ML043220486

From kanterella
Jump to navigation Jump to search

Technical Specifications, Correction to Amendment Nos. 251, 290 & 249 (Enclosure 2)
ML043220486
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/08/2004
From:
NRC/NRR/DLPM/LPD2
To:
Brown Eva, NRR/DLPM, 415-2315
Shared Package
ML043200588 List:
References
TAC MB5733, TAC MB5734, TAC MB5735
Download: ML043220486 (1)


Text

(3) The licensee is authorized to relocate certain requirements included in Appendix A and the former Appendix B to licensee-controlled documents. Implementation of this amendment shall include the relocation of these requirements to the appropriate documents, as described in the licensee's application dated September 6, 1996, as supplemented May 1, August 14, November 5 and 14, December 3,4,11, 22, 23, 29, and 30, 1997, January 23, March 12, April 16, 20, and 28, May 7, 14, 19, and 27, and June 2, 5, 10 and 19, 1998, evaluated in the NRC staff s Safety Evaluation enclosed with this amendment. This amendment is effective immediately and shall be implemented within 90 days of the date of this amendment.

(4) Deleted.

(5) Classroom and simulator training on all power uprate related changes that affect operator performance will be conducted prior to operating at uprated conditions.

Simulator changes that are consistent with power uprate conditions will be made and simulator fidelity will be validated in accordance with ANSIIANS 3.5-1985.

Training and the plant simulator will be modified, as necessary, to incorporate changes identified during startup testing. This amendment is effective immediately.

(6) The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Browns Ferry Physical Security Plan", with revisions submitted through May 24,1988; "Browns Ferry Security Personnel Training and Qualification Plan", with revisions submitted through April 16,1987; and "Browns Ferry Safeguards Contingency Plan", with revisions submitted through June 27,1986. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

BFN-UNIT 3 4 Amendment No. '2 49