Atrachment 1 Page 1 of 2 EXAM QUESTION HISTORY V -

Question # RO SRO 1 TIER 1 Group 1 BOW. 1057 KA oooO17G2.1.32 Importance 3.8 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.435 Learning Objective RES02C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate

.-~

EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(ES-O.2)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Figure 3.0, 33-0.2 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Fig-3.0. Natural Circulation C/D with Shroud Fans.

AnswerAnalysk D is correct since the AT between the Hot legs and the Przr exceeds its 200°F limit. No restrictions are imposed on Aux. Spray because the AT is 320°F.

Distractor Analysis: A is incorrect since the RCS pressure needs to be reduced to < 1400 Der Figure 3.0 and no restrictions are placed on Awc. Spray (used Tu to calculate RCS pressure).

B is incorrect since no restrictions are placed on Am. Spray in these conditions.

C is incorrect due to the wrong RCS pressure.

.- Question 1 B000.1057 (1 point(s))

The plant trip due to loss of offsite power. The RCS is currently being cooled down per ES-0.2, Natural Circulation Cooldown. The following conditions exist:

RCS Pressure - 1850 psig RCS Hot Leg Temps - A - 410°F B - 405°F RCS Cold Leg Temps - A - 390°F B - 385°F Przr Water Temp - 625°F Przr Steam Temp - 626°F Letdown In Service Charging fiom the Regen Hx Temp 385°F SI Blocked Both Control Rod Shroud Fans are running Which of the following states the required actions:

a. Depressurize the RCS to less than 1540psig using only the PORVs due to high AT between the Charging Line and P m Steam space.
b. Depressurizethe RCS to less than 1400 psig using only the PORVs due to high AT L

between the Charging Line and P m Steam space.

c. Depressurizethe RCS to less than 1540psig using auxiliary spray to cooldown the pressurizer.
d. Depressurizethe RCS to less than 1400psig using auxiliary spray to cooldownthe pressurizer.

Answer 1

d. Depressurizethe RCS to less than 1400psig using auxiliary spray to cooldown the pressurizer.

1

EXAM QUESTION HISTORY Question # RO SRO 2 TIER 1 Group 1 BOO. 1058 KA 000022AA2.04 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this ttachment) ~ ~ ~ ~ ~~

X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.43 5 Learning Objective: RAP31C 1.03 State the reasonlbasis for the CAUTIONS, NOTES and/or Major Action Categories in AP-CVCS.3, LOSS Of All Charging Flow.

u Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference AP-CVCS.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct since the midance of AI?-CVCS.3 requires this action.

c

Distractor Analysis: A and C are incorrect since these actions will result in a loss of Pnr

. Level and Pressure Control. D is incorect since this would not be effective in maintaining RCS messure control.

Question 2 B000.1058 (1 point(s>>

--.- While at 100% power a chargingline leak resulted in loss of all charging flow. It will be approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before the line can be repaired and charging restored. Which of the following describes the required operator actions under these conditions. The operators have already isolated Letdown.

a. Shutdown the Rx per the Normal Operating Procedures (lO%/hour)once shutdown depressurize the RCS to -1400 psig and establish SI flow to control inventory. RCS inventory will remain in the pressurizer due to the low outflow rate.
b. Perform a Rapid Rx Shutdown using Abnormal Procedures (5%/min) once shutdown depressurize the RCS to 1400 psig and establish SI to control inventory. RCS inventory will be maintained due to the short time taken to shutdown.
c. No action is required since the pressurizer out flow rate (sealleakoff) is so low that more than the required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the charging line repair are available prior to of Przr Level decreasing to < 13%.
d. Monitor Przr Level when Przr Level decreases to less than 5% the Trip the Reactor and go to E-0, SI will automatically start as pressure decrease and SI flow will maintain RCS Inventory.

Answer 2

b. Perform a Rapid Rx Shutdown using Abnormal Procedures (5%/min) once shutdown depressurize the RCS to 1400 psig and establish SI to control inventory. RCS inventory will be maintained due to the short time taken to shutdown.

2

EXAM QUESTION HISTORY

\- Question # RO SRO 3 TIER 1 Group 1 BOO8.0005 KA oooO26AA2.04 Importance 2.9 Source of Question (Note: Attach question and any subsequent modications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # B008.0005 10CFR55 Content 55.41 55.43 5 Learning Objective: RAP02C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED

. ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (Ap-CCW.2)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Ap-CCW.2 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct per AP-CCW.2 exceeding 200°F bearin? oil temrature reauires trigin3 of the reactor then the affected RCP and then going to Ea.

Distractor Analysis: A is incorrect since high bearing temDerature requires an immediate

- RCP trb. B is incorrect since onlv the affected RCP is trimed. C is incorrect since the Rx must be tripDed prior to the affected RCP and there are no actions for isolating the RCS in AP-ccw.2.

Question 3 B008.0005 (1' point(s))

L-During an ordered 1% per min power reduction, the following annunciatorsand conditions exist:

- AA- 18 RCP Vibration Alert

- A-32 RCP B oil level

  • 1.25

- PPCS display "GD-RCP's" indicates "B" RCP upper bearing at 233 degrees F Which of the following actions are required?

a. Check CCW pump, CCW surge tank and surge tank vent.
b. Trip the Rx,trip both RCP's and go to E-0.
c. Trip both RCP's, verify RCS isolated and go to E-0.
d. Trip the RX,trip "B" RCP and go to E-0.

