ML042380267

From kanterella
Jump to navigation Jump to search
NRC Initial Operator Licensing Examination 05000528-04-301; 05000529-04-301; 05000530-04-301
ML042380267
Person / Time
Site: Palo Verde  
Issue date: 08/19/2004
From: Gody A
Operations Branch IV
To: Overbeck G
Arizona Public Service Co
References
IR-04-301
Download: ML042380267 (4)


See also: IR 05000528/2004301

Text

August 19, 2004

Gregg R. Overbeck, Senior Vice

President, Nuclear

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NRC INITIAL OPERATOR LICENSING EXAMINATION 05000528; 05000529;

05000530/2004-301

In a telephone conversation on May 13, 2004, between Messrs. Gary Box, License Initial

Training Supervisor, and Gregory Werner, Chief Examiner, arrangements were made for the

administration of licensing examinations at Palo Verde Nuclear Generating Station during the

week of December 13, 2004.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." Your support for onsite validation of the examinations is required during the

week of November 29, 2004.

To meet the above schedule, it will be necessary for your staff to submit the examination

outlines by September 3, 2004. The draft written examination, operating test, and the

supporting reference materials identified in Attachment 2 of ES-201 and as specified by the chief

examiner will be due by October 8, 2004. Any delay in receiving the examination and reference

materials, or the submittal of inadequate or incomplete materials, may cause the examinations to

be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the appropriate portions of the facility available on the dates noted above.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

Arizona Public Service Company

-2-

To permit timely NRC review and evaluation, your staff should submit preliminary senior

operators limited to fuel handling license applications (Office of Management and Budget (OMB)

approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and

waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0101, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail

at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of

information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its

enclosure, and your response will be made available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Box has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Werner at 817-860-8156, or

myself 817-860-8159 .

Sincerely,

/RA/ PCG for

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530

Licenses: NPF-41; NPF-51; NPF-74

Arizona Public Service Company

-3-

cc:

Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

M. Dwayne Carnes, Director

Regulatory Affairs/Nuclear Assurance

Palo Verde Nuclear Generating Station

Mail Station 7636

P.O. Box 52034

Phoenix, AZ 85072-2034

Hector R. Puente

Vice President, Power Generation

El Paso Electric Company

310 E. Palm Lane, Suite 310

Phoenix, AZ 85004

Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

John W. Schumann

Los Angeles Department of Water & Power

Southern California Public Power Authority

P.O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

John Taylor

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Cheryl Adams

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. DIN

San Clemente, CA 92672

Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78701-3326

Arizona Public Service Company

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (GXW2)

Branch Chief, DRP/D (TWP)

Senior Project Engineer, DRP/D (JAC)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

ADAMS:  Yes

 No Initials: ______

 Publicly Available  Non-Publicly Available

 Sensitive

 Non-Sensitive

SOE:OB

C:OB

G. E. Werner

A. T. Gody

/RA/

/RA/ pcg for

8/19/2004

8/19/2004

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax