ML050310358

From kanterella
Jump to navigation Jump to search

Technical Specifications, Errata to Amendment Nos. 215 and 220, Dated December 22, 2004
ML050310358
Person / Time
Site: Point Beach  
Issue date: 01/31/2005
From: Chernoff H
NRC/NRR/DLPM/LPD3
To: Koehl D
Nuclear Management Co
Chernoff, M H, NRR/DLPM, 301-415-4041
Shared Package
ML050480058 List:
References
TAC MC1713, TAC MC1714
Download: ML050310358 (1)


Text

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS


NOTE------------------

Separate Condition entry is allowed for each Function.

I CONDITION REQUIRED ACTION COMPLE7lONI1ME A.

One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.

status.

B.

Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.6.

met.

C.

One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.

channels inoperable.

(continued)

Point Beach 3.3.3-1 Unit I - Amendment No. 215 Unit 2 - Amendment No. 220 January 31, 2005" "Revised by correction letter dated