L- Answer 3

d. Trip the Rx,trip "B"RCP and go to E-O.

3

EXAM QUESTION HISTORY

.- Question # RO SRO 4 TIER 1 Group 1 COO0.0266 KA OOOO27G2.1.32 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank Ginna # C000.0266 10CFR55 Content 55.41 55.43 2 Learning Objective: 'RES02C 1.02 Given the notes, cautions, and major action categories in ES-0.2, Natural Circulation Cooldown, explain the basis for the same.

-u Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference ES-0.2. ITS 3.4.9 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct per TS 3.4.9 Basis far PRZR Heaters.

Distractor Analysis: A is incorrect since the Przr will remain saturated. C - Minimum

- heaters are established to mevent a steam bubble from forming. not to collame one that exists.

D - Heaters are restored to maintain RCS pressure above the saturationmessure. SI is normallv blocked during a Natural Circ. Cooldown.

Question 4 C000.0266 (1 point(s))

-- ER-PRZR. 1, Restoration of P U R HTRS during blackout, provides for establishing a minimum amount of P U R heaters.

Which one of the following statements describes the basis or reason for establishingheaters following a blackout?

a. Allows for keeping the PRZR saturated for more uniform pressure control.
b. Allows subcooled natural circulationto be maintained.
c. Allows for collapse of steam bubble in the vessel head.
d. Allows for maintaining RCS pressure above SI setpoint.

Answer 4

b. Allows subcooled natural circulationto be maintained.

TC #96-107

. -i 4

EXAM QUESTION HISTORY i Question ## RO SRO 5 TIER 1 Group 1 B000. 1059 KA oooO55EA2.06 Importance 4.1 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.43 5 Learning Objective: RERl8C 4.0 Given a set of plant conditions (and a procedure figure, if needed) evaluate the appropriate parameters and determine the correct course of action.

L Cognitive Level Memory or F u - a Knowledge Comprehension or Analysis X Technical Reference RGEO7 480V Distniution Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is correct since the correct procedure for restoration is ER-ELEC.1 and SI must be reset to close the normal feed bmker with the buses deewgized.

c- .

Distractor Analysis: B is incorrect since ECA-0.0 is the incorrect restoration procedure L-(doesnt give the step). C is incorrect since SI must be reset. D is incorrect since the wrong procedure is referenced and SI must be reset.

Question 5 B000.1059 (1 pointfs))

L Following a loss of all AC power the operators are performing ECA-0.0, Loss of all AC, when Energy Operations notifies the Control Room that Circuit 75 1 has been restored. The following conditions exist:

0 SI Actuated and not reset No Faults on any 4160V or 480V Bus -

0 All Buses are deenergized Which of the following states the required actions the operators will take to restore power to the 480V SafeguardsBuses.

a. Restore power to the 4160V Buses 12N12B per ER-ELEC.l, Restoration of Offsite Power, then Reset SI to allow closing of the 480V Safeguard Buses Normal Feed Breakers.
b. Restore power to the 4160V Buses 12N12B per ECA-0.0, Loss of All AC Power, then Reset SI to allow closing of the 480V Safeguard Buses Normal Feed Breakers.
c. Restore power to 4160V Buses 12N12B per ER-ELEC.l. The Safeguard Bus Feed Normal Breakers can be closed without resetting SI.

L d. Restore power to 4160V Buses 12- per ECA-0.0, Loss of all AC. The Safeguard Bus Feeder Normal Breakers can be closed without resetting SI.

Answer 5

a. Restore power to the 4160V Buses 12N12B per ER-ELEC.1, Restoration of Offsite Power, then Reset SI to allow closing of the 480V Safe& Buses Normal Feed Breakers.

5

EXAM QUESTION HISTORY Question # RO SRO 6 TIER 1 Group I BOW. 1060 KA 000057G2.4.30 Importance 3.6 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank OriginatingBank #

Learning Objective: R0901C 5.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (Le. COLR) be able to apply the Tech Specs. To include: K O , applicability, applying L

action items, surveillances and the use of basis to aid in application.

RADO4C 1.05 State the time limits for notifying the NRC, State, and County.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference TS 3.8.9/0-9.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

TS 3.8.9. 0-9.3

~~ ~

AnswerAnalysis: C per TS 3.8.9B two hours to restore then initiate shutdown to Mode 3/5 per 0-9.3 initiation o f plant shutdown is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reuortable 10CFR50.72(bM2Mi).

Distractor Analysis: A is incorrect since it does not cause a UE or any other one hour Y -

reportable. B is incorrect since two hours are available for restoration. D is incorrect since onlv six hours are available.

Question 6 3000.1060 (1 point(s))

-v-During 100% power operation, the 1B AC Instrument Bus develops a fault and is deenergized.

Assuming that the Bus is not repaired, which of the following states the latest time the NRC can be notified and still meet the notification requirements.

a. One hour after the event.
b. Four hours after the event.
c. Six hours after the event.
d. Twenty-four hours after the event.

Answer 6

c. Six hours after the event.

