'RA E qja,5-3 UNITED STA'rES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safetv and Licensing Board January 27, 2005 DOCKETED USNRC January 27, 2005 (11:45am)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF In the Matter of ENTERGY NUCLEAR VERMONT YANKEE, LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
II
)
1)
Docket No. 50-271 ASLBP No. 04-832-02-OLA (Operating License Amendment)
ENTERGY'S PRWILEGED AND PROPRIETARY DOCUMENT LOGS As directed by the Atomic Safety and Licensing Board ("Board") during the prehearing conference call to discuss scheduling matters on January 21, 2005, Applicants Entergy Nuclear Vermont Yankee, LLC and Entergy Nucle;ar Operations, Inc. ("Entergy") hereby submit listings of otherwise discoverable documents beinrg withheld on the grounds of privilege, and listings of protected documents containing proprietary information to be held in confidence. With one exception, these lists were provided to tine parties to this proceeding (Vermont Department of Public Service ("DPS"), the New Engljand Coalition ("NEC") and the NRC Staff ("Staff')) on January 19, 2005 pursuant to 10 C.F.R. § 2.336(a)(3).'
In accordance with 10 C.F.R. § 2.336(d),
Entergy will supplement these lists I'as additional privileged or proprietary documents are developed, obtained or identified.
At the time of the initial discover y disclosures on January 18, 2005, Entergy was still compiling a list of proprietary documents relating tV DPS Contentions 1 and 2. Entergy has now completed, and is hereby submitting, that list to the Board. and the parties.
rem p {,
-5 s c 8 i
A.
LISTINGS OF ENTERGY PRIVILEGED DOCUMENTS RELATING TO DPS CONTENTIONS 1 AND 2 AND NEC CONTENTIONS 3 AND 4 Pursuant to 10 C.F.R. § 2.33 6(a)(3), listed below are documents that are protected from disclosure because of their privileged nature. Those documents are in the nature of attorney work product, attorney-client communications, or information developed at the request of counsel for use in this proceeding.
Privileged Documents Relatin2 to DPS Contentions I and 2 Document Document Description Date Privilege Asserted Number 18208 Draft response to pre-filed testimony Undated Attorney Work Product 29265 Email B. Slifer to D. Rosinski, others re revised 10/19/04 Attorney-Client Communication response Attorney Work Product 29410 Draft response to DPS questions Undated Attorney Work Product 30861 Email D. Rosinski to C. Rose re comments on Reply 10/13/04 Attorney-Client Communication Attorney Work Product 30942 Email C. Nichols to J. Silberg, others re Fiction plan 11/2/04 Attorney-Client Communication Attorney Work Product 30960 Email P. Perez to D. Rosinski, others re response to 1112/04 Attorney-Client Communication action plan item Attorney Work Product 31021 Email from P. Perez to J. Silberg, others re 10/14/04 Attorney-Client Communication comments on conference call agenda Attorney Work Product 31102 Email B. Slifer to C. Rose forward ing counsel's 10/12/04 Attorney-Client Communication comments on Reply findings Attorney Work Product 31103 Email B. Slifer to P. Perez, others re comments on 10/12/04 Attorney-Client Communication NEC Reply for counsel Attorney Work Product 31150 Email B. Slifer to C. Nichols re action plan for 11/02/04 Attorney-Client Communication counsel Attorney Work Product Document Document Description Date Privilege Asserted Number 31151 Duplicate of 31150 Attomey-Client Communication Attorney Work Product 31158 Email P. Perez to C. Rose, others re comments on 10/13/04 Attomey-Client Communication NEC Reply declaration for counsel Attorney Work Product 31159 Email B. Slifer to P. Perez, others re comments on 10/13/04 Attorney-Client Communication NEC Reply declaration for counsel Attorney Work Product 31160 Duplicate of 31159 Attomey-Client Communication Attorney Work Product 31161 Duplicate of 31159 Attomey-Client Communication Attorney Work Product 31244 Email M. Powers to C. Rose re file for counsel 10/12/04 Attomey-Client Communication Attorney Work Product 31394 Email P. Perez to J. Silberg, others re response to 10/18/04 Attomey-Client Communication counsel's inquiry on Torus temperature sensitivity 31501 Duplicate of 31394 Attomey-Client Communication 31502 Duplicate of 31394 Attomey-Client Communication 31542 Email C. Nichols to B. Hobbs, others re Actions to 10/06/04 Attomey-Client Communication Respond to NRC Response to Contentions Attorney Work Product 31545 Email C. Nichols to B. Hobbs, others re contention 9/23/04 Attorey-Client Communication response questions from counsel Attomey Work-Product 31548 Duplicate of 31021 Attomey-Client Communication Attorney Work Product 31549 Email C. Nichols to B. Hobbs, others forwarding 11/2/04 Attorney-Client Communication agenda for conference call with counsel Attorney Work Product 31550 Email P. Perez to J. Silberg, others re Draft Letter to 10/20/04 Attomey-Client Communication Attorney Work Product Document Document Description Date Privilege Asserted Number 31555 Email P. Rainey to B. Slifer re comments on NEC 10/13/04 Attorney-Client Communication Reply Attorney Work Product 31556 Email C. Nichols to J. Silberg, others re draft 10/13/04 Attorney-Client Communication response to DPS letter for comment Attorney Work Product 31559 Email B. Slifer to C. Nichols re proposed response 10/07/04 Attorney-Client Communication to contention Attorney Work Product 31566 Duplicate of 31394 Attorney-Client Communication Attorney Work Product 31568 Email B. Slifer to C. Rose re revised response to 10/19/04 Attorney-Client Communication questions for counsel Attorney Work Product Email R. Wanczyk to J. McCann forwarding counsel 09/30/2004 Attorney-Client Communication discussion of NRC Staff position with respect to DPS and NEC contentions Privileged Documents Relating to NEC Contentions 3 and 4 Document Document Description Date Privilege Number 30681 Email R. Daflucas to R. Felumb re counsel's request 9/21/04 Attorney-Client Communication for documents Attorney Work Product 30682 Email B. Pananos to C. Rose forwarding Seismic 10/18/04 Attorney-Client Communication Design Summary for counsel Attorney Work Product 30683 Email T. O'Connor to C. Rose forwarding Seismic 10/18/04 Attorney-Client Communication Design Summary for counsel Attorney Work Product 30687 Email R. Felumb to R. Deflucas re counsel's request 9/21/04 Attorney-Client Communication for documents Attorney Work Product 30688 Email M. Powers to C. Rose re counsel's request for 9/23/04 Attorney-Client Communication documents Attorney Work Product Document Document Description Date Privilege Number 31802 Summary of Seismic Design Bases prepared at 10/16/04 Attorney-Client Communication request of counsel Attorney Work Product 36720 Email J. Fitzpatrick to D. Yasi re draft interrogatory 7/2/04 Attorney-Client Communication responses Attorney Work Product 36721 Email J. Fitzpatrick to D. Yasi re draft interrogatory 6/25/04 Anorney-Client Communication response Attorney Work Product 36722 Email J. Fitzpatrick to D. Yasi re draft response to 6/30/04 Attorney-Client Communication intervenor question attached Attorney Work Product 36931 Email D. Yasi to G. Franklin, others re draft 7/05/04 Atorney-Client Communication interrogatory responses Attorney Work Product 36951 Email S. Goodwin to D. Yasi re analysis of 7/7/04 Attorney-Client Communication intervenor responses for counsel Attorney Work Product 36954 Email D. Yasi to G. Franklin, others re draft 6/27/04 Attorney-Client Communication interrogatory responses Attorney W'ork Product 36987 Email J. Fitzpatrick to S. Goodwin re draft 6/25/04 Attorney-Client Communication interrogatory response Attorney Work Product 37026 Email J. Fitzpatrick to D. Yasi re draft interrogatory 7/2/04 Attorney-Client Communication responses Attorney Work Product 37027 Email J. Fitzpatrick to D. Yasi re draft interrogatory 6/30/04 Attorney-Client Communication response Attorney Work Product 37030 Email S. Goodwin to D. Yasi re draft interrogatory 7/06/04 Attorney-Client Communication responses Attorney Work Product 37236 Draft response to intervenor question re cooling Attorney-Client Communication tower Attorney Work Product Email R. Wanczyk to J. McCann forwarding counsel 09/30/04 Attorney-Client Communication discussion of NRC Staff position with respect to DPS and NEC contentions B.
LISTINGS OF ENTERGY PROPRIETARY DOCUMENTS RELATING TO DPS CONTENTIONS I AND 2 AND NEC CONTENTIONS 3 AND 4 Pursuant to 10 C.F.R. § 2.336(a)(3), listed below are documents to be afforded protected status because they contain proprietary information of Entergy and its vendors and consultants.
The information in those documents warranting protected status generally consists of proprietary commercial and financial information or proprietary technical analyses and designs that should be held in confidence by the NRC pursuant to 10 CFR §§ 2.390(a)(4) and 9.17(a)(4), because:
- 1. This information is and has been held in confidence by the party generating it.
- 2. Tllis information is of a type that is customarily held in confidence by the party generating it because it contains sensitive financial or technical information.
- 3. This information will be transmitted to the parties to this proceeding in confidence, and as required by the discovery obligations set forth in 10 CFR §§ 2.336.
- 4. This information is not available in public sources and could not be gathered readily from other publicly available information.
- 5. Public disclosure of this information would create substantial harm to the competitive position the party generating it by disclosing to its competitors financial or technical data that could be used to the commercial disadvantage of the disclosing party.
Pronrietarv Documents Relating to DPS Contentions 1 and 2 Doc No.
Bates Range Date Doc Title To From Com an EPU 029731 VYC-2314 Minimum Containment
- EPU Overpressure for Non-LOCA EPU000793 029750 9/2/2003 Events lifer VY EPU 029751 VYC-2306-Final - Torus EPU Temperature for Appendix R EPU000794 029871 8/2912003 Events at EPU Conditions Schor VY VYC-2295 R. 0 - Analysis of EPU 029872 Suppression Pool Temperature for
- EPU Relief Valve Discharge Transients EPU000795 030143 6/30/2003 at 20% Power Uprate Guimond VY VYC-2294-Evaluation of Reactor EPU 030144 Coolant Pressure Boundary Piping EPU and Supports for Power Uprate EPU000796 030160 8/11/2003 Conditions Traft VY EPU 030161 WC-2293-Evaluation of Balance
- EPU of Plant Piping and Pipe Supports EPU000797 030187 8/11/2003 or Power Uprate Conditions Traft VY EPU 030188 VYC-2293-Evaluation of Balance
- EPU of Plant Piping and Pipe Supports EPU000798 030214 7/3/2003 for Power Uprate Conditions' Traft Vy EPU 030215 0C-1088 Feedwater and
- EPU Condensate Hydraulic Model EPU000799 030219 8/22/2003 Analysis (PUSAR notes)
- EPU WC-1 088 4160/480 volt Short EPU000800 031254 8/28/2003 Circuit/Voltage Study Ovalle VY EPU 062972 EPU Uploaded Draft Cooling Tower Felumb; EPU00331O 062975 2/12/2003 Perf Report Hobbs Yasi GE EPU 062976 Vermont Yankee Feasibility Study EPU for EPU - Section 5.8 Cooling EPU003311 062978 Tower GE EPU 062979 Vermont Yankee Feasibility Study EPU for EPU - Section 5.8 Cooling EPU003312 062981 Tower GE EPU 062982
- EPU PUSAR Section 6.4 6.4.1 and Nichols; EPU00331 7062985 8/28/2003 6.4.5 input Service Dick Hobbs GE EPU 062986
- EPU PUSAR Section 6.1 input AC Nichols; EPU00331 8062991 8/29/2003 Systems Dick Hobbs GE EPU 062992 EPU PUSAR Section 4.2.6 input ECCS Nichols; EPU003319 062994 8/29/2003 Net Positive Suction Dick Hobbs GE EPU 062995 EPU Nichols; EPU003320 062998 8/29/2003 PUSAR Section 6.7 Dick Hobbs GE EPU 062999
-EPU Nichols; EPU003321 063006 912/2003 PUSAR Section 6.7 Dick Hobbs GE Doc No. Bates Range Date Doc Title To From Cornan EPU 063007
- EPU PUSAR Section 9.3.2 Input lichols; EPU003322 063008 8/29/2003 Station Blackout Dick Hobbs GE EPU 063009 PORC Technical Changes to
- EPU PUSAR Revision B and EPU003323 063023 9/4/2003 Comments Dick Nichols GE EPU 063024
- EPU Safety Analysis Report for EPU003324 063215 7/29/2003 Constant Pressure Power Uprate Schroll GE EPU 063216 EPU Safety Analysis Report for EPU003325 063427 9/5/2003 Constant Pressure Power Uprate Schroll GE EPU 063428
- EPU Safety Analysis Report for EPU003326 063646 8/20/2003 Constant Pressure Power Uprate Schroll GE EPU 063647 EPU Project Task Report: Containment EPU003327 063755 6/1/2003 System Response Rhow GE EPU 063756 EPU Equipment Qualifications EPU003328 063818 8/29/2003 Engineering Report Nichols Yasi; SW EPU 063819 Torus Temperature Response to
- EPU Appendix R and Station Blackout EPU003329 063950 11/5/1998 Scenarios Fago; VY EPU 063951 EPU Station Blackout Documentation EPU003330 064037 12/21/2000 Analysis WC-886 Seifaee VY EPU 064038 EPU EPU003331 064050 8/28/2003 Task 0400 Decay Heat Profile Nichols Dick; GE EPU 064051 EPU EPU003333 064053 5/19/2003 Containment Isolation Devincentis GE EPU 064054 EPU Reactor Core Isolation Cooling LeFrancois; EPU003334 064057 7/3/2003 (RCIC) System Devincentis; GE EPU 064058 EPU Devincentis; EPU003335 064065 6/26/2003 Nuclear Boiler System LeFrancois; GE EPU 064066
- EPU EPU003336 064090 4/4/2002 Fuel Cababilities with EPU Alzaben GE EPU 064091
- EPU GE Proprietary Licensing Topical EPU003337 064144 2/6/2003 Report Stramback GE EPU 064145 EPU Maximum Extended Load Line EPU003338 064274 3/13/2003 Limit Analysis Balduzzi VY EPU 064275
- EPU NRC review of GE-Licensing EPU003339 064360 3/31/2003 opical Report-CPPC Rev. 3 Ruland GE Doc No. Bates Range Date Doc Title To From oompan EPU 064361 EPU NRC review of GE Licensing EPU003340 064444 3/31/2003 Topical Report Safety l
Ruland GE EPU 064445 Summary of GE Part 21
- EPU Evaluations of RLB Loads on EPU003341 064447 3/7/2003 Internals Casillas; GE EPU 064448
- EPU Acoustic and Flow-induced Loads EPU003342 064456 11 /22/2002 Evaluation Tran GE Licensing Topical Report:
EPU 064457 Qualification of the One-EPU Dimensional Core Transient Model EPU003343 064619 211/2000 or Boiling Water Reactors Marquino GE EPU 064620
- EPU Safer/GESTR-LOCA Loss-of-EPU003344 064692 3/1/2003 coolant Accident Analysis Bott; GE EPU 064693
- EPU Licensing Topical Report:
EPU003345 064848 12/21/2001 Constant Pressure Power Uprate Klaaproth GE EPU 064849
- EPU Licensing Topical Report:
EPU003346 064908 10/8/2002 Constant Pressure Power Uprate Stramback; GE EPU 064909
- EPU Licensing Topical Report:
EPU003347 065062 11/1/2002 Constant Pressure Power Uprate Cole GE Licensing Topical Report: Generic EPU 065063 Guidelines for General Electric
- EPU Boiling Water Reactor Extended EPU003348 065236 2/1/1999 Power Uprate Marquino GE Licensing Topical Report: Generic EPU 065237 Evaluation of General Electric EPU Boiling Water Reactor Extended EPU003349 065364 2/1/2000 Power Uprate Marquino GE Licensing Topical Report: Generic EPU 065365 Evaluation of General Electric
- EPU Boiling Water Reactor Extended EPU003350 065455 2/1/1999 Power Uprate Marguino GE Licensing Topical Report: Generic EPU 065456 Evaluation of General Electric EPU Boiling Water Reactor Extended EPU003351 065694 4/1/1999 Power Uprate Marguino GE EPU 065695 EPU EPU003352 065753 3/1/2001 ODYN Statistical CPR Analysis Schrum; GE EPU 065754 VY Final APRM/RBMlTechnical
- EPU Specifications/ Maximum EPU003353 065830 3/4/2003 Extended Load Line Limit Analysis Schrull GE EPU 065831 EPU Work Impact Notification 003 for Dick; EPU003354 065833 12118/2002 Task T0902-ATWS Nichols Hinds; GE EPU 065834 EPU VYC-2161 MOV HELB Closure EPU003355 065870 2/6/2001 imes Lynch VY Doc No.
