LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a.

MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;

b.

MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and

c.

MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an.LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; Point Beach 3.0-1 Unit I -Amendment No. 21 5 Unit 2 - Amendment No. 220

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 (continued)

b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c.

When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

I LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be operated under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system operated under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.14, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by the SFDP evaluation, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

Point Beach 3.0-2 Unit I -Amendment No.21 5 Unit 2 -Amendment No.2 20

LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)

LCO 3.0.7 Test Exception LCOs allow specified Technical Specification (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional. When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.

Point Beach 3.0-3 Unit I -Amendment No.21 5 Unit 2 - Amendment No. 22 0

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.

Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per..." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

Point Beach 3.0-4 Unit 1 -Amendment No. i Unit 2 - Amendment No.

SR Applicability 3.0 3.0 SR APPLICABILITY (continued)

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

I Point Beach 3.0-5 Unit 1 -Amendment No. 215 Unit 2 -Amendment No. 220

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LC O 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS


NOTE------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.

status.

B.

Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.

met.

C. ----------NOTE-----------

C.1 Restore one channel to 7 days Not applicable to OPERABLE status.

hydrogen monitor channels.

One or more Functions with two required channels inoperable.

(continued)

Point Beach 3.3.3-1 Unit 1 - Amendment No. 21 5 Unit 2 - Amendment No. 2 2 0

Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)

LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, MODE 3 with RCS average temperature (Tavg) 2 500 0F.

ACTIONS


NOTE---------------------------------------------

Separate Condition entry is allowed for each PORV and each block valve.

I CONDITION REQUIRED ACTION COMPLEllONETIME A.

One or more PORVs A.1 Close and maintain 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable power to associated of being manually block valve.

cycled.

B. One PORV inoperable B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and not capable of valve.

being manually cycled.

AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.

AND B.3 Restore PORV to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

(continued)

Point Beach 3.4.11-1 Unit 1 - Amendment No. 215 Unit 2 - Amendment No.22 0

LTOP 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) System LCO 3.4.12 An LTOP System shall be OPERABLE with:

a.

A maximum of one Safety Injection (SI) pump capable of injecting into the RCS;

b.

Each accumulator isolated, whose pressure is 2 the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR, and

c.

One of the following pressure relief capabilities:

1.

Two power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR, or

2.

The RCS depressurized and an RCS vent path with venting capability equivalent to or greater than a PORV.

APPLICABILITY:

MODE 4 when any RCS cold leg temperature is < LTOP enabling temperature specified in the PTLR, MODE 5, MODE 6 when the reactor vessel head is on.

ACTIONS NOTES---


N S - -

1. While this LCO is not met, entry into MODE 6, with the reactor vessel head on, from MODE 6, with the reactor vessel head removed, is not permitted.
2. LCO 3.0.4.b is not applicable when entering MODE 4.

CONDITION REQUIRED ACTION COMPLETIONTIME A.

Two SI pumps capable of A.1 Initiate action to verify a Immediately injecting into the RCS.

maximum of one SI pump is capable of injecting into the RCS.

(continued)

Point Beach 3.4.12-1 Unit 1 - Amendment No. W Unit 2 - Amendment No.

RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:

a.

One containment sump level alarm; and

b.

One containment atmosphere radioactivity monitor (gaseous or particulate).

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTI ONS CONDITION REQUIRED ACTION COMPLEflONTIME A.

Required containment


NOTE-----------

sump level alarm Not required until inoperable.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

A.1 Perform SR 3.4.13.1.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore required 30 days containment sump monitor to OPERABLE status.

(continued)

Point Beach 3.4.15-1 Unit 1 - Amendment No. 21 5 Unit 2 - Amendment No. 220

RCS Leakage Detection Instrumentation 3.4.15 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLElONTlIME B.

Required containment B.1.1 Analyze grab samples Once per atmosphere radioactivity of the containment 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> monitor inoperable.

atmosphere.

OR NOTE----------

Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

B.1.2 Perform SR 3.4.13.1.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.2 Restore required 30 days containment atmosphere radioactivity monitor to OPERABLE status.

C.

Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND C.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.

All required monitors D.1 Enter LCO 3.0.3.

Immediately and level alarm inoperable.

Point Beach 3.4.1 5-2 Unit 1 - Amendment No.2 Unit 2 - Amendment No.2 u

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 APPLICABILITY:

The specific activity of the reactor coolant shall be within limits.

MODES I and 2, MODE 3 with RCS average temperature (Tavg) 2 5001F.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A.

DOSE EQUIVALENT


Note---------------

1-131 > 0.8 pCi/gm.

LCO 3.0.4.c is applicable.

A.1 Verify DOSE Once per EQUIVALENT 1-131 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE EQUIVALENT 1-131 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> within limit.

B.