6

EXAM QUESTION HISTORY Question ## RO SRO 7 TIER 1 Group 1 B035.0004 KA WW05EA2.1 Importance 4.4 Source of Question (Note: Attach question and any subsequent modifications to this attachment) -

New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank Ginna # B035.0004 10CFR55 Content 55.41 55.43 5 Learning Objective: WRHlC 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and fiom the procedure determine the appropriate EXPECTED

--. ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(FR-H. 1.)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference CSFST F4.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

None AnswerAnalysis: C uer the CSFST F-0.3 a Red Path exists on Heat Sink and the next procedure which should be performed after E-O is FR-H. 1.

Distractor Analysis: A is incorrect since ES Drocedures do not have Driority over Red Path FRs. B is incorrect since FR-H.l has prioritv. D is incorrect since FR-H. 1 is a higher prioritv than FR-1.2.

Question 7 B035.0004 (1 point@))

Immediately following the completion of the immediate actions of E-0, Reactor Trip or Safety Injection, the following conditions exist:

- SI Not Actuated

- RCS pressure - 2180 psig

- Core Exit TCs - 542 degrees F

- S/G pressures - (A,B) - 1000 psig, 900 psig

- S/G N.R. levels (A,B) - 0%, 3%

- Containmentpressure - 0.3 psig

- Pressurizer level - 3%

. - Total feed flow to S/G A - 50 gpm

- Total feed flow to S/G B - 100 gpm Assuming these conditions exist and cannot be changed as you progress through the procedure, subsequent action should be performed under which of the following procedures?

a. ES-0.1, Reactor Trip Response
b. E-2, Faulted Steam Generator Isolation L' c. FR-H. 1, Response to Loss of Secondary Heat Sink
d. FR-1.2, Response to Low Pressurizer level Answer 7
c. FR-H. 1, Response to Loss of Secondary Heat Sink 7

EXAM QUESTION HISTORY Question # RO SRO 8 TIER 1 Group 2 B000.1061 KA 000069AA2.02 Importance 4.4 New X Modified (Attach original and Modified Questions)

OriginalBank INFO # IP#2 3/10/2003 Bank Originating Bank #

10CFR.55 Content 55.41 55.43 7 Learning Objective: RRF02C 5.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: LCO, applicability, applying

--_ action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference 0-15.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

~- ~ ~~ ~

AnswerAnalysis: A is correct at least one door in each air lockmust be closed.

Distractor Analysis: B - This system is not reauired to be omrable for CNMT Integrity.

C - Containment Purge is allowed in service at CSD. D - One door needs to be closed for CNMT integrity.

I..069.AA2.02 1. 311012003 llndian Point 2 j ~ n g . I ExsmLcvel Jm lThe Reactor Coolant System is in a reduced inventory condition and preparations are being made to detention the RV Head for eventual Iremovsl. AddiUonol plant status information is as follows:

Question 2320 pCmdec3 fL- S*@Irc oRCS boron concentrationi fNUS8)was- 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago aim of the=W6PUS airlock seals of the containment free volume per day Given the above plant conditions, which ONE (1) of the following describes a requirement that must be met prior to proceeding with the

'RV Head detentioning?

I

Question 8 B000.1061 (1 point(s))

The Reactor Coolant System is in a reduced inventory condition and preparationsare being made to detention the RV Head for eventual removal. Additional plant status information is as follows:

0 RCS boron concentration is 2320 ppm.

0 The Penetration Pressurization System was removed from service 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago 0 Both doors of the Equipment Hatch Airlock are open to facilitate repairs of the airlock seals 0 One door of the Personnel Airlock is properly closed 0 Containmentleakage was previously verified to be less than 0.2% of the containment free volume per day 0 Containmentpurge is in service Given the above plant conditions, which ONE (1) of the following describes a requirement that must be met prior to proceeding with the RV Head detentioning?

a. Repair and properly close at least ONE door in the Equipment Hatch.
b. Restore the ContainmentPenetration Pressurization System to operable status.
c. Verify the automatic containment purge is removed from service.
d. Close the other door of the Personnel Airlock.

Answer 8

a. Repair and properly close at least ONE door in the Equipment Hatch.

8

EXAM QUEsTION HISTORY Question # RO SRO 9 TIER 1 Group 2 B000.1062 KA 0000076A2.02 Importance 2.7 New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank INFO # Byron 6/29/2000 10CFR55 Content 55.41 55.43 4 Learning Objective: RAP17C 1.03 State the reasonhasis for the CAUTIONS, NOTES and/or Major Action Categories in AP-RCS.3, High Reactor Coolant Activity.

--- ~

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference AP-RCS.3 High Activitv Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct since the tmxedure states to swap DI Bed if the DF is < 10.

Distractor Analysis: C and D are wrong since thev are both Entry Conditions to AP-RCS.3.

'v-A is wrong since chloride levels are not addressed and Der TRM 3.4.2 this level requires a plant shutdown.

Question 9 BOW. 1062 (1 point(s))

+

During a High Reactor Coolant Activity event, which of the following is the criteria used to determine if the standby mixed bed demineralizer should be placed in serviee?

a. Chloride levels greater than 0.15.
b. Decontamination factor less than 10.
c. Dose equivalent 1-1 3 1 greater than 1 microcurie/gram.
d. Gross radioactivity greater than 1OO/E BAR.

Answer 9

b. Decontamination factor less than 10.