Bates Range Date Doc Title To From ampan EPU 065871 EPU NEDE-24222 Assessment of BWR EPU003356 066688 12/1/1979 Mitigation of ATWS Volume I GE EPU 066689
- EPU EPU003357 066950 0/0/0000 GE Uprate Study GE EPU 066951 EPU Final Task Report: Containment EPU003358 066973 1011/2003 System Response Rhow GE EPU 066974
- EPU Final Task Report: Reactor Heat EPU003359 067002 11/1/2003 Balance Peters GE EPU 067003 EPU VYC Containment Overpressure EPU003360 067016 for Non-LOCA Events vy EPU 067017 EPU Power Uprate Feasibility EPU Study for Balance of Plant EPU003361 067180 4/1/2002 Systems W
EPU 067181 EPU EPU003363 067442 ermont Yankee Feasibility Study GE EPU 067443 EPU Technical Design Procedure OPL EPU003364 067571 5/1/2002 - 3 Design Guide Bolger GE EPU 067572 Task Scoping Document:
EPU Anticipated Transients Without EPU003365 067580 3/1/2003 Scram GE EPU 067581 EPU Project Task Report: Anticipated EPU003366 067626 5/1/2003 Transients Without Scram Niggel GE Claassen; Earle; Holt; EPU 067627 Licensing Topical Report:
chafer; EPU nticipated Transients Without Shirley; EPU003367 067683 21/1987 Scram rightsman GE EPU 067684 Fuel and Peaking Information to
- EPU Support ERIN EPU Risk EPU003368 067753 4/17/2003 Assessment Duda GNF EPU 067754 EPU Vermont Yankee TSC Integrated EPU003369 067765 5/9/2003 Dose Calculation Sher; Metcalf Polestar Project Qa Plan For Design Basis EPU 067766 Source Term Calculation Of
- EPU Vermont Yankee Nuclear Power EPU003370 067774 3/3/2003 Plant Polestar EPU 067775 EPU Radiological Evaluation of a DBA-EPU003371 067901 9/22/2003 Loss of Coolant Accident Metcalf Polestar EPU 067902 Long-term (>600 sec) Pressure EPU Response to DBA-LOCA with EPU003372 067902 Containment Spray NPSH GE Doc No. Bates Range Date Doc Title To From Compan EPU 067903
- EPU GE Licensing Topical Report on EPU003373 068211 7/1/2003 Constant Pressure Power Uprate Roberts GE EPU 068212 General Electric Boiling Water
- EPU Reactor Maximum Extended Load EPU003374 068335 8/23/2002 Line Limit Analysis Plus Stramback GE EPU 068336 EPU ask Scoping Document: ECCS-EPU003375 068347 10/1/2002 LOCA SAFER/GESTR GE Safety Analysis Report for EPU 068348 Vermont Yankee Nuclear Power EPU Station Constant Pressure Power EPU003376 068559 9/1/2003 Uprate Schrull GE EPU 068560 EPU Electrical Power and Auxiliary EPU003377 068566 8/4/2003 Systems PUSAR Section GE Safety Analysis Report for EPU 068567 Vermont Yankee Nuclear Power EPU Station Constant Pressure Power EPU003378 068793 8/1/2003 Uprate Schrull GE Safety Analysis Report for EPU 068794 Vermont Yankee Nuclear Power EPU Station Constant Pressure Power EPU003379 069025 8/1/2003 Uprate Schrull GE EPU 069026 EPU Vermont Yankee Power Uprate EPU003380 069054 8/28/2003 Project SW EPU 069055 EPU EPU003381 069117 8/29/2003 PUSAR Section 10.3.1 Nichols Yasi SW EPU 069118 EPU PUSAR Sections 6.4 6.4.1 and EPU003382 069173 8/25/2003 6.4.5 Nichols asi SW EPU 069174 EPU EPU003383 069203 9/2/2003 PUSAR Section 4.1.4 Nichols Yasi SW EPU 069204 EPU EPU003384 069220 8/28/2003 PUSAR Section 6.2 Nichols Yasi SW EPU 069221 EPU Polestar Calculation: Radiological EPU003385 069345 7/28/2003 Evaluation of a DBA-LOCA Metcalf Polestar EPU 069346
- EPU Polestar Calculation: Radiological EPU003386 069470 7/28/2003 Evaluation of a DBA-LOCA Metcalf Polestar EPU 069471 Submittal of Draft BOP
- EPU Engineering Report ECCS Pump EPU003387 069484 9/15/2003 NPSH Evaluation Draft A Salter SW EPU 069485
- EPU Reference 38 VYC-22606 Source EPU003389 069547 2/5/2003 Term Hamawi VY Doc No.
Bates Range Date Doc Title To From Compan EPU 069548
- EPU Feedwater & Condensate EPU003390 069872 8/22/2003 Hydraulic Model Analysis O'Brien Bounding Core Inventories of EPU 069873 ctinides and Fission Products for EPU Design-Basis Applications at 1950 EPU003391 070251 2/13/2003 MWt Hamawi w
Bounding Core Inventories of EPU 070252 Actinides & Fission Products for EPU Design Basis Applications at 1950 EPU003392 070422 2/13/2003 MWt Hamawi W
EPU 070423 V Calculation: Minimum EPU Containment Overpressure for EPU003393 070442 9/212003 Non-LOCA Events Slifer VY EPU 070443 EPU Torus Temperature for Appendix EPU003394 070563 8129/2003 R Events at EPU Conditions Schor VY Analysis of Suppression Pool EPU 070564 Temperature for Relief Valve EPU Discharge Transients @ 20%
EPU003395 070835 6/30/2003 Power Uprate Guimond
'A EPU 070836 EPU Feasibility Study: Residual Heat EPU003396 070841 Removal System GE EPU 070842 EPU EPU003397 070846 Emergency Core Cooling Systems GE EPU 070847
- EPU EPU003398 070850 Containment Capability GE Safety Analysis Report for EPU 070851 Vermont Yankee Nuclear Power EPU Station Maximum Extended Load EPU003399 070943 8/1/2003 Line Limit Analysis Plus Schrull GE Safety Analysis Report for EPU 070944 Vermont Yankee Nuclear Power
- EPU Station Maximum Extended Load EPU003400 071165 8/1/2003 Line Limit Analysis Plus chrull GE EPU 071166
- EPU VY Feasibility Study 3.14 Special EPU003401 071170 Events GE EPU 071171
- EPU VY Feasibility Study 3.12 Residual EPU003402 071176 Heat Removal System GE EPU 071177 EPU Extended Power Uprate / MELLLA EPU003403 071472 611/2002 Feasibility Study GE EPU 071473
- EPU VYNPS AEP OPL 4A for Entergy EPU003404 071522 2/5/2003 Approval Nichols Dick GE Doc No. Bates Range Date Doc Title To From Compan Safety Analysis Report for EPU 071523 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003405 071734 9/1/2003 Uprate Schrull GE EPU 071735 EPU EPU003406 071751 211/2003 Standby Gas Treatment System Head GE EPU 071752 VYNPS/GE EPU and M+
EPU Feasibility Assessment Meeting EPU003407 071762 4/4/2002 NSSS Assessment Knecht GE EPU 071763 EPU BOP Engineering Report: ECCS EPU003408 071776 9/1512003 Pump NPSH Evaluation Salter SW Torus Temperature for Appendix EPU 071777 R Events with a RHR Service
- EPU Water Temperature of 85 degrees Schur; EPU003409 071983 6/16/2000 F Guimond VY EPU 071984 orus Temperature Response to
- EPU ppendix R and Station Blackout EPU003410 072115 11/511998 Scenarios Fago DE&S EPU 072116
- EPU Station Blackout Documentation EPU003411 072201 12/21/2000 nalysis Farrokh EPU 072202 ermont Yankee Nuclear Power
- EPU Plant Safe Shutdown Capability EPU003412 072380 12/22/1999 nalysis Deinha VY EPU 072381 EPU Draft BOP Engineering Report EPU003413 072461 Condensate & Feedwater Bandeira SW EPU 072462 EPU WPS High Energy Line Break EPU003414 072467 9/22/2003 Target Impact Project Cizauskas; SW EPU 072468 EPU Station Blackout Documentation EPU003415 072553 12/21/2000 nalysis Seifaee VY EPU 072554
- EPU EPU0034161072556 5/29/2003 Reactor Recirculation System Duda GE EPU 072557
- EPU Task Scoping Document Residual EPU003417 072567 1/1/2003 Heat Removal System GE EPU 072568
- EPU Project Task Report: Residual EPU003418 072587 3/1/2003 Heat Removal System en GE EPU 072588 Containment Analysis Input EPU Values For Vermont Yankee EPU003419 072637 2/312003 Nuclear Power Station Rhow GE EPU 072638
- EPU EPU003420 072689 2/28/2003 ransmital of OPL4A Nichols Dick GE EPU 072690
- EPU Decay Heat for Containment EPU003421 072702 317/2003 nalysis Nichols Dick GE Doc No. Bates Range Date Doc Title To From Compan EPU 072703
- EPU Suppression Pool Temperature /
EPU003422 072715 4/5/2003 Pressure Response to DBA-LOCA Nichols Dick GE EPU 072716
- EPU Containment System Response-EPU003423 072726 5/2/2003 IBA & SBA results; Nichols Dick; GE EPU 072727
- EPU DBA LOCA with Suppression Pool EPU003424 072743 5/7/2003 Cooling Event Results Nichols Dick GE EPU 072744 EPU Task Scoping Document:
EPU003425 072752 11/1/2002 Containment System Response GE EPU 072753 DRAFT OPL-4A For Vermont EPU Yankee Nuclear Power Station EPU003426 072793 EPUIMELLLA+
Rhow GE EPU 072794 EPU OPL-4A (Containment Analysis EPU003427 072843 2/2612003 Input Values);
Hobbs Slifer GE OPL-4A (Containment Analysis EPU 072844 Input Values) For Vermont Yankee EPU Nuclear Power Station EPU003428 072897 2/27/2003 EPU/MELLLA+ (Revision 1)
Rhow GE EPU 072898 EPU Project Task Report: Containment EPU003429 073007 6/1/2003 ystem Response Rhow GE EPU 073008 EPU NPS EPU Containment EPU003430 073029 2/1/2003 Isolation Keller GE EPU 073030 EPU EPU003431 073032 5/1912003 Containment System Response Devincentis GE EPU 073033 EPU VNPS EPU Containment EPU003432 073054 4/1/2003 Isolation Keller GE EPU 073055
- EPU Task Scoping Document: Core EPU003433 073063 11/1/2002 Spray System GE EPU 073064
- EPU VYNPS EPU Post-LOCA EPU003434 073089 6/1/2003 Combustible Gas Control Head GE EPU 073090 WNPS/GE EPU and M+
- EPU Feasibility Assessment Meeting EPU003435 073100 4/4/2002 NSSS Assessment Knecht GE EPU 073101 EPU EPU003436 073260 3/25/2002 W Feasibility Study GE EPU 073261 EPU Project Task Report: Transient EPU003437 073294 5/1/2003 Analysis (draft)
Niggel GE Safety Analysis Report for EPU 073295 Vermont Yankee Nuclear Power EPU Station Constant Pressure Power EPU003438 073472 4/24/2003 Uprate Schrull GE Doc No. Bates Range Date Doc Title To From Compan Safety Analysis Report for EPU 073473 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003439 073664 7/29/2003 Uprate Schrull GE EPU 073665
- EPU WY Calculation Station Blackout EPU003440 073750 1/3/2001 Documentation Analysis Seifaee GE Calculation/Analysis for Torus EPU 073751 emperature Response to EPU ppendix R and Station Blackout EPU003441 073882 1115/1998 Scenarios Fago DE&S Calculation/Analysis for Torus EPU 073883 emperature Response to
- EPU Appendix R and Station Blackout EPU003442 074014 11/5/1998 Scenarios Fago DE&S Calculation/Analysis for Torus EPU 074015 Temperature and Pressure EPU Response to Small Break LOCA EPU003443 074219 11/3/1998 Scenarios-Model Development Fago DE&S EPU 074220 Calculation/Analysis of
- EPU Suppression Pool Temperature for EPU003444 074532 11/5/1998 Relief Valve Discharge Transients Ganthner DE&S EPU 074533 Calculation/Analysis of
- EPU Suppression Pool Temperature for EPU003445 074845 11/5/1998 Relief Valve Discharge Transients Ganthner DE&S W Calculation Torus Temperature EPU 074846 for Appendix R Events with a RHR
- EPU Service Water Temperature of 85 EPU003446 075052 6/16/2000 F Guimond WA VY Calculation Torus Temperature EPU 075053 for Appendix R Events with a RHR EPU Service Water Temperature of 85 EPU003447 075259 6/16/2000 F Guimond vy W Calculation Torus Temperature EPU 075260 for Appendix R Events with a RHR
- EPU Service Water Temperature of 85 EPU003448 075466 6/16/2000 F Guimond
'AW EPU 075467 VYC-2306 Torus Temperature for EPU ppendix R Events at EPU EPU003449 075480 Conditions Schor VY EPU 075481 VYC-2306 Torus Temperature for
- EPU Appendix R Events at EPU EPU003450 075494 Conditions Schor co EPU 075495
- EPU Project Task Report: ECCS-LOCA EPU003451 075563 6/1/2003 SAFER/GESTR Bott Boll GE EPU 075564
- EPU Project Task Report: ECCS-LOCA EPU003452 075632 6/1/2003 SAFERlGESTR Bott Boll GE EPU 075633
- EPU Project Task Report: Residual EPU003453 075652 3/1/2003 Heat Removal System Jen GE 15 -
Doc No.