Gross specific activity B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the reactor coolant Tavg < 5000F.

not within limit.

(continued)

I Point Beach 3.4.16-1 Unit 1 - Amendment No.215 Unit 2 - Amendment No.2 2 0

ECCS -

Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.


NOTE----------------------------------

An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.

APPLICABILITY:

MODE 4.

ACTIONS


IVt I I LCO 3.0.4.b is not applicable to ECCS high head subsystem.

CONDITION REQUIRED ACTION COMPLEIONTIME A.

Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable.

subsystem to OPERABLE status.

B. Required ECCS SI B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem inoperable.

SI subsystem to OPERABLE status.

C.

Required Action and C.1 Be in MODE 5.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.

Point Beach 3.5.3-1 Unit I - Amendment No. 21 5 Unit 2 - Amendment No. 220

ADV Flowpaths 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Atmospheric Dump Valve (ADV) Flowpaths LCO 3.7.4 Two ADV flowpaths shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required ADV A.1 Restore required ADV 7 days flowpath inoperable.

flowpath to OPERABLE status.

B. Two required ADV B.1 Restore one ADV 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> flowpaths inoperable.

flowpath to OPERABLE status.

C. Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND C.2 Be in MODE 4 without 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> reliance upon steam generator for heat removal.

I Point Beach 3.7.4-1 Unit I - Amendment No. 215 Unit 2 - Amendment No. 220

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW)

LCO 3.7.5 The AFW System shall be OPERABLE with; one turbine driven AFW pump system and two motor driven AFW pump systems.


NOTE----------------------------------

Only the motor driven AFW pump systems associated with steam generators relied upon for heat removal are required to be OPERABLE in MODE 4.

APPLICABILITY:

MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS


NOTE-------------------------------------------

LCO 3.0.4.b is not applicable.

CONDITION REQUIRED ACTION COMPLElONTlIME A.

One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.

system inoperable.

AND 10 days from discovery of failure to meet the LCO B.

One turbine driven AFW B.1 Restore turbine driven 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pump system inoperable AFW pump system to in MODE 1, 2 or 3 for OPERABLE status.

AND reasons other than Condition A.

10 days from discovery of failure to meet the LCO (continued)

Point Beach 3.7.5-1 Unit 1 - Amendment No.2 1 5 Unit 2 - Amendment No.22 0

AC Sources-Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:

a.

One circuit between the offsite transmission network and the associated unit's 4.16 kV Class 1 E safeguards buses, A05 and A06, utilizing the associated unit's 345/13.8 kV (X03) transformer or the opposite unit's 345/13.8 kV (X03) transformer with the gas turbine in operation, and the associated unit's 13.8/4.16 kV (X04) transformer;

b.

One circuit between the offsite transmission network and the opposite unit's 4.16 kV Class 1E safeguards buses, A05 and A06; and

c.

One standby emergency power source capable of supplying each 4.16 kV/480 V Class IE safeguards bus.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTI ONS


NOTE-------------------------------------------

LCO 3.0.4.b is not applicable to standby emergency power sources.

CONDITION REQUIRED ACTION COMPLETlONTIME A.

Associated unit A.1 Verify one circuit 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 345/13.8 kV (X03) between the offsite transformer inoperable.

transmission network and the associated unit's OR 4.16 kV Class 1E safeguards buses, Gas turbine not in A05 and A06, utilizing operation when utilizing the opposite unit's opposite unit's 345/13.8 kV (X03) 345/13.8 kV (X03) transformer.

transformer.

ANc (continued!

Point Beach 3.8.1-1 Unit 1 - Amendment No.2 1 5 Unit 2 - Amendment No.2 20

AC Sources-Operating 3.8.1 ACTI ONS CONDITION REQUIRED ACTION COMPLETlONTIME A.

(continued)

A.2 Verify gas turbine in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> operation.

B. Associated unit's B.1 Restore associated 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 13.8/4.16 kV (X04) unit's 13.8/4.16 kV (X04) transformer inoperable.

transformer to OPERABLE status.

C.

Associated unit's C.1 Restore required offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> required offsite power power source(s) to source to buses OPERABLE status.

A05 and A06 inoperable.

DR Required offsite power source to buses 1A05 and 2A06 inoperable.

D.

One or more required D.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from offsite power source(s) to feature(s) supported by discovery of one or more required the inoperable required Condition D Class 1E 4.16 kV bus(es) offsite power source concurrent with inoperable.

inoperable when its inoperability of required redundant redundant feature(s) is inoperable.

required feature(s)

ANDa D.2 Restore required offsite 7 days power source(s) to OPERABLE status.

AND 14 days from discovery of failure to meet LCO (continued)

I Point Beach 3.8.1-2 Unit 1 - Amendment No. 215 Unit 2 - Amendment No.2 20