9

EXAM QUESTION HISTORY L Question # RO SRO 10 TIER 1 Group 2 B000.1063 KA WE062.4.4 Importance 4.3 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Learning Objective: RFROOC 2.01 Given a set of plant conditions and a copy of the CSFSTs, apply the CSFST.

Cognitive Level Memory or Fundamental Knowledge c Comprehe&on or Analysis X Technical Reference FR-0.2 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: A is incorrect even though a faulted S/G is indicated - FR-C. 1has a higher

Distractor Analysis: B is incorrect even though a Loss of Heat Sink is indicated. FR-C-1 has L

a hipher prioritv. C is incorrect - no criteria for entry into FR-S.l only FR-S.2 which is an Orange Path. again FR-C.lhas urioritv. D is correct - indications of Inadequate Core Cooling Red Path - the hiFhest Driority Drocedure.

'v '

Question 10 B000.1063 (1 point(s))

- The Reactor has tripped due to a loss of offsite power. SI bas actuated. The crew is performing actions in E-0, "Reactor Trip or Safety Injection". Given the following conditions:

RCS pressure 1700psig and trending up SG pressure "A"= 1015 psig stable "B" = 700 psig and trending down CETs 700°F and trending up -

SG Narrow Range level off scale Low AFW flow approximately 75 gpm to each SG P E R level 15% and trending down CNMT pressure 5 psig and trending up Power is 2% in the PR and IR SUR is slightly negative RVLIS level 45%

Which ONE of the following describes the procedure transition upon exit from E-O?

a. E-2, Faulted Steam Generator Isolation
b. FR-H. 1, Response to Loss of Secondary Heat Sink
c. FR-S. 1, Response to Reactor RestdATWS

-x- d. FR-C.1, Response to Inadequate Core Cooling Answer 10

d. FR-C.1, Response to Inadequate Core Cooling 10

EXAM QUESTION HISTORY Question # 11 RO SRO 11 TIER 1 Group 2 c000.0043 KA WE08 2.1.32 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # c000.0043 10CFR55 Content 55.41.10 55.43.2 Learning Objective: RFRPlC 1.02 Given the notes and/or cautions in FR-P. 1, Response to Imminent Pressurized Thermal Shock Condition, explain the notes and/or cautions in FR-P.1.

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference FR-P.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is incorrect - P E R increase due to SI accumulator iniection basis not

Distractor Analysis: B is incorrect - N, iniection during:depressurization basis not correct.

L C is correct. D is incorrect - rate of accumulator iniection during depressurization more a concern for added thermal stress. not thermal shrink.

c

Question 11 C000.0043 (1 point(s))

L' FR-P.l, Response to Pressurized Thermal Shock, Step 17, has a caution which states, "The RCS should not be depressurizedto less than SI accumulator pressure until the SI accumulator is isolated." Which one of the following is the correct basis for this caution?

a. Depressurizationto less than accumulatorpressure prior to accumulator isolation may cause water solid PRZR which will result in a loss of PRZR pressure control.
b. Depressurization to less than accumulatorpressure prior to accumulator isolation will allow nitrogen into the RCS which may cause gas binding in the SG U-tubes.
c. Depressurizationto less thanaccumulator pressure prior to accumulator isolationwill delay depressurization since accumulator in flow to RCS will tend to stabilize RCS pressure.
d. Depressurizationto less than accumulator pressure prior to accumulator isolation will cause cold water addition to RCS which will result in rapid RCS depressurizationand loss of subcooling from thermal shrink.

Answer 11

c. Depressurizationto less than accumulator pressure prior to accumulator isolation will delay depressurization since accumulator in flow to RCS will tend to stabilize RCS pressure.

TC 96-139 TC 96-140 TC 95-139 11

EXAM QUESTION HISTORY v

Question # 12 RO SRO 12 TIER 1 Group 2 B000.1064 KA W/E09EA2.2 Importance 3.8 New X Modified (Attach original and Modified Questions)

Original Bank INPO # Diablo Canyon 1/1/2000 Bank Originating Bank #

10CFR.55 Content 55.41 55.43.5 Learning Objective: RES03C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriateEXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(ES-O.3)

L Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference ES-0 .3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is incorrect - although these are steps taken during the depressurization, they do not applv to risinp PRZR level.

Distractor Analysis: B is correct - raising RCS Dressure bv 100 Dsie will help collapse the bubble in the Reactor vessel. C is incorrect - continuing the deDressurization will only cause bubble in Reactor vessel head to mow larger. D is incorrect - R W S level indication limit is 93% and midance onlv suggests raising Dressure with no firm guidance on amount.

i I ~

I 1I1 /20m IDiablo Canyon 1 ExamLevel 1s Due to a reactor trip and subsequent loss of offsite power, procedure E-0.4, "Natural Circulation Cooldown with Steam Void in Vessel (without RVLIS)," step 8, is in progress. During depressurizationto the target pressure, PZR level rapidly increases to 92%.

Question IWhat action@)should the operators take?

Stop RCS depressurization. then energize pressurizer heaters to increase RCS pressure by 100 psig.

Answer:

Stop RCS depressurization, then isolate accumulators if RCS pressure is less than Distracter 1 1000 psi@

Distracter 2 Continue RCS depressurizationuntil RCS pressure is wlthln 60 psig of the average pressure of all SGs.

Continue RCS depressurizationuntil RCS pressure is less than 900 psig, then isolate accumulators.