3ates Range Date Doc Title To From ompan PU 075653 EPU Project Task Report: Residual EPU003454 075672 6/1/2003 Heat Removal System Jen GE PU 075673 EPU EPU003455 075934 Vermont Yankee Feasibility Study GE PU 075935 EPU EPU003456 075965 8/25/2003 RBCCW PUSAR Section 6.4.3 Nichols asi SW PU 075966 EPU PUSAR Sections 6.46.4.1 and EPU003457 076018 8/25/2003 6.4.5 Nichols Yasi SW EPU 076019
- EPU Project Task Report: Standby EPU003458 076040 5/1/2003 Liquid Control System Simpson GE EPU 076041
- EPU Project Task Report: Standby EPU003459 076062 5/1/2003 Liquid Control System Simpson GE EPU 076063 Response to Request for EPU dditional Information - Extended an; EPU003460 076099 5/29/2001 Power Uprate Middlesworth GE Long-Term Containment EPU 076100 Response and Overpressure
- EPU Required for Adequate NPSH for EPU003461 076114 121612002 Low Pressure ECCS Pumps Forbes EPU 076115 Long-Term Containment EPU Response And Net-Positive EPU003462 76199 9/24/2003 Suction Head Analyses Palmisano EPU 076200 EPU EPU003463 076286 3/9/2004 GE-13 LOCA Rebaseline Report Dick Nichols GE EPU 076287
- EPU ECCS-LOCA Evaluation for EPU003464 076349 9/1/2002 GE 13 & 14; Enciso GE EPU 076350
- EPU VY ECCS-LOCA Evaluation for EPU003465 076412 911/2002 GE 13 & 14; Enciso GE EPU 076413
- EPU EPU003466 076418 9/2/2003 PUSAR Section 4.2.6 Dick Nichols GE EPU 076419 EPU EPU003467 076421 8/29/2003 PUSAR Section 4.2.6 Dick Nichols GE EPU 076422
- EPU EPU003468 076425 8/29/2003 PUSAR Section 6.7 Dick Nichols GE EPU 076426
- EPU EPU003469 076427 8/2912003 PUSAR Section 9.3.2 Dick Nichols GE EPU 076428 EPU VYNPS PORC Technical Changes EPU003470 076442 9/4/2003 to PUSAR Revision B Dick Nichols GE Doc No. Bates Range Date Doc Title To From Compan EPU 076443 Request for Information for
- EPU Appendix RIFire Protection EPU003471 076597 3/4/2003 evaluation Dick Nichols VY EPU 076598 Request for Information for
- EPU Appendix R/Fire Protection EPU003472 076752 3/4/2003 evaluation Dick Nichols VY EPU 076753
- EPU EPU003473 076792 4/22/2003 OPL-4 & -5 REVIEW FORM GE EPU 076793 EPU SAFERJGESTR-LOCA Loss-of-EPU003474 076864 3/1/2004 Coolant Accident Analysis Bott GE EPU 076865
- EPU SAFER/GESTR-LOCA Loss-of-EPU003475 076950 3/1/2004 Coolant Accident Analysis Bott GE EPU 076951
- EPU SAFER/GESTR-LOCA Loss-of-EPU003476 077021 6/1/2003 Coolant Accident Analysis Bott GE EPU 077022
- EPU SAFER/GESTR-LOCA Loss-of-EPU003477 077094 3/1/2003 Coolant Accident Analysis Bott GE EPU 077095
- EPU SAFER I GESTR-LOCA Loss-of-EPU003478 077167 3/1/2003 Coolant Accident Analysis Bott GE VYNPS LOCA-DBA Long-Term NPSH Information Transmittal EPU 077168 1.5% per Day Leakage and 100%
- EPU Containment Spray Thermal EPU003479 077199 7/6/2004 Mixing Efficiency GE EPU 077200 EPU Peak Cladding Temperature EPU003483 077203 5/28/2004 (PCT) Sensitivity Study Nichols Dick GE EPU 077204
- EPU VYNPS EPU DBA-LOCA for Long EPU003485 077228 6/10/2004 erm NPSH Evaluation Nichols Dick GE EPU 077229
- EPU VYNPS EPU DBA-LOCA for Long EPU003486 077262 7/6/2004 Term NPSH Evaluation Nichols Dick GE EPU 077263
- EPU VNPS EPU DBA-LOCA for Long EPU003487 077296 7/6/2004 Term NPSH Evaluation Nichols Dick GE EPU 077297
- EPU VYNPS EPU DBA-LOCA for Long EPU003488 077331 8/7/2004 Term NPSH Evaluation Nichols Dick GE EPU 077332
- EPU VYNPS EPU - Response to NRC EPU003489 077498 7/1/2004 Request for Additional Information Nichols Dick GE EPU 077499 EPU VYNPS EPU - Response to NRC EPU003490 077511 7/29/2004 Request for Additional Information Nichols Dick GE EPU 077512
- EPU VYNPS EPU - Response to NRC EPU003491 077719 816/2004 Request for Additional Information Nichols Dick GE Doc No. Bates Range Date Doc Title To From Compan 10CFR50.65 Implementation EPU 077720 Guideline No. 2 Selection of SSCs EPU Within The Scope of I OCFR50.65 EPU003493 077737 Revision 4 VY EPU 077738 V Engineering Record EPU Containment Analysis Input EPU003494 077739 5/6/2003 Parameters Hobbs Slifer GE EPU 077740 VNPS Constant Pressure Power EPU Uprate - Generic Disposition EPU003499 077810 1/29/2004 Matrix Nichols Dick GE EPU 077811 Request for License Amendment EPU for Power Uprate Operation for EPU003500 077938 12/27/2000 Dresden & Quad Krich GE EPU 077939 EPU Appendix E Power Uprate Task EPU003501 077959 Report Summary GE EPU 077960 EPU Task Design Input Request -
EPU003502 078139 11/13/2002 Containment System Response Sang GE EPU 078140 EPU ask Design Input Request - High EPU003503 078180 11/11/2002 Pressure Coolant Injection System Simpson GE EPU 078181
-EPU EPU003504 078332 Task Design Input Request (DIR)
GE EPU 078333 Task Design Input Request
- EPU (DIR)T0407 ECCS-LOCA EPU003505 078378 11/1512002 Evaluations Bott GE EPU 078379 EPU Extended Power Uprate /
EPU003506 078674 6/1/2002 MELLLA+ Feasibility Study
. GE Project Task Report Tennessee EPU 078675 Valley Authority Browns Ferry Unit EPU 2 and Unit 3 Extended Power EPU003507 079080 5/1/2002 Uprate ILink GE EPU 079081 EPU Engineering Report Dresden and EPU003508 079123 Quad Cities EPU Project SW EPU 079124 VYC-2314 Minimum Containment
- EPU Overpressure for Non-LOCA EPU003509 079143 9/2/2003 Events.
Slifer VY EPU 079144 VYC-2306 Torus Temperature for EPU Appendix R Events at EPU Schor; EPU00351C 079264 8/29/2003 Conditions Robertshaw vy EPU 079265 C-2314 Minimum Containment
- EPU Overpressure for Non-LOCA EPU003511 079284 9/2/2003 Events Slifer VY EPU 079285 EPU Station Blackout Documentation EPU00351 2079371 12/21/2000 Analysis Seifaee VY EPU 079372
- EPU EPU003513 079440 6/1/2003 ECCS-LOCA SAFER/GESTR Bott GE Doc No.
Bates Range Date Doc Title To From Compan EPU 079441
-EPU Reactor Core Isolation Cooling EPU003514 079459 211/2003 System Davis GE EPU 079460
-EPU Reactor Core Isolation Cooling EPU003515 079477 5/1/2003 System Davis GE EPU 079478 EPU Reactor Core Isolation Cooling EPU003516 079495 5/1/2003 System Davis GE EPU 079496 EPU Reactor Core Isolation Cooling EPU003517 079513 5/1/2003 System Davis GE EPU 079514
-EPU EPU003518 079533 3/1/2003 Residual Heat Removal System Jen GE EPU 079534
.EPU EPU003519 079553 6/1/2003 Residual Heat Removal System en GE EPU 079554 EPU EPU003520 079573 6/1/2003 Residual Heat Removal System en GE EPU 079574 EPU EPU003521 079682 6/1/2003 Containment System Response Rhow GE EPU 079683
- EPU EPU003522 079791 6/1/2003 Containment System Response Rhow GE EPU 079792
-EPU EPU003523 079900 6/1/2003 Containment System Response Rhow GE EPU 079901
-EPU EPU003524 080009 6/1/2003 Containment System Response Rhow GE EPU 080010 EPU EPU003525 080031 2/1/2003 Containment Isolation Keller GE EPU 080032 EPU EPU003526 080053 4/1/2003 Containment Isolation Keller GE EPU 080054
-EPU EPU003527 080075 4/1/2003 Containment Isolation Keller GE EPU 080076 EPU EPU003528 080097 4/1/2003 Containment Isolation Keller GE EPU 080098
- EPU High Pressure Coolant Injection EPU003529 080112 12/1/2002 System Simpson GE EPU 080113
- EPU High Pressure Coolant Injection EPU003530 080127 6/1/2003 System Simpson GE Doc No.
Bates Range Date Doc Title To From Cornan EPU 080128
- EPU High Pressure Coolant Injection EPU003531 080142 6/1/2003 System Simpson GE EPU 080143
- EPU High Pressure Coolant Injection EPU003532 080157 6/1/2003 System Simpson GE EPU 080158
- EPU EPU003533 080173 1/1/2003 Core Spray System Jen GE EPU 080174 EPU EPU003534 080242 6/1/2003 ECCS-LOCA SAFERIGESTR Bott GE EPU 080243
- EPU EPU003535 080277 0/0/2002 ECCS-LOCA SAFER/GESTR Bott GE EPU 080278
- EPU EPU003536 080347 7/1/2003 ECCS-LOCA SAFER/GESTR Bott GE EPU 080348
- EPU EPU003537 080417 7/1/2003 ECCS-LOCA SAFER/GESTR Bott GE EPU 080418
- EPU Safety Analysis Report Constant EPU003538 080609 8/1/2003 Pressure Power Uprate Schrull GE EPU 080610
-EPU EPU003539 081396 7/19/2004 S& W BOP Engineering Report SW EPU 081397
- EPU Project Task Report:Core Spray EPU0035401081412 1/1/2003 System Chen GE EPU 081413
- EPU Evaluate Margin in HPCI Initiation EPU003541 081442 11/21/2000 Time VY EPU 081443
- EPU Evaluate Margin in HPCI Initiation EPU0035421081472 11/21/2000 Time VY EPU 081473
- EPU EPU003543 081563 TE 2003-043 References GE EPU 081564
- EPU EPU003544 081577 9/4/2003 Appendix R PUSAR Input Slifer GE EPU 081578
- EPU EPU003545 081630 8/25/2003 PUSAR Sections 6 Nichols Yasi SW EPU 081631
- EPU Licensing Topical Report Constant EPU003546 081939 7/1/2003 Pressure Power Uprate seismic GE Licensing Topical Report Generic EPU 081940 Guidelines for General Electric
- EPU Boiling Water Reactor Extended Marquino; EPU003547 082113 211/1999 Power Uprate Eckert GE Doc No.
