ML043150163

From kanterella
Jump to navigation Jump to search

Entergy Operations, Inc. - Confirmation of Implementation of April 29, 2003, Orders to Waterford, Unit 3
ML043150163
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/08/2004
From: Mitchell T
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
W3FI-2004-0113
Download: ML043150163 (3)


Text

Entergy Nuclear South

-8 Entergy Operations, Inc.

17265 River Road Killona, LA 70057 Eneersa Tel 504-739M310 F

7

.Fax 504-739M6698

( 'l tmitchl entergy.com Timothy G. Mitchell Director. Engineering Waterford 3 W3FI-2004-0113 November 8, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Entergy Operations, Inc. - Confirmation of Implementation of April 29, 2003, Orders to Waterford Steam Electric Station, Unit 3 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

References:

Updated Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses dated October 4, 2004 (VV3F1 -2004-0088)

April 29, 2004 (W3F1-2004-0034), letter to Document Control Desk, Supplemental Response to the April 29, 2003 Orders to Entergy NRC Letters from Samuel J. Collins to Holders of Licenses for Operating Power Reactors as listed in Enclosure 2, dated April 29, 2003 Regarding Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (EA-03-086), Issuance of Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel (EA-03-039)

Dear Sir or Madam:

The NRC issued Orders dated April 29, 2003: EA-03-038, Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel; EA-03-039, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel; and EA-03-086, Order Requiring Compliance with Revised Design Basis Threat (collectively referred to as "Orders") for Waterford 3 Steam Electric Station (W3). In addition to other requirements, the Orders required nuclear power plant licensees to revise their physical security plans, safeguards contingency plans, and security force training and qualification plans; submit those plans to the NRC for approval by April 29, 2004; and complete implementation of Sv m

W3F1-2004-0113 Page 2 of 3 those plans by October 29, 2004, unless a request for a schedule extension for one or more elements of those plans was approved by the NRC.

On October 4, 2004, Entergy filed a Supplemental Response to Order EA-03-086 as documented in letter W3F1-2004-0088, that contained the Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan as required by Order EA-03-086 for W3. By letter dated October 28, 2004, the NRC issued a Safety Evaluation Report documenting the NRC's review and acceptance of those plans.Section III.C. of Order EA-03-086 required Entergy to advise the NRC when implementation of the physical security plans, safeguards contingency plans, and general training and qualification plans has been accomplished.Section III.C.2. of Order EA-03-39 required Entergy to advise the NRC when full compliance with the requirements in Attachment 2 to that Order have been achieved.

Entergy hereby certifies that those conditions have been met, and the exercise of enforcement discretion pursuant to the Orders during the transition period will no longer be necessary.

This letter includes no new commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on November 8, 2004.

Sincerely,

. Milchell Director, Engineering Waterford Steam Electric Station, Unit 3 TGM/GCS/cbh

W3F11-2004-0113 Page 3 of 3 cc:

Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502