Forthcoming Meeting with Indiana Michigan Power Company - D.C. Cook Schedule and Approach to Loss-of-Coolant Accident Reanalysis to Support a Planned Fuel Upgrade
ML050180574
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/19/2005
From: Lyon C
NRC/NRR/DLPM/LPD3
To: Margie Kotzalas
NRC/NRR/DLPM/LPD3
Lyon F, NRR/DLPM, 415-2296
References
Download: ML050180574 (5)


Text

January 19, 2005 MEMORANDUM TO: Margie Kotzalas, Acting Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Carl F. Lyon, Project Manager, Section 1 /RA/

Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH INDIANA MICHIGAN POWER COMPANY DATE & TIME: Thursday, February 3, 2005 1:00 p.m. - 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room 10B4 Rockville, Maryland 20852 PURPOSE: Pre-application meeting to discuss the schedule and approach to loss-of-coolant accident reanalysis to support a planned fuel upgrade at the Donald C. Cook Nuclear Plant.

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC/NRR LICENSEE F. Orr K. Steinmetz F. Lyon M. Scarpello, et. al (licensee)

M. Kotzalas, et. al. M. Cerrone, et. al (Westinghouse)

Docket Nos. 50-315 and 50-316

Attachment:

Agenda cc: See next page MEETING CONTACT: Fred Lyon, NRR 301-415-2296 CFL@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920),

May 28, 2002

ML050180574 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/(A)SC NAME FLyon THarris MKotzalas DATE 01/19/05 01/19/05 01/19/05 Agenda for Pre-Application Meeting with the NRC - Fuel and LOCA Analysis February 3, 2005

Purpose:

Determine schedule and approach to LOCA reanalysis in support of fuel upgrade to address fretting wear issues in Unit 1.

I. Introduction A. Brief Discussion

1. Purpose
2. Fuel Transition Lessons Learned
3. Westinghouse Fuel Supplier
4. Unit 1 Fuel Upgrade
5. LOCA Reanalysis II. Fretting Wear Issues A. Transition to New Fuel Product (Unit 1)
1. Westinghouse / NRC Fuel Performance Meeting 12/7/04 (a) NRC Review Time (b) NRC Concurrence Before Fuel Load (c) Pre-Application Meeting
2. Best Estimate LOCA
3. WCobra/Trac to Estimate Penalty (a) Apply to current Appendix K LOCA method
4. ASTRUM III. BELOCA Schedule A. Unit 1 - March 2007
1. Cycle 21 - October 2006
2. Cycle 22 - April 2008 B. Unit 2 - March 2009 IV. Actions

Notice of February 3, 2005, meeting to discuss the schedule and approach to loss-of-coolant accident reanalysis to support a planned fuel upgrade at the Donald C. Cook Nuclear Plant Date: January 19, 2005 HARD COPY:

PDIII-1 Reading FLyon Receptionists (OWFN and TWFN)

DISTRIBUTION:

PUBLIC RidsNrrAdpt (BSheron)

RidsNrrDlpm (LMarsh/JLyons)

RidsNrrDlpmLpdiviii (WRuland)

RidsNrrDlpmLpdiii1 (MKotzalas)

FLyon RidsNrrLATHarris RidsOpaMail RidsOgcMailCenter RidsAcrsAcnwMail RidsRgn3MailCenter (EDuncan, RIII)

(JStrasma, RIII)

(DWeaver, RIII)

TMensah KJohnson FOrr DCoe RDennig PMNS

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III Michigan Department of Environmental U.S. Nuclear Regulatory Commission Quality 2443 Warrenville Road, Suite 210 Waste and Hazardous Materials Div.

Lisle, IL 60532-4352 Hazardous Waste & Radiological Protection Section Attorney General Nuclear Facilities Unit Department of Attorney General Constitution Hall, Lower-Level North 525 West Ottawa Street 525 West Allegan Street Lansing, MI 48913 P. O. Box 30241 Lansing, MI 48909-7741 Township Supervisor Lake Township Hall Michael J. Finissi, Plant Manager P.O. Box 818 Indiana Michigan Power Company Bridgman, MI 49106 Nuclear Generation Group One Cook Place U.S. Nuclear Regulatory Commission Bridgman, MI 49106 Resident Inspector's Office 7700 Red Arrow Highway Mr. Joseph N. Jensen, Site Vice President Stevensville, MI 49127 Indiana Michigan Power Company Nuclear Generation Group Phillip E. Troy, Esquire One Cook Place Indiana Michigan Power Company Bridgman, MI 49106 One Cook Place Bridgman, MI 49106 Mr. Mano K. Nazar American Electric Power Mayor, City of Bridgman Senior Vice President and P.O. Box 366 Chief Nuclear Officer Bridgman, MI 49106 Indiana Michigan Power Company Nuclear Generation Group Special Assistant to the Governor 500 Circle Drive Room 1 - State Capitol Buchanan, MI 49107 Lansing, MI 48909 Mr. John A. Zwolinski Safety Assurance Director Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106