Bates Range Date Doc Title To From ompany Licensing Topical Report Generic EPU 082114 Guidelines for General Electric
- EPU Boiling Water Reactor Extended EPU003548 082352 4/1/1999 Power Uprate Marquino GE Licensing Topical Report Generic EPU 082353 Guidelines for General Electric
- EPU Boiling Water Reactor Extended EPU003549 082480 2/1/2000 Power Uprate Marquino GE EPU 082481
- EPU BOP Engineering Report Generic EPU003550 082491 Issues/Programs ohnson SW EPU 082492
- EPU BOP Engineering Report Generic EPU003551 082503 Issues/Programs Johnson SW EPU 082504
- EPU OPL-4A (Containment Analysis EPU003552 082557 2/27/2003 Input Values)
- EPU OPL-4A (Containment Analysis EPU003553 082611 2/27/2003 Input Values)
Rhow GE EPU 082612 VYNPS Extended Power Uprate -
- EPU Response to NRC Request for EPU003559 082819 8/6/2004 Additional Information Nichols Dick GE GESTARR II NEDE24011PA14US EPU 082820 Plant Accident Analysis Info and
- EPU Flow chart Loss of Coolant EPU003560 082822 Accident Eval. Model GNF Licensing Topical Report Generic EPU 082823 Evaluations Of General Electric EPU Boiling Water Reactor Extended EPU003561 082950 2/1/2000 Power Uprate Marquino GE Licensing Topical Report Generic EPU 082951 Evaluations of General Electric
- EPU Boiling Water Reactor EPU EPU003562 083189 4/1/1999 Supplement I Volume II Marquino GE EPU 083190 EPU SAFER/GESTR-LOCA Loss Of EPU003563 083261 3/1/2004 Coolant Accident Analysis Bott GE EPU 083262
- EPU SAFER/GESTR-LOCA Loss Of EPU003564 083332 6/1/2003 Coolant Accident Analysis Bott GE EPU 083333
- EPU SAFER/GESTR-LOCA Loss Of EPU003565 083403 6/1/2003 Coolant Accident Analysis Bott GE EPU 083404
- EPU SAFER/GESTR-LOCA Loss Of EPU003566 083476 3/11/2003 Coolant Accident Analysis Bott GE EPU 083477
- EPU Licensing Topical Report Constant EPU003567 083616 2/1/2003 Pressure Power Uprate GE EPU 083617
- EPU Licensing Topical Report Constant EPU003568 083772 12/21/2001 Pressure Power Uprate Revision 1 Klapproth GE Doc No. Bates Range Date Doc Title To From ompan EPU 083773 EPU Licensing Topical Report Constant EPU003569 083928 12/21/2001 Pressure Power Uprate Revision I Kapproth GE EPU 083929 EPU Licensing Topical Report Constant EPU003570 083988 10/7/2002 Pressure Power Uprate Revision 1 Stramback GE EPU 083989 EPU Licensing Topical Report Constant EPU003571 084128 2/1/2003 Pressure Power Uprate GE EPU 084129
- EPU Licensing Topical Report Constant EPU003572 084268 2/1/2003 Pressure Power Uprate GE EPU 084269 EPU Licensing Topical Report Constant EPU003573 084422 11/1/2002 Pressure Power Uprate GE EPU 084423 EPU Licensing Topical Report Constant EPU003574 084576 11/1/2002 Pressure Power Uprate GE EPU 084577 Assessment Of BWR Mitigation Of EPU ATWS Volume I (NUREG 0460 EPU003575 085394 1211/1979 ALTERNATE NO. 3 )
GE Classen; Earle; Holt; EPU 085395 Licensing Topical Report Schafer;
- EPU nticipated Transients Without Shirley; EPU003576 085451 2/1/1987 Scram rightsman GE VYNPS LOCA-DBA Long-Term NPSH Information Transmittal EPU 085452 1.5% per Day Leakage and 100%
EPU Containment Spray Thermal EPU003577 085483 7/6/2004 Mixing Efficiency GE VYNPS LOCA-DBA Long-Term NPSH Information Transmittal EPU 085484 1.5% per Day Leakage and 100%
EPU Containment Spray Thermal EPU003578 085515 7/6/2004 Mixing Efficiency GE EPU 085516 VYNPS LOCA-DBA Long-Term EPU NPSH Information Transmittal EPU003579 085538 611012004 1.5% per Day Leakage Mintz GE EPU 085539 EPU Engineering Report AC Carter; EPU003580 085581 11i6/2004 Distribution Jacobs SW VY Engineering Record EPU 085582 Corespondence Containment EPU System Response for EPU003581 085645 1/14/2003 EPU/MELLLA+
Hobbs Slifer GE VY Engineering Record EPU 085646 Corespondence Containment EPU System Response for EPU003582 085709 1/14/2003 EPU/MELLLA+
Hobbs Slifer GE EPU 085710 EPU Decay Heat for Containment EPU003583 085722 8/2812003 nalysis Nichols Dick GE Doc No. Bates Range Date Doc Title To From om an OPL-4A (Containment Analysis EPU 085723 Input Values) For Vermont Yankee
- EPU Nuclear Power Station EPU003586 085763 EPUIMELLLA+ Draft GE EPU 085764 EPU S&W Submittal of Draft Report:
EPU003587 085776 7/312003 Emergency Diesel Generator GE EPU 085777 BOP Engineering Report EPU Configuration Management EPU003588 085785 Calculation Matrix SW EPU 085786
- EPU BOP Engineering Report EPU003589 085790 Structural Engineering - Rev. A Pananos SW EPU 085791 EPU OPL-4/5 - OPL-4 for GE14 NFl EPU003590 085829 and GE13 Reanalysis GE Safety Analysis Report For EPU 085830 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003591 086041 9/1/2003 Uprate Schrull GE EPU 086042 Extended Power Uprate -
EPU Response to Request for EPU003592 086240 7/3/2004 Additional Information
- EPU Project Task Report: Transient EPU003593 086274 5/1/2003 Analysis (draft)
Niggel GE EPU 086275 EPU Project Task Report: Anticipated EPU003594 086320 511/2003 Transients Without Scram Niggel GE EPU 086321 EPU Project Task Report: Anticipated EPU003595 086372 7/1/2003 Transients Without Scram Niggel GE EPU 086373
- EPU Project Task Report: Anticipated EPU003596 086424 7/1/2003 Transients Without Scram Niggel GE EPU 086425
- EPU Project Task Report: Anticipated EPU003597 086476 7/1/2003 Transients Without Scram Niggel GE EPU 086477 EPU Project Task Report: Anticipated EPU003598 086529 7/1/2003 Transients Without Scram Niggel GE EPU 086530
- EPU Project Task Report: Containment EPU003599 086639 6/1/2003 System Response Rhow GE EPU 086640
- EPU ECCS NPSH Engineering Report EPU003600 086653 4/29/2004 Section 3.7.1 Salter SW Safety Analysis Report For EPU 086654 ermont Yankee Nuclear Power EPU Station Constant Pressure Power EPU003601 086840 6/27/2003 Uprate Schrull GE Doc No.
Bates Range Date Doc Title To From Compan Safety Analysis Report For EPU 086841 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003602 087028 12/3/2002 Uprate Schrull GE Safety Analysis Report For EPU 087029 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003603 087216 12/3/2002 Uprate Schrull GE Safety Analysis Report For EPU 087217 Vermont Yankee Nuclear Power
- EPU Station Constant Pressure Power EPU003604 087430 8/21/2003 Uprate Schrull GE EPU 087431 Task Scoping Document: NSSS EPU Feasibility Assessment (EPU and EPU003605 087439 111/2002 MELLLA+)
Hinds GE Vermont Yankee GE14 New Fuel EPU 087440 Introduction Task Scope
- EPU Document Agreement for ECCS EPU003606 087450 Performance aradiso GE EPU 087451 EPU EPU003607 087457 PUSAR Section 4.2.6 GE EPU 087458
- EPU EPU003608 087464 PUSAR Section 4.2.6 GE EPU 087465 EPU EPU003609 087469 PUSAR Section 4.2.6 GE EPU 087470 EPU EPU003610 087474 PUSAR Section 4.2.6 GE EPU 087475 EPU EPU003611 087479 7/17/2003 PUSAR Section 4.2.6 GE EPU 087480 EPU EPU003612 087484 PUSAR Section 4.2.6 GE LOCA-DBA Long-Term NPSH Information Transmittal - 1.5% per EPU 087485 Day Leakage and 100%
EPU ontainment Spray Thermal EPU00361 3087517 7/6/2004 Mixing Efficiency GE OPL-4A (Containment Analysis EPU 087518 Input Values) For Vermont Yankee EPU Nuclear Power Station EPU003614 087564 EPU/MELLLA+ Rev 0 GE OPL-4A (Containment Analysis EPU 087565 Input Values) For Vermont Yankee EPU Nuclear Power Station EPU003615 087611 EPU/MELLLA+ Rev 1 GE Doc No. Bates Range Date Doc Title To From Company OPL-4A (Containment Analysis EPU 087612 Input Values) For Vermont Yankee
- EPU Nuclear Power Station EPU003616.087660 EPU/MELLLA+ Rev 0 GE EPU 087661 EPU EPU003617 087668 Miscellaneous Systems Evaluation GE VYNPS LOCA-DBA Long-Term NPSH Information Transmittal -
EPU 087669 1.5% per Day Leakage and 100%
-EPU Containment Spray Thermal EPU003618 087701 7/6/2004 Mixing Efficiency GE EPU 087702 Extended Power Uprate -
EPU Response to NRC Request for EPU003619 087908 8/6/2004 Additional Information Nichols Dick; Lalor GE EPU 087909
- EPU 3.11 Pressure Relief and Reactor EPU003620 087912 Vessel Overpressure Protection GE EPU 087913 Extended Power Uprate -
- EPU Response to NRC Request for EPU003621 088070 6/30/2004 Additional Information
- EPU EPU003622 088080 Feasibility Study For EPU GE EPU 088081 EPU EPU003623 088088 Feasibility Study For EPU GE EPU 088089
- EPU EPU003624 088093 3.6 Transient Analyses GE EPU 088094
- EPU EPU003625 088107 Vermont Yankee Feasibility Study GE EPU 088108
- EPU 3.11 Pressure Relief and Reactor EPU003626 088111 Vessel Overpressure Protection GE EPU 088112
- EPU 3.12 Residual Heat Removal EPU003627 088117 System GE EPU 088118 EPU EPU003628 088124 Miscellaneous Systems Evaluation GE EPU 088125
- EPU EPU003629 088129 3.14 Special Events GE EPU 088130 ermont Yankee Feasibility Study
- EPU 3.15 Steam Separation EPU003630 088135 Performance GE EPU 088136 ermont Yankee Feasibility Study
- EPU 3.16 Emergency Core Cooling EPU003631 088142 System Performance GE Doc No.
Bates Range Date Doc Title To From Compan EPU 088143
- EPU 3.19 Emergency Core Cooling EPU003632 088147 Systems GE EPU 088148
- EPU EPU003633 088151 3.20 Containment Capability GE EPU 088152 EPU ermont Yankee Feasibility Study EPU003634 088154 For EPU GE EPU 088155
- EPU VYNPS: Anticipated Transients EPU003637 088163 11/1/2002 without Scram GE EPU 088164
- EPU NPS: Anticipated Transient EPU003638 088172 3/1/2003 without Scram GE EPU 088173
- EPU Task Scoping Document: Station EPU003639 088181 1/1/2002 Blackout GE EPU 088182
- EPU VNPS EPUT1008 FTRWIP:
EPU003640 088198 6/1/2003 Plant Life; Frew GE EPU 088199 EPU HELB Subcompartment EPU003641 088207 3/1/2002 Evaluation GE EPU 088208
- EPU ask Scoping Document: Safety EPU003642 088216 2/1/2003 Analysis Report Integration GE EPU 088217
- EPU Task Scoping Document: Safety EPU003643 088225 11/1/2002 Analysis Report Integration GE EPU 088226 EPU ask Scoping Document: GE EPU003644 088236 11/1/2002 Project Management GE EPU 088237 3.11 Pressure Relief and Reactor
- EPU Vessel Overpressure Protection EPU003645 088240 Feasibility Study GE EPU 088241 3.12 Residual Heat Removal EPU System Comments on VY EPU003646 088246 Feasibility Study GE EPU 088247 Vermont Yankee Feasibility Study EPU 3.13 Miscellaneous Systems EPU003647 088253 Evaluation GE EPU 088254 EPU 3.19 Emergency Core Cooling EPU003648 088258 Systems GE EPU 088259 Vermont Yankee Feasibility Study
- EPU 3.13 Miscellaneous Systems EPU003649 088266 Evaluation Naeck GE EPU 088267
- EPU EPU003650 088281 2/28/2003 PS Service Water Bandeira SW Doc No. Bates Range Date Doc Title To From Compan EPU 088282
- EPU Work Package Scope - ECCS EPU003651 088294 2/13/2003 Pump NPSH Salter SW EPU 088295
- EPU ork Package Scope - ECCS EPU003652 088307 3/11/2003 Pump NPSH Salter SW EPU 088308 Work Package Scope Power
- EPU Dependent Heating Ventilation EPU003653 088313 3/17/2003 and Air Conditioning (HVAC)
Lind SW EPU 088314 Work Package Scope - Operator
- EPU Mission Dose During Post-LOCA EPU003654 088321 3/28/2003 Vital Access Ferguson SW EPU 088322 Vermont Yankee Feasibility Study
- EPU Section 0313 Miscellaneous EPU003655 088328 System Evaluations GE EPU 088329 V Calculation EPU impact on EPU Ambient Space Temperatures EPU003656 088356 5/29/2003 During Normal Operation O'Brien VY EPU 088357 Vermont Yankee Feasibility Study
- EPU Section 0315 Steam Separation EPU003657 088362 Performance GE Safety Analysis Report For EPU 088363 ermont Yankee Nuclear Power EPU Station Maximum Extended Load EPU003658 088450 1/1/2002 Line Limit Analysis Plus Schrull GE EPU 088451 Mellla+ FTR Work In Progress -
EPU Anticipated Transients Without EPU003659 088500 9/1/2003 Scram Niggel GE EPU 088501 EPU 3.11 Pressure Relief and Reactor EPU003660 088504 Vessel Overpressure Protection GE EPU 088505 3.12 Residual Heat Removal