Distracter Analysis:

Answer:

Distracter 1:

Distracter 2:

Distracter 3:

Question 12 B000.1064 (1 point(s))

Due to a reactor trip and subsequent loss of offsite power, procedure ES-0.3, "Natural Circulation Cooldown with Steam Void in Vessel" is in progress at step 8 Controlling PRZR Level. During depressurization,the PRZR level rapidly increases to 93%.

What action(s) is required?

a. Stop RCS depressurization,then isolate SI accumulators if RCS pressure is l&s than 1500 psig.
b. Stop RCS depressurization,then energize pressurizer heaters to increase RCS pressure by 100 psig.
c. Continue RCS depressurizationuntil RCS pressure is within 50 psig of average S/G pressure.
d. Continue RCS depressurizationuntil RVLIS level is less than 90%, then stop depressurization while continuing with cooldown.

Answer 12 i -

b. Stop RCS depressurization, then energize pressurizer heaters to increase RCS pressure by 100 psig.

12

EXAM QUESTION HISTORY L Question ## RO SRO 13 TIER 2 Group 1 B000.1065 KA 004G2.1.33 Importance 4.0 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Learning Objective: R1601C 5.02 Given a set of plant conditions and a copy of TRM and TRM referenced material, be able to apply the TRM. To include: LCO,applicability, applying action items and surveillances.

5---

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference TRM 3.1.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

TRM 3.1.1 AnswerAnalysis: B is correct since TRM 3.1.1 reauires two c h a mg ~ w p tos be owrable to meet the s ~ e c . Actions A and B as stated are amlicable.

Distractor Analysis:

these are the actions or Mode 3 and 4. and the ulant is in Mode 1. D is incorrect since this is the action for both reauired flow Daths out of service.

Question 13 B000.1065 (1 point(s))

During normal at power operation with the "B" Charging Pump OOS, the "A" Charging Pump

\_

trips and cannot be restarted. Which of the following states the required action.

a. No Actions Required, Charging Pumps are not Tech Spec required equipment.
b. Restore a second charging pump to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, then be in Mode 3 and verify adequate SDM in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. Restore a second charging pump to operable status within 7 days, then be in Mode 5 in 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d. Restore a second charging pump to operable status immediately and be in Mode 3 and verify adequate SDM in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Answer 13

b. Restore a second charging pump to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, then be in Mode 3 and veri@ adequate SDM in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

13

EXAM QUESTION HISTORY

. Question # RO SRO 14 TIER 2 Group 1 B000.1066 KA 013A2.03 Importance 4.7 X New Modified (Attach original and Modified Questions)

Original Bank #

I Bank Originating Bank #

10CFR55 Content 55.41 55.43 5 Learning Objective: RAPllC 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and fromthe procedure determine the appropriate EXPECTED 1 ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (AP-PER. 1)

R2701C 3.06 Describe the cause effect relationship between the ESFAS and the ECCS.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answerhlysis: D correct since the sDray valve will deDressurize the RCS c a u s h ~a Reactor Trip and SI. The SI DumD will deliver flow to the RCS causing a water solid condition at amroximatelv SI pumD shut off head (1575 mid.

L

Distractor Analysis: A is incorrect since the SI DumD will increase RCS pressure to the shut off head once the RCS is water solid. B is incomct because the "B" RCP is the incorrect RCP to stop per AP-PRZR. 1. C is incorrect for the same reasons as A and B.

- Question 14 B000.1066 (1 point(sN During power operations AOV-43 1A Pressurizer Spray Valve opens to control pressure and becomes mechanically stuck at 50% open. Which one of the following describes the plant response with no operator actions and the operator action to mitigate this event.

a. RCS pressure will decrease to approximately 1050 psig. Rx trip and SI will occur.

Pressure will stabilize at approximately 1050 psig. The operators should trip @e Rx and "A" RCP per AP-PRZR. 1, Abnormal PRZR Pressure.

b. RCS Pressure will decrease to below SI pump shutoff head. The Rx will Trip and SI will occur. RCS pressure will stabilizeat approximately 1500 psig. The operators should Trip the Rx and "B" RCP per AP-PER. 1, Abnormal PRZR Pressure.
c. RCS Pressure will decrease to approximately 1050 psig. Rx Trip and SI will occur.

Pressure will stabilize at approximately 1050 psig. The operators should Trip the Rx and "B" RCP per AP-PRZR.1, Abnormal PRZR Pressure.

d. RCS Pressure will decrease to below SI pump shutoff head. The Rx h l l Trip and SI will occur. RCS Pressure will stabilizeat approximately 1500 psig. The operators should trip the Rx and "A" RCP per AP-PRZR. 1, Abnormal PRZR Pressure.

Answer 14

d. RCS Pressure will decrease to below SI pump shutoff head. The Rx will Trip and SI will occur. RCS Pressure will stabilize at approximately 1500psig. The operators should trip the Rx and "A" RCP per AP-PUR. 1, Abnormal PRZR Pressure.

14

EXAM QUESTION HISTORY L

Question # RO SRO 15 TIER 2 Group 1 B022.0004 KA 022A2.01 Importance 2.7 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

E New Modified (Attach original and Modified Questions)

OriginalBank Ginna # B022.0004 Bank OriginatingBank #

10CFR55 Content 55.41. 55.43.5 Learning Objective: R2201C 6.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: K O , applicability, applying

'\

action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehensionor Analysis X Technical Reference ITS 3.6.6 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is correct - "A" and "C"CRFC's both inoperable makes both trains of post accident charcoal trains inoperable thus LCO 3.6.6.C amlies.

