Supplemental Response to the April 29, 2003, Orders Modifying Licenses for Revised Design Basis Threat
ML041410281
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/20/2004
From: John Nakoski
NRC/NRR/DLPM/LPD2
To: Overbeck G
Arizona Public Service Co
Chernoff, M H, NRR/DLPM, 301-415-4041
References
EA-03-086, TAC MC2950, TAC MC2951, TAC MC2952
Download: ML041410281 (4)


Text

May 20, 2004 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

SUPPLEMENTAL RESPONSE TO THE APRIL 29, 2003, ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT (TAC NOS. MC2950, MC2951, AND MC2952)

Dear Mr. Overbeck:

On April 29, 2003, the Nuclear Regulatory Commission (NRC) issued Orders modifying the operating licenses for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 to: (1) require compliance with a revised design basis threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.

Section III.A.1 of the EA-03-086 (DBT Order) required that all licensees submit revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, based on the revised DBT, to the NRC for review and approval no later than April 29, 2004. The Order further requires licensees to implement the revised physical security plans, revised safeguards contingency plans, and revised security force personnel training and qualification plans no later than October 29, 2004.

By letter dated April 28, 2004, you submitted a supplemental response to the Orders for Palo Verde Nuclear Generating Station, Units 1, 2, and 3.

You provided information on your security plan as it relates to your Independent Spent Fuel Storage Installation (ISFSI). You will be notified by separate correspondence of the NRC staffs plan for review of your ISFSI security plan.

The NRC staff will be reviewing your physical security plan in the months of May and June, your training and qualification plan during July, and your contingency plan during August. Should further information regarding your submittal be necessary to support our review, you will be notified promptly.

G. R. Overbeck The NRC staff is currently reviewing your supplemental response and intends to complete the review of your revised plans by October 29, 2004.

Sincerely,

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530 cc: See next page

G. R. Overbeck The NRC staff is currently reviewing your supplemental response and intends to complete the review of your revised plans by October 29, 2004.

Sincerely,

/RA/

John A. Nakoski, Chief Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530 cc: See next page DISTRIBUTION:

PUBLIC SPRT R/F J. Nakoski J. Peralta C. Hawes M. Chernoff P. Peduzzi OGC ACRS NRR/DLPM - PMs NRR/DLPM - SCs A. Howell, RIV ADAMS Accession Number: ML041410281 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR/SSC SPRT/NSIR/SC SPRT/NRR/SC NAME MChernoff CHawes PPeduzzi JPeralta JNakoski DATE 5/20/04 5/20/04 5/20/04 5/20/04 5/20/04 OFFICIAL RECORD COPY

Palo Verde Generating Station, Units 1, 2, and 3 cc:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Ms. Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Terry Bassham, Esq.

General Counsel El Paso Electric Company 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326