- EPU System Feasibility Study for EPU EPU003661 088510 Section GE EPU 088511 Feasibility Study for EPU Section
- EPU 3.13 Miscellaneous Systems EPU003662 088517 Evaluation GE EPU 088518 Feasibility Study for EPU Section
- EPU 3.19 Emergency Core Cooling EPU003663 088522 Systems GE EPU 088523
- EPU Feasibility Study Section 3.13 EPU003664 088530 Miscellaneous Systems Evaluation GE EPU 088531
- EPU SAFERIGESTR-LOCA Loss-of-EPU003665 088604 1/1/2004 Coolant Accident Analysis Bott GE EPU 088605
- EPU Engineering Report Section 3.10 EPU003666 088612 Generic Issues/Programs Johnson SW Selection from VY Feasibility EPU 088613 Study - Section 3.11 Pressure
- EPU Relief and Reactor Vessel EPU003667 088616 Overpressure Protection GE Doc No. Bates Range Date Doc Title To From om an EPU 088617 Asset Enhancement Program
- EPU Project-Specific Project Work Plan EPU003668 088644 11/1/2002 Draft GE Safety Analysis Report for EPU 088645 Vermont Yankee Nuclear Power
- EPU Station for Constant Pressure EPU003669 088831 8/1/2003 Power Uprate Unverified Draft Shrull GE EPU 088832 Task Scoping Document: NSSS
- EPU Feasibility Assessment (EPU and EPU003670 088840 1/1/2002 MELLLA+) Rev 0 Hinds GE EPU 088841
- EPU EPU003671 088841 PUSAR Section 6.4.5 GE EPU 088842 EPU EPU003672 088843 8/25/2003 PUSAR Section 6.4 GE EPU 088844 EPU EPU003674 088848 7/17/2003 PUSAR Section 4.2.6 GE EPU 088849
-EPU EPU003675 088853 7/1712003 PUSAR Section 4.2.6 GE EPU 088854 EPU EPU003677 088858 PUSAR Section 4.2.6 GE EPU 088859 EPU EPU003678 088865 PUSAR Section 6.7 GE EPU 088866 EPU EPU003679 088867 PUSAR Section 7.4 GE EPU 088868 EPU EPU003681 088874 8/8/2003 PUSAR Section 4.2.6 GE EPU 088875 Safety Analysis Report Constant EPU Pressure Power Uprate PUSAR EPU003682 089096 8/1/2003 Draft 08-13-03.doc Schrull GE EPU 089097 Safety Analysis Report Constant
- EPU Pressure Power Uprate Section EPU003683 089289 8/1/2003 10-5 08-13-03.doc Schrull GE EPU 089290 Safety Analysis Report Constant
- EPU Pressure Power Uprate PUSAR EPU003684 089497 9/9/2003 W PUSAR Rev B-1 09-03-03 Schrull GE EPU 089498 Safety Analysis Report Constant EPU Pressure Power Uprate VY EPU003685 089705 9/9/2003 PUSAR Rev B 09-03-03 ISchrull GE EPU 089706 Safety Analysis Report Constant
- EPU Pressure Power Uprate VY Draft EPU003686 089931 8/4/2003 PUSAR 08-04-03 Schrull GE EPU 089932 Safety Analysis Report Constant
- EPU Pressure Power Uprate VY Draft EPU003687 090166 8/12/2003 V Draft PUSAR 08-12-03 Schrull GE Doc No. Bates Range Date Doc Title To From Companl EPU 090167 Safety Analysis Report Constant
- EPU Pressure Power Uprate VY Draft EPU003688 090403 8/1/2003 PUSAR 08-20-03 Schrull GE EPU 090404 Safety Analysis Report Constant
- EPU Pressure Power Uprate VY Draft EPU003689 090635 8/1/2003 PUSAR 09-02-03 Schrull GE Safety Analysis Report Constant EPU 090636 Pressure Power Uprate VY Draft EPU Rev A Project Master PUSAR 08-EPU003690 090849 8/1/2003 29-03 Schrull GE Project Task Report Task EPU 090850 T0400:Containment System
- EPU Response WNPS EPU T0400 EPU003691 090959 6/1/2003 FTR Rhow GE Safety Analysis Report Constant EPU 090960 Pressure Power Uprate Rev 0 EPU WNPS EPU T1104 PUSAR Draft EPU003692 091192 8/1/2003 07-31-03 Schrull GE Task Scoping Document AIM task EPU 091193 T0407 ECCS-LOCA EPU SAFER/GESTR with proposed EPU003694 091203 10/1/2002 comment resolutions GE APRM/RBMtTechnical EPU 091204 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003695 91279 2/1/2003 (ARTSIMELLLA)
Schrull GE APRM/RBM/Technical EPU 091280 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003696 091358 3/1/2003 (ARTS/MELLLA)
Schrull GE EPU 091359 EPU Task Scoping Document EPU003697 091371 10/1/2002 Comment Resolution GE EPU 091372 EPU Task Scoping Document:
EPU003698 091380 9/1/2002 Containment System Response GE EPU 091381 EPU Task Scoping Document: ECCS-EPU003699 091391 10/1/2002 LOCA SAFERIGESTR GE EPU 091392 EPU Task Scoping Document: ECCS-EPU003700 091402 10/1/2002 LOCA SAFER/GESTR GE EPU 091403 Task Scoping Document:
EPU Anticipated Transient without EPU003701 091413 9/1/2002 Scram GE EPU 091414 EPU Critique of Hope Creek Calculation EPU003703 091419 H-1 -ZZ-MDC-1880 Polestar EPU 091420 EPU Post LOCA Suppression Pool pH EPU003704 091434 for Vermont Yankee Hobbins Polestar Doc No. Bates Range Date Doc Title To From Cmpan EPU 091435
- EPU Radiological Evaluation of a DBA-EPU003705 091512 Loss of Coolant Accident Metcalf Polestar EPU 091513 Focused Study of Alternative EPU Leakage Treatment (ALT) And EPU003706 091567 3/3/2003 NRC Methods Polestar EPU 091568 Focused Study of Alternative EPU Leakage Treatment (ALT) And EPU003707 091622 3/3/2003 NRC Methods Polestar EPU 091623 EPU Task Scoping Document: ECCS-EPU003708 091632 9/1/2002 LOCA SAFER/GESTR DRAFT GE EPU 091633 EPU EPU003712 091637 8/13/2003 PUSAR Section 4.2.6 GE EPU 091638 EPU EPU003717 091644 8/8/2003 PUSAR Section 4.2.6 GE EPU 091645 ARTS/MELLLA - Response to EPU NRC Request for Additional EPU003718 091668 6/9/2003 Information Nichols Dick GE EPU 091669 ARTS/MELLLA - Response to EPU NRC Request for Additional EPU003719 091692 6/9/2003 Information Nichols Dick GE EPU 091693 EPU EPU003720 091697 7/17/2003 PUSAR Section 4.2.6 GE EPU 091698 EPU ARTS/MELLLA Reactor Heat EPU003721 091707 8/1/2002 Balance GE EPU 091708
- EPU Reactor Internal Pressure EPU003722 091718 9/1/2002 Differences GE EPU 091719 Task Scoping Document:
EPU003723 091726 1/1/2002 Pressurization Loads GE EPU 091727 EPU Task Scoping Document: Standby EPU003724 091736 9/1/2002 Liquid Control System GE EPU 091737 EPU Task Scoping Document: TS EPU003725 091744 8/1/2002 Markup Integration GE EPU 091745 EPU Safety Analysis Report Constant EPU003726 091952 9/10/2003 Pressure Power Uprate Schrull GE APRM/RBM/Technical EPU 091953 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003727 092028 2/1/2003 (ARTS/MELLLA)
Schrull GE APRM/RBMlTechnical EPU 092029 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003728 092107 2/1/2003 (ARTS/MELLLA)
Schrull GE Doc No. Bates Range Date Doc Title To From Compan APRM/RBM/Technical EPU 092108 Specifications I Maximum EPU Extended Load Line Limit Analysis EPU003729 092187 2/1/2003 (ARTSIMELLLA)
Schrull GE APRM/RBM/Technical EPU 092188 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003730 092262 3/1/2003 (ARTS/MELLLA)
Schrull GE APRMIRBM/Technical EPU 092263 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003731 092339 3/1/2003 (ARTS/MELLLA)
Schrull GE APRMIRBMITechnical EPU 092340 pecifications / Maximum
- EPU Extended Load Line Limit Analysis EPU003732 092417 3/1/2003 (ARTS/MELLLA)
Schrull GE APRM/RBMlTechnical EPU 092418 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003733 092495 3/1/2003 (ARTS/MELLLA)
Schrull GE APRM/RBMlTechnical EPU 092496 Specifications / Maximum
- EPU Extended Load Line Limit Analysis EPU003734 092574 3/1/2003 (ARTS/MELLLA)
Schrull GE APRMJRBMlTechnical EPU 092575 Specifications / Maximum EPU Extended Load Line Limit Analysis EPU003735 092652 3/1/2003 (ARTS/MELLLA)
- EPU Project Task Report: Reactor EPU003736 092668 5/1/2003 Recirculation System Ross GE EPU 092669 afety Analysis Report Maximum
- EPU Extended Load Line Limit Analysis EPU003737 092761 8/1/2003 Plus Schrull GE EPU 092762 Safety Analysis Report Maximum EPU Extended Load Line Limit Analysis EPU003738 092854 8/1/2003 Plus Schrull GE EPU 092855
- EPU EPU003739 092902 8/5/2003 PUSAR Section 6.4.1 Bandeira SW EPU 092903 W Calculation Containment
- EPU Overpressure for Non-LOCA EPU003741 092915 Events W_
EPU 092916 W Calculation Minimum EPU Containment Overpressure for EPU003742 092929 Non-LOCA Events Slifer VY EPU 092930
- EPU ask Scoping Document: Residual EPU003743 092940 1/1/2003 Heat Removal System GE EPU 092941
- EPU Project Task Report: Residual EPU00374' 592960 3/1/2003 Heat Removal System Jen GE Doc No. Bates Range Date Doc Title To From ompany EPU 092961 EPU Project Task Report: Residual EPU003746 092980 6/1/2003 Heat Removal System Jen GE EPU 092981 EPU Task Scoping Document: Residual EPU003747 092991 11/1/2002 Heat Removal System GE EPU 092992.
OPL-4A (Containment Analysis EPU Input Values) for VYNPC EPU /
EPU003748 093032 M+
GE EPU 093033 EPU ask Scoping Document:
EPU003751 093042 11/1/2002 ContainmentSystem Response GE EPU 093043 EPU Project Task Report: Containment EPU003752 093064 2/1/2003 Isolation Keller GE EPU 093065
- EPU Project Task Report: Containment EPU003753 093086 2/1/2003 Isolation Keller GE EPU 093087
- EPU Task Scoping Document: High EPU003754 093094 11/1/2002 Pressure Coolant Injection System GE EPU 093095
- EPU Project Task Report: Core Spray EPU003755 093110 6/1/2003 System Jen GE EPU 093111 EPU Project Task Report: Core Spray EPU003756093126 6/1/2003 System Jen GE EPU 093127 Project Task Report Task T0405:
EPU Core Spray System WIP Task EPU003757 093142 6/1/2003 0405 GE T0405 FTR.doc iJen GE EPU 093143 EPU Project Task Report: Core Spray EPU003758 093158 6/1/2003 System en GE EPU 093159 EPU Project Task Report: Core Spray EPU003759 093167 11/1/2002 System Jen GE EPU 093168 EPU Task Scoping Document: ECCS-EPU003760 093181 2/1/2003 LOCA SAFER/GESTR GE EPU 093182 EPU Task Design Input Request EPU003762 93188 11/15/2002 ECCS-LOCA SAFERIGESTR Bott GE EPU 093189
- EPU Task Scoping Document: ECCS-EPU003763 093198 11/1/2002 LOCA SAFERIGESTR GE EPU 093199 EPU Task Scoping Document: Standby EPU003764 093209 11/1/2002 Liquid Control System GE EPU 093210 EPU Scope And Associated Technical EPU003765 093272 12/1/2003 Review Guidance W_
Doc No.
Bates Range Date Doc Title To From Compan EPU 093273 EPU Scope And Associated Technical EPU003766 093342 12/1/2003 Review Guidance vy EPU 093343 Extended Power Uprate -
EPU Response to Request for EPU003767 093541 7/3/2004 dditional Information Thayer Vy EPU 093542 EPU GE proposed response to NRC EPU003768 093543 RAI SPSB-C-1 1 GE EPU 093544 EPU GE response to NRC RAI SPSB-EPU003769 093544 C-4 GE EPU 093545 EPU GE proposed response to NRC EPU003770 093545 RAI SPSB-C-5 GE EPU 093546 EPU OPL-4A (Containment Analysis EPU003771 093586 Input Values)
Rhow GE EPU 093587 EPU Project Task Report: Containment EPU003773 093696 6/1/2003 System Response Rhow GE EPU 093697
- EPU EPU003774 093701 1/16/2005 /YNPS EPU - RAI Responses Mintz GE EPU 093702 EPU ask Scoping Document:
EPU003778 093711 11/1/2002 Containment System Response GE EPU 093712 EPU Task Scoping Document:
_PU003779 093720 11/1/2002 Containment System Response GE EPU 093721 EPU ask Scoping Document: Core EPU003780 093729 11/1/2002 Spray System GE EPU 093730
- EPU ask Scoping Document: ECCS-EPU003781 093743 2/1/2003 LOCA SAFER/GESTR GE EPU 093744
- EPU Task Report Document: ECCS-EPU003782 093753 11/1/2002 LOCA SAFER/GESTR GE EPU 093754
- EPU ask Scoping Document: Post-EPU00378' 093763 10/1/2002 LOCA Combustible Gas Control GE EPU 093764
- EPU ask Scoping Document: Ultimate EPU003784 093772 1/1/2002 Heat Sink GE EPU 093773
- EPU Task Scoping Document: Power-EPU003785 093782 0/0/2002 Dependent HVAC GE EPU 093783
- EPU ask Scoping Document:
EPU003786 093792 0/0/2002 ppendix R/Fire Protection GE Doc No.
Bates Range Date Doc Title To From Compan EPU 093793 Task Scoping Document:
- EPU Anticipated Transients Without EPU003787 093801 3/11/2003 Scram GE EPU 093802 ask Scoping Document:
- EPU nticipated Transients Without EPU003788 093810 11/1/2002 Scram GE EPU 093811 EPU ask Scoping Document: Station EPU003789 093819 010/2002 Blackout GE EPU 093820 EPU GE response for NRC RAls 29 30.
EPU003790 093961 32 and 33 of Ref. 1.