Distractor Analysis: B is incorrect - wrong LCO action statement. C is incorrect - wronp 1 -

LCO action statement. D is incorrect - containment SDEW and CRFCs are not comDletelv interchangeable.

QUESTION ID: B022.0004 POINTS: 1 STATUS: COG L V L OUESTION 1--

The shift supervisorhas declared the "A" containment recirculation fan cooler (CRFC)inoperable for routine maintenance. Four hours later the "C" CRET shuts down due to a breaker failure. What are the plant operational restrictions due to these events? (TSAS: Tech Spec Action Statement)

a. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.
b. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
c. The plant is in a 7-day TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
d. The plant is in a 7-day TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.

ANSWER

a. The plant is m a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.

Handouts:

None

  • - Lessons Enabling Objs. Tasks References K and A's R2201c R2201C 6.02 None None None

Question 15 B022.0004 (1 point(s))

--- The plant is operating at 100% power with the following equipment alignment:

B, C, and D Containment Recirculation Fan Coolers (CRFCs) are in service. All other equipment is available and aligned for normal operation. The "C"CRFC develops high vibration, is declared "inoperable, and is secured after "A"CRFC is started. Five minutes after starting "A" CRFC, it trips on overcurrent. A local reset is attempted. The "A" CRFC will not Start.

i What are the plant operational restrictions due to these events? (TSAS: Tech Spec Action Statement)

a. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.
b. The plant is in a 7-day TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
c. The plant is in a I-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
d. The plant is not in a TSAS for required shutdown since both trains of containment spray operable.

Answer 15

a. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.

15

EXAM QUESTION HISTORY v

Question # RO SRO 16 TIER 2 Group 1 B300.0034 KA 064G2.1.33 Importance 4.0 New Modified (Attach original and Modified Questions)

Original Bank #

X Bank Originating Bank Ginna # B300.0034 10CFR55 Content 55.41 55.43 2 Learning Objective: R0801C 10.02 Given a set of plant conditions and a copy of Tech Specs and Tech Specs referenced material i.e. (COLR)be able to apply the Tech Specs. To include: LCO, applicability, applying L--

actions, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference PT-12.1/TS3.8.1 Level of Difficulty (fromattachment 3)

References required on Exam (Attach copy to this attachment)

PT-12.1TS 3.8.1 AnswerAnalysis: B is correct - PT-12.1 reauires the D/Gbe declared inoperable due to low lube oil pressure < 68 pie. TS 3.8.1 allows 7 days to repair.

Distractor Analysis: A is wrong since PT-12.1 reauires

- the D/Gbe declared inoperable due L

to low lube oil txessure. C is wronp- since 7 days. not 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. are allowed for restoring the D/G. D is wrong: since PT-12.1 ~ u t the s lube oil Dressure in the Action Reauired range. not the Alert ranee.

I-

Question 16 B300.0034 (1 point(s))

At 97% power during PT-12.1 "Emergency Diesel Generator 1A" test, the following conditions L - 1 were noted:

Load 2005 KW Power Factor .95 Lagging Fuel Oil Press 38 psig Lube Oil Press 67 psig Jacket Water Press 34 psig Air Manifold 22 psig Based on the given information, which one of the following describes any required actions, assuming the "B"DIG and offsite power verified operable.

a. All requirementssatisfied, No Actions.
b. Declare the "A" DIG inoperable, continued operation allowed for 7 days.
c. Declare the "A" DIG inoperable, continued operation allowed for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. One D/G parameter in the Alert Range. Submit an Action Report.

Answer 16

b. Declare the "A" D/G inoperable, continued operation allowed for 7 days.

16

EXAM QUESTION HISTORY Y

Question # RO SRO 17 TIER 2 Group 2 B000.1067 KA 034A2.01 Importance 4.4 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank INPO # Seabrook 5/30/2003 10CFR55 Content 55.41 55.43 7 Learning Objective: RRFOlC 4.00 Given a set of plant conditions and a copy of the Refueling Emergency Procedure (RF-65.4),

apply the procedures.

L Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference RF-65.4 Level of Difficulty (fromattachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: C is correct since these are the actions in RF-65.4.

L--

Distractor Analysis: A is wrong since actions are rewired for drmDing an assemblv.

--.-/

B is incorrect since evacuation is reauired. D is incorrect since position verification is not art of RF-65.4.

Question 17 B000.1067 (1 point(s))

L- The following conditions exist:

There is a core off-load in progress The fuel handlers were moving irradiated fuel to a location in the spent fuel pool You are notified that the spent fuel bundle was accidently dropped in the spent fuel pool The bundle fell into the correct location R-5, Spent Fuel Pool radiation monitor reads 4 mrem/hr and is steady What actions, if any, are required?

a. No action is required
b. Enter procedure EPIP 1-13,High Radiation Area. Confer with RP about evacuating personnel from the area.
c. Enter procedure RF-65.4, Fuel Handling Accident. Evacuate personnel from the area and refer to EPIP 1- 13, Local Radiation Emergency and EPIP 1-0 Event Classification.
d. Enter procedure RF-65.4, Fuel Handling Accident. Instruct the bridge to verify proper location in fuel pool and instruct RP to measure radiation levels above pool. Inform reactor engineering.

