanical Engineers Operating and Maintenance Code required testing would result in hardship or unusual difficultly with out a compensating increase in the level of quality and safety specifically in regards to installing temporary or permanent modifications needed to perform the comprehensive pump test.

McGuire Nuclear Station cc:

Ms. Lisa F. Vaughn Duke Energy Corporation Mail Code - PB06E 422 South Church Street P.O. Box 1244 Charlotte, North Carolina 28201-1244 County Manager of Mecklenburg County 720 East Fourth Street Charlotte, North Carolina 28202 Mr. C. Jeffrey Thomas Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Ms. Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 Senior Resident Inspector c/o U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, North Carolina 28078 Dr. John M. Barry Mecklenburg County Department of Environmental Protection 700 N. Tryon Street Charlotte, North Carolina 28202 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road, 12th Floor Charlotte, North Carolina 28210 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P.O. Box 629 Raleigh, North Carolina 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 South Church Street Mail Stop EC05P Charlotte, North Carolina 28202 NCEM REP Program Manager 4713 Mail Service Center Raleigh, North Carolina 27699-4713 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Dept. of Environment, Health and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, North Carolina 28201-1006