GE EPU 093962 Conservatism in the Containment EPU Pressure Calculation for NPSH EPU003794 093963 Evaluations NRC RAI SPSB-C 11 GE EPU 093964 EPU EPU003795 093972 EPU RAI Responses GE EPU 093973 EPU EPU003796 093974 PUSAR Section 4.2.6 GE EPU 093975 EPU EPU003797 093979 PUSAR Section 4.2.6 GE EPU 093980 EPU EPU003798 093982 PUSAR Section 6.7 GE EPU 093983 EPU EPU003799 093989 PUSAR Section 6.7 GE EPU 093990 EPU EPU003801 093996 PUSAR Section 4.2.6 GE EPU 093997 EPU EPU003802 094003 PUSAR Section 4.2.6 GE EPU 094004
- EPU EPU003803 094008 PUSAR Section 4.2.6 GE EPU 094009 EPU BOP Engineering Report - MOV EPU003805 094037 7/31/2003 Section Johnson SW EPU 094038
- EPU BOP Engineering Report - MOV EPU003806 094066 7/31/2003 Section Johnson SW EPU 094067
- EPU EPU003809 094071 8/13/2003 PUSAR Section 4.2.6 GE EPU 094072 EPU Responses to VYNPS EPU RAI EPU003810 094210 SPSB C-29 C-30 C-32 and C-33 GE Doc No. Bates Range Date Doc Title To From ompany EPU 094211 EPU Responses to VYNPS EPU RAI EPU003811 094349 SPSB C-29 C-30 C-32 and C-33 GE EPU 094350 EPU Project Task Report: Core Spray EPU003812 094365 6/1/2003 System en GE EPU 094366 EPU Project Task Report: Core Spray EPU003813 094381 6/1/2003 System Jen GE EPU 094382 EPU Project Task Report: Transient EPU003814L094416 7/1/2003 nalysis Niggel GE EPU 094417 EPU Project Task Report: ECCS-LOCA EPU003815 094485 6/1/2003 SAFER/GESTR Bott GE EPU 094486 VYNPS Extended Power Uprate -
EPU Response to NRC Request for EPU0038161094559 1/29/2004 Additional Information Nichols Dick GE EPU 094560 VYNPS Extended Power Uprate -
- EPU Response to NRC Request for EPU003817 094634 1/29/2004 Additional Information Nichols Dick GE EPU 094635 EPU NRC EPU Review Standard Matrix EPU0038181094669 1/29/2004 8 Input Nichols Dick GE EPU 094670 VYNPS Extended Power Uprate -
EPU Response to NRC Request for EPU003820 094876 8/6/2004 Additional Information Nichols Dick GE EPU 094877 VYNPS EPU - Responses to EPU VYNPS EPU RAI SPSB C-29 C-EPU003821 095020 30 C-32 and C-33 GE EPU 095021 VYNPS EPU - Responses to EPU VYNPS EPU RAI SPSB C-29 C-EPU003822 095163 30 C-32 and C-33 GE EPU 095164 VYNPS LOCA-DBA Long-Term EPU NPSH Information Transmittal -
EPU003823 095186 6/10/2004 1.5% Per Day Leakage
___intz GE EPU Proposed Technical Specification 061327 -
Change 263; Response to EPU003635 EPU 61417 7/30/2004 Request for Additional Information RC hayer GE EPU 061418 Proposed Technical Specification EPU Change 263; Response to EPU003636 061672 8/1212004 Request for Additional Information NRC hayer GE EPU 061673
- EPU EPU003673 061673 8/25/2003 PUSAR Section 6.4.5 GE EPU 061674 EPU EPU003676 061675 PUSAR Section 4.2.6 GE EPU 061676
- EPU EPU003680 061676 PUSAR Section 9.3.2 GE Doc No.
Bates Range Date Doc Title To From Compan EPU 061677 New Fuel Introduction Task Scope EPU Document Agreement for Task EPU003693 061686 T0407 ECCS Performance Rev 0 Paradiso GE EPU 061687 EPU EPU003709 061688 8t25/2003 PUSAR Sections 6.4, 6.4.1 GE EPU 061689 EPU EPU003710 061689 8/2512003 PUSAR Section 6.4.5 GE EPU 061690 EPU EPU003711 061690 8/25/2003 PUSAR Section 6.4.5 GE EPU 061691
- EPU EPU003713 061692 7/29/2003 PUSAR Section 6.4 GE EPU 061693 EPU EPU003714 061694 7/29/2003 PUSAR Section 6.4.5, draft A GE EPU 061695 EPU EPU00371 5061695 8/8/2003 PUSAR Section 6.4.5, draft B GE EPU 061696
- EPU EPU003716 061697 PUSAR Section 7.4 GE EPU 061813 Draft RAI Assignment Form;
- EPU VYNPS calculations of NPSH and EPU003791 061814 5/25/2004 containment accident pressure Slifer GE EPU 061815 Formal RAI Assignment Form EPU ; Potential impact of EPU003792 061818 6/3/2004 CPPU on HVAC systems Duda GE Redlined Formal RAI Assignment EPU 061819 Form Attachment 3; Potential EPU impact of CPPU on HVAC EPU003793 061822 6/3/2004 systems CDuda GE EPU 061823 EPU EPU003800 061823 PUSAR Section 9.3.2; Final GE EPU 061824 Formal RAI Assignment Form EPU ttachment 3; Effects of CPPU on EPU003804 061825 12/18/2003 safety-related pumps Le Francois GE EPU 061826
-EPU EPU003807 061827 8/25/2003 PUSAR Sections 6.4, 6.4.1 GE EPU 061828 EPU EPU003808 061829 8/25/2003 PUSAR Sections 6.4, 6.4.1 GE Long-Term NPSH Information EPU 095187 Transmittal - 1.5% per Day
- EPU Leakage and 100% Containment EPU003824 095218 Spray Thermal Mixing Efficiency GE Doc No. Bates Range Date Doc Title To From Compan Long-Term NPSH Information EPU 095219 Transmittal - 1.5% per Day EPU Leakage and 100% Containment EPU003825 095250 Spray Thermal Mixing Efficiency GE Long-Term NPSH Information EPU 095251 Transmittal - 1.5% per Day
- EPU Leakage and 100% Containment EPU003826 095282
.Spray Thermal Mixing Efficiency GE EPU 095283 Long-Term NPSH Information EPU Transmittal - 1.5% per Day EPU003827 095305 Leakage Mintz GE PU 095306 CPPU Submittal RAI Response -
EPU Changes to Instrumentation and EPU003828 095426 Controls vy EPU 095427 CPPU Submittal RAI Response -
- EPU Changes to Instrumentation and EPU003829 095547 Controls W
EPU 095548 EPU Project Task Report - Anticipated EPU003830 095593 Transient Without Scram iggel GE EPU 095594 EPU Project Task Report - Anticipated EPU003831 095645 Transient Without Scram Niggel GE EPU 095646 Suppression Pool
- EPU Temperature/Pressure Response EPU003832 095658 415/2003 to DBA-LOCA Nichols Dick GE EPU 095659 EPU Response to NRC Request for EPU003833 095668 9113/2004 Additional Information ichols Dick GE Calculation/Analysis for Torus Temperature and Pressure Response to Large Break LOCA EPU 095669 and MSLB Accident Scenarios EPU dditional Sensitivities VYC EPU003836 096048 1628A Rev I Song VY Calculation/Analysis for Torus EPU 096049 Temperature and Pressure EPU Response to Small Break LOCA EPU003837 096253 10/26/1998 Scenarios - Model Development Fago Calculation/Analysis for Torus EPU 096254 Temperature and Pressure EPU Response to Small Break LOCA EPU003838 096458 10/26/1998 Scenarios - Model Development Fago Calculation/Analysis for Torus EPU 096459 emperature Response to
- EPU ppendix R and Station Blackout EPU003839 096590 11/5/1998 Scenarios Fago VY EPU 096591 EPU Analysis/Calculation for Vermont EPU003840 096907 5/1411999 Yankee LOCA Model Saifaec VY EPU 096908
- EPU SAFER/GESTR-LOCA Loss of EPU003841 097030 3/1998 Coolant Analysis Lipps GE Doc No. Bates Range Date Doc Title To From Compan Duke Engineering EPU 097031 Analysis/Calculation for Cycle
- EPU Independent Analysis for EPU003842 097719 10/20/1999 Appendix R Events Saifaec VY laassen; Earle; Holt; EPU 097720 Licensing Topical Report:
hafer; EPU Anticipated Transients Without hirley; EPU003843 097776 2/1987 cram Wrightsman GE Claassen; Parker; EPU 097777 Rennels; EPU Assessment Of ATWS Stephan; EPU003844 097851 3/1985 Compliance Alternatives Wrightsman GE EPU 097852 Calculation/Analysis for VY Fuel EPU Thernial Performance for EPU003845 097977 8/31/1999 Appendix R Abdelghany VY EPU 097978 Calculation/Analysis for VY Fuel EPU Thermal Performance for EPU003846 098103 8/31/1999 Appendix R Abdelghany VY EPU 098104
- EPU Project Task Report: Anticipated EPU003847 098155 7/2003 Transients Without Scram Niggel GE Long-Term NPSH Information EPU 098156 Transmittal - 1.5% per Day
- EPU Leakage and 100% Containment EPU003849 098188 8/5/2004 Spray Thermal Mixing Efficiency GE EPU 098189
- EPU DBA-LOCA for Long Term NPSH EPU003850 098213 6/10/2004 Evaluation Nichols Dick GE VYC-2295 Analysis of EPU 098214 Suppression Pool Temperature for EPU Relief Valve Discharge Transients EPU003851 98230 6/20/2003 at 20% Power Uprate Guimond VY EPU 098231 VYC-2306 Torus Temperature for
- EPU Appendix R Events at EPU EPU003852 098244 Conditions Schor VY EPU 098245 VYC-2314 Minimum Containment EPU Overpressure for Non-LOCA EPU003853 098262 Events Slifer VY EPU 098263 Technical Design Procedure -
EPU Main Steam Isolation Valve EPU003854 098300 612002 Closure ATWS Events Chu GE Technical Design Procedure -
EPU 098301 Pressure Regulator Failure
- EPU (Maximum Demand) ATWS EPU003855 098342 6/2002 Events Chu GE EPU 098343 Technical Design Procedure -
EPU ODYN Basedeck Preparation for EPU003856 098474 6/2002 ATWS Events Chu GE EPU 098475 Technical Design Procedure Peak EPU Cladding Temperature Analysis for EPU003857 098495 6/2002 TWS Events IC____hu GE Doc No. Bates Range Date Doc Title To From Compan EPU 098496
- EPU EPU003858 098560 TE 2003-043 References GE EPU 098561
- EPU GE Containment System EPU003859 098663 7/14/2000 Response Analysis June 2000 Yasi W
EPU 098664
- EPU DBA-LOCA for Long Term NPSH EPU003860 098698 8/7/2004 Evaluation Nichols Dick GE EPU 098699 EPU Project Task Report: Containment EPU003861 098807 6/2003 System Response Rhow GE EPU 098808 EPU EPU003862 098821 ECCS Pump NPSH Evaluation Salter; Slifer SW Andersen; Chung; Heck; EPU 098822 lebenov;
- EPU LICENSING TOPICAL REPORT -
Shaug; EPU003865 099155 TRACG QUALIFICATION Shiralkar GE EPU 099156
- EPU Task Scoping Document: NSSS EPU003867 099166 1/2002 Feasibility Assessment Knecht GE EPU 099167 EPU ask Scoping Document: GE EPU003870 099176 1/2002 Project Management Hinds GE EPU 099177
- EPU Power Uprate Scoping Study EPU003871 099202 1/2002 Project Work Plan Hoang GE EPU 099203 EPU EPU003873 099362 Feasibility Study for EPU GE EPU 099363
- EPU Feasibility Study Heat Balance EPU003875 099364 Drawing GE EPU 099365
- EPU Project Task Report: Containment EPU003877 099770 5/2002 System Response Link GE EPU 099771
- EPU Project Task Report: Containment EPU003879 100176 5/2002 System Response GE EPU 100177
- EPU Proposal: Extended Power Uprate EPU003881 100213 11/18/2002 Feasibility Study GE EPU 100214
- EPU Task Design Input Request: High EPU003883 100218 Pressure Coolant Injection System GE EPU 100219
- EPU ask Scoping Document: ECCS-EPU003890 100232 2/2003 LOCA SAFER/GESTR GE Doc No.
Bates Range Date Doc Title To From Compan EPU 100233 Task Scoping Document: Fuel
- EPU Pool Cooling and Demineralizer EPU003893 100242 2/2003 System GE EPU 100243 EPU Maximum Extended Load Line EPU003895 100321 312003 Limit Analysis GE EPU 100322 EPU Decay Heat for Containment EPU003897 100334 3/1012003 Analysis Nichols Dick GE EPU 100335 EPU
.arter; EPU003899 100338 Emergency Diesel Generator Jacobs SW EPU 100339
- EPU Power Dependent Heating,
-ind; Le EPU003902 100344 3/17/2003 Ventilation, and Air Conditioning rancois SW EPU 100345 EPU Decay Heat for Containment EPU003907 100357 3/10/2003 Analysis Nichols ick GE EPU 100358 3ain; EPU Balance of Plant Piping Pananos; EPU003909 100363 5/13/2003 Evaluations
.ain;
-EPU ananos; EPU003910 100369 5/13/2003 Torus Attached and NSSS Piping.
izauskas SW EPU 100370 EPU Reactor Building Closed Cooling Bandiera; Le EPU003914 100374 5/20/2003 Water System Francois SW EPU 100375 EPU Project Task Report: Anticipated EPU003918 100420 5/2003 Transients Without Scram Niggel GE EPU 100421 EPU Project Task Report: Reactor EPU003919 100436 5/2003 Recirculation System Ross GE EPU 100437 EPU Project Task Report: Anticipated EPU003921 100482 5/2003 ransients Without Scram
_iggel GE EPU 100483 EPU Project Task Report: Core Spray EPU003926 100498 6/2003 System Jen GE EPU 100499 EPU Task Scoping Document: ECCS-EPU003932 100567 6/2003 LOCA SAFER/GESTR GE EPU 100568
- EPU Project Task Report: Containment EPU003936 100677 6/2003 System Response Rhow GE EPU 100678
- EPU Project Task Report: Anticipated EPU003938 100728 7/2003 Transients Without Scram Niggel GE EPU 100729 EPU Project Task Report: Containment EPU003942 100838 6/2003 System Response Rhow GE Doc No. Bates Range Date Doc Title To From Company EPU 100839 EPU Project Task Report: Anticipated EPU003944 100890 7/2003 Transients Without Scram Niggel GE EPU 100891 EPU Project Task Report: Anticipated EPU003947 100943 712003 Transients Without Scram Niggel GE EPU 100944 EPU Project Task Report: Anticipated EPU003950 100996 7/2003 Transients Without Scram Niggel GE EPU 100997
- EPU AFERIGESTR-LOCA Loss of EPU003953 101067 612003 Cooling Analysis Bott GE EPU 101068 EPU Project Task Report: Anticipated EPU003955 101120 7/2003 Transients Without Scram Niggel GE EPU 101121 EPU Project Task Report: Anticipated EPU003958 101173 712003 Transients Without Scram Niggel GE EPU 101174 EPU oulihan; EPU003963 101185 Instrumentation and Controls Phillips SW EPU 101186 EPU EPU003966 101190 7/1712003 PUSAR Section 4.2.6 GE EPU 101191 EPU EPU003969 101195 7/17/2003 PUSAR Section 4.2.6 GE EPU 101196 EPU Johnson; Le EPU003975 101224 7/31/2003 Motor Operated Valves Francois SW EPU 101225 EPU Safety Analysis Report For W EPU003978 101456 8/2003 Constant Pressure Power Uprate Schrull GE EPU 101457 EPU EPU003981 101463 8/04/2003 NEDC-33090P Unverified Draft GE EPU 101464 EPU EPU003983 101470 8/04/2003 NEDC-33090P Unverified Draft GE EPU 101471
- EPU EPU003985 101477 8/04/2003 NEDC-33090P Unverified Draft GE EPU 101478 EPU EPU003987 101485 IPUSAR Section 3 GE EPU 101486 EPU EPU003996 101490 7/17/2003 PUSAR Section 4.2.6 GE.
