ML050310358
| ML050310358 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/31/2005 |
| From: | Chernoff H NRC/NRR/DLPM/LPD3 |
| To: | Koehl D Nuclear Management Co |
| Chernoff, M H, NRR/DLPM, 301-415-4041 | |
| Shared Package | |
| ML050480058 | List: |
| References | |
| TAC MC1713, TAC MC1714 | |
| Download: ML050310358 (1) | |
Text
PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS
NOTE------------------
Separate Condition entry is allowed for each Function.
I CONDITION REQUIRED ACTION COMPLE7lONI1ME A.
One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.
status.
B.
Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.
met.
C.
One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.
channels inoperable.
(continued)
Point Beach 3.3.3-1 Unit I - Amendment No. 215 Unit 2 - Amendment No. 220 January 31, 2005" "Revised by correction letter dated