-v Answer 17

c. Enter procedure RF-65.4, Fuel Handling Accident. Evacuate personnel from the area and refer to EPIP 1-13, Local Radiation Emergency and EPIP 1-0 Event Classification.

17

EXAM QUESTION HISTORY L,

Question # RO SRO 18 TIER 2 Group 2 B000.1068 KA 086G2.4.4 Importance 4.3 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.43 5 Learning Objective: RAEWC 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED

-.- ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (AP-CR.l)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference AP-CR. 1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct since small fires which do not affect MCB equipment are addressed by AP-CR. 1

Distractor Analysis: A and B are incorrect since ER-FIRE.1onlv addresses Control Room fires where a loss of control room eauipment occurs. C is incorrect since ER-FTRE.0 only gives general guidance for fires outside the Control Room.

Question 18 B000.1068 (1 p o i n w

--- During 100% power operations a small fire occurs in the Control Room kitchen. Large quantities of smoke fill the Control Room forcing the operating crew to evacuate. Assuming the fire is limited to the kitchen area, which one of the following procedure(s) provides guidance for operating the plant under these conditions.

a. AP-CR. 1, Control Room Evacuation and ER-FIRE.1, Alternate Shutdown for Control Complex Fire
b. ER-FIRE. 1, Alternate Shutdown for Control Complex Fire
c. ER-FIRE.0, Control Room Response to Fire Alarm and Reports
d. AP-CR. 1, Control Room Evacuation Answer 18
d. AP-CR. 1, Control Room Evacuation

EXAM QUESTION HISTORY Question # RO SRO 19 TIER 3 Group BO06.OOO 1 KA G2.1.12 Importance 4.0 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank Ginna # B006.0001 lOCF'R.55 Content 55.41 55.43 2 Learning Objective: R2501C 9.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: LCO,applicability, applying t ,

action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Tech Spec 3.5.2.3.5.3. 3 .O Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Tech Specs 3.5.2.3.5.3.

AnswerAnalysis: B is correct since only one ECCS train is required in Mode 4 and two trains are recphd in Mode 3. since YOU cannot increase modes with reauired eaubment 00s (TS 3.0.4)

Distractor Analysis: A is incorrect since the LCO reauirement for Modes 1-3 are not met.

C is incorrect since the LCO for the current mode is met. D is incorrect since TS 3.0.4 prohibits changing mode from 4 to 3.

Question 19 B006.0001 (1 point(s))

i-A plant heatup was in progress, with the RCS at 300 degrees F and 350 psig, when the B SI pump failed its surveillance and was declared inoperable. Which one of the below limits are placed on the plant heatup?

a. All ECCS LCOs satisfied, may operate in any mode.

i

b. ECCS LCO for this mode satisfied but may not proceed into mode 3.
c. ECCS LCO not satisfied. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to restore B SIP then 24 hrs to mode 5.
d. ECCS LCO satisfied for this mode but enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> clock when proceed into mode 3.

Answer 19

b. ECCS LCO for this mode satisfied but may not proceed into mode 3.

19

EXAM QUESTION HISTORY L'

Question # RO SRO 20 TIER 3 Group B000.1070 KA 2.1.14 Importance 3.3 Source of Question (Note: Attach question and any subsequent modifications to this X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Answer Analysis: B is correct since the Fire ResDonse procedure requires notification of the Dlant personnel via the Daging; svstem.

Distractor Analysis: A is incorrect. Enerm ODerations is not initiallv notified of fires.

C and D are incorrect sinced these notifications would onlv be Derformed if an actual fire occurred and it was of a long duration.

i c-

Question 20 B000.1070 (1 point(s))

u A fire alarm on FCP-1 in the Control Room is received. After notifjing the Fire Brigade Captain, what is the next action the Control Room is required to take?

a. Notify RG&E Energy Operations of the fire location and severity.
b. Notify plant personnel on the plant paging system.

c, Notify the NRC per 0-9.3, NRC Immediate Notification.

d. Notify New York State, Monroe and Wayne Counties per EPIP 1-5.

Answer 20

b. Notifl plant personnel on the plant paging system.

20

EXAM QUESTION HISTORY Question ## , RO SRO 21 TIER 3 Group B000.1071 KA 2.2.20 Importance 3.3 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.43 5 Learning Objective Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference AR-J-5 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: C is correct since the AR-J-5 status that the breaker should not be reset unless the comDonent is reauired.

Distractor Analysis: A is incorrect since the comDonent is not needed for these plant L-conditions. B is incorrect for the same reason as A. D is incorrect for the same reason as A.

Question 2 1 B000.1071 (1 point(s))

Plant in Mode 1, 100% power, steady state conditions. Operators are filling the A SI Accumulator per S-16.13 with the B SI pump when the B SI pump breaker trips open. Which of the following is the correct operator aciton?

a. Attempt one B SI pump breaker reset and reclosure.
b. Reset the B SI pump breaker and start the C SI pump.
c. Do not attempt reset and reclosure of the B SI pump breaker. Initiate corrective action per IP-CAP.1
d. Reset the B SI pump breaker and fill the A SI Accumulator with the SI Accumulator makeup pump Answer 2 1
c. Do not attempt reset and reclosure of the B SI pump breaker. Initiate corrective action per IP-CAP. 1 21

EXAM QUESTION HISTORY L

Question # RO SRO 22 TIER 3 B300.006 1 KA 2.2.23 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # B300.0061 10CFR55 Content 55.41 55.43 Learning Objective: RAD13C 1.04 Given a hypothetical situation, demonstrate the ability to properly complete the attachments of procedure A-52.4.