EPU 101491
- EPU EPU004004 101497 8/08/2003 PUSAR Section 4.2.6 GE Doc No.
Bates Range Date Doc Title To From Compan EPU 101498
-EPU EPU004006 101504 8/08/2003 PUSAR Section 4.2.6 GE EPU 101505 EPU EPU004008 101511 8/08/2003 PUSAR Section 4.2.6 GE EPU 101512 EPU Bandiera; Le EPU004010 101559 8/05/2003 Service Water Systems Francois SW EPU 101560 EPU Bandiera; Le EPU00401I2 101607 8/05/2003 Service Water Systems Francois SW EPU 101608 EPU Bandiera; Le EPU004014 101655 8/05/2003 Service Water Systems Francois SW EPU 101656 EPU Safety Analysis Report For Vy EPU004017 101883 8/2003 Constant Pressure Power Uprate Schrull GE EPU 101884 EPU Bandiera; Le EPU004019 101931 8/05/2003 Service Water Systems Francois SW EPU 101932 EPU Safety Analysis Report For Vy EPU004021 102171 8/2003 Constant Pressure Power Uprate chrull GE EPU 102172 EPU Safety Analysis Report For Vy EPU004026 102411 8/2003 Constant Pressure Power Uprate Schrull GE EPU 102412 EPU EPU004028 102417 PUSAR Action Items GE EPU 102418 EPU EPU004029 102447 Draft PUSAR Comments GE EPU 102448
- EPU Safety Analysis Report For VY EPU004031 102675 8/2003 Constant Pressure Power Uprate Schrull GE EPU 102676
- EPU ohnson; Le EPU004034 102704 7/31/2003 Motor Operated Valves Francois SW EPU 102705 EPU Safety Analysis Report For VY EPU004038 102923 8/2003 Constant Pressure Power Uprate Schrull GE EPU 102924
-EPU Safety Analysis Report For VY EPU004039 103163 8/2003 Constant Pressure Power Uprate Schrull GE Le Francois; Rainey; EPU 103164 onasch;
- EPU EPU Comment Form Service Edwards; EPU004042 103165 8/20/2003 Water 3reite VY Doc No. Bates Range Date Doc Title To From Compan Le Francois; Rainey; EPU 103166 Jonasch;
- EPU EPU Comment Form Service Edwards; EPU004044 103167 8/20/2003 ater reite WA EPU 103168
- EPU Bandiera; Le EPU004045 103216 8/0512003 ervice Water Systems
-Francois SW e Francois; Rainey; EPU 103217 onasch; EPU EPU Comment Form Service dwards; EPU004048 103218 8/20/2003 Water reite WA e Francois; Rainey; EPU 103219 onasch;
- EPU EPU Comment Form Service Edwards; EPU004050 103220 8/20/2003 Water Breite W_
EPU 103221
- EPU Bandiera; Le EPU004051 103269 8/05/2003 Service Water Systems Francois SW EPU 103270
- EPU EPU004054 103283 8/04/2003 PUSAR Section 6.6 GE EPU 103284 VYC-2314: Minimum Containment
- EPU Overpressure For Non-LOCA EPU004056 103301 Events Slifer VY EPU 103302
- EPU ohnson; EPU004060 103330 8/28/2003 Motor Operated Valves lifer SW EPU 103331 EPU Johnson; EPU004065 103335 8/28/2003 Air Operated Valve Program Slifer SW EPU 103336
- EPU Transmittal of Final MOV and AOV EPU004066 103338 8/28/2003 PUSAR Sections Nichols Yasi SW EPU 103339
- EPU EPU004070 103342 PUSAR Section 10.3 GE EPU 103343 EPU EPU004071 103405 Equipment Qualification Adam; Slifer SW EPU 103406
- EPU Safety Analysis Report For Vy EPU004073 103640 8/2003 Constant Pressure Power Uprate Schrull GE EPU 103641
- EPU Safety Analysis Report For VY EPU004075 103849 912003 Constant Pressure Power Uprate Schrull GE EPU 103850
- EPU Safety Analysis Report For VY EPU004077 104061 9/2003 Constant Pressure Power Uprate Schrull GE Doc No. Bates Range Date Doc Title To From ompan EPU 104062 EPU EPU004080 104075 9/15/2003 ECCS Pump NPSH Evaluation Salter; Slifer SW EPU 104076 EPU Houlihan; EPU004083 104089 Instrumentation and Controls Phillips SW EPU 104090 EPU Houlihan; EPU004087 104103 Instrumentation and Controls
- EPU Bandiera; Le EPU004091 104184 Condensate and Feedwater Francois SW EPU 104185 EPU VYNPS CPPU & MELLLA+
EPU004093 104198 10/2003 Startup Test Specifications GE EPU 104199
- EPU NPS PUSAR Generic EPU004095 104218 Disposition Topics GE EPU 104219
- EPU VYNPS PUSAR Generic EPU004097 104248 Disposition Topics GE EPU 104249
- EPU EPU004106 104262 9/1512003 ECCS Pump NPSH Evaluation Salter; Slifer SW EPU 104263
- EPU EPU004108 104275 9115/2003 ECCS Pump NPSH Evaluation Salter; Slifer SW EPU 104276
- EPU DBA-LOCA for Long Term NPSH EPU004111 104300 6/10/2004 Evaluation Nichols Dick GE EPU 104301 Long-Term NPSH Information
- EPU Transmittal - 1.5% per Day EPU004112 104323 Leakage Mintz GE EPU 104324
- EPU EPU004116104732 5/23/2003 Parameter File for MAAP 4.0.4 VY EPU 104733
- EPU Project Task Report: Containment EPU004117 104841 6/2003 System Response Rhow GE EPU 104842 EPU Project Task Report: Containment EPU004131 104950 6/2003 System Response Rhow GE EPU 104951 EPU DBA-LOCA for Long Term NPSH EPU004132 104985 8/07/2004 Evaluation Nichols Dick GE Proprietary Documents Relating to NEC Contentions 3 and 4 Doc No. Bates Range Date Doc Title To From Company EPU 520999 Partial VY Feasibility Study for EPU - Section EPU500912 EPU 521001 5.8 Cooling Tower GE EPU 521002 Partial VY Feasibility EPULStudy for EPU - Section EPU500913 521004 5.8 Cooling Tower GE EPU 521005 NRC review of GE EPU Licensing Topical PU500914 521090 3/31/03 Report-NEDC 33004P Klapproth Ruland GE EPU 521091 NRC review of GE EPU Licensing Topical EPU500915 521174 3/31/03 Report-NEDC 33004P Klapproth Ruland GE EPU 521175 Licensing Topical Report EPU Generic Guidelines for EPU500916 521348 2/99 Extended Power Uprate GE EPU 521349 EPU ODYN Statistical CPR EPU500917 521407 3/01 Analysis GE EPU 521408 EPU Vermont Yankee EPU500918 521669 Feasibility Study GE EPU 521670 Project Task Report -
- EPU Startup Test IPU500919 521707 2/03 Specifications GE EPU 521708 Project Task Report -
EPU Startup Test EPU500920 521745 2/03 Specifications GE EPU 521746 Project Task Report -
EPU Startup Test EPU500921 521783 12102 Specifications GE EPU 521784 Project Task Report -
EPULStartup Test PU500922 521821 2103 Specifications GE EPU 521822 Licensing Topical Report EPU
-Constant Pressure EPU500923 22130 7/03 Power Uprate; Rev. 4 GE EPU 522131 Licensing Topical Report l EPU
- Constant Pressure EPU500924 522343 7/03 Power Uprate; Rev. 4 GE ElPU 522344 Licensing Topical Report l EPU
- Constant Pressure EPU500925 522556 7/03 Power Uprate; Rev. 4 GE Safety Analysis Report -
ElPU 522557 VY Constant Pressure
- EPU Power Uprate; Draft Rev.
EPU500926 522768 9/03 B-2 GE Safety Analysis Report -
EPU 522769 VY Constant Pressure
- EPU Power Uprate; Draft Rev.
EPU500927 522987 8/03 A
GE Doc No. Bates Range Date Doc Title To From Company EPU 522988 EPU Project Task Report -
EPU500928 523023 7/03 Transient Analysis GE EPU 523024 Safety Analysis Report -
-EPU VY Constant Pressure EPU500929 523250 8/03 Power Uprate, Rev. 0 GE EPU 523251 Safety Analysis Report -
- EPU VY Constant Pressure EPU500930 523482 8/03 Power Uprate; Rev. 0 GE Constant Pressure EPU 523483 Power Uprate LTR EPU Startup Test Evaluation; EPU500931 523501 7/19/01 Rev. 0 GE EPU 523502 Safety Analysis Report -
EPU VY Constant Pressure EPU500932 523729 8/03 Power Uprate; Rev. 0 GE EPU 523730 Licensing Topical Report
- EPU Constant Pressure EPU500933 524038 7/03 Power Uprate; Rev. 4 GE Safety Analysis Report -
EPU 524039 VY Constant Pressure
-EPU Power Uprate; Draft Rev.
EPU500934 524250 9/03 B-2 GE EPU 524251 Licensing Topical Report
- EPU
- Constant Pressure EPU500935 524463 7/03 Power Uprate; Rev. 4 GE EPU 524464 Project Task Report -
- EPU Transient Analysis; Rev.
EPU500936 524497 5/03 0 GE EPU 524498 Project Task Report -
EPU Startup Test EPU500937 524535 12/02 Specifications, Rev. 0 GE EPU 524536 Project Task Report -
-EPU Startup Test EPU500938 524573 2/03 Specifications, Rev. 0 GE EPU 524574 Project Task Report -
EPU Startup Test EPU500939 524611 2/03 Specifications, Rev. 0 GE EPU 524612 Project Task Report -
- EPU Startup Test EPU500940 524649 2/03 Specifications, Rev. 0 GE EPU 524650 Safety Analysis Report -
-EPU VY Constant Pressure
-PU500941 524827 8/03 Power Uprate; Rev. 0 GE EPU 524828 Safety Analysis Report -
-EPU VY Constant Pressure EPU500942 525019 8/03 Power Uprate; Rev. 0 GE EPU 525020 EPU EPU500943 525281 VY Feasibility Study GE EPU 525282
- EPU PUSAR Section 10.4 EPU500944 525283 8/29/03 Input, 'Testing' Dick Nichols GE Doc No. Bates Range Date Doc Title To From Company VY Implementation Guideline No. 2 -
EPU 525284 Selection of SSCs Within
-EPU he Scope of 1 0 CFR EPU500945 525301 50.65; Revision 4 VY EPU 525302 EPU CPPU LTR Startup Test EPU500946 525306 7/30/01 Specifications Summary GE EPU 525307 Constant Pressure EPU Power Uprate LTR EPU500947 525325 7/19/01 Startup Test Evaluation GE EPU 525326 Power Uprate
- EPU Engineering Report EPU500948 525347 9/26/03 Section 4.1 SW EPU 525348 Safety Analysis Report -
- EPU Constant Pressure EPU500949 525539 8/03 Power Uprate; Rev. 0 GE EPU 525540 Licensing Topical Report EPU
- Constant Pressure EPU500950 525848 7/1/03 Power Uprate GE EPU 525849 Partial NEDC-33090P EPU Draft Rev. A Section EPU500951 525849 8/22/03 10.4; 1 page GE Safety Analysis Report -
EPU 525850 VY Constant Pressure EPU Power Uprate; Draft Rev.
EPU500952 526061 9/03 B-2 GE V Technical Specification Proposed Change No. 263 -
EPU 526062 Extended Power Uprate EPU
- Response to Request EPU500953 526260 7/03/04 for Additional Information NRC Thayer GE EPU 526261 NRC review of GE
- EPU Licensing Topical EPU500956 526344 3/31/03 Report-NEDC 33004P Klapproth Ruland GE EPU 526345 NRC review of GE.
EPU Licensing Topical EPU500957 526428 3/31/03 Report-NEDC 33004P Klapproth Ruland GE EPU 526429 Constant Pressure
- EPU Power Uprate LTR EPU500958 526447 7/19/01 Startup Test Evaluation GE EPU 526448 Project Task Report -
- EPU ranslent Analysis; Rev.
EPU500959 526481 5/03 0r GE EPU 526482 Project Task Report -
- EPU Startup Test EPU500960 526519 12/02 Specifications, Rev. 0 GE EPU 526520 Project Task Report -
EPU Startup Test EPU500961 526557 2/03 Specifications, Rev. 0 GE Doc No. Bates Range Date Doc Title To From Company EPU 526558 Project Task Report -
EPU Startup Test EPU500962 526595 2/03 Specifications, Rev. 0 GE EPU 526596 Project Task Report -
-EPU Startup Test EPU500963 526633 2/03 Specifications, Rev. 0 GE EPU 526634 Safety Analysis Report -
EPU VY Constant Pressure EPU500964 526820 8/03 Power Uprate; Rev. 0 GE EPU 526821 Safety Analysis Report -
EPU VY Constant Pressure EPU500965 527008 Power Uprate; Rev. 0 GE Safety Analysis Report -
EPU 527009 VY Constant Pressure EPU Power Uprate; Draft Rev.
