EMERGENCY CORE COOLING SYSTEMS SURVEILLAN QUM S(Continued)
- 4.
Verifying that a minimum of 290 cubic feet of trisodium phosphate dodecahydrate (TSP) is contained within the TSP storage baskets.
- 5.
Deleted
- 6.
Deleted
- e.
At least once each REFUELING INTERVAL, by
- 1.
Verifying that each automatic valve in the flow path actuates to its correct position on a safety injection test signal.
- 2.
Verifying that each BPI and LPI pump starts automatically upon receipt of a SFAS test signal.
- f.
Deleted
- g.
By verifying the correct position of each mechanical position stop for valves DH-14A and DH-14B.
- 1.
Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of the opening of the valves to their mechanical position stop or following completion of maintenance on the valve when the LPI system is required to be OPERABLE.
- 2.
At least once each REFUELING INTERVAL.
DAVIS-BESSE, UNIT I 3/4 5-5 Amendment No. 20,26,4O,1,207,2152i-6,263