5-/

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference A-52.4 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct since the tracking is used only to document equbment that is not needed for present condition

Distractor Analysis: A is incorrect since if the eauipment is inoperable. it must be tracked repardless of the status of the redundant equbment. B is incorrect since the two documents are not linked. C is incorrect since it is not up to an individual to decide whether to meet this reauirement.

L

Question 22 B300.0061 (1 point(s))

-- Equipment covered in section 3 of ITS has become inoperable and is being documentedby an A-52.4 Attachment. Which one of the following explains when the "Tracking Purposes Only" space should be checked?

a. The redundant componenthain is operable
b. A WR/TR or WO is not required
c. At the discretion of the individual completing the attachment.
d. The equipment is not required to be operable for the present mode.

Answer 22

d. The equipment is not required to be operable for the present mode.

TC 96-020 22

EXAM QUESTION MSTORY Question # , RO SRO 23 TIER 3 Group C0oO. 1061 KA 2.3.6 Importance 3.1 Source of Question (Note: Attach question and any subsequent modifications to this ttachment) ~ ~ ~~~~

New Modified (Attach original and Modified Questions)

Original Bank #

v Bank OriginatingBank Ginna # co00.1061 10CFR55 Content 55.41 55.43 4 Learning Objective Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference CH-RETS-GDT-EL Level of Difficulty (from attachment 3)

References rewired on Exam (Attach copy to this attachment)

Answer Analysis: A is correct since the release procedure reauires that R-14/R-l4A be checked urior to a GDT release.

Distractor Analysis: B is incorrect since both Plant Exhaust Fans are not run at the same time. C is incorrect since the tank does not need to be held for 30 days. D - the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reauirement is incorrect.

Question 23 COOO. 1061 (1 point(s))

Which of the following items is the Shift Supervisor required to verify prior to authorizing a Gas Decay Tank Release?

a. Radiation Monitors R- 14 or R14A operable
b. Both Plant Vent Exhaust Fans are running .-
c. The Gas Decay Tank has been isolated and held for at least 30 days
d. The release will be initiated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of tank sample time.

Answer 23

a. Radiation Monitors R- 14 or R14A operable 23

EXAM QUESTION HISTORY L Question # RO SRO 24 TIER 3 Group B000.1069 KA 2.3.9 Importance 3.4 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Learning Objective: R2201C 6.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: LCO, applicability, applying

-u action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehensionor Analysis X Technical Reference TS 3.3.5, S-23.2.2 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

TS 3.3.5. S-23.2.2 Answer Analysis: A is correct since TS 3.3.5 and S-23.2.2 require R-12 to be operable during irradiated fuel movement inside CNMT.

Distractor Analysis: B. C, and D are incorrect since CNMT puree while irradiated fuel movement is in progress is not allowed with R-12 00s.

Question 24 B000.1069 (1 p o w ) )

Given the following conditions:

Plant is in Mode 5 Irradiated Fuel Movement is in progress inside CNMT CNMT Purge is in service R- 12A is operable and in service R- 12 ContainmentNoble Gas Monitor fails Using the attached references, which of the following statements describesthe required action for this failure.

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to repair R- 12, then remove purge from service and close the purge supply and exhaust valves.
b. Stop movement of Irradiated Fuel immediately, CNMT Purge may continue
c. No actions are required since R-12A is in service and can be used to monitor CNMT purge-
d. Purge may continue provided an operator is dedicated to monitoring R-12A and securing CNMT purge if R- 12A alarms.

Answer 24

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to repair R-12, then remove purge fkom service and close the purge supply and exhaust valves.

24

EXAM QUESTION HISTORY u

Question # RO SRO 25 TIER 3 Group B000.1072 KA 2.4.28 Importance 3.3 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank OriginatingBank #

Learning Objective Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference S-30Step 5-3.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: B is correct. S-30 reauires that the entire series be comrdeted if sabotaye is detected.

Distractor Analysis: A is incorrect since no shutdown is reauired. C is incorrect since W

more than checking the one suspect valve is reauired. D is incorrect since no evacuation is reauired.

Question 25 B000.1072 (1 point(s))

L While the plant is at 100% power, the Primary A 0 notifies the Control Room that he found SI pump suction valve V-890A with its chain cut and in the closed position. After notifying Security of this event, which of the following actions are the operators required to perform?

a. Begin a Plant Shutdown per 0-2.1, Shutdown to Hot Shutdown Conditions, continuing until SI Train A components are verified in their correct position. .-
b. Perform the S-30 Safeguard Equipment Lineup check procedures to verify correct system valve and breaker positions.
c. Send two qualified operators to perform an independent verification on V-890A and to relock the valve.
d. Order the evacuation of non-essential plant personnel to the Training Center until an investigation of the incident is complete.

Answer 25

b. Perform the S-30 Safeguard Equipment Lineup check procedures to verify correct system valve and breaker positions.

25