EPU500966 527225 08/03 GE VY Technical Specification Proposed Change No. 263 -
EPU 527226 Extended Power Uprate EPU
-Response to Request EPU500967 527383 6/30/04 for Additional Information NRC Wanczyk GE EPU 527384 EPU EPU500968 527386 VY Feasibility Study GE EPU 527387 EPU WPS Service Water EPU500969 527402 2/28/03 System SW EPU 527403 Safety Analysis Report -
EPU VY Constant Pressure EPU500970 527589 8/03 Power Uprate; Rev. 0 GE EPU 527590 EPU PUSAR Section 6.4.5; 1 EPU500971 527590 8/25/03 Page GE EPU 527591 EPU PUSAR Section 6.4.5; 1 EPU500972 527591 8/25/03 Page GE EPU 527592 Safety Analysis Report -
- EPU VY Constant Pressure EPU500973 527819 8/03 Power Uprate; Rev. 0 GE EPU 527820 Safety Analysis Report -
EPU V Constant Pressure EPU500975 528013 8/03 Power Uprate; Rev. 0 GE Safety Analysis Report -
EPU 528014 VY Constant Pressure EPU Power Uprate; Draft Rev.
EPU500976 528222 9103 B
GE Safety Analysis Report -
EPU 528223 VY Constant Pressure
- EPU Power Uprate; Draft Rev.
EPU500977 528431 9/03 B
GE Doc No. Bates Range Date Doc Title To From Company EPU 528432 Safety Analysis Report -
- EPU VY Constant Pressure EPU500978 528662 8/03 Power Uprate; Rev. 0 GE EPU 528663 Safety Analysis Report -
EPU V Constant Pressure EPU500979 528902 8/03 Power Uprate; Rev. 0 GE EPU 528903 Safety Analysis Report -
- EPU V Constant Pressure EPU500980 529142 8/03 Power Uprate; Rev. 0 GE EPU 529143 Safety Analysis Report -
EPU V Constant Pressure EPU500981 529377 8/03 Power Uprate; Rev. 0 GE EPU 529378 Safety Analysis Report -
- EPU V Constant Pressure EPU500982 529593 8/03 Power Uprate; Rev. 0 GE EPU 529594 Project Task Report -
- EPU NSSS TS Instrument EPU500983 529642 8/03 Setpoints GE EPU 529643 Project Task Report -
EPU NSSS TS Instrument EPU500984 529689 8/03 Setpoints GE EPU 529690 Project Task Report -
- EPU NSSS TS Instrument EPU500985 529736 8/03 Setpoints GE EPU 529737 Project Task Report -
- EPU NSSS TS Instrument EPU500986 529783 8/03 Setpoints GE EPU 529784 Safety Analysis Report -
- EPU VY Constant Pressure EPU500987 530012 8103 Power Uprate; Rev. 0 GE Safety Analysis Report -
EPU 530013 Constant Pressure
- EPU Power Uprate; Draft Rev.
EPU500988 530221 9/10/03 B Schrull GE Safety Analysis Report -
EPU 530222 VY Maximum Extended
- EPU Load Line Limit Analysis EPU500989 530310 8/1/03 Plus; Unverified Draft Schrull GE Safety Analysis Report -
EPU 530311 V Maximum Extended EPU Load Line Limit Analysis EPU500990 530403 8/1/03 Plus; Unverified Draft Schrull GE Safety Analysis Report -
EPU 530404 VY Maximum Extended
- EPU Load Line Limit Analysis EPU500991 530496 811/03 Plus; Unverified Draft Schrull GE Power Uprate Project EPU 530497 Stone & Webster
- EPU Engineering Report EPU500992 530518 Section 3.4.5 Yasi SW Doc No. Bates Range Date Doc Title To From Company VY Power Uprate Project EPU 530519
- Stone & Webster
- EPU Engineering Report EPU500993 530540 Section 3.4.5 Yasi SW EPU 530541 EPU Safety Analysis Report -
EPU500994 530614 811/01 Brunswick EPU Schrull GE EPU 530615 Project Task Report -
EPU Feedwater Control Hicks; EPU500995 530628 6/1/03 System Royal; Dick GE Scope and Associated Technical Review EPU 530629 Guidance - Materials EPU and Chemical EPU500996 530691 Engineering -
SW LeFrancois, EPU Task Scoping
- Rainey, EPU 530692 Document/Task Report
- onasch,
- EPU Comment Form 1.4.3.1
- Edwards, EPU500997 530693 8/20/03 Service Water Breite SW EPU 530694 NPS CPPU &
- EPU MELLLA+ Startup Test EPU500998 530707 10/1/03 Specifications GE EPU 530708 Draft for review -
- EPU Response to NRC RAI EPU500999 530709 IPSB-A-1 GE EPU 530710 Task Scoping Document EPU
- Startup Test EPU501001 530718 11/1/02 Specifications (Draft)
GE EPU 530719 EPU Project Task Report -
EPU501002 530753 7/1/03 Transient Analysis Niggel GE EPU 530754 BVY 04-008 Attachment EPU 2 - CPPU Submittal RAI EPU501003 530874
Response
GE EPU 530875 BVY 04-008 Attachment
- EPU 2 - CPPU Submittal RAI EPU501004 530995
Response
GE EPU 530996 Project Task Report -
- EPU Startup Test EPU501005 531033 2103 Specifications Quinn; Copp GE Technical Design Procedure - Loss of FW EPU 531034 Flow Long-Term Eckert; EPU Transient Analysis; Rev.
Liffengren; EPU501006 531089 4/01 1
Diaz-Quiroz GE EPU 531090 EPU Project Task Report -
Niggle; EPU501007 531124 7/1/03 Transient Analysis Hicks; GE EPU 531125 VYNPS CPPU &
- EPU MELLLA+ Startup Test EPU501008 531138 10/03 Specifications GE Doc No.
Bates Range Date Doc Title To From Company EPU 531139 Enlarged view of gear
- EPU reducer & drive shaft ower EPU501009 531139 9/30/04 drawing Performance TP EPU 531140 EPU Enlarged view of motor Tower EPU501010 531140 9/30/04 detail drawing Performance TP EPU 531141 Task Scoping Document
- EPU
-Startup Test EPU501012 531149 Specifications (draft)
GE EPU 531150 Project Task Report -
EPU Startup Test EPU501016 531187 2/03 Specifications (draft)
GE EPU 531188 Project Task Report-EPU Startup Test EPU501018 531225 2/03 Specifications (draft)
GE EPU 531226 Project Task Report -
- EPU Startup Test EPU501020 531263 2/03 Specifications (draft)
- EPU Project Task Report -
- Niggle, EPU501022 531297 5/03 Transient Analysis (draft)
- EPU Project Task Report -
- Niggle, EPU501026 531331 5/03 Transient Analysis (draft)
- EPU Draft Report Comment EPUS01030 531339 Responses GE EPU 531340 EPU Project Task Report -
- Niggle, EPU501031 531374 7/03 ransient Analysis Peters GE EPU 531375 EPU Draft Report Comment EPU501 033 531382 Responses GE EPU 531383
- EPU Project Task Report -
- Niggle, EPU501034 531417
[Transient Analysis Peters GE EPU 531418 EPU Draft Report Comment EPU501036 531425 Responses GE EPU 531426 EPU Project Task Report -
- EPU Draft Report Comment EPUS01039 531469 Responses GE EPU 531470 EPU Project Task Report -
- Niggle, EPU501040 531504 7/03 Transient Analysis Peters GE EPU 531505 EPU Draft Report Comment EPU501042 531516 Responses GE Doc No. Bates Range Date Doc Title To From Company EPU 531517
- EPU Project Task Report -
- Niggle, EPU501043 531551 7/03 Transient Analysis Peters GE EPU 531552 EPU Draft Report Comment EPU501045 531563 Responses GE EPU 531564
- EPU Project Task Report -
- Niggle, EPU501046 531598 7/03 Transient Analysis Peters GE EPU 531599 EPU Draft Report Comment EPU501048 531607 Responses GE EPU 531608
- EPU Project Task Report -
- Niggle, EPU501049 531642 Transient Analysis Peters GE Email Forwarding Draft EPU 531643 PUSAR 6.4 & 6.4.5 SW EPU
& ACS DRAFT A WBS EPUS01050 531644 7/30/03 1.4.3.1 Lefrancois Felumb VY EPU 531645
- EPU Draft PUSAR Section EPU501051 531646 7/29/03 6.4.5 GE EPU 531647 Draft PUSAR section 6.4 EPU
& 6.4.5 SW & ACS EPU501052 531648 7/29/03 DRAFT A WBS 1.4.3.1 GE EPU 531649
- EPU CPPU LTR Startup Test EPU501054 531653 7/30/01 Specifications Summary GE EPU 531654 Constant Pressure EPU Power Uprate LTR EPU501055 531672 7/19/01 Startup Test Evaluation GE Email re: VYNPS EPU -
Summary of Original EPU 531673 Startup Test Specs and
- EPU Generic CPPU EPU501056 531674 8/6/03 Evaluations Jacobs Quinn GE EPU 531675
- EPU CPPU LTR Startup Test EPU501057 531679 7/30/01 Specifications GE EPU 531680
- EPU CPPU LTR Startup Test EPU501058 531698 7/19101 Evaluation GE EPU 531699 EPU Draft PUSAR section EPU501060 531699 8/8/03 6.4.5 GE EPU 531700 Power Uprate
- EPU Engineering Report EPU501062 531747 sections 3.5.3 and 3.5.4 SW EPU 531748 Safety Analysis Report EPU for VY CPPU (unverified EPU501065 531975 8/03 draft)
Schrull GE Doc No. Bates Range Date Doc Title To From Company EPU 531976 Safety Analysis Report
- EPU for VY CPPU (unverified EPU501067 532215 8103 draft)
Schrull GE EPU 532216 Safety Analysis Report EPU or VY CPPU (unverified EPU501072 532443 8/03 draft)
Schrull GE EPU 532444 Power Uprate
- EPU Engineering Report EPU501075 532465 section 3.4.5 (draft)
SW EPU 532466 EPU Draft PUSAR section EPU501077 532466 10.4 GE EPU 532467
- EPU Draft PUSAR section EPU501079 532467 10.4
-GE EPU 532468
- EPU Draft PUSAR section EPU501081 532468 10.4 GE EPU 532469 EPU Draft PUSAR section EPU501083 532469 10.4 GE EPU 532470 EPU Draft PUSAR section EPU501085 532470 10.4 GE EPU 532471
- EPU Draft Safety Analysis EPU501087 532689 8/03 Report for VY CPPU Schrull GE EPU 532690 EPU Draft Safety Analysis EPU501088 532929 8/03 Report for VY CPPU Schrull GE LeFrancois,
- Jonash,
- EPU DocumentlTask Report
- Edwards, EPU501091 532931 8/20/03 Comment Form Breite SW LeFrancois,
- onash,
- EPU Document/Task Report
- EPU BOP Engineering Report EPU501094 532982 (draft)
- EPU Engineering Report EPU501096 533035 section 3.5.3 SW EPU 533036
- EPU EPU501097 533038 8/25/03 PUSAR section 6.4 GE EPU 533039
- EPU Engineering Report EPU501099 533043 comments Yasi Nichols SW Doc No.
3ates Range Date Doc Title To From Company PU 533044 EPU EPU501101 533045 8/25/03 PUSAR section 6.4 GE EPU 533046
- EPU EPU501102 533046 PUSAR section 6.4.5 GE EPU 533047
- EPU Partial PUSAR section EPU501104 533047 8/22/03 10.4 (draft)
GE EPU 533048 EPU Partial PUSAR section EPU501106 533048 8/22/03 10.4 (draft)
- EPU Engineering Report EPU5011085 33075 section 3.4.5 SW EPU 533076 EPU BOP Engineering Report EPU501109 533086 section 3.4.6 SW EPU 533087 EPU PUSAR sections 6.4.2 EPU501110 533102 and 7.2 GE EPU 533103 EPU PUSAR sections 6.4.2 EPU5011115 33104 and 7.2 GE EPU 533105
- EPU Transmittal of draft
- EPU Safety Analysis Report EPU5011135 33340 8/30/03 or VY CPPU (draft)
/YNPS CPPU &
EPU MELLLA+ Startup Test EPU501115 533354 10/03 Specifications GE EPU 533355 VYNPS CPPU &
EPU MELLLA+ Startup Test EPU501117 533368 10/03 Specifications (TI 005)
GE EPU 533369 Supplemental EPU Information Supporting EPU5011191533372 10/111021W Cycle 23 SRLR ita Kingston GE Respectfully submitted, Jayy. Vilberg Matias F. Travieso-Diaz Douglas J. Rosinski SHAW PITTMAN LLP 2300 N Street, N.W.
Washington, DC 20037-1128 Tel. (202) 663-8063 Counsel for Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
Dated: January 27, 2005
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of ENTERGY NUCLEAR VERMONT YANKEE, LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
)
)
)
)
)
)
)
Docket No. 50-271 ASLBP No. 04-832-02-OLA (Operating License Amendment)
CERTIFICATE OF SERVICE I hereby certify that copies of "Entergy's Privileged and Proprietary Document Logs" were served on the persons listed below by deposit in the U.S. mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 27th day of January, 2005.
- Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ask2nalnrc.aov
- Administrative Judge Dr. Anthoy J. Baratta Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 aib5(nrc.pgov
- Administrative Judge Lester S. Rubenstein 4270 E Country Villa Drive Tucson AZ 85718 lesrrrnaTcomcast.net Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
- Secretary Att'n: Rulernakings and Adjudications Staff Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 secyanrc.gov, hearingdocketanrc.ov
- Sarah Hofinann Special Counsel Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 Sarah.Hofmannnai)state.vt.us
- Anthony Z. Roisman National Legal Scholars Law Firm 84 East Thetford Rd.
Lyme, NH 03768 aroismanr5),valley.net Office of Commission Appellate Adjudication Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
- Brooke Poole, Esq.
- Robert Weisman, Esq.
- Marisa Higgins, Esq.
Office of the General Counsel Mail Stop 0-15 D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 bdp(inrc.nov, rmrnwnnrc.gov, mch5na)nrc.gov
- Jonathan M. Block 94 Main Street P.O. Box 566 Putney, VT 05346-0566 jonbnai)sover.net
- Raymond Shadis New England Coalition P.O. Box 98 Shadis Road Edgecomb ME 04556 shadis(iprexar.com atias F. Travieso-Diaz