Tech Spec Leak Rate Test
ML043640297
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/2004
From: Hopkins J
NRC/NRR/DLPM/LPD3
To: Bezilla M
FirstEnergy Nuclear Operating Co
Hopkins J , NRR/DLPM, 301-415-3027
References
TAC MC0366
Download: ML043640297 (1)


Text

EMERGENCY CORE COOLING SYSTEMS SURVEILLAN QUM S(Continued)

4.

Verifying that a minimum of 290 cubic feet of trisodium phosphate dodecahydrate (TSP) is contained within the TSP storage baskets.

5.

Deleted

6.

Deleted

e.

At least once each REFUELING INTERVAL, by

1.

Verifying that each automatic valve in the flow path actuates to its correct position on a safety injection test signal.

2.

Verifying that each BPI and LPI pump starts automatically upon receipt of a SFAS test signal.

f.

Deleted

g.

By verifying the correct position of each mechanical position stop for valves DH-14A and DH-14B.

1.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of the opening of the valves to their mechanical position stop or following completion of maintenance on the valve when the LPI system is required to be OPERABLE.

2.

At least once each REFUELING INTERVAL.

DAVIS-BESSE, UNIT I 3/4 5-5 Amendment No. 20,26,4O,1,207,2152i-6,263